{"slug":"post-tensioned-concrete-slabs-strands-ducts-and-anchorage-boq-sheet","sheets":[{"name":"مقايسة البلاطات لاحقة الشد PT","maxRow":18,"maxCol":9,"colWidths":[14.0,15.0,54.0,10.0,14.0,16.0,13.0,17.0,19.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"مقايسة البلاطات الخرسانية لاحقة الشد والكابلات والأنكور والجراوت (Post-Tension Slab BOQ) — كود BOQ-STR-207","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"مرجع الكود: ACI 318-19 (Chapter 20 & 26) | PTI TAB.1-06 | ASTM A416 (Grade 270 Low-Relaxation) | BS EN 1992-1-1 | ECP 203","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"رقم البند","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"الكود المرجعي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"بيان الأعمال والمواصفات الفنية (Item Description)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"الوحدة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"الكمية الحصرية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"سعر المواد والتوريد (ج.م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"سعر المصنعية والشد والحقن (ج.م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"الفئة الإجمالية للوحدة (ج.م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"الإجمالي الكلي للبند (ج.م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":72.0,"cells":[{"c":"A5","v":"PT-CON-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B5","v":"ACI 318-19","bg":"#F8FAFC","al":"center"},{"c":"C5","v":"توريد وصب خرسانة مسلحة عالية المقاومة للبلاطة لاحقة الشد (سمك 26 سم، إجهاد مكعبي fcu = 40 MPa بعد 28 يوم، وتحقيق fci ≥ 25 MPa بعد 3 أيام للشد)","bg":"#F8FAFC"},{"c":"D5","v":"م3","bg":"#F8FAFC","al":"center"},{"c":"E5","v":650,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"F5","v":5800,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"G5","v":950,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"H5","v":6750,"f":"=F5+G5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I5","v":4387500,"f":"=E5*H5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"PT-STR-02","b":true,"al":"center"},{"c":"B6","v":"ASTM A416","al":"center"},{"c":"C6","v":"توريد وتركيب وشد جدائل الفولاذ عالي المقاومة منخفض الاسترخاء (7-Wire Low-Relaxation Prestressing Strands قطر 15.24 مم - 0.6 بوصة، fpu = 1860 MPa)"},{"c":"D6","v":"طن","al":"center"},{"c":"E6","v":32.5,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"F6","v":92000,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"G6","v":14000,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"H6","v":106000,"f":"=F6+G6","b":true,"al":"center","nf":"#,##0.00"},{"c":"I6","v":3445000,"f":"=E6*H6","b":true,"al":"center","nf":"#,##0.00"}]},{"r":7,"h":72.0,"cells":[{"c":"A7","v":"PT-DUC-03","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"FIB Bulletin 7","bg":"#F8FAFC","al":"center"},{"c":"C7","v":"توريد وتركيب أجربة ومجاري الكابلات المسطحة المموجة من الصاج المجلفن (Corrugated Galvanized Flat Ducts 70×20 mm لسعة 3 إلى 5 كابلات شاملة الوصلات والعزل)","bg":"#F8FAFC"},{"c":"D7","v":"م.ط","bg":"#F8FAFC","al":"center"},{"c":"E7","v":6200,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"F7","v":95,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"G7","v":25,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"H7","v":120,"f":"=F7+G7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I7","v":744000,"f":"=E7*H7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"}]},{"r":8,"h":72.0,"cells":[{"c":"A8","v":"PT-ANC-04","b":true,"al":"center"},{"c":"B8","v":"ETAG 013","al":"center"},{"c":"C8","v":"توريد وتركيب رؤوس التثبيت الحية للشد (Live / Stressing End Multi-Plane Castings & Wedges 3S-5S) شاملة القوالب البلاستيكية (Pocket Formers) والأسافين"},{"c":"D8","v":"عدد","al":"center"},{"c":"E8","v":580,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"F8","v":1350,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"G8","v":250,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"H8","v":1600,"f":"=F8+G8","b":true,"al":"center","nf":"#,##0.00"},{"c":"I8","v":928000,"f":"=E8*H8","b":true,"al":"center","nf":"#,##0.00"}]},{"r":9,"h":72.0,"cells":[{"c":"A9","v":"PT-ANC-05","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"ETAG 013","bg":"#F8FAFC","al":"center"},{"c":"C9","v":"توريد وتركيب نهايات التثبيت الميتة (Dead-End Onion / Swaged Anchorages) شاملة التكبيس الهيدروليكي المسبق بالمصنع وشبكة التسليح الحلزوني","bg":"#F8FAFC"},{"c":"D9","v":"عدد","bg":"#F8FAFC","al":"center"},{"c":"E9","v":580,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"F9","v":680,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"G9","v":140,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"H9","v":820,"f":"=F9+G9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I9","v":475600,"f":"=E9*H9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"PT-CHR-06","b":true,"al":"center"},{"c":"B10","v":"PTI TAB.1-06","al":"center"},{"c":"C10","v":"توريد وتركيب كراسي رفع الكابلات المتدرجة (Bar Chairs & Profile Support Bars كل 1.00 م) لضبط المسار المكافئ (Parabolic Tendon Profile) بدقة ±3 مم"},{"c":"D10","v":"عدد","al":"center"},{"c":"E10","v":6500,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"F10","v":28,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"G10","v":12,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"H10","v":40,"f":"=F10+G10","b":true,"al":"center","nf":"#,##0.00"},{"c":"I10","v":260000,"f":"=E10*H10","b":true,"al":"center","nf":"#,##0.00"}]},{"r":11,"h":72.0,"cells":[{"c":"A11","v":"PT-RFT-07","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"ACI 318-19","bg":"#F8FAFC","al":"center"},{"c":"C11","v":"توريد وتركيب حديد تسليح تقليدي غير مشدود (Unprestressed Bonded Rebar B500D-R) للشبكة السفلية والعلوية عند الأعمدة وكانات منطقة الأنكور (Bursting Steel)","bg":"#F8FAFC"},{"c":"D11","v":"طن","bg":"#F8FAFC","al":"center"},{"c":"E11","v":37.5,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"F11","v":44000,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"G11","v":4800,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"H11","v":48800,"f":"=F11+G11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I11","v":1830000,"f":"=E11*H11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"}]},{"r":12,"h":72.0,"cells":[{"c":"A12","v":"PT-GRT-08","b":true,"al":"center"},{"c":"B12","v":"EN 447","al":"center"},{"c":"C12","v":"أعمال حقن أجربة الكابلات بالجراوت الأسمنتي غير القابل للانكماش (Non-Shrink Thixotropic PT Grout w/c ≤ 0.40) شاملة خراطيم التهوية والاختبار"},{"c":"D12","v":"م.ط","al":"center"},{"c":"E12","v":6200,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"F12","v":45,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"G12","v":20,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"H12","v":65,"f":"=F12+G12","b":true,"al":"center","nf":"#,##0.00"},{"c":"I12","v":403000,"f":"=E12*H12","b":true,"al":"center","nf":"#,##0.00"}]},{"r":13,"h":72.0,"cells":[{"c":"A13","v":"PT-CUT-09","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"PTI TAB.1-06","bg":"#F8FAFC","al":"center"},{"c":"C13","v":"قص أطراف الجدائل الزائدة بالصاروخ (Abrasive Disc Cutting) بعد اعتماد استطالات الشد، ودهان الرؤوس بالإيبوكسي وتقفيل الجيوب بمونة إيبوكسية غير منكمشة","bg":"#F8FAFC"},{"c":"D13","v":"عدد","bg":"#F8FAFC","al":"center"},{"c":"E13","v":580,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"F13","v":120,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"G13","v":65,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"H13","v":185,"f":"=F13+G13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"I13","v":107300,"f":"=E13*H13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"}]},{"r":14,"h":72.0,"cells":[{"c":"A14","v":"PT-ENG-10","b":true,"al":"center"},{"c":"B14","v":"ACI 318-19","al":"center"},{"c":"C14","v":"إعداد التصميم الإنشائي التفصيلي (PT Calculation Note using ADAPT/RAM Concept)، مخططات الورشة (Shop Drawings)، ومعايرة ماكينات الشد الهيدروليكية"},{"c":"D14","v":"مقطوعية","al":"center"},{"c":"E14","v":1,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"F14","v":65000,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"G14","v":20000,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"H14","v":85000,"f":"=F14+G14","b":true,"al":"center","nf":"#,##0.00"},{"c":"I14","v":85000,"f":"=E14*H14","b":true,"al":"center","nf":"#,##0.00"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":"الإجمالي المباشر لأعمال البلاطة لاحقة الشد (Subtotal Direct Cost)","bg":"#F1F5F9","b":true,"al":"left","nf":"#,##0.00","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I15","v":12665400,"f":"=SUM(I5:I14)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.00"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":"متوسط تكلفة المتر المربع من البلاطة لاحقة الشد (مسطح 2,500 م2)","bg":"#F8FAFC","b":true,"al":"left","nf":"#,##0.00","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I16","v":5066.16,"f":"=I15/2500","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"ضريبة القيمة المضافة المقررة (VAT 14%)","bg":"#F8FAFC","b":true,"al":"left","nf":"#,##0.00","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I17","v":1773156.0,"f":"=I15*0.14","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"الإجمالي الكلي التقديري لمقايسة البلاطة لاحقة الشد (Grand Total EGP)","bg":"#E0E7FF","b":true,"al":"left","nf":"#,##0.00","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I18","v":14438556,"f":"=I15+I17","bg":"#E0E7FF","b":true,"al":"center","nf":"#,##0.00"}]}]},{"name":"حساب الاستطالة ومقارنة الوفر","maxRow":23,"maxCol":7,"colWidths":[13.0,13.0,13.0,13.0,13.0,13.0,13.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"حاسبة استطالة كابلات الشد (Tendon Elongation Check) ومقارنة الوفر الاقتصادي بين RC و PT","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"التحقق من حدود التفاوت المسموح للاستطالة (±7% طبقا لـ ACI 318-19) ومقارنة استهلاك الحديد والخرسانة","bg":"#3730A3","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":128.0,"cells":[{"c":"A4","v":"م","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"الباراميتر الهندسي لحساب قوة الشد والاستطالة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"الرمز","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"القيمة التصميمية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"الوحدة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"المعادلة الهندسية والمرجع الكودي (ACI 318 & ASTM A416)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"الحالة / الملاحظات الفنية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":104.0,"cells":[{"c":"A5","v":1,"bg":"#EEF2FF","al":"center"},{"c":"B5","v":"مساحة مقطع الجديلة الواحدة (0.6\" Strand Area)","bg":"#EEF2FF"},{"c":"C5","v":"A_ps","bg":"#EEF2FF","al":"center"},{"c":"D5","v":140,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"E5","v":"مم2","bg":"#EEF2FF","al":"center"},{"c":"F5","v":"ASTM A416 Grade 270 (Nominal Diameter 15.24 mm)","bg":"#EEF2FF","al":"center"},{"c":"G5","v":"وزن المتر الطولي = 1.102 كجم/م.ط","bg":"#EEF2FF","al":"center"}]},{"r":6,"h":128.0,"cells":[{"c":"A6","v":2,"bg":"#EEF2FF","al":"center"},{"c":"B6","v":"إجهاد القطع الأقصى لجديلة الفولاذ (Ultimate Strength)","bg":"#EEF2FF"},{"c":"C6","v":"f_pu","bg":"#EEF2FF","al":"center"},{"c":"D6","v":1860,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"E6","v":"MPa","bg":"#EEF2FF","al":"center"},{"c":"F6","v":"Grade 270 ksi = 1860 N/mm2","bg":"#EEF2FF","al":"center"},{"c":"G6","v":"حمل القطع للجديلة = 260.4 kN","bg":"#EEF2FF","al":"center"}]},{"r":7,"h":128.0,"cells":[{"c":"A7","v":3,"bg":"#EEF2FF","al":"center"},{"c":"B7","v":"نسبة الشد الابتدائى عند ماكينة الشد (Jacking Ratio)","bg":"#EEF2FF"},{"c":"C7","v":"Eta_j","bg":"#EEF2FF","al":"center"},{"c":"D7","v":0.75,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"E7","v":"نسبة","bg":"#EEF2FF","al":"center"},{"c":"F7","v":"ACI 318-19 Max Jacking Stress = 0.75 × f_pu","bg":"#EEF2FF","al":"center"},{"c":"G7","v":"إجهاد الشد = 1395 MPa","bg":"#EEF2FF","al":"center"}]},{"r":8,"h":151.9,"cells":[{"c":"A8","v":4,"b":true,"al":"center"},{"c":"B8","v":"قوة الشد الهيدروليكية المطلوبة للجديلة الواحدة (Jacking Force)","b":true},{"c":"C8","v":"P_jack","b":true,"al":"center"},{"c":"D8","v":195.3,"f":"=D5*D6*D7/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"E8","v":"kN","b":true,"al":"center"},{"c":"F8","v":"P_jack = (A_ps × 0.75 × f_pu) / 1000","b":true,"al":"center"},{"c":"G8","v":"195.30 kN للجديلة الواحدة","b":true,"al":"center"}]},{"r":9,"h":104.0,"cells":[{"c":"A9","v":5,"bg":"#EEF2FF","al":"center"},{"c":"B9","v":"معامل المرونة الطولي لجدائل الشد (Modulus of Elasticity)","bg":"#EEF2FF"},{"c":"C9","v":"E_ps","bg":"#EEF2FF","al":"center"},{"c":"D9","v":195000,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"E9","v":"MPa","bg":"#EEF2FF","al":"center"},{"c":"F9","v":"E_ps = 195 GPa (من شهادة اختبار المصنع)","bg":"#EEF2FF","al":"center"},{"c":"G9","v":"يُراجع مع كل دفعة توريد","bg":"#EEF2FF","al":"center"}]},{"r":10,"h":104.0,"cells":[{"c":"A10","v":6,"bg":"#EEF2FF","al":"center"},{"c":"B10","v":"الطول الفعال للكابل المراد شده (Tendon Length)","bg":"#EEF2FF"},{"c":"C10","v":"L_t","bg":"#EEF2FF","al":"center"},{"c":"D10","v":24,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"E10","v":"متر","bg":"#EEF2FF","al":"center"},{"c":"F10","v":"طول الكابل بين رأس التثبيت الميت والحي","bg":"#EEF2FF","al":"center"},{"c":"G10","v":"شامل 1 باكية خارجية + باكية داخلية","bg":"#EEF2FF","al":"center"}]},{"r":11,"h":151.9,"cells":[{"c":"A11","v":7,"bg":"#EEF2FF","al":"center"},{"c":"B11","v":"معامل الاحتكاك المتوسط على طول الكابل (Friction Loss Factor)","bg":"#EEF2FF"},{"c":"C11","v":"Alpha_f","bg":"#EEF2FF","al":"center"},{"c":"D11","v":0.92,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"E11","v":"معامل","bg":"#EEF2FF","al":"center"},{"c":"F11","v":"متوسط القوة الفعالة على طول الكابل بعد الاحتكاك","bg":"#EEF2FF","al":"center"},{"c":"G11","v":"P_avg = 0.92 × P_jack","bg":"#EEF2FF","al":"center"}]},{"r":12,"h":104.0,"cells":[{"c":"A12","v":8,"b":true,"al":"center"},{"c":"B12","v":"الاستطالة النظرية المحسوبة للكابل (Theoretical Elongation)","b":true},{"c":"C12","v":"Delta_th","b":true,"al":"center"},{"c":"D12","v":157.956923,"f":"=(D8*1000*D11*D10*1000)/(D5*D9)","b":true,"al":"center","nf":"#,##0.00"},{"c":"E12","v":"مم","b":true,"al":"center"},{"c":"F12","v":"Delta_th = (P_avg × L) / (A_ps × E_ps)","b":true,"al":"center"},{"c":"G12","v":"الاستطالة النظرية = 158.03 مم","b":true,"al":"center"}]},{"r":13,"h":128.0,"cells":[{"c":"A13","v":9,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"الحد الأدنى المسموح للاستطالة بالموقع (-7% Limit)","bg":"#F8FAFC","b":true},{"c":"C13","v":"Delta_min","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D13","v":146.899938,"f":"=D12*0.93","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E13","v":"مم","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F13","v":"ACI 318-19 Tolerance = -7% for multi-strand tendons","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G13","v":"يرفض الشد إذا قل عن هذه القيمة","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":14,"h":128.0,"cells":[{"c":"A14","v":10,"b":true,"al":"center"},{"c":"B14","v":"الحد الأقصى المسموح للاستطالة بالموقع (+7% Limit)","b":true},{"c":"C14","v":"Delta_max","b":true,"al":"center"},{"c":"D14","v":169.013908,"f":"=D12*1.07","b":true,"al":"center","nf":"#,##0.00"},{"c":"E14","v":"مم","b":true,"al":"center"},{"c":"F14","v":"ACI 318-19 Tolerance = +7% for multi-strand tendons","b":true,"al":"center"},{"c":"G14","v":"تُفحص الأسافين إذا زاد عن هذه القيمة","b":true,"al":"center"}]},{"r":15,"h":151.9,"cells":[{"c":"A15","v":11,"bg":"#EEF2FF","al":"center"},{"c":"B15","v":"القراءة الحقلية المسجلة للاستطالة بالموقع (Measured Elongation)","bg":"#EEF2FF"},{"c":"C15","v":"Delta_act","bg":"#EEF2FF","al":"center"},{"c":"D15","v":161,"in":true,"bg":"#EEF2FF","al":"center","nf":"#,##0.00"},{"c":"E15","v":"مم","bg":"#EEF2FF","al":"center"},{"c":"F15","v":"قراءة مسطرة الشد بعد خصم Lock-off seating (6 مم)","bg":"#EEF2FF","al":"center"},{"c":"G15","v":"نسبة الانحراف = +1.88% (مقبول Code A)","bg":"#EEF2FF","al":"center"}]},{"r":16,"h":28.0,"cells":[{"c":"A16","v":""},{"c":"B16","v":""},{"c":"C16","v":""},{"c":"D16","v":""},{"c":"E16","v":""},{"c":"F16","v":""},{"c":"G16","v":""}]},{"r":17,"h":28.0,"cells":[{"c":"A17","v":""},{"c":"B17","v":""},{"c":"C17","v":""},{"c":"D17","v":""},{"c":"E17","v":""},{"c":"F17","v":""},{"c":"G17","v":""}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"مقارنة التكلفة لمسطح سقف 2,500 م2 (بحر 9.5 متر): بلاطة لاكمرية تقليدية RC مقابل بلاطة PT","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E18","v":""},{"c":"F18","v":""},{"c":"G18","v":""}]},{"r":19,"h":72.0,"cells":[{"c":"A19","v":"عنصر المقارنة الهندسية والمالية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B19","v":"بلاطة لاكمرية تقليدية RC (سمك 34 سم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C19","v":"بلاطة لاحقة الشد PT (سمك 26 سم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D19","v":"الوفر المحقق بنظام PT","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E19","v":""},{"c":"F19","v":""},{"c":"G19","v":""}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":"تكلفة الخرسانة المسلحة للسقف (ج.م)","nf":"#,##0.00"},{"c":"B20","v":5270000,"in":true,"al":"center","nf":"#,##0.00"},{"c":"C20","v":4387500,"f":"='مقايسة البلاطات لاحقة الشد PT'!I5","al":"center","nf":"#,##0.00"},{"c":"D20","v":882500,"f":"=B20-C20","al":"center","nf":"#,##0.00"},{"c":"E20","v":""},{"c":"F20","v":""},{"c":"G20","v":""}]},{"r":21,"h":72.0,"cells":[{"c":"A21","v":"تكلفة حديد التسليح التقليدي غير المشدود (ج.م)","nf":"#,##0.00"},{"c":"B21","v":5760000,"in":true,"al":"center","nf":"#,##0.00"},{"c":"C21","v":1830000,"f":"='مقايسة البلاطات لاحقة الشد PT'!I11","al":"center","nf":"#,##0.00"},{"c":"D21","v":3930000,"f":"=B21-C21","al":"center","nf":"#,##0.00"},{"c":"E21","v":""},{"c":"F21","v":""},{"c":"G21","v":""}]},{"r":22,"h":128.0,"cells":[{"c":"A22","v":"تكلفة منظومة كابلات وأجربة وأنكور وجراوت PT (ج.م)","nf":"#,##0.00"},{"c":"B22","v":0,"in":true,"al":"center","nf":"#,##0.00"},{"c":"C22","v":6447900,"f":"='مقايسة البلاطات لاحقة الشد PT'!I15-'مقايسة البلاطات لاحقة الشد PT'!I5-'مقايسة البلاطات لاحقة الشد PT'!I11","al":"center","nf":"#,##0.00"},{"c":"D22","v":-6447900,"f":"=B22-C22","al":"center","nf":"#,##0.00"},{"c":"E22","v":""},{"c":"F22","v":""},{"c":"G22","v":""}]},{"r":23,"h":52.0,"cells":[{"c":"A23","v":"الإجمالي الكلي المباشر للسقف (ج.م)","bg":"#E0E7FF","b":true,"nf":"#,##0.00"},{"c":"B23","v":11030000,"f":"=SUM(B20:B22)","bg":"#E0E7FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"C23","v":12665400,"f":"=SUM(C20:C22)","bg":"#E0E7FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"D23","v":-1635400,"f":"=B23-C23","bg":"#E0E7FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E23","v":""},{"c":"F23","v":""},{"c":"G23","v":""}]}],"charts":[{"title":"مقارنة تكلفة السقف (2,500 م2): بلاطة تقليدية RC مقابل بلاطة لاحقة الشد PT","type":"bar","grouping":"clustered","anchorRow":18,"anchorCol":4,"categories":["تكلفة الخرسانة المسلحة للسقف (ج.م)","تكلفة حديد التسليح التقليدي غير المشدود (ج.م)","تكلفة منظومة كابلات وأجربة وأنكور وجراوت PT (ج.م)"],"series":[{"name":"بلاطة لاكمرية تقليدية RC (سمك 34 سم)","valRef":"'حساب الاستطالة ومقارنة الوفر'!$B$20:$B$22","values":[5270000.0,5760000.0,0.0],"color":"#2563EB","titleRef":"'حساب الاستطالة ومقارنة الوفر'!$B$19","nf":"#,##0.00"},{"name":"بلاطة لاحقة الشد PT (سمك 26 سم)","valRef":"'حساب الاستطالة ومقارنة الوفر'!$C$20:$C$22","values":[4387500.0,1830000.0,6447900.0],"color":"#059669","titleRef":"'حساب الاستطالة ومقارنة الوفر'!$C$19","nf":"#,##0.00"}],"catRef":"'حساب الاستطالة ومقارنة الوفر'!$A$20:$A$22"}]}]}