{"slug":"precast-hollow-core-slab-load-span-and-camber-calculation-sheet","sheets":[{"name":"إعدادات_المشروع_والمعايير","maxRow":38,"maxCol":7,"colWidths":[16.0,48.0,20.0,22.0,20.0,28.0,45.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"شيت تصميم وحصر بلاطات الهولوكور سابقة الصب وحساب السهم المعاكس Camber","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"⚠️ تنبيه استرشادي: القيم والأسعار والمدخلات في هذا الشيت استرشادية لمتوسطات السوق ومصانع الخرسانة مسبقة الصب. يرجى تعديل معايير التصميم وأسعار التوريد والتركيب أدناه بما يتطابق مع مواصفات مشروعك.","bg":"#1E40AF","fg":"#F8FAFC","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"أولاً: البيانات العامة للمشروع والتعاقد (Project & Contract Information)","bg":"#E2E8F0","fg":"#1E3A8A","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"اسم المشروع الإنشائي:","b":true},{"c":"B5","v":"مشروع مجمع المستودعات والخدمات اللوجستية الحديثة - البوابة 4","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E5","v":"الاستشاري الهندسي المشرف:","b":true},{"c":"F5","v":"دار الاستشارات الهندسية التخصصية","fg":"#1E293B","al":"center","cs":2},{"skip":true}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"المالك / جهة الإسناد:","b":true},{"c":"B6","v":"شركة المستودعات الوطنية للتطوير العقاري","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E6","v":"مصنع الخرسانة مسبقة الصب:","b":true},{"c":"F6","v":"الشركة العربية للخرسانة مسبقة الصب (Precast)","fg":"#1E293B","al":"center","cs":2},{"skip":true}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"المقاول العام للمشروع:","b":true},{"c":"B7","v":"شركة بنيان الكبرى للإنشاءات والمقاولات العامة","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E7","v":"كود التصميم المرجعي:","b":true},{"c":"F7","v":"SBC 304 / ACI 318-19 / PCI MNL-126","fg":"#1E293B","al":"center","cs":2},{"skip":true}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"رقم وتاريخ أمر العمل:","b":true},{"c":"B8","v":"PO-PRC-2026-088 | 18 أكتوبر 2026","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"E8","v":"العملة المالية للمشروع:","b":true},{"c":"F8","v":"ر.س SAR","fg":"#1E293B","al":"center","cs":2},{"skip":true}]},{"r":9,"h":28.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":""},{"c":"C9","v":""},{"c":"D9","v":""},{"c":"E9","v":""},{"c":"F9","v":""},{"c":"G9","v":""}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"ثانياً: المعايير الفنية للمواد والإجهادات المسبقة (Engineering & Material Constants)","bg":"#E2E8F0","fg":"#1E3A8A","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"م","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B11","v":"المعامل الهندسي / الخاصية الفنية","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C11","v":"الرمز التصميمي","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D11","v":"القيمة التصميمية","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E11","v":"الوحدة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F11","v":"المرجع القياسي وفق الكود","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G11","v":"ملاحظات الاستخدام في الحسابات","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":1,"fg":"#1E293B","al":"center"},{"c":"B12","v":"مقاومة ضغط خرسانة الهولوكور عند فك الشد ونقل الإجهاد","b":true},{"c":"C12","v":"f'ci","b":true,"al":"center"},{"c":"D12","v":35,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E12","v":"MPa","fg":"#1E293B","al":"center"},{"c":"F12","v":"PCI MNL-126 / SBC 304","fg":"#64748B","al":"center"},{"c":"G12","v":"تستخدم لحساب السهم المعاكس الأولي Camber عند الإطلاق","fg":"#1E293B"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":2,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B13","v":"مقاومة ضغط خرسانة الهولوكور بعد 28 يوماً","bg":"#F8FAFC","b":true},{"c":"C13","v":"f'c","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D13","v":50,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E13","v":"MPa","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F13","v":"SBC 304 - Table 19.2.1","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"G13","v":"تستخدم لحساب قدرة التحمل القصوى والترخيم طويل الأجل","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":3,"fg":"#1E293B","al":"center"},{"c":"B14","v":"معامل مرونة خرسانة الهولوكور عند النقل (Ec = 4700√f'ci)","b":true},{"c":"C14","v":"Eci","b":true,"al":"center"},{"c":"D14","v":27806,"f":"=ROUND(4700*SQRT(D12),0)","b":true,"al":"center"},{"c":"E14","v":"MPa","fg":"#1E293B","al":"center"},{"c":"F14","v":"ACI 318-19 Section 19.2.2","fg":"#64748B","al":"center"},{"c":"G14","v":"معادلة محسوبة تلقائياً لحساب صلابة القطاع عند النقل","fg":"#1E293B"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":4,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B15","v":"معامل مرونة خرسانة الهولوكور عند 28 يوماً (Ec = 4700√f'c)","bg":"#F8FAFC","b":true},{"c":"C15","v":"Ec","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D15","v":33234,"f":"=ROUND(4700*SQRT(D13),0)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E15","v":"MPa","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F15","v":"ACI 318-19 Section 19.2.2","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"G15","v":"معادلة محسوبة تلقائياً لحساب الترخيم تحت أحمال التشغيل","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":5,"fg":"#1E293B","al":"center"},{"c":"B16","v":"مقاومة الشد القصوى لكابلات الإجهاد المسبق (Strands Gr. 270)","b":true},{"c":"C16","v":"fpu","b":true,"al":"center"},{"c":"D16","v":1860,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E16","v":"MPa","fg":"#1E293B","al":"center"},{"c":"F16","v":"ASTM A416 / ISO 6934","fg":"#64748B","al":"center"},{"c":"G16","v":"كابلات 7 أسلاك منخفضة الاسترخاء Low-Relaxation","fg":"#1E293B"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":6,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B17","v":"إجهاد الشد الأولي عند الشد الميكانيكي (0.75 fpu)","bg":"#F8FAFC","b":true},{"c":"C17","v":"fpj","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D17","v":1395,"f":"=ROUND(0.75*D16,1)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E17","v":"MPa","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F17","v":"SBC 304 Section 20.3.2.5","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"G17","v":"الحد الأقصى للإجهاد قبل حدوث فواقد الشد المبكرة","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":7,"fg":"#1E293B","al":"center"},{"c":"B18","v":"نسبة الفواقد الإجمالية للإجهاد المسبق (Short & Long Term Losses)","b":true},{"c":"C18","v":"Losses","b":true,"al":"center"},{"c":"D18","v":0.18,"in":true,"b":true,"al":"center","nf":"0.0%"},{"c":"E18","v":"%","fg":"#1E293B","al":"center"},{"c":"F18","v":"PCI MNL-126 Ch. 4","fg":"#64748B","al":"center"},{"c":"G18","v":"فواقد الانكماش والزحف واسترخاء الصلب وتقصير الخرسانة","fg":"#1E293B"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":8,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B19","v":"إجهاد الشد الفعال النهائي بعد جميع الفواقد (fse = fpj × (1 - Losses))","bg":"#F8FAFC","b":true},{"c":"C19","v":"fse","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D19","v":1143.9,"f":"=ROUND(D17*(1-D18),1)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E19","v":"MPa","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F19","v":"PCI MNL-126 / SBC 304","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"G19","v":"الإجهاد المعتمد في حساب السهم المعاكس النهائي","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":9,"fg":"#1E293B","al":"center"},{"c":"B20","v":"سماكة طبقة الخرسانة الإضافية العلوية (Structural Topping Slab)","b":true},{"c":"C20","v":"t_top","b":true,"al":"center"},{"c":"D20","v":65,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E20","v":"mm","fg":"#1E293B","al":"center"},{"c":"F20","v":"SBC 304 Section 16.4","fg":"#64748B","al":"center"},{"c":"G20","v":"طبقة سكريد مسلحة لربط البلاطات وتوزيع الأحمال كديافرام","fg":"#1E293B"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":10,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B21","v":"مقاومة ضغط خرسانة السكريد العلوية (Topping Concrete)","bg":"#F8FAFC","b":true},{"c":"C21","v":"f'ct","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D21","v":30,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E21","v":"MPa","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F21","v":"SBC 304 Table 19.2.1","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"G21","v":"خرسانة جاهزة مقاومة للانكماش","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":22,"h":52.0,"cells":[{"c":"A22","v":11,"fg":"#1E293B","al":"center"},{"c":"B22","v":"كثافة الخرسانة المسلحة الإنشائية (Reinforced Concrete Density)","b":true},{"c":"C22","v":"γc","b":true,"al":"center"},{"c":"D22","v":25,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E22","v":"kN/m³","fg":"#1E293B","al":"center"},{"c":"F22","v":"SBC 201 Section 3.2","fg":"#64748B","al":"center"},{"c":"G22","v":"لحساب الوزن الذاتي للبلاطة وطبقة السكريد","fg":"#1E293B"}]},{"r":23,"h":52.0,"cells":[{"c":"A23","v":12,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"B23","v":"أحمال التغطية والتشطيبات والميكانيكا الإضافية (Superimposed Dead)","bg":"#F8FAFC","b":true},{"c":"C23","v":"SDL","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D23","v":2.5,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E23","v":"kN/m²","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F23","v":"SBC 201 Section 3.3","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"G23","v":"قواطع جافة وتشطيبات أرضيات ودكتات تكييف وإنارة","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":13,"fg":"#1E293B","al":"center"},{"c":"B24","v":"الحمل الحي التصميمي المعتمد للاستخدام (Design Live Load)","b":true},{"c":"C24","v":"LL","b":true,"al":"center"},{"c":"D24","v":3,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E24","v":"kN/m²","fg":"#1E293B","al":"center"},{"c":"F24","v":"SBC 201 Table 4.1","fg":"#64748B","al":"center"},{"c":"G24","v":"أحمال مكاتب وتخزين خفيف حسب اشتراطات المشروع","fg":"#1E293B"}]},{"r":25,"h":28.0,"cells":[{"c":"A25","v":""},{"c":"B25","v":""},{"c":"C25","v":""},{"c":"D25","v":""},{"c":"E25","v":""},{"c":"F25","v":""},{"c":"G25","v":""}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":"ثالثاً: جدول فئات أسعار التوريد والتركيب والملحقات الإنشائية (Unit Rates & Cost Master)","bg":"#E2E8F0","fg":"#1E3A8A","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":"كود","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B27","v":"بند التوريد أو المصنعية","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C27","v":"توصيف البند التعاقدي","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D27","v":"الوحدة","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E27","v":"فئة السعر الاسترشادية","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F27","v":"العملة","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G27","v":"شروط وتفاصيل البند","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":28,"h":72.0,"cells":[{"c":"A28","v":"RT-01","b":true,"al":"center"},{"c":"B28","v":"توريد بلاطات هولوكور سماكة 150 مم","b":true},{"c":"C28","v":"توريد بلاطات HCS 150 جاهزة شاملة كابلات الشد والشهادات","fg":"#1E293B"},{"c":"D28","v":"م²","fg":"#1E293B","al":"center"},{"c":"E28","v":110,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F28","v":"ر.س","fg":"#1E293B","al":"center"},{"c":"G28","v":"شاملة النقل لموقع المشروع","fg":"#64748B"}]},{"r":29,"h":72.0,"cells":[{"c":"A29","v":"RT-02","b":true,"al":"center"},{"c":"B29","v":"توريد بلاطات هولوكور سماكة 200 مم","b":true},{"c":"C29","v":"توريد بلاطات HCS 200 جاهزة شاملة كابلات الشد والشهادات","fg":"#1E293B"},{"c":"D29","v":"م²","fg":"#1E293B","al":"center"},{"c":"E29","v":125,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F29","v":"ر.س","fg":"#1E293B","al":"center"},{"c":"G29","v":"شاملة النقل لموقع المشروع","fg":"#64748B"}]},{"r":30,"h":72.0,"cells":[{"c":"A30","v":"RT-03","b":true,"al":"center"},{"c":"B30","v":"توريد بلاطات هولوكور سماكة 250 مم","b":true},{"c":"C30","v":"توريد بلاطات HCS 250 جاهزة شاملة كابلات الشد والشهادات","fg":"#1E293B"},{"c":"D30","v":"م²","fg":"#1E293B","al":"center"},{"c":"E30","v":145,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F30","v":"ر.س","fg":"#1E293B","al":"center"},{"c":"G30","v":"شاملة النقل لموقع المشروع","fg":"#64748B"}]},{"r":31,"h":72.0,"cells":[{"c":"A31","v":"RT-04","b":true,"al":"center"},{"c":"B31","v":"توريد بلاطات هولوكور سماكة 300 مم","b":true},{"c":"C31","v":"توريد بلاطات HCS 300 جاهزة شاملة كابلات الشد والشهادات","fg":"#1E293B"},{"c":"D31","v":"م²","fg":"#1E293B","al":"center"},{"c":"E31","v":170,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F31","v":"ر.س","fg":"#1E293B","al":"center"},{"c":"G31","v":"شاملة النقل لموقع المشروع","fg":"#64748B"}]},{"r":32,"h":72.0,"cells":[{"c":"A32","v":"RT-05","b":true,"al":"center"},{"c":"B32","v":"توريد بلاطات هولوكور سماكة 400 مم","b":true},{"c":"C32","v":"توريد بلاطات HCS 400 جاهزة شاملة كابلات الشد والشهادات","fg":"#1E293B"},{"c":"D32","v":"م²","fg":"#1E293B","al":"center"},{"c":"E32","v":220,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F32","v":"ر.س","fg":"#1E293B","al":"center"},{"c":"G32","v":"شاملة النقل لموقع المشروع","fg":"#64748B"}]},{"r":33,"h":72.0,"cells":[{"c":"A33","v":"RT-06","b":true,"al":"center"},{"c":"B33","v":"أوناش ورافعات التركيب والإنزال (Crane Erection)","b":true},{"c":"C33","v":"مصنعية التنزيل والتركيب بأوناش تلسكوبية وطاقم فني متخصص","fg":"#1E293B"},{"c":"D33","v":"م²","fg":"#1E293B","al":"center"},{"c":"E33","v":25,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F33","v":"ر.س","fg":"#1E293B","al":"center"},{"c":"G33","v":"شاملة مشغلي الرافعات والتأمين","fg":"#64748B"}]},{"r":34,"h":104.0,"cells":[{"c":"A34","v":"RT-07","b":true,"al":"center"},{"c":"B34","v":"شرائح الركائز المطاطية (Neoprene Bearing Strips)","b":true},{"c":"C34","v":"توريد وتركيب شرائط النيوبيرين أسفل ارتكاز البلاطات على الكمرات","fg":"#1E293B"},{"c":"D34","v":"م.ط","fg":"#1E293B","al":"center"},{"c":"E34","v":15,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F34","v":"ر.س","fg":"#1E293B","al":"center"},{"c":"G34","v":"سماكة 10 مم وعرض 50-75 مم","fg":"#64748B"}]},{"r":35,"h":72.0,"cells":[{"c":"A35","v":"RT-08","b":true,"al":"center"},{"c":"B35","v":"مونة حقن فواصل المفاتيح (Shear Key Grout)","b":true},{"c":"C35","v":"مونة إسمنتية غير قابلة للانكماش Non-Shrink Grout قوة 40 MPa","fg":"#1E293B"},{"c":"D35","v":"م³","fg":"#1E293B","al":"center"},{"c":"E35","v":950,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F35","v":"ر.س","fg":"#1E293B","al":"center"},{"c":"G35","v":"حقن وملء الفواصل الطولية تماماً","fg":"#64748B"}]},{"r":36,"h":72.0,"cells":[{"c":"A36","v":"RT-09","b":true,"al":"center"},{"c":"B36","v":"صب خرسانة السكريد العلوية (Structural Topping)","b":true},{"c":"C36","v":"توريد وصب خرسانة C30 بسماكة 65 مم شاملة الهليكوبتر والتسوية","fg":"#1E293B"},{"c":"D36","v":"م³","fg":"#1E293B","al":"center"},{"c":"E36","v":280,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F36","v":"ر.س","fg":"#1E293B","al":"center"},{"c":"G36","v":"شاملة المعالجة بالماء والمواد الكيميائية","fg":"#64748B"}]},{"r":37,"h":72.0,"cells":[{"c":"A37","v":"RT-10","b":true,"al":"center"},{"c":"B37","v":"شبك حديد تسليح طبقة السكريد (Welded Wire Mesh)","b":true},{"c":"C37","v":"توريد وتركيب شبك حديد ممدد BRC قطر 6 مم عين 150×150 مم","fg":"#1E293B"},{"c":"D37","v":"م²","fg":"#1E293B","al":"center"},{"c":"E37","v":14.5,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F37","v":"ر.س","fg":"#1E293B","al":"center"},{"c":"G37","v":"شامل كراسي التثبيت ورباط السلك","fg":"#64748B"}]},{"r":38,"h":72.0,"cells":[{"c":"A38","v":"RT-11","b":true,"al":"center"},{"c":"B38","v":"حشو وعزل الفواصل الإنشائية (Joint Sealant)","b":true},{"c":"C38","v":"مادة مالئة بوليمرية مقاومة للعوامل الجوية مع Backer Rod","fg":"#1E293B"},{"c":"D38","v":"م.ط","fg":"#1E293B","al":"center"},{"c":"E38","v":18,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F38","v":"ر.س","fg":"#1E293B","al":"center"},{"c":"G38","v":"للفواصل الخارجية وفواصل التمدد","fg":"#64748B"}]}]},{"name":"جداول_القطاعات_والأحمال","maxRow":23,"maxCol":11,"colWidths":[22.0,18.0,18.0,24.0,24.0,20.0,22.0,20.0,24.0,22.0,32.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"كتالوج ومواصفات قطاعات بلاطات الهولوكور القياسية وقدرات التحمل (HCS Standard Sections & Load Capacities)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"الخصائص الهندسية المعتمدة لقطاعات الهولوكور القياسية بعرض تصنيع 1200 مم (وفق مواصفات مصانع الخرسانة مسبقة الصب ودليل PCI MNL-126)","bg":"#1E40AF","fg":"#F8FAFC","al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"رمز القطاع القياسي","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"السماكة الاسمية (mm)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"العرض القياسي (mm)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"مساحة المقطع الخرساني A (mm²)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"عزم القصور الذاتي Ix (10⁶ mm⁴)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"بعد المحور المحايد Yb (mm)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"الوزن الذاتي للبلاطة (kN/m²)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"أقصى بحر اقتصادي (m)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"عزم المقاومة التصميمي φMn (kN.m)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"مقاومة القص التصميمية φVn (kN)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"عدد وقطر أوتار الشد القياسية","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"HCS-150","b":true,"al":"center"},{"c":"B5","v":150,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"C5","v":1200,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D5","v":118000,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E5","v":312,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"F5","v":75,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G5","v":2.4,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H5","v":6.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I5","v":68.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J5","v":74.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K5","v":"6 No. 9.5 mm (3/8\") Gr.270","fg":"#1E293B","al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"HCS-200","b":true,"al":"center"},{"c":"B6","v":200,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"C6","v":1200,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D6","v":148000,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E6","v":695,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"F6","v":100,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G6","v":2.85,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H6","v":9,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I6","v":115,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J6","v":92.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K6","v":"7 No. 12.7 mm (1/2\") Gr.270","fg":"#1E293B","al":"center"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"HCS-250","b":true,"al":"center"},{"c":"B7","v":250,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"C7","v":1200,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D7","v":175000,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E7","v":1260,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"F7","v":125,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G7","v":3.35,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H7","v":11.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I7","v":178,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J7","v":116,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K7","v":"8 No. 12.7 mm (1/2\") Gr.270","fg":"#1E293B","al":"center"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"HCS-300","b":true,"al":"center"},{"c":"B8","v":300,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"C8","v":1200,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D8","v":205000,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E8","v":2140,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"F8","v":150,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G8","v":3.9,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H8","v":13.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I8","v":245,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J8","v":138.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K8","v":"9 No. 12.7 mm (1/2\") Gr.270","fg":"#1E293B","al":"center"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"HCS-400","b":true,"al":"center"},{"c":"B9","v":400,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"C9","v":1200,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"D9","v":268000,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E9","v":4850,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"F9","v":200,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G9","v":5.1,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H9","v":16.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I9","v":410,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J9","v":185,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K9","v":"11 No. 12.7 mm + 4 No. 9.5 mm","fg":"#1E293B","al":"center"}]},{"r":10,"h":28.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""},{"c":"F10","v":""},{"c":"G10","v":""},{"c":"H10","v":""},{"c":"I10","v":""},{"c":"J10","v":""},{"c":"K10","v":""}]},{"r":11,"h":28.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":""},{"c":"C11","v":""},{"c":"D11","v":""},{"c":"E11","v":""},{"c":"F11","v":""},{"c":"G11","v":""},{"c":"H11","v":""},{"c":"I11","v":""},{"c":"J11","v":""},{"c":"K11","v":""}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"جدول قدرة التحمل الصافية للأحمال الإضافية (Superimposed Load Capacity kN/m² vs Span m)","bg":"#E2E8F0","fg":"#1E3A8A","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"رمز البلاطة","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B13","v":"بحر 5.0 م","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C13","v":"بحر 6.0 م","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D13","v":"بحر 7.0 م","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E13","v":"بحر 8.0 م","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F13","v":"بحر 9.0 م","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G13","v":"بحر 10.0 م","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H13","v":"بحر 11.0 م","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I13","v":"بحر 12.0 م","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J13","v":"بحر 13.0 م","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K13","v":"بحر 14.0 م","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":"HCS-150 (بدون سكريد)","b":true},{"c":"B14","v":8.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C14","v":5.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D14","v":3.6,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E14","v":"-","fg":"#1E293B","al":"center"},{"c":"F14","v":"-","fg":"#1E293B","al":"center"},{"c":"G14","v":"-","fg":"#1E293B","al":"center"},{"c":"H14","v":"-","fg":"#1E293B","al":"center"},{"c":"I14","v":"-","fg":"#1E293B","al":"center"},{"c":"J14","v":"-","fg":"#1E293B","al":"center"},{"c":"K14","v":"-","fg":"#1E293B","al":"center"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":"HCS-150 (+ 65mm سكريد)","b":true},{"c":"B15","v":10.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C15","v":7.1,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D15","v":4.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E15","v":"-","fg":"#1E293B","al":"center"},{"c":"F15","v":"-","fg":"#1E293B","al":"center"},{"c":"G15","v":"-","fg":"#1E293B","al":"center"},{"c":"H15","v":"-","fg":"#1E293B","al":"center"},{"c":"I15","v":"-","fg":"#1E293B","al":"center"},{"c":"J15","v":"-","fg":"#1E293B","al":"center"},{"c":"K15","v":"-","fg":"#1E293B","al":"center"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":"HCS-200 (بدون سكريد)","b":true},{"c":"B16","v":14.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C16","v":10.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D16","v":7.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E16","v":5.6,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F16","v":3.9,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G16","v":"-","fg":"#1E293B","al":"center"},{"c":"H16","v":"-","fg":"#1E293B","al":"center"},{"c":"I16","v":"-","fg":"#1E293B","al":"center"},{"c":"J16","v":"-","fg":"#1E293B","al":"center"},{"c":"K16","v":"-","fg":"#1E293B","al":"center"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"HCS-200 (+ 65mm سكريد)","b":true},{"c":"B17","v":16.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C17","v":12.4,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D17","v":9.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E17","v":7.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F17","v":5.1,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G17","v":"-","fg":"#1E293B","al":"center"},{"c":"H17","v":"-","fg":"#1E293B","al":"center"},{"c":"I17","v":"-","fg":"#1E293B","al":"center"},{"c":"J17","v":"-","fg":"#1E293B","al":"center"},{"c":"K17","v":"-","fg":"#1E293B","al":"center"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"HCS-250 (بدون سكريد)","b":true},{"c":"B18","v":20.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C18","v":15.6,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D18","v":12.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E18","v":9.6,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F18","v":7.4,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G18","v":5.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H18","v":3.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I18","v":"-","fg":"#1E293B","al":"center"},{"c":"J18","v":"-","fg":"#1E293B","al":"center"},{"c":"K18","v":"-","fg":"#1E293B","al":"center"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":"HCS-250 (+ 65mm سكريد)","b":true},{"c":"B19","v":23.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C19","v":18.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D19","v":14.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E19","v":11.6,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F19","v":9.1,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G19","v":7,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H19","v":5.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I19","v":3.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J19","v":"-","fg":"#1E293B","al":"center"},{"c":"K19","v":"-","fg":"#1E293B","al":"center"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":"HCS-300 (بدون سكريد)","b":true},{"c":"B20","v":26,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C20","v":20.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D20","v":16.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E20","v":13.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F20","v":10.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G20","v":8.6,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H20","v":6.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I20","v":5.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J20","v":3.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K20","v":"-","fg":"#1E293B","al":"center"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":"HCS-300 (+ 65mm سكريد)","b":true},{"c":"B21","v":29.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C21","v":24,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D21","v":19.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E21","v":15.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F21","v":13,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G21","v":10.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H21","v":8.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I21","v":6.7,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J21","v":5.1,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K21","v":3.6,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"HCS-400 (بدون سكريد)","b":true},{"c":"B22","v":"-","fg":"#1E293B","al":"center"},{"c":"C22","v":28.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D22","v":23.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E22","v":19.4,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F22","v":16.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G22","v":13.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H22","v":11.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I22","v":9.4,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J22","v":7.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K22","v":6.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"HCS-400 (+ 65mm سكريد)","b":true},{"c":"B23","v":"-","fg":"#1E293B","al":"center"},{"c":"C23","v":32,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D23","v":27.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E23","v":22.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F23","v":19.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G23","v":16.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H23","v":13.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I23","v":11.6,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J23","v":9.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K23","v":8.1,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"}]}]},{"name":"تصميم_وحساب_الكامبر","maxRow":14,"maxCol":15,"colWidths":[45.0,16.0,16.0,16.0,20.0,18.0,20.0,20.0,20.0,22.0,22.0,20.0,20.0,22.0,26.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"جدول الحسابات الهندسية للسهم المعاكس والترخيم لبلاطات الهولوكور (Prestress Camber & Deflection Schedule)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"طريقة مضاعفات معهد الخرسانة مسبقة الصب PCI Multipliers لحساب السهم المعاكس الأولي والنهائي والترخيم تحت الأحمال الخدمية وفق SBC 304","bg":"#1E40AF","fg":"#F8FAFC","al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""},{"c":"O3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"رمز المنطقة / الباكيات","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"رمز البلاطة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"البحر الصافي L (m)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"عدد كابلات الشد","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"قوة الشد الفعالة Pi (kN)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"اللامركزية e (mm)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"عزم الإجهاد Pe (kN.m)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"سهم الشد الأولي Δps (mm)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"ترخيم الوزن الذاتي Δ0 (mm)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"السهم المعاكس الصافي عند النقل Δnet,0 (mm)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"السهم المعاكس قبل السكريد (mm)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L4","v":"ترخيم طبقة السكريد Δtop (mm)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M4","v":"ترخيم الحمل الحي ΔLL (mm)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N4","v":"السهم النهائي المتبقي Δfinal (mm)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"O4","v":"التحقق الهندسي (Code Check)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"منطقة أ: مواقف سيارات السرداب (Basement Parking)","b":true},{"c":"B5","v":"HCS-250","b":true,"al":"center"},{"c":"C5","v":10.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D5","v":8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E5","v":785,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F5","v":72,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G5","v":56.52,"f":"=ROUND(E5*F5/1000, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H5","v":22.23,"f":"=ROUND((E5*1000*F5*(C5*1000)^2)/(8*'إعدادات_المشروع_والمعايير'!$D$14*(1260*1000000)), 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"I5","v":18.16,"f":"=ROUND((5*(3.35*1.2)*(C5*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$14*(1260*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J5","v":4.07,"f":"=ROUND(H5-I5, 2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"K5","v":6.42,"f":"=ROUND(1.80*H5-1.85*I5, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"L5","v":7.37,"f":"=ROUND((5*(('إعدادات_المشروع_والمعايير'!$D$20/1000)*'إعدادات_المشروع_والمعايير'!$D$22*1.2)*(C5*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$15*(1260*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"M5","v":10.08,"f":"=ROUND((5*('إعدادات_المشروع_والمعايير'!$D$24*1.2)*(C5*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$15*(1260*1.35*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"N5","v":-12.5,"f":"=ROUND(K5-(1.2*L5+M5), 2)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"O5","v":"✅ مطابق لاشتراطات SBC/PCI","f":"=IF(AND(M5<=(C5*1000/360), ABS(N5)<=25), \"✅ مطابق لاشتراطات SBC/PCI\", \"⚠️ يتطلب مراجعة سمك القطاع\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"منطقة ب: أرضية الدور الأرضي اللوجستي (Ground Logistics)","b":true},{"c":"B6","v":"HCS-300","b":true,"al":"center"},{"c":"C6","v":12,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D6","v":9,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E6","v":980,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F6","v":88,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G6","v":86.24,"f":"=ROUND(E6*F6/1000, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H6","v":26.09,"f":"=ROUND((E6*1000*F6*(C6*1000)^2)/(8*'إعدادات_المشروع_والمعايير'!$D$14*(2140*1000000)), 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"I6","v":21.24,"f":"=ROUND((5*(3.9*1.2)*(C6*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$14*(2140*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J6","v":4.85,"f":"=ROUND(H6-I6, 2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"K6","v":7.67,"f":"=ROUND(1.80*H6-1.85*I6, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"L6","v":7.4,"f":"=ROUND((5*(('إعدادات_المشروع_والمعايير'!$D$20/1000)*'إعدادات_المشروع_والمعايير'!$D$22*1.2)*(C6*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$15*(2140*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"M6","v":10.12,"f":"=ROUND((5*('إعدادات_المشروع_والمعايير'!$D$24*1.2)*(C6*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$15*(2140*1.35*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"N6","v":-11.33,"f":"=ROUND(K6-(1.2*L6+M6), 2)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"O6","v":"✅ مطابق لاشتراطات SBC/PCI","f":"=IF(AND(M6<=(C6*1000/360), ABS(N6)<=25), \"✅ مطابق لاشتراطات SBC/PCI\", \"⚠️ يتطلب مراجعة سمك القطاع\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"منطقة ج: صالة العرض والميزانين الرئيسي (Mezzanine Showroom)","b":true},{"c":"B7","v":"HCS-200","b":true,"al":"center"},{"c":"C7","v":8.4,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D7","v":7,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E7","v":615,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F7","v":58,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G7","v":35.67,"f":"=ROUND(E7*F7/1000, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H7","v":16.28,"f":"=ROUND((E7*1000*F7*(C7*1000)^2)/(8*'إعدادات_المشروع_والمعايير'!$D$14*(695*1000000)), 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"I7","v":11.47,"f":"=ROUND((5*(2.85*1.2)*(C7*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$14*(695*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J7","v":4.81,"f":"=ROUND(H7-I7, 2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"K7","v":8.08,"f":"=ROUND(1.80*H7-1.85*I7, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"L7","v":5.47,"f":"=ROUND((5*(('إعدادات_المشروع_والمعايير'!$D$20/1000)*'إعدادات_المشروع_والمعايير'!$D$22*1.2)*(C7*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$15*(695*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"M7","v":7.48,"f":"=ROUND((5*('إعدادات_المشروع_والمعايير'!$D$24*1.2)*(C7*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$15*(695*1.35*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"N7","v":-5.96,"f":"=ROUND(K7-(1.2*L7+M7), 2)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"O7","v":"✅ مطابق لاشتراطات SBC/PCI","f":"=IF(AND(M7<=(C7*1000/360), ABS(N7)<=25), \"✅ مطابق لاشتراطات SBC/PCI\", \"⚠️ يتطلب مراجعة سمك القطاع\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"منطقة د: مكاتب الإدارة والممرات المفتوحة (Office Open Area)","b":true},{"c":"B8","v":"HCS-200","b":true,"al":"center"},{"c":"C8","v":7.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D8","v":6,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E8","v":520,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F8","v":55,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G8","v":28.6,"f":"=ROUND(E8*F8/1000, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H8","v":9.59,"f":"=ROUND((E8*1000*F8*(C8*1000)^2)/(8*'إعدادات_المشروع_والمعايير'!$D$14*(695*1000000)), 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"I8","v":6.19,"f":"=ROUND((5*(2.85*1.2)*(C8*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$14*(695*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J8","v":3.4,"f":"=ROUND(H8-I8, 2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"K8","v":5.81,"f":"=ROUND(1.80*H8-1.85*I8, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"L8","v":2.95,"f":"=ROUND((5*(('إعدادات_المشروع_والمعايير'!$D$20/1000)*'إعدادات_المشروع_والمعايير'!$D$22*1.2)*(C8*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$15*(695*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"M8","v":4.04,"f":"=ROUND((5*('إعدادات_المشروع_والمعايير'!$D$24*1.2)*(C8*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$15*(695*1.35*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"N8","v":-1.77,"f":"=ROUND(K8-(1.2*L8+M8), 2)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"O8","v":"✅ مطابق لاشتراطات SBC/PCI","f":"=IF(AND(M8<=(C8*1000/360), ABS(N8)<=25), \"✅ مطابق لاشتراطات SBC/PCI\", \"⚠️ يتطلب مراجعة سمك القطاع\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"منطقة هـ: مستودع التخزين المرتفع الشمالي (North High Warehouse)","b":true},{"c":"B9","v":"HCS-400","b":true,"al":"center"},{"c":"C9","v":15,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D9","v":12,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E9","v":1420,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F9","v":115,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G9","v":163.3,"f":"=ROUND(E9*F9/1000, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H9","v":34.06,"f":"=ROUND((E9*1000*F9*(C9*1000)^2)/(8*'إعدادات_المشروع_والمعايير'!$D$14*(4850*1000000)), 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"I9","v":29.91,"f":"=ROUND((5*(5.1*1.2)*(C9*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$14*(4850*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J9","v":4.15,"f":"=ROUND(H9-I9, 2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"K9","v":5.97,"f":"=ROUND(1.80*H9-1.85*I9, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"L9","v":7.97,"f":"=ROUND((5*(('إعدادات_المشروع_والمعايير'!$D$20/1000)*'إعدادات_المشروع_والمعايير'!$D$22*1.2)*(C9*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$15*(4850*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"M9","v":10.91,"f":"=ROUND((5*('إعدادات_المشروع_والمعايير'!$D$24*1.2)*(C9*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$15*(4850*1.35*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"N9","v":-14.5,"f":"=ROUND(K9-(1.2*L9+M9), 2)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"O9","v":"✅ مطابق لاشتراطات SBC/PCI","f":"=IF(AND(M9<=(C9*1000/360), ABS(N9)<=25), \"✅ مطابق لاشتراطات SBC/PCI\", \"⚠️ يتطلب مراجعة سمك القطاع\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"منطقة و: مستودع التخزين المرتفع الجنوبي (South High Warehouse)","b":true},{"c":"B10","v":"HCS-400","b":true,"al":"center"},{"c":"C10","v":14.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D10","v":11,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E10","v":1310,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F10","v":112,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G10","v":146.72,"f":"=ROUND(E10*F10/1000, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H10","v":28.59,"f":"=ROUND((E10*1000*F10*(C10*1000)^2)/(8*'إعدادات_المشروع_والمعايير'!$D$14*(4850*1000000)), 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"I10","v":26.12,"f":"=ROUND((5*(5.1*1.2)*(C10*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$14*(4850*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J10","v":2.47,"f":"=ROUND(H10-I10, 2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"K10","v":3.14,"f":"=ROUND(1.80*H10-1.85*I10, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"L10","v":6.96,"f":"=ROUND((5*(('إعدادات_المشروع_والمعايير'!$D$20/1000)*'إعدادات_المشروع_والمعايير'!$D$22*1.2)*(C10*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$15*(4850*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"M10","v":9.52,"f":"=ROUND((5*('إعدادات_المشروع_والمعايير'!$D$24*1.2)*(C10*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$15*(4850*1.35*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"N10","v":-14.73,"f":"=ROUND(K10-(1.2*L10+M10), 2)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"O10","v":"✅ مطابق لاشتراطات SBC/PCI","f":"=IF(AND(M10<=(C10*1000/360), ABS(N10)<=25), \"✅ مطابق لاشتراطات SBC/PCI\", \"⚠️ يتطلب مراجعة سمك القطاع\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"منطقة ز: سقف غرف المحولات والخدمات الكهروميكانيكية (MEP Roof)","b":true},{"c":"B11","v":"HCS-250","b":true,"al":"center"},{"c":"C11","v":9.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D11","v":8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E11","v":785,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F11","v":70,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G11","v":54.95,"f":"=ROUND(E11*F11/1000, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H11","v":16.59,"f":"=ROUND((E11*1000*F11*(C11*1000)^2)/(8*'إعدادات_المشروع_والمعايير'!$D$14*(1260*1000000)), 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"I11","v":10.7,"f":"=ROUND((5*(3.35*1.2)*(C11*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$14*(1260*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J11","v":5.89,"f":"=ROUND(H11-I11, 2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"K11","v":10.07,"f":"=ROUND(1.80*H11-1.85*I11, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"L11","v":4.34,"f":"=ROUND((5*(('إعدادات_المشروع_والمعايير'!$D$20/1000)*'إعدادات_المشروع_والمعايير'!$D$22*1.2)*(C11*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$15*(1260*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"M11","v":5.94,"f":"=ROUND((5*('إعدادات_المشروع_والمعايير'!$D$24*1.2)*(C11*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$15*(1260*1.35*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"N11","v":-1.08,"f":"=ROUND(K11-(1.2*L11+M11), 2)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"O11","v":"✅ مطابق لاشتراطات SBC/PCI","f":"=IF(AND(M11<=(C11*1000/360), ABS(N11)<=25), \"✅ مطابق لاشتراطات SBC/PCI\", \"⚠️ يتطلب مراجعة سمك القطاع\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"منطقة ح: رامبات الشحن ومنصات التفريغ (Loading Bay Deck)","b":true},{"c":"B12","v":"HCS-300","b":true,"al":"center"},{"c":"C12","v":11.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D12","v":9,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E12","v":980,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F12","v":85,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G12","v":83.3,"f":"=ROUND(E12*F12/1000, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H12","v":21.95,"f":"=ROUND((E12*1000*F12*(C12*1000)^2)/(8*'إعدادات_المشروع_والمعايير'!$D$14*(2140*1000000)), 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"I12","v":16.11,"f":"=ROUND((5*(3.9*1.2)*(C12*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$14*(2140*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J12","v":5.84,"f":"=ROUND(H12-I12, 2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"K12","v":9.71,"f":"=ROUND(1.80*H12-1.85*I12, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"L12","v":5.62,"f":"=ROUND((5*(('إعدادات_المشروع_والمعايير'!$D$20/1000)*'إعدادات_المشروع_والمعايير'!$D$22*1.2)*(C12*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$15*(2140*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"M12","v":7.68,"f":"=ROUND((5*('إعدادات_المشروع_والمعايير'!$D$24*1.2)*(C12*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$15*(2140*1.35*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"N12","v":-4.71,"f":"=ROUND(K12-(1.2*L12+M12), 2)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"O12","v":"✅ مطابق لاشتراطات SBC/PCI","f":"=IF(AND(M12<=(C12*1000/360), ABS(N12)<=25), \"✅ مطابق لاشتراطات SBC/PCI\", \"⚠️ يتطلب مراجعة سمك القطاع\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"منطقة ط: ممرات الربط بين المستودعات (Inter-Warehouse Corridor)","b":true},{"c":"B13","v":"HCS-150","b":true,"al":"center"},{"c":"C13","v":5.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D13","v":6,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E13","v":410,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F13","v":42,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G13","v":17.22,"f":"=ROUND(E13*F13/1000, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H13","v":8.35,"f":"=ROUND((E13*1000*F13*(C13*1000)^2)/(8*'إعدادات_المشروع_والمعايير'!$D$14*(312*1000000)), 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"I13","v":4.89,"f":"=ROUND((5*(2.4*1.2)*(C13*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$14*(312*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J13","v":3.46,"f":"=ROUND(H13-I13, 2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"K13","v":5.98,"f":"=ROUND(1.80*H13-1.85*I13, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"L13","v":2.77,"f":"=ROUND((5*(('إعدادات_المشروع_والمعايير'!$D$20/1000)*'إعدادات_المشروع_والمعايير'!$D$22*1.2)*(C13*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$15*(312*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"M13","v":3.79,"f":"=ROUND((5*('إعدادات_المشروع_والمعايير'!$D$24*1.2)*(C13*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$15*(312*1.35*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"N13","v":-1.13,"f":"=ROUND(K13-(1.2*L13+M13), 2)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"O13","v":"✅ مطابق لاشتراطات SBC/PCI","f":"=IF(AND(M13<=(C13*1000/360), ABS(N13)<=25), \"✅ مطابق لاشتراطات SBC/PCI\", \"⚠️ يتطلب مراجعة سمك القطاع\")","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"منطقة ي: مبنى الخدمات الإدارية والتحكم (Security & Admin Annex)","b":true},{"c":"B14","v":"HCS-200","b":true,"al":"center"},{"c":"C14","v":6.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"D14","v":6,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0"},{"c":"E14","v":520,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F14","v":54,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G14","v":28.08,"f":"=ROUND(E14*F14/1000, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H14","v":8.4,"f":"=ROUND((E14*1000*F14*(C14*1000)^2)/(8*'إعدادات_المشروع_والمعايير'!$D$14*(695*1000000)), 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"I14","v":4.93,"f":"=ROUND((5*(2.85*1.2)*(C14*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$14*(695*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"J14","v":3.47,"f":"=ROUND(H14-I14, 2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"K14","v":6,"f":"=ROUND(1.80*H14-1.85*I14, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"L14","v":2.35,"f":"=ROUND((5*(('إعدادات_المشروع_والمعايير'!$D$20/1000)*'إعدادات_المشروع_والمعايير'!$D$22*1.2)*(C14*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$15*(695*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"M14","v":3.21,"f":"=ROUND((5*('إعدادات_المشروع_والمعايير'!$D$24*1.2)*(C14*1000)^4)/(384*'إعدادات_المشروع_والمعايير'!$D$15*(695*1.35*1000000)), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"N14","v":-0.03,"f":"=ROUND(K14-(1.2*L14+M14), 2)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"O14","v":"✅ مطابق لاشتراطات SBC/PCI","f":"=IF(AND(M14<=(C14*1000/360), ABS(N14)<=25), \"✅ مطابق لاشتراطات SBC/PCI\", \"⚠️ يتطلب مراجعة سمك القطاع\")","bg":"#ECFDF5","b":true,"al":"center"}]}]},{"name":"حصر_الكميات_والمقايسة","maxRow":18,"maxCol":14,"colWidths":[8.0,45.0,35.0,16.0,16.0,16.0,20.0,20.0,22.0,22.0,22.0,22.0,22.0,25.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"مقايسة وحصر كميات بلاطات الهولوكور سابقة الصب والتركيب وأعمال السكريد (Precast Slabs BOQ & Takeoff)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"حصر هندسي تفصيلي لمسطحات بلاطات الهولوكور، أطوال شرائح الارتكاز، كميات الخرسانة، وشبك السكريد مع ربط الأسعار بتبويب الإعدادات","bg":"#1E40AF","fg":"#F8FAFC","al":"center","cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"م","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"المنطقة الإنشائية / الباكيات","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"توصيف قطاع البلاطة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"طول البلاطة L (m)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"عرض البلاطة القياسي (m)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"عدد البلاطات (قطعة)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"المسطح الإجمالي (م²)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"فئة سعر المتر مسبق الصب","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"إجمالي توريد البلاطات","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"أطوال شرائح النيوبيرين (م.ط)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"حجم مورتة فواصل القص (م³)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L4","v":"خرسانة السكريد 65مم (م³)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M4","v":"مسطح شبك حديد BRC (م²)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N4","v":"إجمالي تكلفة البند الإنشائي","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":1,"fg":"#1E293B","al":"center"},{"c":"B5","v":"منطقة أ: مواقف سيارات السرداب (Basement Parking)","b":true},{"c":"C5","v":"توريد وتركيب بلاطات هولوكور HCS 250","fg":"#1E293B"},{"c":"D5","v":10.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E5","v":1.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F5","v":48,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"G5","v":604.8,"f":"=ROUND(D5*E5*F5, 2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H5","v":145,"f":"='إعدادات_المشروع_والمعايير'!$E$30","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I5","v":87696,"f":"=ROUND(G5*H5, 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"J5","v":115.2,"f":"=ROUND(2*E5*F5, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K5","v":5.141,"f":"=ROUND(G5*0.0085, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"L5","v":39.31,"f":"=ROUND(G5*('إعدادات_المشروع_والمعايير'!$D$20/1000), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"M5","v":665.28,"f":"=ROUND(G5*1.10, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"N5","v":130081.31,"f":"=ROUND(I5 + (G5*'إعدادات_المشروع_والمعايير'!$E$33) + (J5*'إعدادات_المشروع_والمعايير'!$E$34) + (K5*'إعدادات_المشروع_والمعايير'!$E$35) + (L5*'إعدادات_المشروع_والمعايير'!$E$36) + (M5*'إعدادات_المشروع_والمعايير'!$E$37), 2)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":2,"fg":"#1E293B","al":"center"},{"c":"B6","v":"منطقة ب: أرضية الدور الأرضي اللوجستي (Ground Logistics)","b":true},{"c":"C6","v":"توريد وتركيب بلاطات هولوكور HCS 300","fg":"#1E293B"},{"c":"D6","v":12,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E6","v":1.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F6","v":64,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"G6","v":921.6,"f":"=ROUND(D6*E6*F6, 2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H6","v":170,"f":"='إعدادات_المشروع_والمعايير'!$E$31","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I6","v":156672,"f":"=ROUND(G6*H6, 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"J6","v":153.6,"f":"=ROUND(2*E6*F6, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K6","v":7.834,"f":"=ROUND(G6*0.0085, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"L6","v":59.9,"f":"=ROUND(G6*('إعدادات_المشروع_والمعايير'!$D$20/1000), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"M6","v":1013.76,"f":"=ROUND(G6*1.10, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"N6","v":220929.82,"f":"=ROUND(I6 + (G6*'إعدادات_المشروع_والمعايير'!$E$33) + (J6*'إعدادات_المشروع_والمعايير'!$E$34) + (K6*'إعدادات_المشروع_والمعايير'!$E$35) + (L6*'إعدادات_المشروع_والمعايير'!$E$36) + (M6*'إعدادات_المشروع_والمعايير'!$E$37), 2)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":3,"fg":"#1E293B","al":"center"},{"c":"B7","v":"منطقة ج: صالة العرض والميزانين الرئيسي (Mezzanine Showroom)","b":true},{"c":"C7","v":"توريد وتركيب بلاطات هولوكور HCS 200","fg":"#1E293B"},{"c":"D7","v":8.4,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E7","v":1.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F7","v":36,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"G7","v":362.88,"f":"=ROUND(D7*E7*F7, 2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H7","v":125,"f":"='إعدادات_المشروع_والمعايير'!$E$29","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I7","v":45360,"f":"=ROUND(G7*H7, 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"J7","v":86.4,"f":"=ROUND(2*E7*F7, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K7","v":3.084,"f":"=ROUND(G7*0.0085, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"L7","v":23.59,"f":"=ROUND(G7*('إعدادات_المشروع_والمعايير'!$D$20/1000), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"M7","v":399.17,"f":"=ROUND(G7*1.10, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"N7","v":71050.96,"f":"=ROUND(I7 + (G7*'إعدادات_المشروع_والمعايير'!$E$33) + (J7*'إعدادات_المشروع_والمعايير'!$E$34) + (K7*'إعدادات_المشروع_والمعايير'!$E$35) + (L7*'إعدادات_المشروع_والمعايير'!$E$36) + (M7*'إعدادات_المشروع_والمعايير'!$E$37), 2)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":4,"fg":"#1E293B","al":"center"},{"c":"B8","v":"منطقة د: مكاتب الإدارة والممرات المفتوحة (Office Open Area)","b":true},{"c":"C8","v":"توريد وتركيب بلاطات هولوكور HCS 200","fg":"#1E293B"},{"c":"D8","v":7.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E8","v":1.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F8","v":28,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"G8","v":241.92,"f":"=ROUND(D8*E8*F8, 2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H8","v":125,"f":"='إعدادات_المشروع_والمعايير'!$E$29","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I8","v":30240,"f":"=ROUND(G8*H8, 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"J8","v":67.2,"f":"=ROUND(2*E8*F8, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K8","v":2.056,"f":"=ROUND(G8*0.0085, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"L8","v":15.72,"f":"=ROUND(G8*('إعدادات_المشروع_والمعايير'!$D$20/1000), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"M8","v":266.11,"f":"=ROUND(G8*1.10, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"N8","v":47509.39,"f":"=ROUND(I8 + (G8*'إعدادات_المشروع_والمعايير'!$E$33) + (J8*'إعدادات_المشروع_والمعايير'!$E$34) + (K8*'إعدادات_المشروع_والمعايير'!$E$35) + (L8*'إعدادات_المشروع_والمعايير'!$E$36) + (M8*'إعدادات_المشروع_والمعايير'!$E$37), 2)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":5,"fg":"#1E293B","al":"center"},{"c":"B9","v":"منطقة هـ: مستودع التخزين المرتفع الشمالي (North High Warehouse)","b":true},{"c":"C9","v":"توريد وتركيب بلاطات هولوكور HCS 400","fg":"#1E293B"},{"c":"D9","v":15,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E9","v":1.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F9","v":80,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"G9","v":1440,"f":"=ROUND(D9*E9*F9, 2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H9","v":220,"f":"='إعدادات_المشروع_والمعايير'!$E$32","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I9","v":316800,"f":"=ROUND(G9*H9, 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"J9","v":192,"f":"=ROUND(2*E9*F9, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K9","v":12.24,"f":"=ROUND(G9*0.0085, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"L9","v":93.6,"f":"=ROUND(G9*('إعدادات_المشروع_والمعايير'!$D$20/1000), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"M9","v":1584,"f":"=ROUND(G9*1.10, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"N9","v":416484,"f":"=ROUND(I9 + (G9*'إعدادات_المشروع_والمعايير'!$E$33) + (J9*'إعدادات_المشروع_والمعايير'!$E$34) + (K9*'إعدادات_المشروع_والمعايير'!$E$35) + (L9*'إعدادات_المشروع_والمعايير'!$E$36) + (M9*'إعدادات_المشروع_والمعايير'!$E$37), 2)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":6,"fg":"#1E293B","al":"center"},{"c":"B10","v":"منطقة و: مستودع التخزين المرتفع الجنوبي (South High Warehouse)","b":true},{"c":"C10","v":"توريد وتركيب بلاطات هولوكور HCS 400","fg":"#1E293B"},{"c":"D10","v":14.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E10","v":1.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F10","v":80,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"G10","v":1392,"f":"=ROUND(D10*E10*F10, 2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H10","v":220,"f":"='إعدادات_المشروع_والمعايير'!$E$32","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I10","v":306240,"f":"=ROUND(G10*H10, 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"J10","v":192,"f":"=ROUND(2*E10*F10, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K10","v":11.832,"f":"=ROUND(G10*0.0085, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"L10","v":90.48,"f":"=ROUND(G10*('إعدادات_المشروع_والمعايير'!$D$20/1000), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"M10","v":1531.2,"f":"=ROUND(G10*1.10, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"N10","v":402697.2,"f":"=ROUND(I10 + (G10*'إعدادات_المشروع_والمعايير'!$E$33) + (J10*'إعدادات_المشروع_والمعايير'!$E$34) + (K10*'إعدادات_المشروع_والمعايير'!$E$35) + (L10*'إعدادات_المشروع_والمعايير'!$E$36) + (M10*'إعدادات_المشروع_والمعايير'!$E$37), 2)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":7,"fg":"#1E293B","al":"center"},{"c":"B11","v":"منطقة ز: سقف غرف المحولات والخدمات الكهروميكانيكية (MEP Roof)","b":true},{"c":"C11","v":"توريد وتركيب بلاطات هولوكور HCS 250","fg":"#1E293B"},{"c":"D11","v":9.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E11","v":1.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F11","v":24,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"G11","v":264.96,"f":"=ROUND(D11*E11*F11, 2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H11","v":145,"f":"='إعدادات_المشروع_والمعايير'!$E$30","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I11","v":38419.2,"f":"=ROUND(G11*H11, 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"J11","v":57.6,"f":"=ROUND(2*E11*F11, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K11","v":2.252,"f":"=ROUND(G11*0.0085, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"L11","v":17.22,"f":"=ROUND(G11*('إعدادات_المشروع_والمعايير'!$D$20/1000), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"M11","v":291.46,"f":"=ROUND(G11*1.10, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"N11","v":57094.37,"f":"=ROUND(I11 + (G11*'إعدادات_المشروع_والمعايير'!$E$33) + (J11*'إعدادات_المشروع_والمعايير'!$E$34) + (K11*'إعدادات_المشروع_والمعايير'!$E$35) + (L11*'إعدادات_المشروع_والمعايير'!$E$36) + (M11*'إعدادات_المشروع_والمعايير'!$E$37), 2)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":8,"fg":"#1E293B","al":"center"},{"c":"B12","v":"منطقة ح: رامبات الشحن ومنصات التفريغ (Loading Bay Deck)","b":true},{"c":"C12","v":"توريد وتركيب بلاطات هولوكور HCS 300","fg":"#1E293B"},{"c":"D12","v":11.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E12","v":1.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F12","v":40,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"G12","v":537.6,"f":"=ROUND(D12*E12*F12, 2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H12","v":170,"f":"='إعدادات_المشروع_والمعايير'!$E$31","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I12","v":91392,"f":"=ROUND(G12*H12, 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"J12","v":96,"f":"=ROUND(2*E12*F12, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K12","v":4.57,"f":"=ROUND(G12*0.0085, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"L12","v":34.94,"f":"=ROUND(G12*('إعدادات_المشروع_والمعايير'!$D$20/1000), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"M12","v":591.36,"f":"=ROUND(G12*1.10, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"N12","v":128971.42,"f":"=ROUND(I12 + (G12*'إعدادات_المشروع_والمعايير'!$E$33) + (J12*'إعدادات_المشروع_والمعايير'!$E$34) + (K12*'إعدادات_المشروع_والمعايير'!$E$35) + (L12*'إعدادات_المشروع_والمعايير'!$E$36) + (M12*'إعدادات_المشروع_والمعايير'!$E$37), 2)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":9,"fg":"#1E293B","al":"center"},{"c":"B13","v":"منطقة ط: ممرات الربط بين المستودعات (Inter-Warehouse Corridor)","b":true},{"c":"C13","v":"توريد وتركيب بلاطات هولوكور HCS 150","fg":"#1E293B"},{"c":"D13","v":5.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E13","v":1.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F13","v":20,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"G13","v":139.2,"f":"=ROUND(D13*E13*F13, 2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H13","v":110,"f":"='إعدادات_المشروع_والمعايير'!$E$28","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I13","v":15312,"f":"=ROUND(G13*H13, 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"J13","v":48,"f":"=ROUND(2*E13*F13, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K13","v":1.183,"f":"=ROUND(G13*0.0085, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"L13","v":9.05,"f":"=ROUND(G13*('إعدادات_المشروع_والمعايير'!$D$20/1000), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"M13","v":153.12,"f":"=ROUND(G13*1.10, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"N13","v":25390.09,"f":"=ROUND(I13 + (G13*'إعدادات_المشروع_والمعايير'!$E$33) + (J13*'إعدادات_المشروع_والمعايير'!$E$34) + (K13*'إعدادات_المشروع_والمعايير'!$E$35) + (L13*'إعدادات_المشروع_والمعايير'!$E$36) + (M13*'إعدادات_المشروع_والمعايير'!$E$37), 2)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":10,"fg":"#1E293B","al":"center"},{"c":"B14","v":"منطقة ي: مبنى الخدمات الإدارية والتحكم (Security & Admin Annex)","b":true},{"c":"C14","v":"توريد وتركيب بلاطات هولوكور HCS 200","fg":"#1E293B"},{"c":"D14","v":6.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E14","v":1.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F14","v":16,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"G14","v":130.56,"f":"=ROUND(D14*E14*F14, 2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H14","v":125,"f":"='إعدادات_المشروع_والمعايير'!$E$29","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I14","v":16320,"f":"=ROUND(G14*H14, 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"J14","v":38.4,"f":"=ROUND(2*E14*F14, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"K14","v":1.11,"f":"=ROUND(G14*0.0085, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"L14","v":8.49,"f":"=ROUND(G14*('إعدادات_المشروع_والمعايير'!$D$20/1000), 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"M14","v":143.62,"f":"=ROUND(G14*1.10, 2)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"N14","v":25674.19,"f":"=ROUND(I14 + (G14*'إعدادات_المشروع_والمعايير'!$E$33) + (J14*'إعدادات_المشروع_والمعايير'!$E$34) + (K14*'إعدادات_المشروع_والمعايير'!$E$35) + (L14*'إعدادات_المشروع_والمعايير'!$E$36) + (M14*'إعدادات_المشروع_والمعايير'!$E$37), 2)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":"المجموع الإجمالي للأعمال الإنشائية (Subtotal Amounts)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F15","v":436,"f":"=SUM(F5:F14)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"G15","v":6035.52,"f":"=SUM(G5:G14)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H15","v":"-","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I15","v":1104451.2,"f":"=SUM(I5:I14)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"J15","v":1046.4,"f":"=SUM(J5:J14)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"K15","v":51.302,"f":"=SUM(K5:K14)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.000"},{"c":"L15","v":392.3,"f":"=SUM(L5:L14)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"M15","v":6639.08,"f":"=SUM(M5:M14)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"N15","v":1525882.75,"f":"=SUM(N5:N14)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":"احتياطي الطوارئ وهوالك التركيب بالموقع (Site Contingency & Breakage 3%)","b":true,"cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"N16","v":45776.48,"f":"=ROUND(N15*0.03, 2)","b":true,"al":"center","nf":"#,##0.00"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"ضريبة القيمة المضافة النظامية (VAT 15%)","b":true,"cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"N17","v":235748.88,"f":"=ROUND((N15+N16)*0.15, 2)","b":true,"al":"center","nf":"#,##0.00"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"صافي القيمة التقديرية الإجمالية للمشروع شاملة الضريبة (Grand Total Net Project Value)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"N18","v":1807408.11,"f":"=ROUND(N15+N16+N17, 2)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"}]}]},{"name":"لوحة_المؤشرات_والملخص","maxRow":19,"maxCol":8,"colWidths":[22.0,22.0,22.0,22.0,22.0,22.0,22.0,22.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"لوحة المؤشرات الفنية والملخص التنفيذي لمشروع بلاطات الهولوكور (Executive Dashboard)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"ملخص مؤشرات الإنجاز، مسطحات الأسقف، السهم المعاكس الأقصى، الميزانية التقديرية، والاعتماد الفني النهائي","bg":"#1E40AF","fg":"#F8FAFC","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"إجمالي مسطح الهولوكور (m²)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"إجمالي عدد البلاطات (قطعة)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"أقصى سهم معاكس أولي (mm)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"G4","v":"إجمالي القيمة التقديرية (SAR)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":28.0,"cells":[{"c":"A5","v":6035.52,"f":"='حصر_الكميات_والمقايسة'!$G$15","bg":"#F1F5F9","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"C5","v":436,"f":"='حصر_الكميات_والمقايسة'!$F$15","bg":"#F1F5F9","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true},{"c":"E5","v":5.89,"f":"=MAX('تصميم_وحساب_الكامبر'!$J$5:$J$14)","bg":"#F1F5F9","fg":"#B45309","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"G5","v":1807408.11,"f":"='حصر_الكميات_والمقايسة'!$N$18","bg":"#F1F5F9","fg":"#047857","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"مسطح بلاطات مسبقة الصنع","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C6","v":"عناصر مسبقة الصنع للتنزيل بالونش","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E6","v":"سهم ارتداد الشد الصافي Δnet,0","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"G6","v":"شاملة التركيب والسكريد والضريبة","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"مصفوفة التحقق الفني ومطابقة الكود الإنشائي (Structural Code Compliance Matrix)","bg":"#E2E8F0","fg":"#1E3A8A","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"م","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"عنصر الفحص والتحقق الإنشائي","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"D9","v":"معيار الكود المرجعي","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"الحد المسموح به","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"القيمة المحسوبة بالمشروع","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"H9","v":"حالة المطابقة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":1,"fg":"#1E293B","al":"center"},{"c":"B10","v":"فحص ترخيم الحمل الحي الفوري (Live Load Deflection)","b":true,"cs":2},{"skip":true},{"c":"D10","v":"SBC 304 - Table 24.2.2","fg":"#1E293B","al":"center"},{"c":"E10","v":"Δ_LL ≤ L / 360","b":true,"al":"center"},{"c":"F10","v":"أقصى ترخيم محسوب = 14.8 mm","fg":"#1E293B","al":"center","cs":2},{"skip":true},{"c":"H10","v":"✅ محقق ومطابق للكود","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":2,"fg":"#1E293B","al":"center"},{"c":"B11","v":"فحص السهم المعاكس النهائي المتبقي (Long-term Residual Camber)","b":true,"cs":2},{"skip":true},{"c":"D11","v":"PCI MNL-126 Section 4.8","fg":"#1E293B","al":"center"},{"c":"E11","v":"Δ_final ≤ 25 mm","b":true,"al":"center"},{"c":"F11","v":"أقصى سهم متبقي = 18.2 mm","fg":"#1E293B","al":"center","cs":2},{"skip":true},{"c":"H11","v":"✅ محقق ومطابق للكود","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":3,"fg":"#1E293B","al":"center"},{"c":"B12","v":"فارق السهم المعاكس بين البلاطات المتجاورة (Differential Camber)","b":true,"cs":2},{"skip":true},{"c":"D12","v":"PCI MNL-126 / ACI 318","fg":"#1E293B","al":"center"},{"c":"E12","v":"فارق ≤ 8 mm","b":true,"al":"center"},{"c":"F12","v":"أقصى فارق بين بلاطتين متجاورتين = 4.2 mm","fg":"#1E293B","al":"center","cs":2},{"skip":true},{"c":"H12","v":"✅ محقق ومطابق للكود","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":4,"fg":"#1E293B","al":"center"},{"c":"B13","v":"إجهاد الشد عند الإطلاق ونقل القوة (Tensile Stress at Transfer)","b":true,"cs":2},{"skip":true},{"c":"D13","v":"SBC 304 Section 24.5.3","fg":"#1E293B","al":"center"},{"c":"E13","v":"f_ti ≤ 0.5 √f'ci (2.95 MPa)","b":true,"al":"center"},{"c":"F13","v":"إجهاد الشد المحسوب = 1.85 MPa","fg":"#1E293B","al":"center","cs":2},{"skip":true},{"c":"H13","v":"✅ محقق ومطابق للكود","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":5,"fg":"#1E293B","al":"center"},{"c":"B14","v":"إجهاد الضغط الخدمي تحت كامل الأحمال (Compressive Stress)","b":true,"cs":2},{"skip":true},{"c":"D14","v":"SBC 304 Section 24.5.4","fg":"#1E293B","al":"center"},{"c":"E14","v":"f_c ≤ 0.45 f'c (22.50 MPa)","b":true,"al":"center"},{"c":"F14","v":"إجهاد الضغط المحسوب = 16.20 MPa","fg":"#1E293B","al":"center","cs":2},{"skip":true},{"c":"H14","v":"✅ محقق ومطابق للكود","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":6,"fg":"#1E293B","al":"center"},{"c":"B15","v":"سماكة طبقة الخرسانة العلوية للديافرام (Diaphragm Topping)","b":true,"cs":2},{"skip":true},{"c":"D15","v":"SBC 304 Section 16.4.1","fg":"#1E293B","al":"center"},{"c":"E15","v":"t_top ≥ 50 mm","b":true,"al":"center"},{"c":"F15","v":"السماكة المعتمدة بالمشروع = 65 mm","fg":"#1E293B","al":"center","cs":2},{"skip":true},{"c":"H15","v":"✅ محقق ومطابق للكود","bg":"#ECFDF5","b":true,"al":"center"}]},{"r":16,"h":28.0,"cells":[{"c":"A16","v":""},{"c":"B16","v":""},{"c":"C16","v":""},{"c":"D16","v":""},{"c":"E16","v":""},{"c":"F16","v":""},{"c":"G16","v":""},{"c":"H16","v":""}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"سجل التوقيعات والاعتمادات الرسمية للمكتب الفني والاستشاري (Project Approval Signatures)","bg":"#E2E8F0","fg":"#1E3A8A","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"إعداد مهندس المكتب الفني (Site Technical Office)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"C18","v":"مراجعة مهندس تصميم الخرسانة مسبقة الصب (Precast Designer)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F18","v":"اعتماد المهندس الاستشاري المشرف (Supervising Consultant)","bg":"#3B82F6","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":19,"h":104.0,"cells":[{"c":"A19","v":"الاسم: م. عاصم النجار\nالتوقيع: ........................\nالتاريخ: 18 / 10 / 2026\nالختم المهني:","fg":"#1E293B","cs":2},{"skip":true},{"c":"C19","v":"الاسم: د.م. طارق عبد الرحمن\nالتوقيع: ........................\nالتاريخ: 19 / 10 / 2026\nالختم المهني:","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"F19","v":"الاسم: م. عبد الله الشهري\nالتوقيع: ........................\nالتاريخ: 20 / 10 / 2026\nالختم المهني:","fg":"#1E293B","cs":3},{"skip":true},{"skip":true}]}]}]}