{"slug":"ready-mix-concrete-pour-log-and-truck-dispatch-reconciliation-sheet","sheets":[{"name":"إعدادات الصب ومحطة الخلط","maxRow":25,"maxCol":7,"colWidths":[26.0,26.0,22.0,22.0,26.0,26.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"سجل ومواصفات صب الخرسانة الجاهزة ومحطة الخلط المركزية وفق ASTM C94 و SBC 304","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":42.0,"cells":[{"c":"A2","v":"⚠️ تنبيه استرشادي: هذا الشيت قالب تشغيلي هندسي لضبط جودة استلام الخرسانة الجاهزة ومتابعة حركة الخلاطات وحساب الهالك، قابِل للتعديل الكامل وفق كود المشروع.","bg":"#EFF6FF","fg":"#1E3A8A","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: البيانات العامة للمشروع وتصريح صب العنصر الإنشائي","bg":"#0F766E","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"اسم المشروع الإنشائي","bg":"#F1F5F9","fg":"#334155","b":true},{"c":"B5","v":"مشروع أبراج السحاب السكنية والتجارية","cs":3},{"skip":true},{"skip":true},{"c":"E5","v":"رقم طلب الفحص RFI Ref","bg":"#F1F5F9","fg":"#334155","b":true},{"c":"F5","v":"RFI-CIV-2026-0428","cs":2},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"المالك / جهة العمل","bg":"#F1F5F9","fg":"#334155","b":true},{"c":"B6","v":"شركة التطوير العمراني القابضة","cs":3},{"skip":true},{"skip":true},{"c":"E6","v":"تاريخ وتوقيت الصب المقترح","bg":"#F1F5F9","fg":"#334155","b":true},{"c":"F6","v":"18 أكتوبر 2026 - الساعة 07:00 صباحاً","cs":2},{"skip":true}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"الاستشاري الهندسي المشرف","bg":"#F1F5F9","fg":"#334155","b":true},{"c":"B7","v":"دار العمارة للاستشارات الهندسية","cs":3},{"skip":true},{"skip":true},{"c":"E7","v":"العنصر الإنشائي المصبوب","bg":"#F1F5F9","fg":"#334155","b":true},{"c":"F7","v":"لبشة خرسانية مسلحة - بلوك A (Raft Foundation)","cs":2},{"skip":true}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"المقاول العام المنفذ","bg":"#F1F5F9","fg":"#334155","b":true},{"c":"B8","v":"شركة البنيان المتكامل للمقاولات العامة","cs":3},{"skip":true},{"skip":true},{"c":"E8","v":"المنسوب الهندسي للصب","bg":"#F1F5F9","fg":"#334155","b":true},{"c":"F8","v":"-4.50 متر (منسوب التأسيس السفلي)","cs":2},{"skip":true}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"مورد الخرسانة ومحطة الخلط","bg":"#F1F5F9","fg":"#334155","b":true},{"c":"B9","v":"مصنع الشرق للخرسانة الجاهزة - محطة رقم 2","cs":3},{"skip":true},{"skip":true},{"c":"E9","v":"رقم اللوحة الإنشائية المرجعية","bg":"#F1F5F9","fg":"#334155","b":true},{"c":"F9","v":"STR-DWG-FD-104 Rev.C","cs":2},{"skip":true}]},{"r":10,"h":28.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""},{"c":"F10","v":""},{"c":"G10","v":""}]},{"r":11,"h":38.0,"cells":[{"c":"A11","v":"ثانياً: مواصفات تصميم الخلطة الخرسانية والحدود الرقابية (Mix Design & QC Limits)","bg":"#0F766E","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"رتبة الخرسانة التصميمية المطلوبة f'c (MPa)","bg":"#F1F5F9","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C12","v":35,"in":true,"fg":"#0F766E","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true},{"c":"E12","v":"رتبة مكعب الخرسانة المقابلة fcu (MPa)","bg":"#F1F5F9","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G12","v":40,"in":true,"fg":"#0F766E","b":true,"al":"center","nf":"#,##0"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"نوع الأسمنت المستخدم في الخلطة","bg":"#F1F5F9","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C13","v":"أسمنت مقاوم للأملاح (Type V - SRC)","fg":"#0F766E","b":true,"al":"center","cs":2},{"skip":true},{"c":"E13","v":"نسبة الماء إلى الأسمنت القصوى (w/c max)","bg":"#F1F5F9","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G13","v":0.42,"in":true,"fg":"#0F766E","b":true,"al":"center","nf":"#,##0.0"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":"الهبوط التصميمي المستهدف بالموقع (Slump mm)","bg":"#F1F5F9","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C14","v":150,"in":true,"fg":"#0F766E","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true},{"c":"E14","v":"التفاوت الكودي المسموح في الهبوط (± mm)","bg":"#F1F5F9","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G14","v":25,"in":true,"fg":"#0F766E","b":true,"al":"center","nf":"#,##0"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":"نوع الإضافة الكيميائية المعتمدة","bg":"#F1F5F9","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C15","v":"ملدن فائق ومؤخر شك (ASTM C494 Type G)","fg":"#0F766E","b":true,"al":"center","cs":2},{"skip":true},{"c":"E15","v":"الجرعة المعتمدة للإضافة (% من وزن الأسمنت)","bg":"#F1F5F9","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G15","v":1.2,"in":true,"fg":"#0F766E","b":true,"al":"center","nf":"#,##0.0"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":"المقاس الاعتباري الأكبر للركام (NMSA mm)","bg":"#F1F5F9","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C16","v":20,"in":true,"fg":"#0F766E","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true},{"c":"E16","v":"محتوى الأسمنت الأدنى بالخلطة (kg/m³)","bg":"#F1F5F9","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G16","v":380,"in":true,"fg":"#0F766E","b":true,"al":"center","nf":"#,##0"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"أقصى درجة حرارة مسموحة للخرسانة (°C)","bg":"#F1F5F9","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C17","v":32,"in":true,"fg":"#0F766E","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true},{"c":"E17","v":"الحد الأقصى لزمن الخلط حتى الصب (دقيقة)","bg":"#F1F5F9","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G17","v":90,"in":true,"fg":"#0F766E","b":true,"al":"center","nf":"#,##0"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"وتيرة أخذ عينات المكعبات (م³ لكل طقم)","bg":"#F1F5F9","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C18","v":50,"in":true,"fg":"#0F766E","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true},{"c":"E18","v":"عدد المكعبات في طقم العينة الواحدة","bg":"#F1F5F9","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G18","v":6,"in":true,"fg":"#0F766E","b":true,"al":"center","nf":"#,##0"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":"الحجم الإجمالي المقدر للصبة (م³)","bg":"#F1F5F9","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"C19","v":125,"in":true,"fg":"#0F766E","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true},{"c":"E19","v":"نسبة الهالك التعاقدية المسموحة (% max)","bg":"#F1F5F9","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"G19","v":2.5,"in":true,"fg":"#0F766E","b":true,"al":"center","nf":"#,##0.0"}]},{"r":20,"h":28.0,"cells":[{"c":"A20","v":""},{"c":"B20","v":""},{"c":"C20","v":""},{"c":"D20","v":""},{"c":"E20","v":""},{"c":"F20","v":""},{"c":"G20","v":""}]},{"r":21,"h":38.0,"cells":[{"c":"A21","v":"ثالثاً: لوجستيات الموقع وتجهيزات محطة الخلط ومضخات الخرسانة","bg":"#0F766E","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"المسافة بين المحطة والموقع (كم)","bg":"#F1F5F9","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"C22","v":"18.5 كم","al":"center","cs":2},{"skip":true},{"c":"E22","v":"متوسط زمن الرحلة المتوقع للشاحنة","bg":"#F1F5F9","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"G22","v":"35 دقيقة في أوقات الذروة","al":"center"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"عدد شاحنات الخلاطات المخصصة للصبة","bg":"#F1F5F9","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"C23","v":"8 شاحنات دوارة (Transit Mixers)","al":"center","cs":2},{"skip":true},{"c":"E23","v":"متوسط سعة حمولة الخلاطة الواحدة","bg":"#F1F5F9","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"G23","v":"8.0 إلى 10.0 متر مكعب","al":"center"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":"نوع مضخة الخرسانة المستخدمة","bg":"#F1F5F9","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"C24","v":"مضخة هيدروليكية ذراعية (Boom Pump 42m)","al":"center","cs":2},{"skip":true},{"c":"E24","v":"الطاقة الإنتاجية الاسمية للمضخة","bg":"#F1F5F9","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"G24","v":"65 إلى 80 م³ / ساعة","al":"center"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":"مضخة الخرسانة الاحتياطية (Standby)","bg":"#F1F5F9","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"C25","v":"متوفرة بالموقع وجاهزة للتشغيل الفوري","al":"center","cs":2},{"skip":true},{"c":"E25","v":"مصدر مياه غسيل المضخة والخطوط","bg":"#F1F5F9","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"G25","v":"خزان مياه مخصص سعة 5000 لتر بالموقع","al":"center"}]}]},{"name":"سجل صب وتتابع الخلاطات بالموقع","maxRow":24,"maxCol":22,"colWidths":[6.0,16.0,16.0,24.0,16.0,16.0,16.0,16.0,16.0,16.0,18.0,18.0,16.0,16.0,16.0,16.0,16.0,16.0,16.0,16.0,22.0,60.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"سجل تتابع وصول وتفريغ سيارات خلاطات الخرسانة الجاهزة بالموقع (Ready-Mix Dispatch & Pour Log)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":22},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":40.0,"cells":[{"c":"A2","v":"متابعة دقيقة لحركة الشاحنات، زمن الرحلة والتفريغ (حد أقصى 90 دقيقة)، درجة الحرارة (≤ 32°م)، اختبارات الهبوط الحقلي، وقرار القبول الفوري","bg":"#EFF6FF","fg":"#1E3A8A","al":"center","cs":22},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""},{"c":"O3","v":""},{"c":"P3","v":""},{"c":"Q3","v":""},{"c":"R3","v":""},{"c":"S3","v":""},{"c":"T3","v":""},{"c":"U3","v":""},{"c":"V3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"إجمالي حجم الخرسانة الموردة (م³)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F4","v":"إجمالي عدد شاحنات الصب المستلمة","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"K4","v":"متوسط زمن الخلط حتى انتهاء التفريغ","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"P4","v":"متوسط درجة الحرارة والهبوط الحقلي","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":48.0,"cells":[{"c":"A5","v":120,"f":"=SUM(M9:M23)","bg":"#F1F5F9","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F5","v":15,"f":"=COUNTA(B9:B23)","bg":"#F1F5F9","fg":"#0F766E","b":true,"al":"center","nf":"#,##0","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"K5","v":60.733333,"f":"=AVERAGE(K9:K23)","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"P5","v":"29.8 °م | 152 مم","f":"=TEXT(AVERAGE(O9:O23), \"0.0\") & \" °م | \" & TEXT(AVERAGE(Q9:Q23), \"0\") & \" مم\"","bg":"#F1F5F9","fg":"#166534","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"الحجم الإجمالي الصافي وفق تذاكر التوريد","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F6","v":"عدد سيارات الخلاطات الواصلة للموقع","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"K6","v":"الحد الأقصى الكودي المسموح 90 دقيقة","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"P6","v":"متوسط القراءات الحقلية لجميع الخلاطات","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""},{"c":"K7","v":""},{"c":"L7","v":""},{"c":"M7","v":""},{"c":"N7","v":""},{"c":"O7","v":""},{"c":"P7","v":""},{"c":"Q7","v":""},{"c":"R7","v":""},{"c":"S7","v":""},{"c":"T7","v":""},{"c":"U7","v":""},{"c":"V7","v":""}]},{"r":8,"h":54.0,"cells":[{"c":"A8","v":"م","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B8","v":"رقم تذكرة التوريد","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C8","v":"رقم خلاطة الخرسانة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D8","v":"اسم السائق","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E8","v":"وقت الخروج من المحطة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F8","v":"وقت الوصول للموقع","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G8","v":"زمن الرحلة (دقيقة)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H8","v":"وقت بدء الصب","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I8","v":"وقت انتهاء التفريغ","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J8","v":"مدة التفريغ (دقيقة)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K8","v":"إجمالي الزمن المنقضي (دقيقة)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L8","v":"مطابقة زمن الصب (ASTM C94)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M8","v":"حجم الحمولة (م³)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N8","v":"الكمية التراكمية (م³)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"O8","v":"درجة الحرارة الحقلية (°C)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"P8","v":"مطابقة الحرارة (≤ 32°C)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"Q8","v":"الهبوط الحقلي المقاس (مم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"R8","v":"انحراف الهبوط (مم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"S8","v":"مطابقة الهبوط (±25 مم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"T8","v":"رقم طقم المكعبات","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"U8","v":"قرار قبول الشاحنة والإذن بالصب","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"V8","v":"ملاحظات مهندس الموقع وضبط الجودة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":1,"b":true,"al":"center"},{"c":"B9","v":"TK-98401","fg":"#1E3A8A","b":true,"al":"center"},{"c":"C9","v":"TRK-102","al":"center"},{"c":"D9","v":"أحمد سالم الغامدي"},{"c":"E9","v":"07:15","al":"center"},{"c":"F9","v":"07:48","al":"center"},{"c":"G9","v":33,"in":true,"al":"center","nf":"#,##0"},{"c":"H9","v":"07:52","al":"center"},{"c":"I9","v":"08:15","al":"center"},{"c":"J9","v":23,"in":true,"al":"center","nf":"#,##0"},{"c":"K9","v":56,"f":"=G9+J9","b":true,"al":"center","nf":"#,##0"},{"c":"L9","v":"تجاوز الحد الأقصى","f":"=IF(K9<='إعدادات الصب ومحطة الخلط'!$H$17, \"مطابق\", \"تجاوز الحد الأقصى\")","fg":"#166534","b":true,"al":"center"},{"c":"M9","v":8,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"N9","v":8,"f":"=SUM(M$9:M9)","fg":"#0F766E","b":true,"al":"center","nf":"#,##0.0"},{"c":"O9","v":27.5,"in":true,"al":"center","nf":"#,##0.0"},{"c":"P9","v":"حرارة مرتفعة","f":"=IF(O9<='إعدادات الصب ومحطة الخلط'!$D$17, \"مطابق\", \"حرارة مرتفعة\")","fg":"#166534","b":true,"al":"center"},{"c":"Q9","v":155,"in":true,"al":"center","nf":"#,##0"},{"c":"R9","v":155,"f":"=Q9-'إعدادات الصب ومحطة الخلط'!$D$14","al":"center","nf":"+#,##0;-#,##0;0"},{"c":"S9","v":"خارج التفاوت","f":"=IF(ABS(R9)<='إعدادات الصب ومحطة الخلط'!$H$14, \"مطابق\", \"خارج التفاوت\")","fg":"#166534","b":true,"al":"center"},{"c":"T9","v":"SET-01","fg":"#0284C7","b":true,"al":"center"},{"c":"U9","v":"مرفوض - عدم مطابقة","f":"=IF(AND(L9=\"مطابق\", P9=\"مطابق\", S9=\"مطابق\"), \"مقبول ومصرح بالصب\", \"مرفوض - عدم مطابقة\")","fg":"#166534","b":true,"al":"center"},{"c":"V9","v":"تم أخذ عينة المكعبات الأولى واختبار الهبوط ممتاز","fg":"#475569"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":2,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":"TK-98402","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center"},{"c":"C10","v":"TRK-108","bg":"#F8FAFC","al":"center"},{"c":"D10","v":"محمود عبد الرحمن السيد","bg":"#F8FAFC"},{"c":"E10","v":"07:25","bg":"#F8FAFC","al":"center"},{"c":"F10","v":"08:02","bg":"#F8FAFC","al":"center"},{"c":"G10","v":37,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"H10","v":"08:16","bg":"#F8FAFC","al":"center"},{"c":"I10","v":"08:38","bg":"#F8FAFC","al":"center"},{"c":"J10","v":22,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"K10","v":59,"f":"=G10+J10","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L10","v":"تجاوز الحد الأقصى","f":"=IF(K10<='إعدادات الصب ومحطة الخلط'!$H$17, \"مطابق\", \"تجاوز الحد الأقصى\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"M10","v":8.5,"in":true,"bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"N10","v":16.5,"f":"=SUM(M$9:M10)","bg":"#F8FAFC","fg":"#0F766E","b":true,"al":"center","nf":"#,##0.0"},{"c":"O10","v":28,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"P10","v":"حرارة مرتفعة","f":"=IF(O10<='إعدادات الصب ومحطة الخلط'!$D$17, \"مطابق\", \"حرارة مرتفعة\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"Q10","v":150,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"R10","v":150,"f":"=Q10-'إعدادات الصب ومحطة الخلط'!$D$14","bg":"#F8FAFC","al":"center","nf":"+#,##0;-#,##0;0"},{"c":"S10","v":"خارج التفاوت","f":"=IF(ABS(R10)<='إعدادات الصب ومحطة الخلط'!$H$14, \"مطابق\", \"خارج التفاوت\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"T10","v":"-","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"U10","v":"مرفوض - عدم مطابقة","f":"=IF(AND(L10=\"مطابق\", P10=\"مطابق\", S10=\"مطابق\"), \"مقبول ومصرح بالصب\", \"مرفوض - عدم مطابقة\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"V10","v":"صب مستمر ومباشر بدون أي تأخير بالمضخة","bg":"#F8FAFC","fg":"#475569"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":3,"b":true,"al":"center"},{"c":"B11","v":"TK-98403","fg":"#1E3A8A","b":true,"al":"center"},{"c":"C11","v":"TRK-114","al":"center"},{"c":"D11","v":"طارق بن ناصر الدوسري"},{"c":"E11","v":"07:40","al":"center"},{"c":"F11","v":"08:18","al":"center"},{"c":"G11","v":38,"in":true,"al":"center","nf":"#,##0"},{"c":"H11","v":"08:39","al":"center"},{"c":"I11","v":"09:02","al":"center"},{"c":"J11","v":23,"in":true,"al":"center","nf":"#,##0"},{"c":"K11","v":61,"f":"=G11+J11","b":true,"al":"center","nf":"#,##0"},{"c":"L11","v":"تجاوز الحد الأقصى","f":"=IF(K11<='إعدادات الصب ومحطة الخلط'!$H$17, \"مطابق\", \"تجاوز الحد الأقصى\")","fg":"#166534","b":true,"al":"center"},{"c":"M11","v":8,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"N11","v":24.5,"f":"=SUM(M$9:M11)","fg":"#0F766E","b":true,"al":"center","nf":"#,##0.0"},{"c":"O11","v":28.2,"in":true,"al":"center","nf":"#,##0.0"},{"c":"P11","v":"حرارة مرتفعة","f":"=IF(O11<='إعدادات الصب ومحطة الخلط'!$D$17, \"مطابق\", \"حرارة مرتفعة\")","fg":"#166534","b":true,"al":"center"},{"c":"Q11","v":160,"in":true,"al":"center","nf":"#,##0"},{"c":"R11","v":160,"f":"=Q11-'إعدادات الصب ومحطة الخلط'!$D$14","al":"center","nf":"+#,##0;-#,##0;0"},{"c":"S11","v":"خارج التفاوت","f":"=IF(ABS(R11)<='إعدادات الصب ومحطة الخلط'!$H$14, \"مطابق\", \"خارج التفاوت\")","fg":"#166534","b":true,"al":"center"},{"c":"T11","v":"-","fg":"#64748B","al":"center"},{"c":"U11","v":"مرفوض - عدم مطابقة","f":"=IF(AND(L11=\"مطابق\", P11=\"مطابق\", S11=\"مطابق\"), \"مقبول ومصرح بالصب\", \"مرفوض - عدم مطابقة\")","fg":"#166534","b":true,"al":"center"},{"c":"V11","v":"قوام متجانس وتشغيلية ممتازة وفق المواصفات","fg":"#475569"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":4,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B12","v":"TK-98404","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center"},{"c":"C12","v":"TRK-120","bg":"#F8FAFC","al":"center"},{"c":"D12","v":"سعيد عوض القحطاني","bg":"#F8FAFC"},{"c":"E12","v":"07:55","bg":"#F8FAFC","al":"center"},{"c":"F12","v":"08:32","bg":"#F8FAFC","al":"center"},{"c":"G12","v":37,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"H12","v":"09:03","bg":"#F8FAFC","al":"center"},{"c":"I12","v":"09:25","bg":"#F8FAFC","al":"center"},{"c":"J12","v":22,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"K12","v":59,"f":"=G12+J12","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L12","v":"تجاوز الحد الأقصى","f":"=IF(K12<='إعدادات الصب ومحطة الخلط'!$H$17, \"مطابق\", \"تجاوز الحد الأقصى\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"M12","v":8.5,"in":true,"bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"N12","v":33,"f":"=SUM(M$9:M12)","bg":"#F8FAFC","fg":"#0F766E","b":true,"al":"center","nf":"#,##0.0"},{"c":"O12","v":28.8,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"P12","v":"حرارة مرتفعة","f":"=IF(O12<='إعدادات الصب ومحطة الخلط'!$D$17, \"مطابق\", \"حرارة مرتفعة\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"Q12","v":145,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"R12","v":145,"f":"=Q12-'إعدادات الصب ومحطة الخلط'!$D$14","bg":"#F8FAFC","al":"center","nf":"+#,##0;-#,##0;0"},{"c":"S12","v":"خارج التفاوت","f":"=IF(ABS(R12)<='إعدادات الصب ومحطة الخلط'!$H$14, \"مطابق\", \"خارج التفاوت\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"T12","v":"-","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"U12","v":"مرفوض - عدم مطابقة","f":"=IF(AND(L12=\"مطابق\", P12=\"مطابق\", S12=\"مطابق\"), \"مقبول ومصرح بالصب\", \"مرفوض - عدم مطابقة\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"V12","v":"أقصى زمن مسموح وصل 90 دقيقة بالضبط مع تفريغ فوري","bg":"#F8FAFC","fg":"#475569"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":5,"b":true,"al":"center"},{"c":"B13","v":"TK-98405","fg":"#1E3A8A","b":true,"al":"center"},{"c":"C13","v":"TRK-105","al":"center"},{"c":"D13","v":"خالد إبراهيم الشمري"},{"c":"E13","v":"08:10","al":"center"},{"c":"F13","v":"08:46","al":"center"},{"c":"G13","v":36,"in":true,"al":"center","nf":"#,##0"},{"c":"H13","v":"09:26","al":"center"},{"c":"I13","v":"09:48","al":"center"},{"c":"J13","v":22,"in":true,"al":"center","nf":"#,##0"},{"c":"K13","v":58,"f":"=G13+J13","b":true,"al":"center","nf":"#,##0"},{"c":"L13","v":"تجاوز الحد الأقصى","f":"=IF(K13<='إعدادات الصب ومحطة الخلط'!$H$17, \"مطابق\", \"تجاوز الحد الأقصى\")","fg":"#166534","b":true,"al":"center"},{"c":"M13","v":8,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"N13","v":41,"f":"=SUM(M$9:M13)","fg":"#0F766E","b":true,"al":"center","nf":"#,##0.0"},{"c":"O13","v":29,"in":true,"al":"center","nf":"#,##0.0"},{"c":"P13","v":"حرارة مرتفعة","f":"=IF(O13<='إعدادات الصب ومحطة الخلط'!$D$17, \"مطابق\", \"حرارة مرتفعة\")","fg":"#166534","b":true,"al":"center"},{"c":"Q13","v":150,"in":true,"al":"center","nf":"#,##0"},{"c":"R13","v":150,"f":"=Q13-'إعدادات الصب ومحطة الخلط'!$D$14","al":"center","nf":"+#,##0;-#,##0;0"},{"c":"S13","v":"خارج التفاوت","f":"=IF(ABS(R13)<='إعدادات الصب ومحطة الخلط'!$H$14, \"مطابق\", \"خارج التفاوت\")","fg":"#166534","b":true,"al":"center"},{"c":"T13","v":"-","fg":"#64748B","al":"center"},{"c":"U13","v":"مرفوض - عدم مطابقة","f":"=IF(AND(L13=\"مطابق\", P13=\"مطابق\", S13=\"مطابق\"), \"مقبول ومصرح بالصب\", \"مرفوض - عدم مطابقة\")","fg":"#166534","b":true,"al":"center"},{"c":"V13","v":"تفريغ منتظم مع استمرار اهتزاز الخرسانة بالهزاز الميكانيكي","fg":"#475569"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":6,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":"TK-98406","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center"},{"c":"C14","v":"TRK-111","bg":"#F8FAFC","al":"center"},{"c":"D14","v":"عمر عبد الله العتيبي","bg":"#F8FAFC"},{"c":"E14","v":"08:25","bg":"#F8FAFC","al":"center"},{"c":"F14","v":"09:05","bg":"#F8FAFC","al":"center"},{"c":"G14","v":40,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"H14","v":"09:49","bg":"#F8FAFC","al":"center"},{"c":"I14","v":"10:12","bg":"#F8FAFC","al":"center"},{"c":"J14","v":23,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"K14","v":63,"f":"=G14+J14","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L14","v":"تجاوز الحد الأقصى","f":"=IF(K14<='إعدادات الصب ومحطة الخلط'!$H$17, \"مطابق\", \"تجاوز الحد الأقصى\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"M14","v":8.5,"in":true,"bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"N14","v":49.5,"f":"=SUM(M$9:M14)","bg":"#F8FAFC","fg":"#0F766E","b":true,"al":"center","nf":"#,##0.0"},{"c":"O14","v":29.5,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"P14","v":"حرارة مرتفعة","f":"=IF(O14<='إعدادات الصب ومحطة الخلط'!$D$17, \"مطابق\", \"حرارة مرتفعة\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"Q14","v":160,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"R14","v":160,"f":"=Q14-'إعدادات الصب ومحطة الخلط'!$D$14","bg":"#F8FAFC","al":"center","nf":"+#,##0;-#,##0;0"},{"c":"S14","v":"خارج التفاوت","f":"=IF(ABS(R14)<='إعدادات الصب ومحطة الخلط'!$H$14, \"مطابق\", \"خارج التفاوت\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"T14","v":"SET-02","bg":"#F8FAFC","fg":"#0284C7","b":true,"al":"center"},{"c":"U14","v":"مرفوض - عدم مطابقة","f":"=IF(AND(L14=\"مطابق\", P14=\"مطابق\", S14=\"مطابق\"), \"مقبول ومصرح بالصب\", \"مرفوض - عدم مطابقة\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"V14","v":"تم أخذ طقم العينات الثاني عند اكتمال 50 م³ تقريبا","bg":"#F8FAFC","fg":"#475569"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":7,"b":true,"al":"center"},{"c":"B15","v":"TK-98407","fg":"#1E3A8A","b":true,"al":"center"},{"c":"C15","v":"TRK-117","al":"center"},{"c":"D15","v":"ياسر محمد القرني"},{"c":"E15","v":"08:40","al":"center"},{"c":"F15","v":"09:18","al":"center"},{"c":"G15","v":38,"in":true,"al":"center","nf":"#,##0"},{"c":"H15","v":"10:13","al":"center"},{"c":"I15","v":"10:35","al":"center"},{"c":"J15","v":22,"in":true,"al":"center","nf":"#,##0"},{"c":"K15","v":60,"f":"=G15+J15","b":true,"al":"center","nf":"#,##0"},{"c":"L15","v":"تجاوز الحد الأقصى","f":"=IF(K15<='إعدادات الصب ومحطة الخلط'!$H$17, \"مطابق\", \"تجاوز الحد الأقصى\")","fg":"#166534","b":true,"al":"center"},{"c":"M15","v":8,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"N15","v":57.5,"f":"=SUM(M$9:M15)","fg":"#0F766E","b":true,"al":"center","nf":"#,##0.0"},{"c":"O15","v":29.8,"in":true,"al":"center","nf":"#,##0.0"},{"c":"P15","v":"حرارة مرتفعة","f":"=IF(O15<='إعدادات الصب ومحطة الخلط'!$D$17, \"مطابق\", \"حرارة مرتفعة\")","fg":"#166534","b":true,"al":"center"},{"c":"Q15","v":140,"in":true,"al":"center","nf":"#,##0"},{"c":"R15","v":140,"f":"=Q15-'إعدادات الصب ومحطة الخلط'!$D$14","al":"center","nf":"+#,##0;-#,##0;0"},{"c":"S15","v":"خارج التفاوت","f":"=IF(ABS(R15)<='إعدادات الصب ومحطة الخلط'!$H$14, \"مطابق\", \"خارج التفاوت\")","fg":"#166534","b":true,"al":"center"},{"c":"T15","v":"-","fg":"#64748B","al":"center"},{"c":"U15","v":"مرفوض - عدم مطابقة","f":"=IF(AND(L15=\"مطابق\", P15=\"مطابق\", S15=\"مطابق\"), \"مقبول ومصرح بالصب\", \"مرفوض - عدم مطابقة\")","fg":"#166534","b":true,"al":"center"},{"c":"V15","v":"انخفاض طفيف في الهبوط ولكن ضمن الحدود المسموحة (±25 مم)","fg":"#475569"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":8,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B16","v":"TK-98408","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center"},{"c":"C16","v":"TRK-123","bg":"#F8FAFC","al":"center"},{"c":"D16","v":"فيصل سلطان المطيري","bg":"#F8FAFC"},{"c":"E16","v":"08:55","bg":"#F8FAFC","al":"center"},{"c":"F16","v":"09:34","bg":"#F8FAFC","al":"center"},{"c":"G16","v":39,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"H16","v":"10:36","bg":"#F8FAFC","al":"center"},{"c":"I16","v":"10:58","bg":"#F8FAFC","al":"center"},{"c":"J16","v":22,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"K16","v":61,"f":"=G16+J16","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L16","v":"تجاوز الحد الأقصى","f":"=IF(K16<='إعدادات الصب ومحطة الخلط'!$H$17, \"مطابق\", \"تجاوز الحد الأقصى\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"M16","v":8.5,"in":true,"bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"N16","v":66,"f":"=SUM(M$9:M16)","bg":"#F8FAFC","fg":"#0F766E","b":true,"al":"center","nf":"#,##0.0"},{"c":"O16","v":30,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"P16","v":"حرارة مرتفعة","f":"=IF(O16<='إعدادات الصب ومحطة الخلط'!$D$17, \"مطابق\", \"حرارة مرتفعة\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"Q16","v":155,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"R16","v":155,"f":"=Q16-'إعدادات الصب ومحطة الخلط'!$D$14","bg":"#F8FAFC","al":"center","nf":"+#,##0;-#,##0;0"},{"c":"S16","v":"خارج التفاوت","f":"=IF(ABS(R16)<='إعدادات الصب ومحطة الخلط'!$H$14, \"مطابق\", \"خارج التفاوت\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"T16","v":"-","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"U16","v":"مرفوض - عدم مطابقة","f":"=IF(AND(L16=\"مطابق\", P16=\"مطابق\", S16=\"مطابق\"), \"مقبول ومصرح بالصب\", \"مرفوض - عدم مطابقة\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"V16","v":"استمرار حركة الصب وتوزيع الخرسانة على طبقات متساوية","bg":"#F8FAFC","fg":"#475569"}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":9,"b":true,"al":"center"},{"c":"B17","v":"TK-98409","fg":"#1E3A8A","b":true,"al":"center"},{"c":"C17","v":"TRK-103","al":"center"},{"c":"D17","v":"حسام علي الشهراني"},{"c":"E17","v":"09:10","al":"center"},{"c":"F17","v":"09:50","al":"center"},{"c":"G17","v":40,"in":true,"al":"center","nf":"#,##0"},{"c":"H17","v":"10:59","al":"center"},{"c":"I17","v":"11:22","al":"center"},{"c":"J17","v":23,"in":true,"al":"center","nf":"#,##0"},{"c":"K17","v":63,"f":"=G17+J17","b":true,"al":"center","nf":"#,##0"},{"c":"L17","v":"تجاوز الحد الأقصى","f":"=IF(K17<='إعدادات الصب ومحطة الخلط'!$H$17, \"مطابق\", \"تجاوز الحد الأقصى\")","fg":"#166534","b":true,"al":"center"},{"c":"M17","v":8,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"N17","v":74,"f":"=SUM(M$9:M17)","fg":"#0F766E","b":true,"al":"center","nf":"#,##0.0"},{"c":"O17","v":30.2,"in":true,"al":"center","nf":"#,##0.0"},{"c":"P17","v":"حرارة مرتفعة","f":"=IF(O17<='إعدادات الصب ومحطة الخلط'!$D$17, \"مطابق\", \"حرارة مرتفعة\")","fg":"#166534","b":true,"al":"center"},{"c":"Q17","v":150,"in":true,"al":"center","nf":"#,##0"},{"c":"R17","v":150,"f":"=Q17-'إعدادات الصب ومحطة الخلط'!$D$14","al":"center","nf":"+#,##0;-#,##0;0"},{"c":"S17","v":"خارج التفاوت","f":"=IF(ABS(R17)<='إعدادات الصب ومحطة الخلط'!$H$14, \"مطابق\", \"خارج التفاوت\")","fg":"#166534","b":true,"al":"center"},{"c":"T17","v":"-","fg":"#64748B","al":"center"},{"c":"U17","v":"مرفوض - عدم مطابقة","f":"=IF(AND(L17=\"مطابق\", P17=\"مطابق\", S17=\"مطابق\"), \"مقبول ومصرح بالصب\", \"مرفوض - عدم مطابقة\")","fg":"#166534","b":true,"al":"center"},{"c":"V17","v":"حالة الخرسانة جيدة والحرارة في الحدود الآمنة","fg":"#475569"}]},{"r":18,"h":36.0,"cells":[{"c":"A18","v":10,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B18","v":"TK-98410","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center"},{"c":"C18","v":"TRK-109","bg":"#F8FAFC","al":"center"},{"c":"D18","v":"وليد منصور الزهراني","bg":"#F8FAFC"},{"c":"E18","v":"09:25","bg":"#F8FAFC","al":"center"},{"c":"F18","v":"10:04","bg":"#F8FAFC","al":"center"},{"c":"G18","v":39,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"H18","v":"11:23","bg":"#F8FAFC","al":"center"},{"c":"I18","v":"11:45","bg":"#F8FAFC","al":"center"},{"c":"J18","v":22,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"K18","v":61,"f":"=G18+J18","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L18","v":"تجاوز الحد الأقصى","f":"=IF(K18<='إعدادات الصب ومحطة الخلط'!$H$17, \"مطابق\", \"تجاوز الحد الأقصى\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"M18","v":8.5,"in":true,"bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"N18","v":82.5,"f":"=SUM(M$9:M18)","bg":"#F8FAFC","fg":"#0F766E","b":true,"al":"center","nf":"#,##0.0"},{"c":"O18","v":30.5,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"P18","v":"حرارة مرتفعة","f":"=IF(O18<='إعدادات الصب ومحطة الخلط'!$D$17, \"مطابق\", \"حرارة مرتفعة\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"Q18","v":165,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"R18","v":165,"f":"=Q18-'إعدادات الصب ومحطة الخلط'!$D$14","bg":"#F8FAFC","al":"center","nf":"+#,##0;-#,##0;0"},{"c":"S18","v":"خارج التفاوت","f":"=IF(ABS(R18)<='إعدادات الصب ومحطة الخلط'!$H$14, \"مطابق\", \"خارج التفاوت\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"T18","v":"-","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"U18","v":"مرفوض - عدم مطابقة","f":"=IF(AND(L18=\"مطابق\", P18=\"مطابق\", S18=\"مطابق\"), \"مقبول ومصرح بالصب\", \"مرفوض - عدم مطابقة\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"V18","v":"زيادة في الهبوط 15 مم مقبولة كوديا وتسهل الدمك حول حديد اللبشة","bg":"#F8FAFC","fg":"#475569"}]},{"r":19,"h":36.0,"cells":[{"c":"A19","v":11,"b":true,"al":"center"},{"c":"B19","v":"TK-98411","fg":"#1E3A8A","b":true,"al":"center"},{"c":"C19","v":"TRK-115","al":"center"},{"c":"D19","v":"ماجد خالد العنزي"},{"c":"E19","v":"09:40","al":"center"},{"c":"F19","v":"10:20","al":"center"},{"c":"G19","v":40,"in":true,"al":"center","nf":"#,##0"},{"c":"H19","v":"11:46","al":"center"},{"c":"I19","v":"12:10","al":"center"},{"c":"J19","v":24,"in":true,"al":"center","nf":"#,##0"},{"c":"K19","v":64,"f":"=G19+J19","b":true,"al":"center","nf":"#,##0"},{"c":"L19","v":"تجاوز الحد الأقصى","f":"=IF(K19<='إعدادات الصب ومحطة الخلط'!$H$17, \"مطابق\", \"تجاوز الحد الأقصى\")","fg":"#166534","b":true,"al":"center"},{"c":"M19","v":8,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"N19","v":90.5,"f":"=SUM(M$9:M19)","fg":"#0F766E","b":true,"al":"center","nf":"#,##0.0"},{"c":"O19","v":30.8,"in":true,"al":"center","nf":"#,##0.0"},{"c":"P19","v":"حرارة مرتفعة","f":"=IF(O19<='إعدادات الصب ومحطة الخلط'!$D$17, \"مطابق\", \"حرارة مرتفعة\")","fg":"#166534","b":true,"al":"center"},{"c":"Q19","v":150,"in":true,"al":"center","nf":"#,##0"},{"c":"R19","v":150,"f":"=Q19-'إعدادات الصب ومحطة الخلط'!$D$14","al":"center","nf":"+#,##0;-#,##0;0"},{"c":"S19","v":"خارج التفاوت","f":"=IF(ABS(R19)<='إعدادات الصب ومحطة الخلط'!$H$14, \"مطابق\", \"خارج التفاوت\")","fg":"#166534","b":true,"al":"center"},{"c":"T19","v":"SET-03","fg":"#0284C7","b":true,"al":"center"},{"c":"U19","v":"مرفوض - عدم مطابقة","f":"=IF(AND(L19=\"مطابق\", P19=\"مطابق\", S19=\"مطابق\"), \"مقبول ومصرح بالصب\", \"مرفوض - عدم مطابقة\")","fg":"#166534","b":true,"al":"center"},{"c":"V19","v":"طقم المكعبات الثالث عند الوصول لـ 100 م³ مصبوبة","fg":"#475569"}]},{"r":20,"h":36.0,"cells":[{"c":"A20","v":12,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B20","v":"TK-98412","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center"},{"c":"C20","v":"TRK-121","bg":"#F8FAFC","al":"center"},{"c":"D20","v":"سلمان فهد الحربي","bg":"#F8FAFC"},{"c":"E20","v":"09:55","bg":"#F8FAFC","al":"center"},{"c":"F20","v":"10:35","bg":"#F8FAFC","al":"center"},{"c":"G20","v":40,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"H20","v":"12:11","bg":"#F8FAFC","al":"center"},{"c":"I20","v":"12:34","bg":"#F8FAFC","al":"center"},{"c":"J20","v":23,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"K20","v":63,"f":"=G20+J20","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L20","v":"تجاوز الحد الأقصى","f":"=IF(K20<='إعدادات الصب ومحطة الخلط'!$H$17, \"مطابق\", \"تجاوز الحد الأقصى\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"M20","v":8.5,"in":true,"bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"N20","v":99,"f":"=SUM(M$9:M20)","bg":"#F8FAFC","fg":"#0F766E","b":true,"al":"center","nf":"#,##0.0"},{"c":"O20","v":31,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"P20","v":"حرارة مرتفعة","f":"=IF(O20<='إعدادات الصب ومحطة الخلط'!$D$17, \"مطابق\", \"حرارة مرتفعة\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"Q20","v":155,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"R20","v":155,"f":"=Q20-'إعدادات الصب ومحطة الخلط'!$D$14","bg":"#F8FAFC","al":"center","nf":"+#,##0;-#,##0;0"},{"c":"S20","v":"خارج التفاوت","f":"=IF(ABS(R20)<='إعدادات الصب ومحطة الخلط'!$H$14, \"مطابق\", \"خارج التفاوت\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"T20","v":"-","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"U20","v":"مرفوض - عدم مطابقة","f":"=IF(AND(L20=\"مطابق\", P20=\"مطابق\", S20=\"مطابق\"), \"مقبول ومصرح بالصب\", \"مرفوض - عدم مطابقة\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"V20","v":"متابعة زمن الشك ومنع حدوث أي فواصل صب باردة","bg":"#F8FAFC","fg":"#475569"}]},{"r":21,"h":36.0,"cells":[{"c":"A21","v":13,"b":true,"al":"center"},{"c":"B21","v":"TK-98413","fg":"#1E3A8A","b":true,"al":"center"},{"c":"C21","v":"TRK-106","al":"center"},{"c":"D21","v":"بدر تركي المالكي"},{"c":"E21","v":"10:10","al":"center"},{"c":"F21","v":"10:50","al":"center"},{"c":"G21","v":40,"in":true,"al":"center","nf":"#,##0"},{"c":"H21","v":"12:35","al":"center"},{"c":"I21","v":"12:58","al":"center"},{"c":"J21","v":23,"in":true,"al":"center","nf":"#,##0"},{"c":"K21","v":63,"f":"=G21+J21","b":true,"al":"center","nf":"#,##0"},{"c":"L21","v":"تجاوز الحد الأقصى","f":"=IF(K21<='إعدادات الصب ومحطة الخلط'!$H$17, \"مطابق\", \"تجاوز الحد الأقصى\")","fg":"#166534","b":true,"al":"center"},{"c":"M21","v":8,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"N21","v":107,"f":"=SUM(M$9:M21)","fg":"#0F766E","b":true,"al":"center","nf":"#,##0.0"},{"c":"O21","v":31.2,"in":true,"al":"center","nf":"#,##0.0"},{"c":"P21","v":"حرارة مرتفعة","f":"=IF(O21<='إعدادات الصب ومحطة الخلط'!$D$17, \"مطابق\", \"حرارة مرتفعة\")","fg":"#166534","b":true,"al":"center"},{"c":"Q21","v":145,"in":true,"al":"center","nf":"#,##0"},{"c":"R21","v":145,"f":"=Q21-'إعدادات الصب ومحطة الخلط'!$D$14","al":"center","nf":"+#,##0;-#,##0;0"},{"c":"S21","v":"خارج التفاوت","f":"=IF(ABS(R21)<='إعدادات الصب ومحطة الخلط'!$H$14, \"مطابق\", \"خارج التفاوت\")","fg":"#166534","b":true,"al":"center"},{"c":"T21","v":"-","fg":"#64748B","al":"center"},{"c":"U21","v":"مرفوض - عدم مطابقة","f":"=IF(AND(L21=\"مطابق\", P21=\"مطابق\", S21=\"مطابق\"), \"مقبول ومصرح بالصب\", \"مرفوض - عدم مطابقة\")","fg":"#166534","b":true,"al":"center"},{"c":"V21","v":"درجة الحرارة تقترب من 31.2°م مع توجيه برش المياه المبردة بالمحطة","fg":"#475569"}]},{"r":22,"h":36.0,"cells":[{"c":"A22","v":14,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B22","v":"TK-98414","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center"},{"c":"C22","v":"TRK-112","bg":"#F8FAFC","al":"center"},{"c":"D22","v":"فهد عبد العزيز الرشيدي","bg":"#F8FAFC"},{"c":"E22","v":"10:25","bg":"#F8FAFC","al":"center"},{"c":"F22","v":"11:05","bg":"#F8FAFC","al":"center"},{"c":"G22","v":40,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"H22","v":"12:59","bg":"#F8FAFC","al":"center"},{"c":"I22","v":"13:20","bg":"#F8FAFC","al":"center"},{"c":"J22","v":21,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"K22","v":61,"f":"=G22+J22","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"L22","v":"تجاوز الحد الأقصى","f":"=IF(K22<='إعدادات الصب ومحطة الخلط'!$H$17, \"مطابق\", \"تجاوز الحد الأقصى\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"M22","v":8.5,"in":true,"bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"N22","v":115.5,"f":"=SUM(M$9:M22)","bg":"#F8FAFC","fg":"#0F766E","b":true,"al":"center","nf":"#,##0.0"},{"c":"O22","v":31.5,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"P22","v":"حرارة مرتفعة","f":"=IF(O22<='إعدادات الصب ومحطة الخلط'!$D$17, \"مطابق\", \"حرارة مرتفعة\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"Q22","v":150,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"R22","v":150,"f":"=Q22-'إعدادات الصب ومحطة الخلط'!$D$14","bg":"#F8FAFC","al":"center","nf":"+#,##0;-#,##0;0"},{"c":"S22","v":"خارج التفاوت","f":"=IF(ABS(R22)<='إعدادات الصب ومحطة الخلط'!$H$14, \"مطابق\", \"خارج التفاوت\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"T22","v":"-","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"U22","v":"مرفوض - عدم مطابقة","f":"=IF(AND(L22=\"مطابق\", P22=\"مطابق\", S22=\"مطابق\"), \"مقبول ومصرح بالصب\", \"مرفوض - عدم مطابقة\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"V22","v":"تم إنهاء تفريغ الخلاطة بنجاح والحرارة 31.5°م أقل من 32°م","bg":"#F8FAFC","fg":"#475569"}]},{"r":23,"h":36.0,"cells":[{"c":"A23","v":15,"b":true,"al":"center"},{"c":"B23","v":"TK-98415","fg":"#1E3A8A","b":true,"al":"center"},{"c":"C23","v":"TRK-118","al":"center"},{"c":"D23","v":"عبد الرحمن صالح الصالح"},{"c":"E23","v":"10:40","al":"center"},{"c":"F23","v":"11:18","al":"center"},{"c":"G23","v":38,"in":true,"al":"center","nf":"#,##0"},{"c":"H23","v":"13:21","al":"center"},{"c":"I23","v":"13:42","al":"center"},{"c":"J23","v":21,"in":true,"al":"center","nf":"#,##0"},{"c":"K23","v":59,"f":"=G23+J23","b":true,"al":"center","nf":"#,##0"},{"c":"L23","v":"تجاوز الحد الأقصى","f":"=IF(K23<='إعدادات الصب ومحطة الخلط'!$H$17, \"مطابق\", \"تجاوز الحد الأقصى\")","fg":"#166534","b":true,"al":"center"},{"c":"M23","v":4.5,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"N23","v":120,"f":"=SUM(M$9:M23)","fg":"#0F766E","b":true,"al":"center","nf":"#,##0.0"},{"c":"O23","v":31,"in":true,"al":"center","nf":"#,##0.0"},{"c":"P23","v":"حرارة مرتفعة","f":"=IF(O23<='إعدادات الصب ومحطة الخلط'!$D$17, \"مطابق\", \"حرارة مرتفعة\")","fg":"#166534","b":true,"al":"center"},{"c":"Q23","v":155,"in":true,"al":"center","nf":"#,##0"},{"c":"R23","v":155,"f":"=Q23-'إعدادات الصب ومحطة الخلط'!$D$14","al":"center","nf":"+#,##0;-#,##0;0"},{"c":"S23","v":"خارج التفاوت","f":"=IF(ABS(R23)<='إعدادات الصب ومحطة الخلط'!$H$14, \"مطابق\", \"خارج التفاوت\")","fg":"#166534","b":true,"al":"center"},{"c":"T23","v":"SET-04","fg":"#0284C7","b":true,"al":"center"},{"c":"U23","v":"مرفوض - عدم مطابقة","f":"=IF(AND(L23=\"مطابق\", P23=\"مطابق\", S23=\"مطابق\"), \"مقبول ومصرح بالصب\", \"مرفوض - عدم مطابقة\")","fg":"#166534","b":true,"al":"center"},{"c":"V23","v":"شحنة ختامية متبقية لاستكمال المنسوب النهائي وتغطية الشدات","fg":"#475569"}]},{"r":24,"h":42.0,"cells":[{"c":"A24","v":"الإجمالي العام ومتوسطات مؤشرات جودة الصب","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G24","v":38.333333,"f":"=AVERAGE(G9:G23)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0"},{"c":"H24","v":"-","bg":"#1E3A8A","al":"center","cs":2},{"skip":true},{"c":"J24","v":22.4,"f":"=AVERAGE(J9:J23)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0"},{"c":"K24","v":60.733333,"f":"=AVERAGE(K9:K23)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0"},{"c":"L24","v":"100% مطابق","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M24","v":120,"f":"=SUM(M9:M23)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0"},{"c":"N24","v":120,"f":"=M24","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0"},{"c":"O24","v":29.8,"f":"=AVERAGE(O9:O23)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.1"},{"c":"P24","v":"≤ 32°م مطابق","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"Q24","v":152.333333,"f":"=AVERAGE(Q9:Q23)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0"},{"c":"R24","v":152.333333,"f":"=AVERAGE(R9:R23)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"+#,##0;-#,##0;0"},{"c":"S24","v":"ضمن التفاوت","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"T24","v":"4 أطقم (24 مكعب)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"U24","v":"جميع الشاحنات معتمدة ومطابقة للاشتراطات الفنية","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true}]}]},{"name":"مطابقة الكميات وتوقفات الصب","maxRow":29,"maxCol":8,"colWidths":[6.0,38.0,18.0,20.0,36.0,26.0,24.0,40.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"مطابقة كميات الخرسانة الجاهزة وتحليل توقفات المضخة ونسب الهالك بالموقع","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":40.0,"cells":[{"c":"A2","v":"الموازنة الحجمية الدقيقة بين الكميات التصميمية والتوريد الفعلي، حساب نسبة الهالك، وسجل أعطال وموانع الصب المستمر وتفادي الفواصل الباردة","bg":"#EFF6FF","fg":"#1E3A8A","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: جدول مطابقة الكميات والحجم الفعلي وهالك الخرسانة الموقعي (Volumetric Reconciliation)","bg":"#0F766E","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":40.0,"cells":[{"c":"A5","v":"م","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"بيان عنصر المطابقة الحجمية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"الوحدة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"القيمة المسجلة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"المعادلة الهندسية المرجعية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"الحدود الكودية والتعاقدية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"حالة المطابقة الفنية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"ملاحظات وتوجيهات المكتب الفني","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":1,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B6","v":"الحجم التصميمي الهندسي للعنصر الإنشائي (وفق لوحات الحصر الهندسي)","bg":"#F8FAFC"},{"c":"C6","v":"متر مكعب (م³)","bg":"#F8FAFC","al":"center"},{"c":"D6","v":121.5,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"E6","v":"حصر أبعاد اللبشة (طول × عرض × سمك)","bg":"#F8FAFC"},{"c":"F6","v":"القيمة التصميمية المعتمدة","bg":"#F8FAFC","al":"center"},{"c":"G6","v":"أساس الموازنة","bg":"#F8FAFC","b":true,"al":"center"},{"c":"H6","v":"الحجم النظري للقوالب بدون احتساب أي هالك","bg":"#F8FAFC"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":2,"b":true,"al":"center"},{"c":"B7","v":"إجمالي حجم الخرسانة الموردة بالموقع (وفق تذاكر محطة الخلط)"},{"c":"C7","v":"متر مكعب (م³)","al":"center"},{"c":"D7","v":120,"f":"='سجل صب وتتابع الخلاطات بالموقع'!$M$24","b":true,"al":"center"},{"c":"E7","v":"مجموع حمولات 15 خلاطة موردة"},{"c":"F7","v":"تذاكر التوريد الرسمية","al":"center"},{"c":"G7","v":"توريد رسمي","b":true,"al":"center"},{"c":"H7","v":"مطابقة لأرقام التذاكر والأوزان بمحطة الخلط"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":3,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B8","v":"حجم الخرسانة المرفوضة أو الراجعة للمحطة (Rejected / Returned)","bg":"#F8FAFC"},{"c":"C8","v":"متر مكعب (م³)","bg":"#F8FAFC","al":"center"},{"c":"D8","v":0,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"E8","v":"حصر حمولات الخلاطات غير المصرح بصبها","bg":"#F8FAFC"},{"c":"F8","v":"الحد المستهدف 0.0 م³","bg":"#F8FAFC","al":"center"},{"c":"G8","v":"صفر هالك مرفوض","bg":"#F8FAFC","b":true,"al":"center"},{"c":"H8","v":"استيفاء جميع الشاحنات لمعايير الهبوط والحرارة","bg":"#F8FAFC"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":4,"b":true,"al":"center"},{"c":"B9","v":"صافي الخرسانة المفرغة والمصبوبة فعلياً في العنصر الإنشائي"},{"c":"C9","v":"متر مكعب (م³)","al":"center"},{"c":"D9","v":120,"f":"=D7-D8","b":true,"al":"center"},{"c":"E9","v":"حجم التوريد ناقص المرفوض والراجع"},{"c":"F9","v":"صافي الصب الفعلي","al":"center"},{"c":"G9","v":"مكتمل بالكامل","b":true,"al":"center"},{"c":"H9","v":"الكمية المودعة فعلياً داخل قوالب الشدات الخشبية"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":5,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":"فارق الكمية الإجمالي / هالك الخرسانة الموقعي الفعلي (Variance Volume)","bg":"#F8FAFC"},{"c":"C10","v":"متر مكعب (م³)","bg":"#F8FAFC","al":"center"},{"c":"D10","v":-1.5,"f":"=D9-D6","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E10","v":"صافي المصبوب فعليا ناقص الحجم التصميمي","bg":"#F8FAFC"},{"c":"F10","v":"ضمن التفاوت المسموح","bg":"#F8FAFC","al":"center"},{"c":"G10","v":"هالك إيجابي مبرر","bg":"#F8FAFC","b":true,"al":"center"},{"c":"H10","v":"ناتج عن انتفاخ الشدات وهالك خط الضخ وتنظيف المضخة","bg":"#F8FAFC"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":6,"b":true,"al":"center"},{"c":"B11","v":"نسبة الهالك الموقعي المحققة فعلياً (Actual Waste %)"},{"c":"C11","v":"نسبة مئوية (%)","al":"center"},{"c":"D11","v":-1.234568,"f":"=(D10/D6)*100","b":true,"al":"center","nf":"0.00\"%\""},{"c":"E11","v":"[فارق الكمية ÷ الحجم التصميمي] × 100"},{"c":"F11","v":"≤ 2.50% (الحد التعاقدي)","al":"center"},{"c":"G11","v":"ضمن الحدود المسموحة","b":true,"al":"center"},{"c":"H11","v":"نسبة ممتازة تعكس دقة النجارة وإحكام أعمال الصب"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":7,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B12","v":"الخرسانة المستهلكة في غسيل خطوط المضخة (Pump Line Washout)","bg":"#F8FAFC"},{"c":"C12","v":"متر مكعب (م³)","bg":"#F8FAFC","al":"center"},{"c":"D12","v":0.8,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"E12","v":"حجم الخرسانة الراكدة في خراطيم وبستم المضخة","bg":"#F8FAFC"},{"c":"F12","v":"معدل طبيعي لمضخة 42م","bg":"#F8FAFC","al":"center"},{"c":"G12","v":"هالك تشغيلي حتمي","bg":"#F8FAFC","b":true,"al":"center"},{"c":"H12","v":"تم تفريغها في حوض غسيل بيئي مخصص بالموقع","bg":"#F8FAFC"}]},{"r":13,"h":28.0,"cells":[{"c":"A13","v":""},{"c":"B13","v":""},{"c":"C13","v":""},{"c":"D13","v":""},{"c":"E13","v":""},{"c":"F13","v":""},{"c":"G13","v":""},{"c":"H13","v":""}]},{"r":14,"h":38.0,"cells":[{"c":"A14","v":"ثانياً: سجل توقفات الصب وأعطال المضخة وتقييم مخاطر الفاصل البارد (Cold Joint Prevention Log)","bg":"#0F766E","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"م","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B15","v":"وقت بداية التوقف","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C15","v":"وقت استئناف الصب","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D15","v":"مدة التوقف (دقيقة)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E15","v":"سبب توقف الصب / العطل الفني","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F15","v":"تقييم خطر الفاصل البارد","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G15","v":"الإجراء الفني التصحيحي المتخذ بالموقع","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H15","v":"اعتماد مهندس الإشراف","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":16,"h":72.0,"cells":[{"c":"A16","v":1,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B16","v":"09:05","bg":"#F8FAFC","al":"center"},{"c":"C16","v":"09:18","bg":"#F8FAFC","al":"center"},{"c":"D16","v":13,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"E16","v":"ترحيل مسار بوم المضخة لتغطية الركن الشمالي الشرقي للبشة","bg":"#F8FAFC"},{"c":"F16","v":"منخفض جداً (زمن توقف قصير)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G16","v":"إعادة تدوير الخرسانة داخل الحلة وتشغيل الهزاز فور الاستئناف","bg":"#F8FAFC"},{"c":"H16","v":"معتمد","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":17,"h":72.0,"cells":[{"c":"A17","v":2,"b":true,"al":"center"},{"c":"B17","v":"10:35","al":"center"},{"c":"C17","v":"10:48","al":"center"},{"c":"D17","v":13,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"E17","v":"تأخر وصول الخلاطة رقم 8 بسبب ازدحام مروري بطريق الخدمة"},{"c":"F17","v":"منخفض (أقل من 30 دقيقة)","b":true,"al":"center"},{"c":"G17","v":"تغطية واجهة الصب السابقة بخيش رطب ودمج الطبقتين بعمق 15 سم بالهزاز"},{"c":"H17","v":"معتمد","b":true,"al":"center"}]},{"r":18,"h":72.0,"cells":[{"c":"A18","v":3,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B18","v":"12:10","bg":"#F8FAFC","al":"center"},{"c":"C18","v":"12:22","bg":"#F8FAFC","al":"center"},{"c":"D18","v":12,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"E18","v":"فحص ومعايرة هيدروليك المضخة وتنظيف سلة التغذية من التكتلات","bg":"#F8FAFC"},{"c":"F18","v":"منخفض (الخرسانة لا تزال لدنة)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G18","v":"تقليب واجهة الصب والتأكد من عدم تصلد القشرة السطحية","bg":"#F8FAFC"},{"c":"H18","v":"معتمد","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":19,"h":72.0,"cells":[{"c":"A19","v":4,"b":true,"al":"center"},{"c":"B19","v":"-","al":"center"},{"c":"C19","v":"-","al":"center"},{"c":"D19","v":0,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"E19","v":"لا توجد أعطال ميكانيكية أو توقفات حرجة إضافية خلال الصبة"},{"c":"F19","v":"آمن تماماً","b":true,"al":"center"},{"c":"G19","v":"استمرار عملية الضخ حتى المنسوب النهائي المعتمد بنجاح"},{"c":"H19","v":"معتمد","b":true,"al":"center"}]},{"r":20,"h":28.0,"cells":[{"c":"A20","v":""},{"c":"B20","v":""},{"c":"C20","v":""},{"c":"D20","v":""},{"c":"E20","v":""},{"c":"F20","v":""},{"c":"G20","v":""},{"c":"H20","v":""}]},{"r":21,"h":38.0,"cells":[{"c":"A21","v":"ثالثاً: ملخص مؤشرات إنتاجية الصب ومعدل تشغيل المعدات بالموقع","bg":"#0F766E","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"توقيت بدء صب أول خلاطة بالموقع","bg":"#F1F5F9","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"C22","v":"07:52 صباحاً","al":"center","cs":2},{"skip":true},{"c":"E22","v":"توقيت انتهاء صب آخر خلاطة بالموقع","bg":"#F1F5F9","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"G22","v":"13:42 ظهراً","al":"center","cs":2},{"skip":true}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"إجمالي مدة عملية الصب والتفريغ الحقلية","bg":"#F1F5F9","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"C23","v":"5 ساعات و 50 دقيقة (350 دقيقة)","al":"center","cs":2},{"skip":true},{"c":"E23","v":"متوسط معدل الضخ الفعلي بالموقع","bg":"#F1F5F9","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"G23","v":"21.3 م³ / ساعة (متوافق مع وتيرة الدمك)","al":"center","cs":2},{"skip":true}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":"إجمالي أزمنة التوقفات الطارئة بالموقع","bg":"#F1F5F9","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"C24","v":"38 دقيقة (تشكل 10.8% من إجمالي الوقت)","al":"center","cs":2},{"skip":true},{"c":"E24","v":"حالة جودة السطح النهائي واستواء اللبشة","bg":"#F1F5F9","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"G24","v":"تمت التسوية بالقدة الميكانيكية ومعالجة بالهليكوبتر","al":"center","cs":2},{"skip":true}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":"بروتوكول معالجة الخرسانة المعتمد (Curing)","bg":"#F1F5F9","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"C25","v":"رش مركب المعالجة الكيميائي المعتمد + خيش مبلل","al":"center","cs":2},{"skip":true},{"c":"E25","v":"موعد بدء الرش بالماء والمعالجة المستمرة","bg":"#F1F5F9","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"G25","v":"بعد التصلد الابتدائي مباشرة ولمدة 7 أيام متواصلة","al":"center","cs":2},{"skip":true}]},{"r":26,"h":28.0,"cells":[{"c":"A26","v":""},{"c":"B26","v":""},{"c":"C26","v":""},{"c":"D26","v":""},{"c":"E26","v":""},{"c":"F26","v":""},{"c":"G26","v":""},{"c":"H26","v":""}]},{"r":27,"h":36.0,"cells":[{"c":"A27","v":"مهندس تنفيذ الموقع (المقاول العام)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"C27","v":"مهندس ضبط الجودة بالموقع (QC Engineer)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F27","v":"المهندس الاستشاري المشرف (مكتب الإشراف)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":28,"h":75.0,"cells":[{"c":"A28","v":"الاسم: م. عبد الله الشهري\nالتوقيع: ........................\nالتاريخ: 18/10/2026","fg":"#1E293B","al":"center","cs":2},{"skip":true},{"c":"C28","v":"الاسم: م. مصطفى الشافعي\nالتوقيع: ........................\nالتاريخ: 18/10/2026","fg":"#1E293B","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F28","v":"الاسم: م. عبد العزيز السعدون\nالتوقيع والختم: ........................\nالتاريخ: 18/10/2026","fg":"#1E293B","al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":"التحقق من جاهزية الشدات والموقع","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C29","v":"مطابقة الهبوط والحرارة وأطقم المكعبات","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F29","v":"اعتماد استلام الصبة ونتائج الفحص","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true}]}]}]}