{"slug":"rebar-lap-splice-and-development-length-calculation-sheet","sheets":[{"name":"حاسبة أطوال التماسك والتراكب","maxRow":18,"maxCol":11,"colWidths":[16.0,18.0,22.0,24.0,26.0,26.0,24.0,24.0,22.0,22.0,22.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"حاسبة أطوال التماسك ووصلات تراكب حديد التسليح (SBC 304 / ACI 318-19)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":42.0,"cells":[{"c":"A2","v":"حساب دقيق لأطوال التماسك والتراكب في الشد (Class A & B) والضغط والأشواك والجنشات لجميع الأقطار طبقاً لكود البناء السعودي","bg":"#1E293B","fg":"#FFFFFF","al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":34.0,"cells":[{"c":"A3","v":"مقاومة الخرسانة المميزة f'c (MPa)","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D3","v":"إجهاد خضوع حديد التسليح fy (MPa)","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G3","v":"معامل موضع الصب والتثبيت (Top Bar ψt)","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J3","v":"معامل دهان الإيبوكسي (ψe)","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true}]},{"r":4,"h":48.0,"cells":[{"c":"A4","v":30,"bg":"#F0F9FF","fg":"#0284C7","b":true,"al":"center","nf":"0 \" MPa\"","cs":3},{"skip":true},{"skip":true},{"c":"D4","v":420,"in":true,"bg":"#DCFCE7","fg":"#166534","b":true,"al":"center","nf":"0 \" MPa (Grade 60)\"","cs":3},{"skip":true},{"skip":true},{"c":"G4","v":1,"in":true,"bg":"#FEF3C7","fg":"#B45309","b":true,"al":"center","nf":"0.0 \" (أسياخ سفلية)\"","cs":3},{"skip":true},{"skip":true},{"c":"J4","v":1,"in":true,"bg":"#F0F9FF","fg":"#0284C7","b":true,"al":"center","nf":"0.0 \" (حديد أسود غير مدهون)\"","cs":2},{"skip":true}]},{"r":5,"h":38.0,"cells":[{"c":"A5","v":"جدول أطوال التماسك والتراكب لجميع أقطار حديد التسليح القياسية (Development & Lap Splice Schedule)","bg":"#334155","fg":"#FFFFFF","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":6,"h":42.0,"cells":[{"c":"A6","v":"قطر السيخ Φ (مم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B6","v":"مساحة المقطع (مم²)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C6","v":"الوزن النظري (كجم/م.ط)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D6","v":"طول التماسك بالشد Ld (مم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E6","v":"وصلة تراكب شد فئة أ Class A (مم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F6","v":"وصلة تراكب شد فئة ب Class B (مم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G6","v":"طول التماسك بالضغط Ldc (مم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H6","v":"وصلة تراكب ضغط Lsc (مم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I6","v":"طول الجنش 90° Ldh (مم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J6","v":"طول الجنش 180° Ldh (مم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K6","v":"مضاعف القطر النموذجي (شد)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":8,"b":true,"al":"center","nf":"0 \" مم\""},{"c":"B7","v":50.3,"f":"=ROUND(PI()*A7*A7/4, 1)","al":"center","nf":"#,##0.0"},{"c":"C7","v":0.395,"f":"=ROUND(A7*A7/162, 3)","al":"center","nf":"0.000"},{"c":"D7","v":300,"f":"=ROUNDUP(MAX(300, IF(A7<=19, ($D$4*$G$4*$J$4/(2.1*SQRT($A$4)))*A7, ($D$4*$G$4*$J$4/(1.7*SQRT($A$4)))*A7))/50, 0)*50","b":true,"al":"center","nf":"#,##0"},{"c":"E7","v":300,"f":"=D7","al":"center","nf":"#,##0"},{"c":"F7","v":400,"f":"=ROUNDUP(1.3*D7/50, 0)*50","fg":"#991B1B","b":true,"al":"center","nf":"#,##0"},{"c":"G7","v":200,"f":"=ROUNDUP(MAX(200, (0.24*$D$4/SQRT($A$4))*A7, 0.043*$D$4*A7)/50, 0)*50","al":"center","nf":"#,##0"},{"c":"H7","v":300,"f":"=ROUNDUP(MAX(300, IF($D$4<=420, 0.071*$D$4*A7, (0.13*$D$4-24)*A7))/50, 0)*50","b":true,"al":"center","nf":"#,##0"},{"c":"I7","v":150,"f":"=ROUNDUP(MAX(150, 8*A7, (0.24*$D$4*$J$4/SQRT($A$4))*A7)/50, 0)*50","al":"center","nf":"#,##0"},{"c":"J7","v":150,"f":"=I7","al":"center","nf":"#,##0"},{"c":"K7","v":"50 Φ","f":"=ROUND(F7/A7, 0)&\" Φ\"","b":true,"al":"center"}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":10,"bg":"#F8FAFC","b":true,"al":"center","nf":"0 \" مم\""},{"c":"B8","v":78.5,"f":"=ROUND(PI()*A8*A8/4, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"C8","v":0.617,"f":"=ROUND(A8*A8/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D8","v":300,"f":"=ROUNDUP(MAX(300, IF(A8<=19, ($D$4*$G$4*$J$4/(2.1*SQRT($A$4)))*A8, ($D$4*$G$4*$J$4/(1.7*SQRT($A$4)))*A8))/50, 0)*50","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"E8","v":300,"f":"=D8","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"F8","v":400,"f":"=ROUNDUP(1.3*D8/50, 0)*50","bg":"#F8FAFC","fg":"#991B1B","b":true,"al":"center","nf":"#,##0"},{"c":"G8","v":200,"f":"=ROUNDUP(MAX(200, (0.24*$D$4/SQRT($A$4))*A8, 0.043*$D$4*A8)/50, 0)*50","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"H8","v":300,"f":"=ROUNDUP(MAX(300, IF($D$4<=420, 0.071*$D$4*A8, (0.13*$D$4-24)*A8))/50, 0)*50","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"I8","v":150,"f":"=ROUNDUP(MAX(150, 8*A8, (0.24*$D$4*$J$4/SQRT($A$4))*A8)/50, 0)*50","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J8","v":150,"f":"=I8","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"K8","v":"40 Φ","f":"=ROUND(F8/A8, 0)&\" Φ\"","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":12,"b":true,"al":"center","nf":"0 \" مم\""},{"c":"B9","v":113.1,"f":"=ROUND(PI()*A9*A9/4, 1)","al":"center","nf":"#,##0.0"},{"c":"C9","v":0.889,"f":"=ROUND(A9*A9/162, 3)","al":"center","nf":"0.000"},{"c":"D9","v":300,"f":"=ROUNDUP(MAX(300, IF(A9<=19, ($D$4*$G$4*$J$4/(2.1*SQRT($A$4)))*A9, ($D$4*$G$4*$J$4/(1.7*SQRT($A$4)))*A9))/50, 0)*50","b":true,"al":"center","nf":"#,##0"},{"c":"E9","v":300,"f":"=D9","al":"center","nf":"#,##0"},{"c":"F9","v":400,"f":"=ROUNDUP(1.3*D9/50, 0)*50","fg":"#991B1B","b":true,"al":"center","nf":"#,##0"},{"c":"G9","v":200,"f":"=ROUNDUP(MAX(200, (0.24*$D$4/SQRT($A$4))*A9, 0.043*$D$4*A9)/50, 0)*50","al":"center","nf":"#,##0"},{"c":"H9","v":300,"f":"=ROUNDUP(MAX(300, IF($D$4<=420, 0.071*$D$4*A9, (0.13*$D$4-24)*A9))/50, 0)*50","b":true,"al":"center","nf":"#,##0"},{"c":"I9","v":150,"f":"=ROUNDUP(MAX(150, 8*A9, (0.24*$D$4*$J$4/SQRT($A$4))*A9)/50, 0)*50","al":"center","nf":"#,##0"},{"c":"J9","v":150,"f":"=I9","al":"center","nf":"#,##0"},{"c":"K9","v":"33 Φ","f":"=ROUND(F9/A9, 0)&\" Φ\"","b":true,"al":"center"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":14,"bg":"#F8FAFC","b":true,"al":"center","nf":"0 \" مم\""},{"c":"B10","v":153.9,"f":"=ROUND(PI()*A10*A10/4, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"C10","v":1.21,"f":"=ROUND(A10*A10/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D10","v":300,"f":"=ROUNDUP(MAX(300, IF(A10<=19, ($D$4*$G$4*$J$4/(2.1*SQRT($A$4)))*A10, ($D$4*$G$4*$J$4/(1.7*SQRT($A$4)))*A10))/50, 0)*50","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"E10","v":300,"f":"=D10","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"F10","v":400,"f":"=ROUNDUP(1.3*D10/50, 0)*50","bg":"#F8FAFC","fg":"#991B1B","b":true,"al":"center","nf":"#,##0"},{"c":"G10","v":200,"f":"=ROUNDUP(MAX(200, (0.24*$D$4/SQRT($A$4))*A10, 0.043*$D$4*A10)/50, 0)*50","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"H10","v":300,"f":"=ROUNDUP(MAX(300, IF($D$4<=420, 0.071*$D$4*A10, (0.13*$D$4-24)*A10))/50, 0)*50","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"I10","v":150,"f":"=ROUNDUP(MAX(150, 8*A10, (0.24*$D$4*$J$4/SQRT($A$4))*A10)/50, 0)*50","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J10","v":150,"f":"=I10","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"K10","v":"29 Φ","f":"=ROUND(F10/A10, 0)&\" Φ\"","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":16,"b":true,"al":"center","nf":"0 \" مم\""},{"c":"B11","v":201.1,"f":"=ROUND(PI()*A11*A11/4, 1)","al":"center","nf":"#,##0.0"},{"c":"C11","v":1.58,"f":"=ROUND(A11*A11/162, 3)","al":"center","nf":"0.000"},{"c":"D11","v":300,"f":"=ROUNDUP(MAX(300, IF(A11<=19, ($D$4*$G$4*$J$4/(2.1*SQRT($A$4)))*A11, ($D$4*$G$4*$J$4/(1.7*SQRT($A$4)))*A11))/50, 0)*50","b":true,"al":"center","nf":"#,##0"},{"c":"E11","v":300,"f":"=D11","al":"center","nf":"#,##0"},{"c":"F11","v":400,"f":"=ROUNDUP(1.3*D11/50, 0)*50","fg":"#991B1B","b":true,"al":"center","nf":"#,##0"},{"c":"G11","v":200,"f":"=ROUNDUP(MAX(200, (0.24*$D$4/SQRT($A$4))*A11, 0.043*$D$4*A11)/50, 0)*50","al":"center","nf":"#,##0"},{"c":"H11","v":300,"f":"=ROUNDUP(MAX(300, IF($D$4<=420, 0.071*$D$4*A11, (0.13*$D$4-24)*A11))/50, 0)*50","b":true,"al":"center","nf":"#,##0"},{"c":"I11","v":150,"f":"=ROUNDUP(MAX(150, 8*A11, (0.24*$D$4*$J$4/SQRT($A$4))*A11)/50, 0)*50","al":"center","nf":"#,##0"},{"c":"J11","v":150,"f":"=I11","al":"center","nf":"#,##0"},{"c":"K11","v":"25 Φ","f":"=ROUND(F11/A11, 0)&\" Φ\"","b":true,"al":"center"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":18,"bg":"#F8FAFC","b":true,"al":"center","nf":"0 \" مم\""},{"c":"B12","v":254.5,"f":"=ROUND(PI()*A12*A12/4, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"C12","v":2,"f":"=ROUND(A12*A12/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D12","v":300,"f":"=ROUNDUP(MAX(300, IF(A12<=19, ($D$4*$G$4*$J$4/(2.1*SQRT($A$4)))*A12, ($D$4*$G$4*$J$4/(1.7*SQRT($A$4)))*A12))/50, 0)*50","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"E12","v":300,"f":"=D12","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"F12","v":400,"f":"=ROUNDUP(1.3*D12/50, 0)*50","bg":"#F8FAFC","fg":"#991B1B","b":true,"al":"center","nf":"#,##0"},{"c":"G12","v":200,"f":"=ROUNDUP(MAX(200, (0.24*$D$4/SQRT($A$4))*A12, 0.043*$D$4*A12)/50, 0)*50","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"H12","v":300,"f":"=ROUNDUP(MAX(300, IF($D$4<=420, 0.071*$D$4*A12, (0.13*$D$4-24)*A12))/50, 0)*50","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"I12","v":150,"f":"=ROUNDUP(MAX(150, 8*A12, (0.24*$D$4*$J$4/SQRT($A$4))*A12)/50, 0)*50","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J12","v":150,"f":"=I12","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"K12","v":"22 Φ","f":"=ROUND(F12/A12, 0)&\" Φ\"","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":20,"b":true,"al":"center","nf":"0 \" مم\""},{"c":"B13","v":314.2,"f":"=ROUND(PI()*A13*A13/4, 1)","al":"center","nf":"#,##0.0"},{"c":"C13","v":2.469,"f":"=ROUND(A13*A13/162, 3)","al":"center","nf":"0.000"},{"c":"D13","v":300,"f":"=ROUNDUP(MAX(300, IF(A13<=19, ($D$4*$G$4*$J$4/(2.1*SQRT($A$4)))*A13, ($D$4*$G$4*$J$4/(1.7*SQRT($A$4)))*A13))/50, 0)*50","b":true,"al":"center","nf":"#,##0"},{"c":"E13","v":300,"f":"=D13","al":"center","nf":"#,##0"},{"c":"F13","v":400,"f":"=ROUNDUP(1.3*D13/50, 0)*50","fg":"#991B1B","b":true,"al":"center","nf":"#,##0"},{"c":"G13","v":200,"f":"=ROUNDUP(MAX(200, (0.24*$D$4/SQRT($A$4))*A13, 0.043*$D$4*A13)/50, 0)*50","al":"center","nf":"#,##0"},{"c":"H13","v":300,"f":"=ROUNDUP(MAX(300, IF($D$4<=420, 0.071*$D$4*A13, (0.13*$D$4-24)*A13))/50, 0)*50","b":true,"al":"center","nf":"#,##0"},{"c":"I13","v":200,"f":"=ROUNDUP(MAX(150, 8*A13, (0.24*$D$4*$J$4/SQRT($A$4))*A13)/50, 0)*50","al":"center","nf":"#,##0"},{"c":"J13","v":200,"f":"=I13","al":"center","nf":"#,##0"},{"c":"K13","v":"20 Φ","f":"=ROUND(F13/A13, 0)&\" Φ\"","b":true,"al":"center"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":22,"bg":"#F8FAFC","b":true,"al":"center","nf":"0 \" مم\""},{"c":"B14","v":380.1,"f":"=ROUND(PI()*A14*A14/4, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"C14","v":2.988,"f":"=ROUND(A14*A14/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D14","v":300,"f":"=ROUNDUP(MAX(300, IF(A14<=19, ($D$4*$G$4*$J$4/(2.1*SQRT($A$4)))*A14, ($D$4*$G$4*$J$4/(1.7*SQRT($A$4)))*A14))/50, 0)*50","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"E14","v":300,"f":"=D14","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"F14","v":400,"f":"=ROUNDUP(1.3*D14/50, 0)*50","bg":"#F8FAFC","fg":"#991B1B","b":true,"al":"center","nf":"#,##0"},{"c":"G14","v":200,"f":"=ROUNDUP(MAX(200, (0.24*$D$4/SQRT($A$4))*A14, 0.043*$D$4*A14)/50, 0)*50","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"H14","v":300,"f":"=ROUNDUP(MAX(300, IF($D$4<=420, 0.071*$D$4*A14, (0.13*$D$4-24)*A14))/50, 0)*50","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"I14","v":200,"f":"=ROUNDUP(MAX(150, 8*A14, (0.24*$D$4*$J$4/SQRT($A$4))*A14)/50, 0)*50","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J14","v":200,"f":"=I14","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"K14","v":"18 Φ","f":"=ROUND(F14/A14, 0)&\" Φ\"","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":25,"b":true,"al":"center","nf":"0 \" مم\""},{"c":"B15","v":490.9,"f":"=ROUND(PI()*A15*A15/4, 1)","al":"center","nf":"#,##0.0"},{"c":"C15","v":3.858,"f":"=ROUND(A15*A15/162, 3)","al":"center","nf":"0.000"},{"c":"D15","v":300,"f":"=ROUNDUP(MAX(300, IF(A15<=19, ($D$4*$G$4*$J$4/(2.1*SQRT($A$4)))*A15, ($D$4*$G$4*$J$4/(1.7*SQRT($A$4)))*A15))/50, 0)*50","b":true,"al":"center","nf":"#,##0"},{"c":"E15","v":300,"f":"=D15","al":"center","nf":"#,##0"},{"c":"F15","v":400,"f":"=ROUNDUP(1.3*D15/50, 0)*50","fg":"#991B1B","b":true,"al":"center","nf":"#,##0"},{"c":"G15","v":200,"f":"=ROUNDUP(MAX(200, (0.24*$D$4/SQRT($A$4))*A15, 0.043*$D$4*A15)/50, 0)*50","al":"center","nf":"#,##0"},{"c":"H15","v":300,"f":"=ROUNDUP(MAX(300, IF($D$4<=420, 0.071*$D$4*A15, (0.13*$D$4-24)*A15))/50, 0)*50","b":true,"al":"center","nf":"#,##0"},{"c":"I15","v":200,"f":"=ROUNDUP(MAX(150, 8*A15, (0.24*$D$4*$J$4/SQRT($A$4))*A15)/50, 0)*50","al":"center","nf":"#,##0"},{"c":"J15","v":200,"f":"=I15","al":"center","nf":"#,##0"},{"c":"K15","v":"16 Φ","f":"=ROUND(F15/A15, 0)&\" Φ\"","b":true,"al":"center"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":28,"bg":"#F8FAFC","b":true,"al":"center","nf":"0 \" مم\""},{"c":"B16","v":615.8,"f":"=ROUND(PI()*A16*A16/4, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"C16","v":4.84,"f":"=ROUND(A16*A16/162, 3)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D16","v":300,"f":"=ROUNDUP(MAX(300, IF(A16<=19, ($D$4*$G$4*$J$4/(2.1*SQRT($A$4)))*A16, ($D$4*$G$4*$J$4/(1.7*SQRT($A$4)))*A16))/50, 0)*50","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"E16","v":300,"f":"=D16","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"F16","v":400,"f":"=ROUNDUP(1.3*D16/50, 0)*50","bg":"#F8FAFC","fg":"#991B1B","b":true,"al":"center","nf":"#,##0"},{"c":"G16","v":200,"f":"=ROUNDUP(MAX(200, (0.24*$D$4/SQRT($A$4))*A16, 0.043*$D$4*A16)/50, 0)*50","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"H16","v":300,"f":"=ROUNDUP(MAX(300, IF($D$4<=420, 0.071*$D$4*A16, (0.13*$D$4-24)*A16))/50, 0)*50","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0"},{"c":"I16","v":250,"f":"=ROUNDUP(MAX(150, 8*A16, (0.24*$D$4*$J$4/SQRT($A$4))*A16)/50, 0)*50","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J16","v":250,"f":"=I16","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"K16","v":"14 Φ","f":"=ROUND(F16/A16, 0)&\" Φ\"","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":32,"b":true,"al":"center","nf":"0 \" مم\""},{"c":"B17","v":804.2,"f":"=ROUND(PI()*A17*A17/4, 1)","al":"center","nf":"#,##0.0"},{"c":"C17","v":6.321,"f":"=ROUND(A17*A17/162, 3)","al":"center","nf":"0.000"},{"c":"D17","v":300,"f":"=ROUNDUP(MAX(300, IF(A17<=19, ($D$4*$G$4*$J$4/(2.1*SQRT($A$4)))*A17, ($D$4*$G$4*$J$4/(1.7*SQRT($A$4)))*A17))/50, 0)*50","b":true,"al":"center","nf":"#,##0"},{"c":"E17","v":300,"f":"=D17","al":"center","nf":"#,##0"},{"c":"F17","v":400,"f":"=ROUNDUP(1.3*D17/50, 0)*50","fg":"#991B1B","b":true,"al":"center","nf":"#,##0"},{"c":"G17","v":200,"f":"=ROUNDUP(MAX(200, (0.24*$D$4/SQRT($A$4))*A17, 0.043*$D$4*A17)/50, 0)*50","al":"center","nf":"#,##0"},{"c":"H17","v":300,"f":"=ROUNDUP(MAX(300, IF($D$4<=420, 0.071*$D$4*A17, (0.13*$D$4-24)*A17))/50, 0)*50","b":true,"al":"center","nf":"#,##0"},{"c":"I17","v":300,"f":"=ROUNDUP(MAX(150, 8*A17, (0.24*$D$4*$J$4/SQRT($A$4))*A17)/50, 0)*50","al":"center","nf":"#,##0"},{"c":"J17","v":300,"f":"=I17","al":"center","nf":"#,##0"},{"c":"K17","v":"12 Φ","f":"=ROUND(F17/A17, 0)&\" Φ\"","b":true,"al":"center"}]},{"r":18,"h":42.0,"cells":[{"c":"A18","v":"المتوسط العام لأطوال الوصلات","bg":"#E2E8F0","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D18","v":300,"f":"=AVERAGE(D7:D17)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0"},{"c":"E18","v":300,"f":"=AVERAGE(E7:E17)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0"},{"c":"F18","v":400,"f":"=AVERAGE(F7:F17)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0"},{"c":"G18","v":200,"f":"=AVERAGE(G7:G17)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0"},{"c":"H18","v":300,"f":"=AVERAGE(H7:H17)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0"},{"c":"I18","v":186.363636,"f":"=AVERAGE(I7:I17)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0"},{"c":"J18","v":186.363636,"f":"=AVERAGE(J7:J17)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0"},{"c":"K18","v":"القيم مقربة لأقرب 50 مم","bg":"#E2E8F0","b":true,"al":"center"}]}]},{"name":"جدول تفاصيل الوصلات بالعناصر","maxRow":14,"maxCol":9,"colWidths":[8.0,30.0,26.0,24.0,38.0,20.0,22.0,22.0,55.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول توزيع واشتراطات وصلات التراكب بالعناصر الإنشائية (Structural Elements Splice Zones)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":42.0,"cells":[{"c":"A2","v":"محددات مواضع الوصلات المسموح بها ونسب التبادل (Staggering) واشتراطات تكثيف الكانات وفق كود SBC 304","bg":"#1E293B","fg":"#FFFFFF","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":34.0,"cells":[{"c":"A3","v":"نسبة الوصلات التبادلية الموصى بها في المقطع الواحد","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D3","v":"أقصى مسافة لتباعد كانات منطقة الوصل في الأعمدة","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G3","v":"المسافة الصافية المحورية بين الوصلات المجاورة","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":4,"h":48.0,"cells":[{"c":"A4","v":"≤ 50% تبادلي (Staggered)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D4","v":"≤ 100 مم أو d/4","bg":"#F0F9FF","fg":"#0284C7","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G4","v":"≥ 600 مم محورياً","bg":"#FEF3C7","fg":"#B45309","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":5,"h":42.0,"cells":[{"c":"A5","v":"م","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"العنصر الإنشائي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"موقع حديد التسليح","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"نوع الإجهاد الرئيسي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"الموقع المسموح به للوصل","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"فئة الوصلة المقررة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"طول الوصلة لقطر Φ16","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"طول الوصلة لقطر Φ20","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"اشتراطات التنفيذ وتكثيف الكانات","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":1,"bg":"#F8FAFC","al":"center"},{"c":"B6","v":"الكمرات والجسور الساقطة (Beams)","bg":"#F8FAFC"},{"c":"C6","v":"الحديد السفلي (Bottom Bars)","bg":"#F8FAFC"},{"c":"D6","v":"شد رئيسي بأقصى عزم موجب","bg":"#F8FAFC","al":"center"},{"c":"E6","v":"فوق أو قرب الركائز والأعمدة (L/4 إلى L/3)","bg":"#F8FAFC"},{"c":"F6","v":"Class B (1.3 Ld)","bg":"#F8FAFC","al":"center"},{"c":"G6","v":400,"f":"='حاسبة أطوال التماسك والتراكب'!F11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0 \" مم\""},{"c":"H6","v":400,"f":"='حاسبة أطوال التماسك والتراكب'!F13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0 \" مم\""},{"c":"I6","v":"يمنع منعاً باتاً الوصل في منتصف البحر (منطقة أقصى عزم)","bg":"#F8FAFC"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":2,"al":"center"},{"c":"B7","v":"الكمرات والجسور الساقطة (Beams)"},{"c":"C7","v":"الحديد العلوي (Top Bars)"},{"c":"D7","v":"شد علوي عند الركائز","al":"center"},{"c":"E7","v":"في منتصف البحر (Middle Strip L/3 إلى 2L/3)"},{"c":"F7","v":"Class B (1.3 Ld)","al":"center"},{"c":"G7","v":520,"f":"='حاسبة أطوال التماسك والتراكب'!F11*1.3","b":true,"al":"center","nf":"#,##0 \" مم\""},{"c":"H7","v":520,"f":"='حاسبة أطوال التماسك والتراكب'!F13*1.3","b":true,"al":"center","nf":"#,##0 \" مم\""},{"c":"I7","v":"تطبيق معامل الموضع العلوي ψt=1.3 لوجود أكثر من 30سم خرسانة تحته"}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":3,"bg":"#F8FAFC","al":"center"},{"c":"B8","v":"الأسقف المصمتة والكمرية (Solid Slabs)","bg":"#F8FAFC"},{"c":"C8","v":"الحديد السفلي والفرش","bg":"#F8FAFC"},{"c":"D8","v":"شد سفلي رئيسي","bg":"#F8FAFC","al":"center"},{"c":"E8","v":"فوق الكمرات أو خطوط الارتكاز","bg":"#F8FAFC"},{"c":"F8","v":"Class B (1.3 Ld)","bg":"#F8FAFC","al":"center"},{"c":"G8","v":400,"f":"='حاسبة أطوال التماسك والتراكب'!F11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0 \" مم\""},{"c":"H8","v":400,"f":"='حاسبة أطوال التماسك والتراكب'!F13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0 \" مم\""},{"c":"I8","v":"وصل تبادلي بنسبة لا تتعدى 50% في نفس المقطع","bg":"#F8FAFC"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":4,"al":"center"},{"c":"B9","v":"الأسقف اللاكمرية (Flat Slabs)"},{"c":"C9","v":"الحديد العلوي عند الأعمدة"},{"c":"D9","v":"شد سالب محوري","al":"center"},{"c":"E9","v":"في شريحة الوسط (Middle Strip) بعيداً عن العمود"},{"c":"F9","v":"Class B (1.3 Ld)","al":"center"},{"c":"G9","v":520,"f":"='حاسبة أطوال التماسك والتراكب'!F11*1.3","b":true,"al":"center","nf":"#,##0 \" مم\""},{"c":"H9","v":520,"f":"='حاسبة أطوال التماسك والتراكب'!F13*1.3","b":true,"al":"center","nf":"#,##0 \" مم\""},{"c":"I9","v":"يمنع الوصل داخل شريحة العمود (Column Strip) لمقاومة القص الثاقب"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":5,"bg":"#F8FAFC","al":"center"},{"c":"B10","v":"الأعمدة الخرسانية (Columns)","bg":"#F8FAFC"},{"c":"C10","v":"الحديد الرأسي الطولي","bg":"#F8FAFC"},{"c":"D10","v":"ضغط محوري مع عزم انحناء","bg":"#F8FAFC","al":"center"},{"c":"E10","v":"في النصف الأوسط لارتفاع الدور (Mid-Height)","bg":"#F8FAFC"},{"c":"F10","v":"Class A أو ضغط Lsc","bg":"#F8FAFC","al":"center"},{"c":"G10","v":300,"f":"='حاسبة أطوال التماسك والتراكب'!H11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0 \" مم\""},{"c":"H10","v":300,"f":"='حاسبة أطوال التماسك والتراكب'!H13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0 \" مم\""},{"c":"I10","v":"تكثيف الكانات على كامل مسافة الوصل بمسافات لا تزيد عن 100 مم","bg":"#F8FAFC"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":6,"al":"center"},{"c":"B11","v":"حوائط القص والارتكاز (Shear Walls)"},{"c":"C11","v":"الحديد الرأسي الموزع"},{"c":"D11","v":"قوى رأسية وعزوم زلزالية","al":"center"},{"c":"E11","v":"بالتبادل في مناطق الضغط أو النصف السفلي"},{"c":"F11","v":"Class B (1.3 Ld)","al":"center"},{"c":"G11","v":400,"f":"='حاسبة أطوال التماسك والتراكب'!F11","b":true,"al":"center","nf":"#,##0 \" مم\""},{"c":"H11","v":400,"f":"='حاسبة أطوال التماسك والتراكب'!F13","b":true,"al":"center","nf":"#,##0 \" مم\""},{"c":"I11","v":"وصل 50% من الأسياخ في كل منسوب مع ترحيل الوصلات 600 مم على الأقل"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":7,"bg":"#F8FAFC","al":"center"},{"c":"B12","v":"اللبشة الخرسانية (Raft Foundation)","bg":"#F8FAFC"},{"c":"C12","v":"الحديد العلوي للأساسات","bg":"#F8FAFC"},{"c":"D12","v":"شد علوي بين الأعمدة","bg":"#F8FAFC","al":"center"},{"c":"E12","v":"تحت أو قرب مساقط الأعمدة والقواعد","bg":"#F8FAFC"},{"c":"F12","v":"Class B (1.3 Ld)","bg":"#F8FAFC","al":"center"},{"c":"G12","v":520,"f":"='حاسبة أطوال التماسك والتراكب'!F11*1.3","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0 \" مم\""},{"c":"H12","v":520,"f":"='حاسبة أطوال التماسك والتراكب'!F13*1.3","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0 \" مم\""},{"c":"I12","v":"مراعاة معامل صب الأسياخ العلوية ψt=1.3 لارتفاع اللبشة الكبير","bg":"#F8FAFC"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":8,"al":"center"},{"c":"B13","v":"اللبشة الخرسانية (Raft Foundation)"},{"c":"C13","v":"الحديد السفلي للأساسات"},{"c":"D13","v":"شد سفلي تحت الأعمدة","al":"center"},{"c":"E13","v":"في منتصف المسافة بين الأعمدة"},{"c":"F13","v":"Class B (1.3 Ld)","al":"center"},{"c":"G13","v":400,"f":"='حاسبة أطوال التماسك والتراكب'!F11","b":true,"al":"center","nf":"#,##0 \" مم\""},{"c":"H13","v":400,"f":"='حاسبة أطوال التماسك والتراكب'!F13","b":true,"al":"center","nf":"#,##0 \" مم\""},{"c":"I13","v":"تركيب كراسي حديد متينة لمنع هبوط الأسياخ وضمان الغطاء الخرساني"}]},{"r":14,"h":42.0,"cells":[{"c":"A14","v":"المتوسط الحسابي لأطوال الوصلات لكافة العناصر","bg":"#E2E8F0","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G14","v":432.5,"f":"=AVERAGE(G6:G13)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0 \" مم\""},{"c":"H14","v":432.5,"f":"=AVERAGE(H6:H13)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0 \" مم\""},{"c":"I14","v":"شاملة معاملات الموضع والتراكب","bg":"#E2E8F0","b":true,"al":"center"}]}]},{"name":"دليل اشتراطات SBC304 و ACI318","maxRow":14,"maxCol":7,"colWidths":[18.0,35.0,16.0,45.0,22.0,22.0,58.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"دليل معاملات واشتراطات أطوال التماسك والوصلات (SBC 304 / ACI 318-19 Guide)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":42.0,"cells":[{"c":"A2","v":"شرح تفصيلي للمعاملات الهندسية (ψt, ψe, ψs, λ, ψr) والبنود القياسية الحاكمة لتفريد وتراكب حديد التسليح","bg":"#1E293B","fg":"#FFFFFF","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":42.0,"cells":[{"c":"A3","v":"المعامل / الرمز","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B3","v":"اسم المعامل الهندسي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C3","v":"القيمة المقررة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D3","v":"شروط التطبيق بالكود","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E3","v":"البند الحاكم (SBC 304)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F3","v":"البند الحاكم (ACI 318)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G3","v":"أثر المعامل على طول التماسك","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"ψt (Casting)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B4","v":"معامل موضع الصب الرأسي (Top Bars)","bg":"#F8FAFC"},{"c":"C4","v":"1.30","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D4","v":"عند وجود أكثر من 300 مم من الخرسانة الطازجة المصبوبة أسفل الأسياخ الأفقية","bg":"#F8FAFC"},{"c":"E4","v":"Section 25.4.2.4","bg":"#F8FAFC","al":"center"},{"c":"F4","v":"Section 25.4.2.4","bg":"#F8FAFC","al":"center"},{"c":"G4","v":"زيادة طول التماسك بنسبة 30% لتعويض ضعف التماسك بسبب فقاعات الهواء والماء الصاعد","bg":"#F8FAFC"}]},{"r":5,"h":36.0,"cells":[{"c":"A5","v":"ψt (Other)","b":true,"al":"center"},{"c":"B5","v":"معامل موضع الصب الرأسي (Other Bars)"},{"c":"C5","v":"1.00","b":true,"al":"center"},{"c":"D5","v":"لكافة الأسياخ السفلية والرأسية في الأعمدة والحوائط"},{"c":"E5","v":"Section 25.4.2.4","al":"center"},{"c":"F5","v":"Section 25.4.2.4","al":"center"},{"c":"G5","v":"قيمة قياسية أساسية بدون زيادة"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"ψe (Coated)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B6","v":"معامل دهان الإيبوكسي (Epoxy Coated)","bg":"#F8FAFC"},{"c":"C6","v":"1.50","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D6","v":"للأسياخ المدهونة بالإيبوكسي بغطاء خرساني < 3d أو مسافة خلوص < 6d","bg":"#F8FAFC"},{"c":"E6","v":"Section 25.4.2.4","bg":"#F8FAFC","al":"center"},{"c":"F6","v":"Section 25.4.2.4","bg":"#F8FAFC","al":"center"},{"c":"G6","v":"زيادة طول التماسك بنسبة 50% لتقليل الاحتكاك بين السيخ والخرسانة","bg":"#F8FAFC"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"ψe (Coated)","b":true,"al":"center"},{"c":"B7","v":"معامل دهان الإيبوكسي (Epoxy Coated)"},{"c":"C7","v":"1.20","b":true,"al":"center"},{"c":"D7","v":"للأسياخ المدهونة بالإيبوكسي في الحالات الأخرى (غطاء خرساني كافٍ)"},{"c":"E7","v":"Section 25.4.2.4","al":"center"},{"c":"F7","v":"Section 25.4.2.4","al":"center"},{"c":"G7","v":"زيادة طول التماسك بنسبة 20%"}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":"ψe (Uncoated)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B8","v":"معامل دهان الإيبوكسي (Uncoated)","bg":"#F8FAFC"},{"c":"C8","v":"1.00","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D8","v":"للحديد الأسود الكربوني العادي غير المدهون","bg":"#F8FAFC"},{"c":"E8","v":"Section 25.4.2.4","bg":"#F8FAFC","al":"center"},{"c":"F8","v":"Section 25.4.2.4","bg":"#F8FAFC","al":"center"},{"c":"G8","v":"قيمة أساسية بدون تعديل","bg":"#F8FAFC"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":"ψs (Size)","b":true,"al":"center"},{"c":"B9","v":"معامل حجم وقطر السيخ (Bar Size)"},{"c":"C9","v":"0.80","b":true,"al":"center"},{"c":"D9","v":"للأسياخ بقطر 19 مم أو أصغر (Φ8 إلى Φ18)"},{"c":"E9","v":"Section 25.4.2.4","al":"center"},{"c":"F9","v":"Section 25.4.2.4","al":"center"},{"c":"G9","v":"تخفيض طول التماسك بنسبة 20% للأقطار الصغيرة"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":"ψs (Size)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":"معامل حجم وقطر السيخ (Bar Size)","bg":"#F8FAFC"},{"c":"C10","v":"1.00","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D10","v":"للأسياخ بقطر 20 مم أو أكبر (Φ20 إلى Φ36)","bg":"#F8FAFC"},{"c":"E10","v":"Section 25.4.2.4","bg":"#F8FAFC","al":"center"},{"c":"F10","v":"Section 25.4.2.4","bg":"#F8FAFC","al":"center"},{"c":"G10","v":"قيمة قياسية أساسية","bg":"#F8FAFC"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":"λ (Lightweight)","b":true,"al":"center"},{"c":"B11","v":"معامل نوع وركام الخرسانة (Concrete)"},{"c":"C11","v":"0.75","b":true,"al":"center"},{"c":"D11","v":"للخرسانات الخفيفة خفيفة الوزن (Lightweight Concrete)"},{"c":"E11","v":"Section 25.4.2.4","al":"center"},{"c":"F11","v":"Section 25.4.2.4","al":"center"},{"c":"G11","v":"زيادة طول التماسك بالقسمة على 0.75 (زيادة 33%) لضعف مقاومة الشد"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":"λ (Normal)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B12","v":"معامل نوع وركام الخرسانة (Normal)","bg":"#F8FAFC"},{"c":"C12","v":"1.00","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D12","v":"للخرسانات العادية المصنوعة من الركام الطبيعي","bg":"#F8FAFC"},{"c":"E12","v":"Section 25.4.2.4","bg":"#F8FAFC","al":"center"},{"c":"F12","v":"Section 25.4.2.4","bg":"#F8FAFC","al":"center"},{"c":"G12","v":"قيمة قياسية أساسية","bg":"#F8FAFC"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"Class A Splice","b":true,"al":"center"},{"c":"B13","v":"وصلة تراكب فئة أ (Class A Tension)"},{"c":"C13","v":"1.0 Ld","b":true,"al":"center"},{"c":"D13","v":"عندما تكون مساحة الحديد المنفذة ضعف المطلوبة ونسبة الوصل ≤ 50%"},{"c":"E13","v":"Section 25.5.2.1","al":"center"},{"c":"F13","v":"Section 25.5.2.1","al":"center"},{"c":"G13","v":"الوصلة مساوية لطول التماسك الصافي Ld (بحد أدنى 300 مم)"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"Class B Splice","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":"وصلة تراكب فئة ب (Class B Tension)","bg":"#F8FAFC"},{"c":"C14","v":"1.3 Ld","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D14","v":"في كافة الحالات الأخرى (وهي الفئة الأكثر شيوعاً في الموقع)","bg":"#F8FAFC"},{"c":"E14","v":"Section 25.5.2.1","bg":"#F8FAFC","al":"center"},{"c":"F14","v":"Section 25.5.2.1","bg":"#F8FAFC","al":"center"},{"c":"G14","v":"زيادة طول الوصلة بنسبة 30% فوق طول التماسك (بحد أدنى 300 مم)","bg":"#F8FAFC"}]}]}]}