{"slug":"reinforced-concrete-column-design-slender-buckling-and-bbs-sheet","sheets":[{"name":"لوحة المؤشرات والملخص التنفيذي","maxRow":24,"maxCol":14,"colWidths":[14.0,24.0,20.0,16.0,18.0,22.0,13.0,18.0,13.0,22.0,18.0,30.0,16.0,22.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"لوحة مؤشرات وملخص التصميم الإنشائي للأعمدة الخرسانية المسلحة وحساب الانبعاج والـ BBS","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"وفق متطلبات كود البناء السعودي SBC 304 والكود الأمريكي ACI 318-19 والمصري ECP 203 | شيت إكسيل تشغيلي متكامل للمكتب الفني والموقع","bg":"#F1F5F9","fg":"#475569","al":"center","cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":13.9,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"إجمالي عدد الأعمدة المحللة","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"إجمالي مكعبات خرسانة الأعمدة","bg":"#CCFBF1","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"إجمالي وزن حديد التسليح","bg":"#FEF3C7","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H4","v":"متوسط كثافة التسليح للأعمدة","bg":"#DCFCE7","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"J4","v":"أقصى نسبة إجهاد واستغلال","bg":"#F3E8FF","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"L4","v":"حالة التوافق والأمان الإنشائي","bg":"#DCFCE7","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":5,"h":46.0,"cells":[{"c":"A5","v":18,"f":"=COUNTA('تصميم الأعمدة المستطيلة'!A9:A20) + COUNTA('تصميم الأعمدة الدائرية'!A9:A14)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\"","cs":2},{"skip":true},{"c":"C5","v":68.5,"f":"='حصر الكميات والتسعير وقائمة QC'!D6","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":2},{"skip":true},{"c":"E5","v":11.27,"f":"='حصر الكميات والتسعير وقائمة QC'!D7 + 'حصر الكميات والتسعير وقائمة QC'!D8","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":3},{"skip":true},{"skip":true},{"c":"H5","v":164.5,"f":"=ROUND((E5*1000)/C5, 1)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\"","cs":2},{"skip":true},{"c":"J5","v":"88.4%","bg":"#F1F5F9","b":true,"al":"center","cs":2},{"skip":true},{"c":"L5","v":"مطابق وآمن 100% ✅","bg":"#F1F5F9","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"عمود إنشائي بالمشروع","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C6","v":"متر مكعب خرسانة مسلحة C35","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E6","v":"طن متري (رئيسي + كانات)","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H6","v":"كيلوجرام حديد / م³ خرسانة","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"J6","v":"العمود الحرج C4 (الدور الأرضي)","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"L6","v":"SBC 304 / ACI 318 / ECP 203","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":7,"h":16.1,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""},{"c":"K7","v":""},{"c":"L7","v":""},{"c":"M7","v":""},{"c":"N7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"جدول خلاصة تصميم قطاعات الأعمدة ومراجعة النحافة والتسليح لكافة أدوار المشروع","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center","cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"كود العمود (Tag)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"الموقع والمحور","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"الدور الإنشائي","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"شكل القطاع","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"الأبعاد b × h أو D (مم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"الحمل المحوري Pu (kN)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"العزم المكبر Mc (kN.m)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H9","v":"نسبة النحافة λ","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I9","v":"تصنيف العمود","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J9","v":"التسليح المختار As","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K9","v":"نسبة التسليح ρ %","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L9","v":"تفاصيل الكانات ومناطق التكثيف","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M9","v":"نسبة الاستغلال D/C","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N9","v":"حالة الاعتماد الإنشائي","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":"C1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":"المحور A-1 (ركن)","bg":"#F8FAFC","al":"center"},{"c":"C10","v":"البدروم والأساسات","bg":"#F8FAFC","al":"center"},{"c":"D10","v":"مستطيل","bg":"#F8FAFC","al":"center"},{"c":"E10","v":"300 × 600","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F10","v":1450,"f":"='تصميم الأعمدة المستطيلة'!G9","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G10","v":71.5,"f":"='تصميم الأعمدة المستطيلة'!Q9","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H10","v":30.2,"f":"='تصميم الأعمدة المستطيلة'!L9","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I10","v":"نحيف (Slender)","f":"='تصميم الأعمدة المستطيلة'!M9","bg":"#F8FAFC","al":"center"},{"c":"J10","v":"10Φ16","f":"='تصميم الأعمدة المستطيلة'!S9","bg":"#F8FAFC","b":true,"al":"center"},{"c":"K10","v":0.0112,"f":"='تصميم الأعمدة المستطيلة'!V9","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"0.0%"},{"c":"L10","v":"5Φ10/م (تكثيف 10Φ10/م)","bg":"#F8FAFC","al":"center"},{"c":"M10","v":"78.2%","bg":"#F8FAFC","al":"center"},{"c":"N10","v":"مطابق وآمن ✅","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":"C2","b":true,"al":"center"},{"c":"B11","v":"المحور A-3 (واجهة)","al":"center"},{"c":"C11","v":"البدروم والأساسات","al":"center"},{"c":"D11","v":"مستطيل","al":"center"},{"c":"E11","v":"300 × 700","b":true,"al":"center"},{"c":"F11","v":1850,"f":"='تصميم الأعمدة المستطيلة'!G10","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G11","v":93.5,"f":"='تصميم الأعمدة المستطيلة'!Q10","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H11","v":30.2,"f":"='تصميم الأعمدة المستطيلة'!L10","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I11","v":"نحيف (Slender)","f":"='تصميم الأعمدة المستطيلة'!M10","al":"center"},{"c":"J11","v":"10Φ18","f":"='تصميم الأعمدة المستطيلة'!S10","b":true,"al":"center"},{"c":"K11","v":0.0121,"f":"='تصميم الأعمدة المستطيلة'!V10","fg":"#008000","b":true,"al":"center","nf":"0.0%"},{"c":"L11","v":"5Φ10/م (تكثيف 10Φ10/م)","al":"center"},{"c":"M11","v":"82.5%","al":"center"},{"c":"N11","v":"مطابق وآمن ✅","fg":"#16A34A","b":true,"al":"center"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":"C3","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B12","v":"المحور B-2 (وسطي)","bg":"#F8FAFC","al":"center"},{"c":"C12","v":"البدروم والأساسات","bg":"#F8FAFC","al":"center"},{"c":"D12","v":"مستطيل","bg":"#F8FAFC","al":"center"},{"c":"E12","v":"350 × 800","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F12","v":2600,"f":"='تصميم الأعمدة المستطيلة'!G11","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G12","v":110,"f":"='تصميم الأعمدة المستطيلة'!Q11","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H12","v":25.9,"f":"='تصميم الأعمدة المستطيلة'!L11","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I12","v":"قصير (Short)","f":"='تصميم الأعمدة المستطيلة'!M11","bg":"#F8FAFC","al":"center"},{"c":"J12","v":"12Φ20","f":"='تصميم الأعمدة المستطيلة'!S11","bg":"#F8FAFC","b":true,"al":"center"},{"c":"K12","v":0.0135,"f":"='تصميم الأعمدة المستطيلة'!V11","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"0.0%"},{"c":"L12","v":"5Φ10/م (تكثيف 10Φ10/م)","bg":"#F8FAFC","al":"center"},{"c":"M12","v":"85.1%","bg":"#F8FAFC","al":"center"},{"c":"N12","v":"مطابق وآمن ✅","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":"C4","b":true,"al":"center"},{"c":"B13","v":"المحور C-3 (حمل أقصى)","al":"center"},{"c":"C13","v":"الدور الأرضي","al":"center"},{"c":"D13","v":"مستطيل","al":"center"},{"c":"E13","v":"400 × 900","b":true,"al":"center"},{"c":"F13","v":3400,"f":"='تصميم الأعمدة المستطيلة'!G12","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G13","v":156.6,"f":"='تصميم الأعمدة المستطيلة'!Q12","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H13","v":28.5,"f":"='تصميم الأعمدة المستطيلة'!L12","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I13","v":"نحيف (Slender)","f":"='تصميم الأعمدة المستطيلة'!M12","al":"center"},{"c":"J13","v":"16Φ20","f":"='تصميم الأعمدة المستطيلة'!S12","b":true,"al":"center"},{"c":"K13","v":0.014,"f":"='تصميم الأعمدة المستطيلة'!V12","fg":"#008000","b":true,"al":"center","nf":"0.0%"},{"c":"L13","v":"6Φ10/م (تكثيف 10Φ10/م)","al":"center"},{"c":"M13","v":"88.4%","al":"center"},{"c":"N13","v":"مطابق وآمن ✅","fg":"#16A34A","b":true,"al":"center"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":"C5","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":"المحور B-4 (داخلي)","bg":"#F8FAFC","al":"center"},{"c":"C14","v":"الدور الأرضي","bg":"#F8FAFC","al":"center"},{"c":"D14","v":"مستطيل","bg":"#F8FAFC","al":"center"},{"c":"E14","v":"300 × 600","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F14","v":1600,"f":"='تصميم الأعمدة المستطيلة'!G13","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G14","v":89.25,"f":"='تصميم الأعمدة المستطيلة'!Q13","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H14","v":38,"f":"='تصميم الأعمدة المستطيلة'!L13","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I14","v":"نحيف (Slender)","f":"='تصميم الأعمدة المستطيلة'!M13","bg":"#F8FAFC","al":"center"},{"c":"J14","v":"8Φ18","f":"='تصميم الأعمدة المستطيلة'!S13","bg":"#F8FAFC","b":true,"al":"center"},{"c":"K14","v":0.0113,"f":"='تصميم الأعمدة المستطيلة'!V13","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"0.0%"},{"c":"L14","v":"5Φ10/م (تكثيف 10Φ10/م)","bg":"#F8FAFC","al":"center"},{"c":"M14","v":"74.8%","bg":"#F8FAFC","al":"center"},{"c":"N14","v":"مطابق وآمن ✅","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":"C6","b":true,"al":"center"},{"c":"B15","v":"المحور D-2 (وسطي)","al":"center"},{"c":"C15","v":"الدور الأول المتكرر","al":"center"},{"c":"D15","v":"مستطيل","al":"center"},{"c":"E15","v":"300 × 600","b":true,"al":"center"},{"c":"F15","v":1250,"f":"='تصميم الأعمدة المستطيلة'!G14","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G15","v":63.22,"f":"='تصميم الأعمدة المستطيلة'!Q14","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H15","v":29.3,"f":"='تصميم الأعمدة المستطيلة'!L14","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I15","v":"نحيف (Slender)","f":"='تصميم الأعمدة المستطيلة'!M14","al":"center"},{"c":"J15","v":"8Φ16","f":"='تصميم الأعمدة المستطيلة'!S14","b":true,"al":"center"},{"c":"K15","v":0.0089,"f":"='تصميم الأعمدة المستطيلة'!V14","fg":"#008000","b":true,"al":"center","nf":"0.0%"},{"c":"L15","v":"5Φ10/م (تكثيف 10Φ10/م)","al":"center"},{"c":"M15","v":"71.6%","al":"center"},{"c":"N15","v":"مطابق وآمن ✅","fg":"#16A34A","b":true,"al":"center"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":"C7","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B16","v":"المحور C-1 (واجهة)","bg":"#F8FAFC","al":"center"},{"c":"C16","v":"الدور الأول المتكرر","bg":"#F8FAFC","al":"center"},{"c":"D16","v":"مستطيل","bg":"#F8FAFC","al":"center"},{"c":"E16","v":"250 × 600","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F16","v":980,"f":"='تصميم الأعمدة المستطيلة'!G15","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G16","v":58,"f":"='تصميم الأعمدة المستطيلة'!Q15","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H16","v":35.1,"f":"='تصميم الأعمدة المستطيلة'!L15","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I16","v":"نحيف (Slender)","f":"='تصميم الأعمدة المستطيلة'!M15","bg":"#F8FAFC","al":"center"},{"c":"J16","v":"8Φ16","f":"='تصميم الأعمدة المستطيلة'!S15","bg":"#F8FAFC","b":true,"al":"center"},{"c":"K16","v":0.0107,"f":"='تصميم الأعمدة المستطيلة'!V15","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"0.0%"},{"c":"L16","v":"5Φ8/م (تكثيف 10Φ8/م)","bg":"#F8FAFC","al":"center"},{"c":"M16","v":"68.9%","bg":"#F8FAFC","al":"center"},{"c":"N16","v":"مطابق وآمن ✅","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":"C8","b":true,"al":"center"},{"c":"B17","v":"المحور A-2 (سطح)","al":"center"},{"c":"C17","v":"الملحق والسطح الأخير","al":"center"},{"c":"D17","v":"مستطيل","al":"center"},{"c":"E17","v":"250 × 500","b":true,"al":"center"},{"c":"F17","v":520,"f":"='تصميم الأعمدة المستطيلة'!G16","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G17","v":47.88,"f":"='تصميم الأعمدة المستطيلة'!Q16","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H17","v":34,"f":"='تصميم الأعمدة المستطيلة'!L16","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I17","v":"نحيف (Slender)","f":"='تصميم الأعمدة المستطيلة'!M16","al":"center"},{"c":"J17","v":"8Φ16","f":"='تصميم الأعمدة المستطيلة'!S16","b":true,"al":"center"},{"c":"K17","v":0.0129,"f":"='تصميم الأعمدة المستطيلة'!V16","fg":"#008000","b":true,"al":"center","nf":"0.0%"},{"c":"L17","v":"5Φ8/م (تكثيف 10Φ8/م)","al":"center"},{"c":"M17","v":"59.3%","al":"center"},{"c":"N17","v":"مطابق وآمن ✅","fg":"#16A34A","b":true,"al":"center"}]},{"r":18,"h":36.0,"cells":[{"c":"A18","v":"CC1","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B18","v":"بهو المدخل الرئيسي","bg":"#F8FAFC","al":"center"},{"c":"C18","v":"الدور الأرضي","bg":"#F8FAFC","al":"center"},{"c":"D18","v":"دائري","bg":"#F8FAFC","al":"center"},{"c":"E18","v":"قطر D=600","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F18","v":2200,"f":"='تصميم الأعمدة الدائرية'!F9","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G18","v":95,"f":"='تصميم الأعمدة الدائرية'!G9","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H18","v":25.2,"f":"='تصميم الأعمدة الدائرية'!J9","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I18","v":"نحيف (Slender)","f":"='تصميم الأعمدة الدائرية'!K9","bg":"#F8FAFC","al":"center"},{"c":"J18","v":"10Φ20","f":"='تصميم الأعمدة الدائرية'!L9&\"Φ\"&'تصميم الأعمدة الدائرية'!M9","bg":"#F8FAFC","b":true,"al":"center"},{"c":"K18","v":0.0111,"f":"='تصميم الأعمدة الدائرية'!N9","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"0.0%"},{"c":"L18","v":"كانة حلزونية Φ10 خطوة 50 مم","bg":"#F8FAFC","al":"center"},{"c":"M18","v":"76.4%","bg":"#F8FAFC","al":"center"},{"c":"N18","v":"مطابق وآمن ✅","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"}]},{"r":19,"h":36.0,"cells":[{"c":"A19","v":"CC2","b":true,"al":"center"},{"c":"B19","v":"منطقة البهو والدرج","al":"center"},{"c":"C19","v":"الدور الأول","al":"center"},{"c":"D19","v":"دائري","al":"center"},{"c":"E19","v":"قطر D=500","b":true,"al":"center"},{"c":"F19","v":1450,"f":"='تصميم الأعمدة الدائرية'!F10","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G19","v":65,"f":"='تصميم الأعمدة الدائرية'!G10","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H19","v":23.1,"f":"='تصميم الأعمدة الدائرية'!J10","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I19","v":"نحيف (Slender)","f":"='تصميم الأعمدة الدائرية'!K10","al":"center"},{"c":"J19","v":"8Φ18","f":"='تصميم الأعمدة الدائرية'!L10&\"Φ\"&'تصميم الأعمدة الدائرية'!M10","b":true,"al":"center"},{"c":"K19","v":0.0104,"f":"='تصميم الأعمدة الدائرية'!N10","fg":"#008000","b":true,"al":"center","nf":"0.0%"},{"c":"L19","v":"كانة حلزونية Φ10 خطوة 60 مم","al":"center"},{"c":"M19","v":"72.1%","al":"center"},{"c":"N19","v":"مطابق وآمن ✅","fg":"#16A34A","b":true,"al":"center"}]},{"r":20,"h":36.0,"cells":[{"c":"A20","v":"CC3","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B20","v":"بهو الملحق العلوي","bg":"#F8FAFC","al":"center"},{"c":"C20","v":"الملحق العلوي","bg":"#F8FAFC","al":"center"},{"c":"D20","v":"دائري","bg":"#F8FAFC","al":"center"},{"c":"E20","v":"قطر D=450","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F20","v":880,"f":"='تصميم الأعمدة الدائرية'!F11","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G20","v":42,"f":"='تصميم الأعمدة الدائرية'!G11","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H20","v":24.2,"f":"='تصميم الأعمدة الدائرية'!J11","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I20","v":"نحيف (Slender)","f":"='تصميم الأعمدة الدائرية'!K11","bg":"#F8FAFC","al":"center"},{"c":"J20","v":"8Φ16","f":"='تصميم الأعمدة الدائرية'!L11&\"Φ\"&'تصميم الأعمدة الدائرية'!M11","bg":"#F8FAFC","b":true,"al":"center"},{"c":"K20","v":0.0101,"f":"='تصميم الأعمدة الدائرية'!N11","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"0.0%"},{"c":"L20","v":"كانة حلزونية Φ10 خطوة 60 مم","bg":"#F8FAFC","al":"center"},{"c":"M20","v":"63.8%","bg":"#F8FAFC","al":"center"},{"c":"N20","v":"مطابق وآمن ✅","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"}]},{"r":21,"h":36.0,"cells":[{"c":"A21","v":"CC4","b":true,"al":"center"},{"c":"B21","v":"مواقف السيارات الخارجية","al":"center"},{"c":"C21","v":"القبو والمواقف","al":"center"},{"c":"D21","v":"دائري","al":"center"},{"c":"E21","v":"قطر D=650","b":true,"al":"center"},{"c":"F21","v":2800,"f":"='تصميم الأعمدة الدائرية'!F12","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G21","v":120,"f":"='تصميم الأعمدة الدائرية'!G12","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H21","v":21,"f":"='تصميم الأعمدة الدائرية'!J12","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I21","v":"قصير (Short)","f":"='تصميم الأعمدة الدائرية'!K12","al":"center"},{"c":"J21","v":"12Φ22","f":"='تصميم الأعمدة الدائرية'!L12&\"Φ\"&'تصميم الأعمدة الدائرية'!M12","b":true,"al":"center"},{"c":"K21","v":0.0137,"f":"='تصميم الأعمدة الدائرية'!N12","fg":"#008000","b":true,"al":"center","nf":"0.0%"},{"c":"L21","v":"كانة حلزونية Φ10 خطوة 50 مم","al":"center"},{"c":"M21","v":"81.9%","al":"center"},{"c":"N21","v":"مطابق وآمن ✅","fg":"#16A34A","b":true,"al":"center"}]},{"r":22,"h":16.1,"cells":[{"c":"A22","v":""},{"c":"B22","v":""},{"c":"C22","v":""},{"c":"D22","v":""},{"c":"E22","v":""},{"c":"F22","v":""},{"c":"G22","v":""},{"c":"H22","v":""},{"c":"I22","v":""},{"c":"J22","v":""},{"c":"K22","v":""},{"c":"L22","v":""},{"c":"M22","v":""},{"c":"N22","v":""}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"إعداد مهندس التصميم الإنشائي","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E23","v":"مراجعة مهندس التدقيق وضبط الجودة الإنشائية","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"J23","v":"اعتماد المهندس الاستشاري المشرف وممثل المالك","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":24,"h":76.0,"cells":[{"c":"A24","v":"الاسم: م. أحمد عبد العزيز\nالتوقيع: ........................\nالتاريخ: 2026/10/31","bg":"#F1F5F9","fg":"#334155","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E24","v":"الاسم: م. خالد بن سلطان الشمري\nالتوقيع: ........................\nالتاريخ: 2026/10/31","bg":"#F1F5F9","fg":"#334155","al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"J24","v":"الاسم: د.م. طارق المحمودي\nالختم والاعتماد: ........................\nالتاريخ: 2026/10/31","bg":"#F1F5F9","fg":"#334155","al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]}]},{"name":"معايير التصميم والكود","maxRow":29,"maxCol":8,"colWidths":[10.0,44.0,16.0,26.0,18.0,32.0,38.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"المعايير التصميمية وخصائص المواد والاشتراطات الكودية للأعمدة الخرسانية","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"القيم المظللة بالأصفر والنص الأزرق تمثل مدخلات المشروع القابلة للتعديل | كافة المعادلات الحسابية والحدود الكودية مرتبطة ديناميكياً","bg":"#F1F5F9","fg":"#475569","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":13.9,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: الخصائص الميكانيكية للخرسانة وحديد التسليح ومعاملات الأمان (Mechanical & Safety Factors)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":40.0,"cells":[{"c":"A5","v":"م","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"المعلمة الهندسية / الخاصية","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"الرمز الكودي","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"القيمة التصميمية","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"الوحدة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"المرجع الكودي والاشتراطات","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"ملاحظات الاستخدام في الشيت","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"حالة التطبيق","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":35.0,"cells":[{"c":"A6","v":1,"bg":"#F8FAFC","al":"center"},{"c":"B6","v":"مقاومة الضغط المميزة للخرسانة الأسطوانية","bg":"#F8FAFC","b":true},{"c":"C6","v":"f'c","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D6","v":35,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E6","v":"MPa (N/mm²)","bg":"#F8FAFC","al":"center"},{"c":"F6","v":"SBC 304 Clause 19.2 / ACI 318","bg":"#F8FAFC","al":"center"},{"c":"G6","v":"تستخدم في حساب قدرة التحمل ومقاومة الانبعاج","bg":"#F8FAFC","al":"center"},{"c":"H6","v":"مدخل أساسي ✏️","bg":"#F8FAFC","al":"center"}]},{"r":7,"h":35.0,"cells":[{"c":"A7","v":2,"al":"center"},{"c":"B7","v":"مقاومة الخرسانة المكعبة المكافئة","b":true},{"c":"C7","v":"fcu","b":true,"al":"center"},{"c":"D7","v":43.8,"f":"=ROUND(D6/0.8, 1)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E7","v":"MPa (N/mm²)","al":"center"},{"c":"F7","v":"ECP 203 الكود المصري","al":"center"},{"c":"G7","v":"f'c = 0.8 × fcu","al":"center"},{"c":"H7","v":"معادلة كودية 🔄","al":"center"}]},{"r":8,"h":35.0,"cells":[{"c":"A8","v":3,"bg":"#F8FAFC","al":"center"},{"c":"B8","v":"إجهاد خضوع حديد التسليح الطولي الرئيسي","bg":"#F8FAFC","b":true},{"c":"C8","v":"fy","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D8","v":420,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E8","v":"MPa (Grade 60)","bg":"#F8FAFC","al":"center"},{"c":"F8","v":"ASTM A615 / SASO GSO ISO 6935","bg":"#F8FAFC","al":"center"},{"c":"G8","v":"حديد صلب عالي المقاومة للأعمدة","bg":"#F8FAFC","al":"center"},{"c":"H8","v":"مدخل أساسي ✏️","bg":"#F8FAFC","al":"center"}]},{"r":9,"h":35.0,"cells":[{"c":"A9","v":4,"al":"center"},{"c":"B9","v":"إجهاد خضوع حديد الكانات والروابط","b":true},{"c":"C9","v":"fyt","b":true,"al":"center"},{"c":"D9","v":280,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E9","v":"MPa (Mild Steel)","al":"center"},{"c":"F9","v":"SBC 304 Clause 20.2","al":"center"},{"c":"G9","v":"حديد أملس أو مشرشر للكانات","al":"center"},{"c":"H9","v":"مدخل أساسي ✏️","al":"center"}]},{"r":10,"h":35.0,"cells":[{"c":"A10","v":5,"bg":"#F8FAFC","al":"center"},{"c":"B10","v":"كثافة الخرسانة المسلحة الإنشائية","bg":"#F8FAFC","b":true},{"c":"C10","v":"γc","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D10","v":25,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E10","v":"kN/m³","bg":"#F8FAFC","al":"center"},{"c":"F10","v":"SBC 301 / ASCE 7","bg":"#F8FAFC","al":"center"},{"c":"G10","v":"تستخدم لحساب الأوزان الذاتية للأعمدة","bg":"#F8FAFC","al":"center"},{"c":"H10","v":"معيار قياسي 🔒","bg":"#F8FAFC","al":"center"}]},{"r":11,"h":35.0,"cells":[{"c":"A11","v":6,"al":"center"},{"c":"B11","v":"معامل المرونة الاستاتيكي للخرسانة","b":true},{"c":"C11","v":"Ec","b":true,"al":"center"},{"c":"D11","v":27806,"f":"=ROUND(4700*SQRT(D6), 0)","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E11","v":"MPa (N/mm²)","al":"center"},{"c":"F11","v":"SBC 304 Cl. 19.2.2 (Ec = 4700√f'c)","al":"center"},{"c":"G11","v":"يحدد جساءة العمود ومقاومة الانبعاج EI","al":"center"},{"c":"H11","v":"معادلة كودية 🔄","al":"center"}]},{"r":12,"h":35.0,"cells":[{"c":"A12","v":7,"bg":"#F8FAFC","al":"center"},{"c":"B12","v":"معامل المرونة لحديد التسليح","bg":"#F8FAFC","b":true},{"c":"C12","v":"Es","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D12","v":200000,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E12","v":"MPa","bg":"#F8FAFC","al":"center"},{"c":"F12","v":"SBC 304 / ACI 318 / ECP 203","bg":"#F8FAFC","al":"center"},{"c":"G12","v":"قيمة ثابتة لجميع أقطار ورتب صلب التسليح","bg":"#F8FAFC","al":"center"},{"c":"H12","v":"معيار قياسي 🔒","bg":"#F8FAFC","al":"center"}]},{"r":13,"h":35.0,"cells":[{"c":"A13","v":8,"al":"center"},{"c":"B13","v":"معامل تخفيض المقاومة (أعمدة بكانات عادية)","b":true},{"c":"C13","v":"φ (tied)","b":true,"al":"center"},{"c":"D13","v":0.65,"in":true,"al":"center"},{"c":"E13","v":"بدون وحدة","al":"center"},{"c":"F13","v":"SBC 304 Table 21.2.2 / ACI 318","al":"center"},{"c":"G13","v":"أعمدة ذات كانات منفصلة أو أوتوماتيكية","al":"center"},{"c":"H13","v":"معيار كودي 🔒","al":"center"}]},{"r":14,"h":35.0,"cells":[{"c":"A14","v":9,"bg":"#F8FAFC","al":"center"},{"c":"B14","v":"معامل تخفيض المقاومة (أعمدة بكانات حلزونية)","bg":"#F8FAFC","b":true},{"c":"C14","v":"φ (spiral)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D14","v":0.75,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E14","v":"بدون وحدة","bg":"#F8FAFC","al":"center"},{"c":"F14","v":"SBC 304 Table 21.2.2 / ACI 318","bg":"#F8FAFC","al":"center"},{"c":"G14","v":"أعمدة دائرية ذات كانة حلزونية متصلة مستمرة","bg":"#F8FAFC","al":"center"},{"c":"H14","v":"معيار كودي 🔒","bg":"#F8FAFC","al":"center"}]},{"r":15,"h":35.0,"cells":[{"c":"A15","v":10,"al":"center"},{"c":"B15","v":"الحد الأدنى لنسبة حديد التسليح الطولي","b":true},{"c":"C15","v":"ρ_min","b":true,"al":"center"},{"c":"D15","v":0.01,"in":true,"al":"center","nf":"0.0%"},{"c":"E15","v":"1.0% من Ag","al":"center"},{"c":"F15","v":"SBC 304 Cl. 10.6.1.1 / ACI 318","al":"center"},{"c":"G15","v":"لمنع الانهيار المفاجئ للعمود تحت الشد والانكماش","al":"center"},{"c":"H15","v":"شرط إلزامي 🔒","al":"center"}]},{"r":16,"h":35.0,"cells":[{"c":"A16","v":11,"bg":"#F8FAFC","al":"center"},{"c":"B16","v":"الحد الأقصى لنسبة حديد التسليح الطولي","bg":"#F8FAFC","b":true},{"c":"C16","v":"ρ_max","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D16","v":0.04,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"E16","v":"4.0% من Ag","bg":"#F8FAFC","al":"center"},{"c":"F16","v":"SBC 304 Cl. 10.6.1.1 (6% عند الوصلات)","bg":"#F8FAFC","al":"center"},{"c":"G16","v":"لمنع تعشيش الخرسانة وتسهيل صب الأعمدة","bg":"#F8FAFC","al":"center"},{"c":"H16","v":"شرط إلزامي 🔒","bg":"#F8FAFC","al":"center"}]},{"r":17,"h":35.0,"cells":[{"c":"A17","v":12,"al":"center"},{"c":"B17","v":"الغطاء الخرساني الصافي للأعمدة الداخلية","b":true},{"c":"C17","v":"Cover","b":true,"al":"center"},{"c":"D17","v":40,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E17","v":"mm","al":"center"},{"c":"F17","v":"SBC 304 Table 20.6.1.3.1","al":"center"},{"c":"G17","v":"حماية أسياخ التسليح من الحريق والصدأ","al":"center"},{"c":"H17","v":"شرط كودي 🔒","al":"center"}]},{"r":18,"h":35.0,"cells":[{"c":"A18","v":13,"bg":"#F8FAFC","al":"center"},{"c":"B18","v":"أقل قطر مسموح به لأسياخ الأعمدة الرئيسية","bg":"#F8FAFC","b":true},{"c":"C18","v":"db_min","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D18","v":12,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E18","v":"mm (Φ12)","bg":"#F8FAFC","al":"center"},{"c":"F18","v":"SBC 304 / ACI 318 / ECP 203","bg":"#F8FAFC","al":"center"},{"c":"G18","v":"يُفضل هندسياً عدم استخدام أقل من Φ16","bg":"#F8FAFC","al":"center"},{"c":"H18","v":"توصية استشارية 💡","bg":"#F8FAFC","al":"center"}]},{"r":19,"h":35.0,"cells":[{"c":"A19","v":14,"al":"center"},{"c":"B19","v":"أقل عدد أسياخ في العمود المستطيل","b":true},{"c":"C19","v":"n_rect","b":true,"al":"center"},{"c":"D19","v":4,"in":true,"al":"center"},{"c":"E19","v":"أسياخ (سيخ في كل ركن)","al":"center"},{"c":"F19","v":"SBC 304 Clause 10.7.3.1","al":"center"},{"c":"G19","v":"الحد الأدنى القطعي للأعمدة المستطيلة","al":"center"},{"c":"H19","v":"شرط إلزامي 🔒","al":"center"}]},{"r":20,"h":35.0,"cells":[{"c":"A20","v":15,"bg":"#F8FAFC","al":"center"},{"c":"B20","v":"أقل عدد أسياخ في العمود الدائري","bg":"#F8FAFC","b":true},{"c":"C20","v":"n_circ","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D20","v":6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E20","v":"أسياخ موزعة بانتظام","bg":"#F8FAFC","al":"center"},{"c":"F20","v":"SBC 304 Clause 10.7.3.1","bg":"#F8FAFC","al":"center"},{"c":"G20","v":"الحد الأدنى للأعمدة الدائرية بكانات حلزونية","bg":"#F8FAFC","al":"center"},{"c":"H20","v":"شرط إلزامي 🔒","bg":"#F8FAFC","al":"center"}]},{"r":21,"h":28.0,"cells":[{"c":"A21","v":""},{"c":"B21","v":""},{"c":"C21","v":""},{"c":"D21","v":""},{"c":"E21","v":""},{"c":"F21","v":""},{"c":"G21","v":""},{"c":"H21","v":""}]},{"r":22,"h":16.1,"cells":[{"c":"A22","v":""},{"c":"B22","v":""},{"c":"C22","v":""},{"c":"D22","v":""},{"c":"E22","v":""},{"c":"F22","v":""},{"c":"G22","v":""},{"c":"H22","v":""}]},{"r":23,"h":38.0,"cells":[{"c":"A23","v":"ثانياً: متطلبات التكثيف الزلزالي واشتراطات الكانات (Seismic Confinement & Ductility - SBC 304 Ch. 18)","bg":"#B45309","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":24,"h":40.0,"cells":[{"c":"A24","v":"م","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B24","v":"المعلمة الهندسية / الخاصية","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C24","v":"الرمز الكودي","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D24","v":"القيمة التصميمية","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E24","v":"الوحدة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F24","v":"المرجع الكودي والاشتراطات","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G24","v":"ملاحظات الاستخدام في الشيت","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H24","v":"حالة التطبيق","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":25,"h":36.0,"cells":[{"c":"A25","v":1,"al":"center"},{"c":"B25","v":"طول منطقة التكثيف الحرجة عند طرفي العمود","b":true},{"c":"C25","v":"lo","b":true,"al":"center"},{"c":"D25","v":"الأكبر من: (h، H/6، 450 مم)","al":"center"},{"c":"E25","v":"mm","al":"center"},{"c":"F25","v":"SBC 304 Cl. 18.7.5.1","al":"center"},{"c":"G25","v":"تكثف الكانات أعلى القاعدة وأسفل وأعلى كل سقف","al":"center"},{"c":"H25","v":"إلزامي للمقاومة الزلزالية 🔒","al":"center"}]},{"r":26,"h":36.0,"cells":[{"c":"A26","v":2,"bg":"#F8FAFC","al":"center"},{"c":"B26","v":"أقصى مسافة تباعد للكانات في منطقة التكثيف","bg":"#F8FAFC","b":true},{"c":"C26","v":"so","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D26","v":"الأصغر من: (b/3، 8db، 100 مم)","bg":"#F8FAFC","al":"center"},{"c":"E26","v":"mm","bg":"#F8FAFC","al":"center"},{"c":"F26","v":"SBC 304 Cl. 18.7.5.3","bg":"#F8FAFC","al":"center"},{"c":"G26","v":"تضمن حبس الخرسانة ومنع انبعاج الأسياخ الطولية","bg":"#F8FAFC","al":"center"},{"c":"H26","v":"إلزامي لمنع التفلطح 🔒","bg":"#F8FAFC","al":"center"}]},{"r":27,"h":36.0,"cells":[{"c":"A27","v":3,"al":"center"},{"c":"B27","v":"أقصى تباعد للكانات في منطقة وسط العمود","b":true},{"c":"C27","v":"s_mid","b":true,"al":"center"},{"c":"D27","v":"الأصغر من: (b، 16db، 300 مم)","al":"center"},{"c":"E27","v":"mm","al":"center"},{"c":"F27","v":"SBC 304 Cl. 10.7.6.5.2","al":"center"},{"c":"G27","v":"منطقة غير حرجة في منتصف ارتفاع العمود","al":"center"},{"c":"H27","v":"شرط الكود العام 🔒","al":"center"}]},{"r":28,"h":52.0,"cells":[{"c":"A28","v":4,"bg":"#F8FAFC","al":"center"},{"c":"B28","v":"زاوية قفل الكانات الإلزامية في الزلازل","bg":"#F8FAFC","b":true},{"c":"C28","v":"θ_hook","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D28","v":"135 درجة (Seismic Hook)","bg":"#F8FAFC","al":"center"},{"c":"E28","v":"درجة","bg":"#F8FAFC","al":"center"},{"c":"F28","v":"SBC 304 Cl. 25.7.2.2","bg":"#F8FAFC","al":"center"},{"c":"G28","v":"امتداد القفل لا يقل عن 10 أضعاف قطر الكانة (≥ 75 مم)","bg":"#F8FAFC","al":"center"},{"c":"H28","v":"ممنوع قفل 90 درجة ⚠️","bg":"#F8FAFC","al":"center"}]},{"r":29,"h":36.0,"cells":[{"c":"A29","v":5,"al":"center"},{"c":"B29","v":"أقصى مسافة أفقية بين فروع الكانات والكلبسات","b":true},{"c":"C29","v":"x_tie","b":true,"al":"center"},{"c":"D29","v":350,"in":true,"al":"center"},{"c":"E29","v":"mm","al":"center"},{"c":"F29","v":"SBC 304 Cl. 18.7.5.2","al":"center"},{"c":"G29","v":"إذا زادت عن 150 مم يجب وضع كانة داخلية أو كلبس","al":"center"},{"c":"H29","v":"لمنع انبعاج الكانات العريضة 🔒","al":"center"}]}]},{"name":"تصميم الأعمدة المستطيلة","maxRow":20,"maxCol":23,"colWidths":[14.0,24.0,20.0,18.0,13.0,13.0,20.0,13.0,13.0,18.0,13.0,13.0,13.0,20.0,13.0,18.0,22.0,13.0,20.0,16.0,13.0,18.0,22.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول التحليل الإنشائي والتصميم المتقدم للأعمدة المستطيلة وفحص النحافة والانبعاج والـ P-M","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":23},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"الخلايا الصفراء بنص أزرق مدخلات هندسية | الشيت يحسب آلياً: نصف قطر القصور، نسبة النحافة، تصنيف العمود، اللامركزية الصغرى، العزم المكبر، والتسليح ومطابقة الأمان","bg":"#F1F5F9","fg":"#475569","al":"center","cs":23},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""},{"c":"O3","v":""},{"c":"P3","v":""},{"c":"Q3","v":""},{"c":"R3","v":""},{"c":"S3","v":""},{"c":"T3","v":""},{"c":"U3","v":""},{"c":"V3","v":""},{"c":"W3","v":""}]},{"r":4,"h":28.0,"cells":[{"c":"A4","v":""},{"c":"B4","v":""},{"c":"C4","v":""},{"c":"D4","v":""},{"c":"E4","v":""},{"c":"F4","v":""},{"c":"G4","v":""},{"c":"H4","v":""},{"c":"I4","v":""},{"c":"J4","v":""},{"c":"K4","v":""},{"c":"L4","v":""},{"c":"M4","v":""},{"c":"N4","v":""},{"c":"O4","v":""},{"c":"P4","v":""},{"c":"Q4","v":""},{"c":"R4","v":""},{"c":"S4","v":""},{"c":"T4","v":""},{"c":"U4","v":""},{"c":"V4","v":""},{"c":"W4","v":""}]},{"r":5,"h":28.0,"cells":[{"c":"A5","v":""},{"c":"B5","v":""},{"c":"C5","v":""},{"c":"D5","v":""},{"c":"E5","v":""},{"c":"F5","v":""},{"c":"G5","v":""},{"c":"H5","v":""},{"c":"I5","v":""},{"c":"J5","v":""},{"c":"K5","v":""},{"c":"L5","v":""},{"c":"M5","v":""},{"c":"N5","v":""},{"c":"O5","v":""},{"c":"P5","v":""},{"c":"Q5","v":""},{"c":"R5","v":""},{"c":"S5","v":""},{"c":"T5","v":""},{"c":"U5","v":""},{"c":"V5","v":""},{"c":"W5","v":""}]},{"r":6,"h":28.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":""},{"c":"C6","v":""},{"c":"D6","v":""},{"c":"E6","v":""},{"c":"F6","v":""},{"c":"G6","v":""},{"c":"H6","v":""},{"c":"I6","v":""},{"c":"J6","v":""},{"c":"K6","v":""},{"c":"L6","v":""},{"c":"M6","v":""},{"c":"N6","v":""},{"c":"O6","v":""},{"c":"P6","v":""},{"c":"Q6","v":""},{"c":"R6","v":""},{"c":"S6","v":""},{"c":"T6","v":""},{"c":"U6","v":""},{"c":"V6","v":""},{"c":"W6","v":""}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""},{"c":"K7","v":""},{"c":"L7","v":""},{"c":"M7","v":""},{"c":"N7","v":""},{"c":"O7","v":""},{"c":"P7","v":""},{"c":"Q7","v":""},{"c":"R7","v":""},{"c":"S7","v":""},{"c":"T7","v":""},{"c":"U7","v":""},{"c":"V7","v":""},{"c":"W7","v":""}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"كود العمود","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B8","v":"الموقع بالمسقط","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C8","v":"الدور","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D8","v":"عرض العمود b (مم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E8","v":"عمق العمود h (مم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F8","v":"الارتفاع الصافي Lu (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G8","v":"الحمل التصميمي Pu (kN)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H8","v":"عزم الانحناء M1 (kN.m)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I8","v":"عزم الانحناء M2 (kN.m)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J8","v":"معامل الطول الفعال k","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K8","v":"نصف قطر القصور r (مم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L8","v":"نسبة النحافة λ","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M8","v":"تصنيف العمود","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N8","v":"اللامركزية الصغرى emin (مم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"O8","v":"العزم الأدنى Mmin (kN.m)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"P8","v":"معامل تكبير العزم δns","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"Q8","v":"العزم التصميمي النهائي Mc (kN.m)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"R8","v":"مساحة الحديد المطلوبة As,req (سم²)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"S8","v":"التسليح المختار (عدد × قطر)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"T8","v":"عدد الأسياخ","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"U8","v":"قطر السيخ Φ (مم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"V8","v":"نسبة التسليح الفعلية ρ %","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"W8","v":"التحقق والأمان الإنشائي","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":"C1","al":"center"},{"c":"B9","v":"المحور A-1 (ركن)"},{"c":"C9","v":"البدروم والأساسات","al":"center"},{"c":"D9","v":300,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E9","v":600,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F9","v":3.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G9","v":1450,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H9","v":35,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I9","v":65,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J9","v":0.85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K9","v":90,"f":"=ROUND(0.3*D9, 1)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L9","v":30.2,"f":"=ROUND((J9*F9*1000)/K9, 1)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M9","v":"نحيف (Slender)","f":"=IF(L9<=ROUND(34-12*(H9/I9), 1), \"قصير (Short)\", \"نحيف (Slender)\")","b":true,"al":"center"},{"c":"N9","v":33,"f":"=ROUND(15 + 0.03*E9, 1)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O9","v":47.85,"f":"=ROUND(G9*N9/1000, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P9","v":1.1,"f":"=IF(M9=\"قصير (Short)\", 1, ROUND(1 + 0.012*(L9-22), 2))","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q9","v":71.5,"f":"=ROUND(P9*MAX(I9, O9), 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R9","v":22.53,"f":"=ROUND((((G9*1000)/(0.65*420))*0.35 + (Q9*1000000)/(0.9*420*0.8*E9))/100, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"S9","v":"10Φ16","f":"=T9&\"Φ\"&U9","b":true,"al":"center"},{"c":"T9","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"U9","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"V9","v":0.0112,"f":"=ROUND((T9*PI()*(U9/2)^2)/(D9*E9), 4)","b":true,"al":"center","nf":"0.0%"},{"c":"W9","v":"غير مطابق ⚠️","f":"=IF(AND(V9>=0.01, V9<=0.04, (T9*PI()*(U9/2)^2/100)>=R9), \"مطابق وآمن ✅\", \"غير مطابق ⚠️\")","fg":"#16A34A","b":true,"al":"center"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":"C2","bg":"#F8FAFC","al":"center"},{"c":"B10","v":"المحور A-3 (واجهة)","bg":"#F8FAFC"},{"c":"C10","v":"البدروم والأساسات","bg":"#F8FAFC","al":"center"},{"c":"D10","v":300,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E10","v":700,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F10","v":3.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G10","v":1850,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H10","v":45,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I10","v":85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J10","v":0.85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K10","v":90,"f":"=ROUND(0.3*D10, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L10","v":30.2,"f":"=ROUND((J10*F10*1000)/K10, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M10","v":"نحيف (Slender)","f":"=IF(L10<=ROUND(34-12*(H10/I10), 1), \"قصير (Short)\", \"نحيف (Slender)\")","bg":"#F8FAFC","b":true,"al":"center"},{"c":"N10","v":36,"f":"=ROUND(15 + 0.03*E10, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O10","v":66.6,"f":"=ROUND(G10*N10/1000, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P10","v":1.1,"f":"=IF(M10=\"قصير (Short)\", 1, ROUND(1 + 0.012*(L10-22), 2))","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q10","v":93.5,"f":"=ROUND(P10*MAX(I10, O10), 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R10","v":28.13,"f":"=ROUND((((G10*1000)/(0.65*420))*0.35 + (Q10*1000000)/(0.9*420*0.8*E10))/100, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"S10","v":"10Φ18","f":"=T10&\"Φ\"&U10","bg":"#F8FAFC","b":true,"al":"center"},{"c":"T10","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"U10","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"V10","v":0.0121,"f":"=ROUND((T10*PI()*(U10/2)^2)/(D10*E10), 4)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0%"},{"c":"W10","v":"غير مطابق ⚠️","f":"=IF(AND(V10>=0.01, V10<=0.04, (T10*PI()*(U10/2)^2/100)>=R10), \"مطابق وآمن ✅\", \"غير مطابق ⚠️\")","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":"C3","al":"center"},{"c":"B11","v":"المحور B-2 (وسطي)"},{"c":"C11","v":"البدروم والأساسات","al":"center"},{"c":"D11","v":350,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E11","v":800,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F11","v":3.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G11","v":2600,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H11","v":55,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I11","v":110,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J11","v":0.85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K11","v":105,"f":"=ROUND(0.3*D11, 1)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L11","v":25.9,"f":"=ROUND((J11*F11*1000)/K11, 1)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M11","v":"قصير (Short)","f":"=IF(L11<=ROUND(34-12*(H11/I11), 1), \"قصير (Short)\", \"نحيف (Slender)\")","b":true,"al":"center"},{"c":"N11","v":39,"f":"=ROUND(15 + 0.03*E11, 1)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O11","v":101.4,"f":"=ROUND(G11*N11/1000, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P11","v":1,"f":"=IF(M11=\"قصير (Short)\", 1, ROUND(1 + 0.012*(L11-22), 2))","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q11","v":110,"f":"=ROUND(P11*MAX(I11, O11), 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R11","v":37.88,"f":"=ROUND((((G11*1000)/(0.65*420))*0.35 + (Q11*1000000)/(0.9*420*0.8*E11))/100, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"S11","v":"12Φ20","f":"=T11&\"Φ\"&U11","b":true,"al":"center"},{"c":"T11","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"U11","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"V11","v":0.0135,"f":"=ROUND((T11*PI()*(U11/2)^2)/(D11*E11), 4)","b":true,"al":"center","nf":"0.0%"},{"c":"W11","v":"غير مطابق ⚠️","f":"=IF(AND(V11>=0.01, V11<=0.04, (T11*PI()*(U11/2)^2/100)>=R11), \"مطابق وآمن ✅\", \"غير مطابق ⚠️\")","fg":"#16A34A","b":true,"al":"center"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":"C4","bg":"#F8FAFC","al":"center"},{"c":"B12","v":"المحور C-3 (حمل أقصى)","bg":"#F8FAFC"},{"c":"C12","v":"الدور الأرضي","bg":"#F8FAFC","al":"center"},{"c":"D12","v":400,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E12","v":900,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F12","v":3.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G12","v":3400,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H12","v":70,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I12","v":145,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J12","v":0.9,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K12","v":120,"f":"=ROUND(0.3*D12, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L12","v":28.5,"f":"=ROUND((J12*F12*1000)/K12, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M12","v":"نحيف (Slender)","f":"=IF(L12<=ROUND(34-12*(H12/I12), 1), \"قصير (Short)\", \"نحيف (Slender)\")","bg":"#F8FAFC","b":true,"al":"center"},{"c":"N12","v":42,"f":"=ROUND(15 + 0.03*E12, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O12","v":142.8,"f":"=ROUND(G12*N12/1000, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P12","v":1.08,"f":"=IF(M12=\"قصير (Short)\", 1, ROUND(1 + 0.012*(L12-22), 2))","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q12","v":156.6,"f":"=ROUND(P12*MAX(I12, O12), 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R12","v":49.34,"f":"=ROUND((((G12*1000)/(0.65*420))*0.35 + (Q12*1000000)/(0.9*420*0.8*E12))/100, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"S12","v":"16Φ20","f":"=T12&\"Φ\"&U12","bg":"#F8FAFC","b":true,"al":"center"},{"c":"T12","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"U12","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"V12","v":0.014,"f":"=ROUND((T12*PI()*(U12/2)^2)/(D12*E12), 4)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0%"},{"c":"W12","v":"مطابق وآمن ✅","f":"=IF(AND(V12>=0.01, V12<=0.04, (T12*PI()*(U12/2)^2/100)>=R12), \"مطابق وآمن ✅\", \"غير مطابق ⚠️\")","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":"C5","al":"center"},{"c":"B13","v":"المحور B-4 (داخلي)"},{"c":"C13","v":"الدور الأرضي","al":"center"},{"c":"D13","v":300,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E13","v":600,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F13","v":3.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G13","v":1600,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H13","v":40,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I13","v":75,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J13","v":0.9,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K13","v":90,"f":"=ROUND(0.3*D13, 1)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L13","v":38,"f":"=ROUND((J13*F13*1000)/K13, 1)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M13","v":"نحيف (Slender)","f":"=IF(L13<=ROUND(34-12*(H13/I13), 1), \"قصير (Short)\", \"نحيف (Slender)\")","b":true,"al":"center"},{"c":"N13","v":33,"f":"=ROUND(15 + 0.03*E13, 1)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O13","v":52.8,"f":"=ROUND(G13*N13/1000, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P13","v":1.19,"f":"=IF(M13=\"قصير (Short)\", 1, ROUND(1 + 0.012*(L13-22), 2))","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q13","v":89.25,"f":"=ROUND(P13*MAX(I13, O13), 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R13","v":25.43,"f":"=ROUND((((G13*1000)/(0.65*420))*0.35 + (Q13*1000000)/(0.9*420*0.8*E13))/100, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"S13","v":"8Φ18","f":"=T13&\"Φ\"&U13","b":true,"al":"center"},{"c":"T13","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"U13","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"V13","v":0.0113,"f":"=ROUND((T13*PI()*(U13/2)^2)/(D13*E13), 4)","b":true,"al":"center","nf":"0.0%"},{"c":"W13","v":"غير مطابق ⚠️","f":"=IF(AND(V13>=0.01, V13<=0.04, (T13*PI()*(U13/2)^2/100)>=R13), \"مطابق وآمن ✅\", \"غير مطابق ⚠️\")","fg":"#16A34A","b":true,"al":"center"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":"C6","bg":"#F8FAFC","al":"center"},{"c":"B14","v":"المحور D-2 (وسطي)","bg":"#F8FAFC"},{"c":"C14","v":"الدور الأول المتكرر","bg":"#F8FAFC","al":"center"},{"c":"D14","v":300,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E14","v":600,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F14","v":3.1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G14","v":1250,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H14","v":30,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I14","v":58,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J14","v":0.85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K14","v":90,"f":"=ROUND(0.3*D14, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L14","v":29.3,"f":"=ROUND((J14*F14*1000)/K14, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M14","v":"نحيف (Slender)","f":"=IF(L14<=ROUND(34-12*(H14/I14), 1), \"قصير (Short)\", \"نحيف (Slender)\")","bg":"#F8FAFC","b":true,"al":"center"},{"c":"N14","v":33,"f":"=ROUND(15 + 0.03*E14, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O14","v":41.25,"f":"=ROUND(G14*N14/1000, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P14","v":1.09,"f":"=IF(M14=\"قصير (Short)\", 1, ROUND(1 + 0.012*(L14-22), 2))","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q14","v":63.22,"f":"=ROUND(P14*MAX(I14, O14), 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R14","v":19.51,"f":"=ROUND((((G14*1000)/(0.65*420))*0.35 + (Q14*1000000)/(0.9*420*0.8*E14))/100, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"S14","v":"8Φ16","f":"=T14&\"Φ\"&U14","bg":"#F8FAFC","b":true,"al":"center"},{"c":"T14","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"U14","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"V14","v":0.0089,"f":"=ROUND((T14*PI()*(U14/2)^2)/(D14*E14), 4)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0%"},{"c":"W14","v":"غير مطابق ⚠️","f":"=IF(AND(V14>=0.01, V14<=0.04, (T14*PI()*(U14/2)^2/100)>=R14), \"مطابق وآمن ✅\", \"غير مطابق ⚠️\")","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":"C7","al":"center"},{"c":"B15","v":"المحور C-1 (واجهة)"},{"c":"C15","v":"الدور الأول المتكرر","al":"center"},{"c":"D15","v":250,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E15","v":600,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F15","v":3.1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G15","v":980,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H15","v":25,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I15","v":50,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J15","v":0.85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K15","v":75,"f":"=ROUND(0.3*D15, 1)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L15","v":35.1,"f":"=ROUND((J15*F15*1000)/K15, 1)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M15","v":"نحيف (Slender)","f":"=IF(L15<=ROUND(34-12*(H15/I15), 1), \"قصير (Short)\", \"نحيف (Slender)\")","b":true,"al":"center"},{"c":"N15","v":33,"f":"=ROUND(15 + 0.03*E15, 1)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O15","v":32.34,"f":"=ROUND(G15*N15/1000, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P15","v":1.16,"f":"=IF(M15=\"قصير (Short)\", 1, ROUND(1 + 0.012*(L15-22), 2))","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q15","v":58,"f":"=ROUND(P15*MAX(I15, O15), 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R15","v":15.76,"f":"=ROUND((((G15*1000)/(0.65*420))*0.35 + (Q15*1000000)/(0.9*420*0.8*E15))/100, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"S15","v":"8Φ16","f":"=T15&\"Φ\"&U15","b":true,"al":"center"},{"c":"T15","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"U15","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"V15","v":0.0107,"f":"=ROUND((T15*PI()*(U15/2)^2)/(D15*E15), 4)","b":true,"al":"center","nf":"0.0%"},{"c":"W15","v":"مطابق وآمن ✅","f":"=IF(AND(V15>=0.01, V15<=0.04, (T15*PI()*(U15/2)^2/100)>=R15), \"مطابق وآمن ✅\", \"غير مطابق ⚠️\")","fg":"#16A34A","b":true,"al":"center"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":"C8","bg":"#F8FAFC","al":"center"},{"c":"B16","v":"المحور A-2 (سطح)","bg":"#F8FAFC"},{"c":"C16","v":"الملحق والسطح الأخير","bg":"#F8FAFC","al":"center"},{"c":"D16","v":250,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E16","v":500,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F16","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G16","v":520,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H16","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I16","v":42,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J16","v":0.85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K16","v":75,"f":"=ROUND(0.3*D16, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L16","v":34,"f":"=ROUND((J16*F16*1000)/K16, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M16","v":"نحيف (Slender)","f":"=IF(L16<=ROUND(34-12*(H16/I16), 1), \"قصير (Short)\", \"نحيف (Slender)\")","bg":"#F8FAFC","b":true,"al":"center"},{"c":"N16","v":30,"f":"=ROUND(15 + 0.03*E16, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O16","v":15.6,"f":"=ROUND(G16*N16/1000, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P16","v":1.14,"f":"=IF(M16=\"قصير (Short)\", 1, ROUND(1 + 0.012*(L16-22), 2))","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q16","v":47.88,"f":"=ROUND(P16*MAX(I16, O16), 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R16","v":9.83,"f":"=ROUND((((G16*1000)/(0.65*420))*0.35 + (Q16*1000000)/(0.9*420*0.8*E16))/100, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"S16","v":"8Φ16","f":"=T16&\"Φ\"&U16","bg":"#F8FAFC","b":true,"al":"center"},{"c":"T16","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"U16","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"V16","v":0.0129,"f":"=ROUND((T16*PI()*(U16/2)^2)/(D16*E16), 4)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0%"},{"c":"W16","v":"مطابق وآمن ✅","f":"=IF(AND(V16>=0.01, V16<=0.04, (T16*PI()*(U16/2)^2/100)>=R16), \"مطابق وآمن ✅\", \"غير مطابق ⚠️\")","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":"C9","al":"center"},{"c":"B17","v":"المحور E-1 (خدمات)"},{"c":"C17","v":"الدور الأرضي","al":"center"},{"c":"D17","v":250,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E17","v":500,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F17","v":3.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G17","v":890,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H17","v":28,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I17","v":48,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J17","v":0.95,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K17","v":75,"f":"=ROUND(0.3*D17, 1)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L17","v":48.1,"f":"=ROUND((J17*F17*1000)/K17, 1)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M17","v":"نحيف (Slender)","f":"=IF(L17<=ROUND(34-12*(H17/I17), 1), \"قصير (Short)\", \"نحيف (Slender)\")","b":true,"al":"center"},{"c":"N17","v":30,"f":"=ROUND(15 + 0.03*E17, 1)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O17","v":26.7,"f":"=ROUND(G17*N17/1000, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P17","v":1.31,"f":"=IF(M17=\"قصير (Short)\", 1, ROUND(1 + 0.012*(L17-22), 2))","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q17","v":62.88,"f":"=ROUND(P17*MAX(I17, O17), 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R17","v":15.57,"f":"=ROUND((((G17*1000)/(0.65*420))*0.35 + (Q17*1000000)/(0.9*420*0.8*E17))/100, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"S17","v":"6Φ16","f":"=T17&\"Φ\"&U17","b":true,"al":"center"},{"c":"T17","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"U17","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"V17","v":0.0097,"f":"=ROUND((T17*PI()*(U17/2)^2)/(D17*E17), 4)","b":true,"al":"center","nf":"0.0%"},{"c":"W17","v":"غير مطابق ⚠️","f":"=IF(AND(V17>=0.01, V17<=0.04, (T17*PI()*(U17/2)^2/100)>=R17), \"مطابق وآمن ✅\", \"غير مطابق ⚠️\")","fg":"#16A34A","b":true,"al":"center"}]},{"r":18,"h":36.0,"cells":[{"c":"A18","v":"C10","bg":"#F8FAFC","al":"center"},{"c":"B18","v":"المحور E-3 (سور/مظلة)","bg":"#F8FAFC"},{"c":"C18","v":"الدور الأرضي","bg":"#F8FAFC","al":"center"},{"c":"D18","v":250,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E18","v":400,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F18","v":3.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G18","v":620,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H18","v":22,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I18","v":38,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J18","v":0.95,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K18","v":75,"f":"=ROUND(0.3*D18, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L18","v":44.3,"f":"=ROUND((J18*F18*1000)/K18, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M18","v":"نحيف (Slender)","f":"=IF(L18<=ROUND(34-12*(H18/I18), 1), \"قصير (Short)\", \"نحيف (Slender)\")","bg":"#F8FAFC","b":true,"al":"center"},{"c":"N18","v":27,"f":"=ROUND(15 + 0.03*E18, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O18","v":16.74,"f":"=ROUND(G18*N18/1000, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P18","v":1.27,"f":"=IF(M18=\"قصير (Short)\", 1, ROUND(1 + 0.012*(L18-22), 2))","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q18","v":48.26,"f":"=ROUND(P18*MAX(I18, O18), 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R18","v":11.94,"f":"=ROUND((((G18*1000)/(0.65*420))*0.35 + (Q18*1000000)/(0.9*420*0.8*E18))/100, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"S18","v":"6Φ14","f":"=T18&\"Φ\"&U18","bg":"#F8FAFC","b":true,"al":"center"},{"c":"T18","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"U18","v":14,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"V18","v":0.0092,"f":"=ROUND((T18*PI()*(U18/2)^2)/(D18*E18), 4)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0%"},{"c":"W18","v":"غير مطابق ⚠️","f":"=IF(AND(V18>=0.01, V18<=0.04, (T18*PI()*(U18/2)^2/100)>=R18), \"مطابق وآمن ✅\", \"غير مطابق ⚠️\")","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"}]},{"r":19,"h":36.0,"cells":[{"c":"A19","v":"C11","al":"center"},{"c":"B19","v":"المحور F-2 (غرفة حارس)"},{"c":"C19","v":"الأرضي الخارجي","al":"center"},{"c":"D19","v":200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E19","v":400,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F19","v":2.9,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G19","v":410,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H19","v":15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I19","v":28,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J19","v":0.85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K19","v":60,"f":"=ROUND(0.3*D19, 1)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L19","v":41.1,"f":"=ROUND((J19*F19*1000)/K19, 1)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M19","v":"نحيف (Slender)","f":"=IF(L19<=ROUND(34-12*(H19/I19), 1), \"قصير (Short)\", \"نحيف (Slender)\")","b":true,"al":"center"},{"c":"N19","v":27,"f":"=ROUND(15 + 0.03*E19, 1)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O19","v":11.07,"f":"=ROUND(G19*N19/1000, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P19","v":1.23,"f":"=IF(M19=\"قصير (Short)\", 1, ROUND(1 + 0.012*(L19-22), 2))","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q19","v":34.44,"f":"=ROUND(P19*MAX(I19, O19), 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R19","v":8.1,"f":"=ROUND((((G19*1000)/(0.65*420))*0.35 + (Q19*1000000)/(0.9*420*0.8*E19))/100, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"S19","v":"6Φ14","f":"=T19&\"Φ\"&U19","b":true,"al":"center"},{"c":"T19","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"U19","v":14,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"V19","v":0.0115,"f":"=ROUND((T19*PI()*(U19/2)^2)/(D19*E19), 4)","b":true,"al":"center","nf":"0.0%"},{"c":"W19","v":"مطابق وآمن ✅","f":"=IF(AND(V19>=0.01, V19<=0.04, (T19*PI()*(U19/2)^2/100)>=R19), \"مطابق وآمن ✅\", \"غير مطابق ⚠️\")","fg":"#16A34A","b":true,"al":"center"}]},{"r":20,"h":36.0,"cells":[{"c":"A20","v":"C12","bg":"#F8FAFC","al":"center"},{"c":"B20","v":"المحور F-4 (خزان علوي)","bg":"#F8FAFC"},{"c":"C20","v":"أعلى بيت الدرج","bg":"#F8FAFC","al":"center"},{"c":"D20","v":300,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E20","v":500,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F20","v":3.4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G20","v":780,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H20","v":32,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I20","v":60,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J20","v":0.9,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K20","v":90,"f":"=ROUND(0.3*D20, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L20","v":34,"f":"=ROUND((J20*F20*1000)/K20, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M20","v":"نحيف (Slender)","f":"=IF(L20<=ROUND(34-12*(H20/I20), 1), \"قصير (Short)\", \"نحيف (Slender)\")","bg":"#F8FAFC","b":true,"al":"center"},{"c":"N20","v":30,"f":"=ROUND(15 + 0.03*E20, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O20","v":23.4,"f":"=ROUND(G20*N20/1000, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P20","v":1.14,"f":"=IF(M20=\"قصير (Short)\", 1, ROUND(1 + 0.012*(L20-22), 2))","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q20","v":68.4,"f":"=ROUND(P20*MAX(I20, O20), 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R20","v":14.52,"f":"=ROUND((((G20*1000)/(0.65*420))*0.35 + (Q20*1000000)/(0.9*420*0.8*E20))/100, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"S20","v":"8Φ16","f":"=T20&\"Φ\"&U20","bg":"#F8FAFC","b":true,"al":"center"},{"c":"T20","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"U20","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"V20","v":0.0107,"f":"=ROUND((T20*PI()*(U20/2)^2)/(D20*E20), 4)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0%"},{"c":"W20","v":"مطابق وآمن ✅","f":"=IF(AND(V20>=0.01, V20<=0.04, (T20*PI()*(U20/2)^2/100)>=R20), \"مطابق وآمن ✅\", \"غير مطابق ⚠️\")","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"}]}]},{"name":"تصميم الأعمدة الدائرية","maxRow":14,"maxCol":17,"colWidths":[14.0,24.0,20.0,18.0,13.0,20.0,13.0,16.0,18.0,16.0,18.0,13.0,13.0,13.0,22.0,13.0,13.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول تصميم وتسليح الأعمدة الدائرية والكانات الحلزونية Spiral Reinforcement وفق كود SBC 304","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":17},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"الكانات الحلزونية المستمرة تزيد معامل أمان العمود (φ = 0.75) ومعامل كفاءة التحمل (0.85) | يتم حساب خطوة الكانة ومطابقة نسبة الحبس الحجمي آلياً","bg":"#F1F5F9","fg":"#475569","al":"center","cs":17},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""},{"c":"O3","v":""},{"c":"P3","v":""},{"c":"Q3","v":""}]},{"r":4,"h":28.0,"cells":[{"c":"A4","v":""},{"c":"B4","v":""},{"c":"C4","v":""},{"c":"D4","v":""},{"c":"E4","v":""},{"c":"F4","v":""},{"c":"G4","v":""},{"c":"H4","v":""},{"c":"I4","v":""},{"c":"J4","v":""},{"c":"K4","v":""},{"c":"L4","v":""},{"c":"M4","v":""},{"c":"N4","v":""},{"c":"O4","v":""},{"c":"P4","v":""},{"c":"Q4","v":""}]},{"r":5,"h":28.0,"cells":[{"c":"A5","v":""},{"c":"B5","v":""},{"c":"C5","v":""},{"c":"D5","v":""},{"c":"E5","v":""},{"c":"F5","v":""},{"c":"G5","v":""},{"c":"H5","v":""},{"c":"I5","v":""},{"c":"J5","v":""},{"c":"K5","v":""},{"c":"L5","v":""},{"c":"M5","v":""},{"c":"N5","v":""},{"c":"O5","v":""},{"c":"P5","v":""},{"c":"Q5","v":""}]},{"r":6,"h":28.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":""},{"c":"C6","v":""},{"c":"D6","v":""},{"c":"E6","v":""},{"c":"F6","v":""},{"c":"G6","v":""},{"c":"H6","v":""},{"c":"I6","v":""},{"c":"J6","v":""},{"c":"K6","v":""},{"c":"L6","v":""},{"c":"M6","v":""},{"c":"N6","v":""},{"c":"O6","v":""},{"c":"P6","v":""},{"c":"Q6","v":""}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""},{"c":"K7","v":""},{"c":"L7","v":""},{"c":"M7","v":""},{"c":"N7","v":""},{"c":"O7","v":""},{"c":"P7","v":""},{"c":"Q7","v":""}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"كود العمود","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B8","v":"الموقع بالمسقط","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C8","v":"الدور","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D8","v":"قطر العمود D (مم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E8","v":"الارتفاع الصافي Lu (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F8","v":"الحمل التصميمي Pu (kN)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G8","v":"العزم التصميمي Mu (kN.m)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H8","v":"معامل الطول k","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I8","v":"نصف قطر القصور r (مم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J8","v":"نسبة النحافة λ","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K8","v":"تصنيف العمود","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L8","v":"عدد الأسياخ الطولية","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M8","v":"قطر السيخ الطولي Φ (مم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N8","v":"نسبة التسليح الطولي ρ %","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"O8","v":"قطر الكانة الحلزونية Φ (مم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"P8","v":"خطوة الكانة الحلزونية Pitch (مم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"Q8","v":"التحقق والاعتماد الإنشائي","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":"CC1","al":"center"},{"c":"B9","v":"بهو المدخل الرئيسي"},{"c":"C9","v":"الدور الأرضي","al":"center"},{"c":"D9","v":600,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E9","v":4.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F9","v":2200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G9","v":95,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H9","v":0.9,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I9","v":150,"f":"=ROUND(D9/4, 1)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J9","v":25.2,"f":"=ROUND((H9*E9*1000)/I9, 1)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K9","v":"نحيف (Slender)","f":"=IF(J9<=22, \"قصير (Short)\", \"نحيف (Slender)\")","b":true,"al":"center"},{"c":"L9","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"M9","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"N9","v":0.0111,"f":"=ROUND((L9*(M9/2)^2)/((D9/2)^2), 4)","b":true,"al":"center","nf":"0.0%"},{"c":"O9","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"P9","v":50,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"Q9","v":"مطابق وآمن ✅","f":"=IF(AND(N9>=0.01, N9<=0.04, P9>=25, P9<=75), \"مطابق وآمن ✅\", \"مراجعة ⚠️\")","fg":"#16A34A","b":true,"al":"center"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":"CC2","bg":"#F8FAFC","al":"center"},{"c":"B10","v":"منطقة البهو والدرج","bg":"#F8FAFC"},{"c":"C10","v":"الدور الأول","bg":"#F8FAFC","al":"center"},{"c":"D10","v":500,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E10","v":3.4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F10","v":1450,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G10","v":65,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H10","v":0.85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I10","v":125,"f":"=ROUND(D10/4, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J10","v":23.1,"f":"=ROUND((H10*E10*1000)/I10, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K10","v":"نحيف (Slender)","f":"=IF(J10<=22, \"قصير (Short)\", \"نحيف (Slender)\")","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L10","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"M10","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"N10","v":0.0104,"f":"=ROUND((L10*(M10/2)^2)/((D10/2)^2), 4)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0%"},{"c":"O10","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"P10","v":60,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"Q10","v":"مطابق وآمن ✅","f":"=IF(AND(N10>=0.01, N10<=0.04, P10>=25, P10<=75), \"مطابق وآمن ✅\", \"مراجعة ⚠️\")","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":"CC3","al":"center"},{"c":"B11","v":"بهو الملحق العلوي"},{"c":"C11","v":"الملحق العلوي","al":"center"},{"c":"D11","v":450,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E11","v":3.2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F11","v":880,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G11","v":42,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H11","v":0.85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I11","v":112.5,"f":"=ROUND(D11/4, 1)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J11","v":24.2,"f":"=ROUND((H11*E11*1000)/I11, 1)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K11","v":"نحيف (Slender)","f":"=IF(J11<=22, \"قصير (Short)\", \"نحيف (Slender)\")","b":true,"al":"center"},{"c":"L11","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"M11","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"N11","v":0.0101,"f":"=ROUND((L11*(M11/2)^2)/((D11/2)^2), 4)","b":true,"al":"center","nf":"0.0%"},{"c":"O11","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"P11","v":60,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"Q11","v":"مطابق وآمن ✅","f":"=IF(AND(N11>=0.01, N11<=0.04, P11>=25, P11<=75), \"مطابق وآمن ✅\", \"مراجعة ⚠️\")","fg":"#16A34A","b":true,"al":"center"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":"CC4","bg":"#F8FAFC","al":"center"},{"c":"B12","v":"مواقف السيارات الخارجية","bg":"#F8FAFC"},{"c":"C12","v":"القبو والمواقف","bg":"#F8FAFC","al":"center"},{"c":"D12","v":650,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E12","v":3.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F12","v":2800,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G12","v":120,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H12","v":0.9,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I12","v":162.5,"f":"=ROUND(D12/4, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J12","v":21,"f":"=ROUND((H12*E12*1000)/I12, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K12","v":"قصير (Short)","f":"=IF(J12<=22, \"قصير (Short)\", \"نحيف (Slender)\")","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L12","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"M12","v":22,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"N12","v":0.0137,"f":"=ROUND((L12*(M12/2)^2)/((D12/2)^2), 4)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0%"},{"c":"O12","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"P12","v":50,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"Q12","v":"مطابق وآمن ✅","f":"=IF(AND(N12>=0.01, N12<=0.04, P12>=25, P12<=75), \"مطابق وآمن ✅\", \"مراجعة ⚠️\")","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":"CC5","al":"center"},{"c":"B13","v":"مدخل صالة الاحتفالات"},{"c":"C13","v":"الدور الأرضي","al":"center"},{"c":"D13","v":700,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E13","v":4.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F13","v":3250,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G13","v":150,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H13","v":0.9,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I13","v":175,"f":"=ROUND(D13/4, 1)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J13","v":23.1,"f":"=ROUND((H13*E13*1000)/I13, 1)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K13","v":"نحيف (Slender)","f":"=IF(J13<=22, \"قصير (Short)\", \"نحيف (Slender)\")","b":true,"al":"center"},{"c":"L13","v":14,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"M13","v":22,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"N13","v":0.0138,"f":"=ROUND((L13*(M13/2)^2)/((D13/2)^2), 4)","b":true,"al":"center","nf":"0.0%"},{"c":"O13","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"P13","v":50,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"Q13","v":"مطابق وآمن ✅","f":"=IF(AND(N13>=0.01, N13<=0.04, P13>=25, P13<=75), \"مطابق وآمن ✅\", \"مراجعة ⚠️\")","fg":"#16A34A","b":true,"al":"center"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":"CC6","bg":"#F8FAFC","al":"center"},{"c":"B14","v":"رواق الحديقة واللاندسكيب","bg":"#F8FAFC"},{"c":"C14","v":"الفناء الخارجي","bg":"#F8FAFC","al":"center"},{"c":"D14","v":400,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E14","v":3,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F14","v":650,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G14","v":35,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"H14","v":0.85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I14","v":100,"f":"=ROUND(D14/4, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J14","v":25.5,"f":"=ROUND((H14*E14*1000)/I14, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K14","v":"نحيف (Slender)","f":"=IF(J14<=22, \"قصير (Short)\", \"نحيف (Slender)\")","bg":"#F8FAFC","b":true,"al":"center"},{"c":"L14","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"M14","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"N14","v":0.0096,"f":"=ROUND((L14*(M14/2)^2)/((D14/2)^2), 4)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0%"},{"c":"O14","v":8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"P14","v":60,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"Q14","v":"مراجعة ⚠️","f":"=IF(AND(N14>=0.01, N14<=0.04, P14>=25, P14<=75), \"مطابق وآمن ✅\", \"مراجعة ⚠️\")","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"}]}]},{"name":"تفريد حديد الأعمدة BBS","maxRow":32,"maxCol":18,"colWidths":[14.0,18.0,32.0,20.0,16.0,22.0,13.0,18.0,20.0,22.0,13.0,13.0,18.0,13.0,13.0,13.0,13.0,13.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول تفريد حديد التسليح وقوائم التقطيع للأعمدة والكانات (Bar Bending Schedule - BS 8666)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":18},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"قوائم تشكيل الأسياخ والكانات الصندوقية والأوتوماتيكية وحساب الأطوال والأوزان التراكمية ونسبة الهالك وفق المواصفة البريطانية والكود السعودي","bg":"#F1F5F9","fg":"#475569","al":"center","cs":18},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""},{"c":"O3","v":""},{"c":"P3","v":""},{"c":"Q3","v":""},{"c":"R3","v":""}]},{"r":4,"h":28.0,"cells":[{"c":"A4","v":""},{"c":"B4","v":""},{"c":"C4","v":""},{"c":"D4","v":""},{"c":"E4","v":""},{"c":"F4","v":""},{"c":"G4","v":""},{"c":"H4","v":""},{"c":"I4","v":""},{"c":"J4","v":""},{"c":"K4","v":""},{"c":"L4","v":""},{"c":"M4","v":""},{"c":"N4","v":""},{"c":"O4","v":""},{"c":"P4","v":""},{"c":"Q4","v":""},{"c":"R4","v":""}]},{"r":5,"h":28.0,"cells":[{"c":"A5","v":""},{"c":"B5","v":""},{"c":"C5","v":""},{"c":"D5","v":""},{"c":"E5","v":""},{"c":"F5","v":""},{"c":"G5","v":""},{"c":"H5","v":""},{"c":"I5","v":""},{"c":"J5","v":""},{"c":"K5","v":""},{"c":"L5","v":""},{"c":"M5","v":""},{"c":"N5","v":""},{"c":"O5","v":""},{"c":"P5","v":""},{"c":"Q5","v":""},{"c":"R5","v":""}]},{"r":6,"h":28.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":""},{"c":"C6","v":""},{"c":"D6","v":""},{"c":"E6","v":""},{"c":"F6","v":""},{"c":"G6","v":""},{"c":"H6","v":""},{"c":"I6","v":""},{"c":"J6","v":""},{"c":"K6","v":""},{"c":"L6","v":""},{"c":"M6","v":""},{"c":"N6","v":""},{"c":"O6","v":""},{"c":"P6","v":""},{"c":"Q6","v":""},{"c":"R6","v":""}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""},{"c":"K7","v":""},{"c":"L7","v":""},{"c":"M7","v":""},{"c":"N7","v":""},{"c":"O7","v":""},{"c":"P7","v":""},{"c":"Q7","v":""},{"c":"R7","v":""}]},{"r":8,"h":42.0,"cells":[{"c":"A8","v":"كود العنصر","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B8","v":"رقم الإشارة (Mark)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C8","v":"توصيف ونوع السيخ","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D8","v":"رمز التشكيل (Shape Code)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E8","v":"القطر Φ (مم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F8","v":"عدد الأعمدة المتماثلة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G8","v":"عدد الأسياخ في العمود","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H8","v":"إجمالي عدد الأسياخ","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I8","v":"طول تقطيع السيخ (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J8","v":"إجمالي الطول الكلي (م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K8","v":"وزن المتر الطولي (كجم/م)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L8","v":"الوزن الصافي (كجم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M8","v":"وزن Φ8 (كجم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N8","v":"وزن Φ10 (كجم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"O8","v":"وزن Φ16 (كجم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"P8","v":"وزن Φ18 (كجم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"Q8","v":"وزن Φ20 (كجم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"R8","v":"وزن Φ25 (كجم)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":9,"h":35.0,"cells":[{"c":"A9","v":"C1","al":"center"},{"c":"B9","v":"01","al":"center"},{"c":"C9","v":"حديد رأسي رئيسي (قوائم العمود)"},{"c":"D9","v":"Code 00 (مستقيم)","al":"center"},{"c":"E9","v":16,"in":true,"al":"center"},{"c":"F9","v":4,"in":true,"al":"center"},{"c":"G9","v":8,"in":true,"al":"center"},{"c":"H9","v":32,"f":"=F9*G9","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I9","v":4.45,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J9","v":142.4,"f":"=ROUND(H9*I9, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K9","v":1.58,"f":"=ROUND((E9^2)/162, 3)","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L9","v":224.99,"f":"=ROUND(J9*K9, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M9","v":0,"f":"=IF(E9=8, L9, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N9","v":0,"f":"=IF(E9=10, L9, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O9","v":224.99,"f":"=IF(E9=16, L9, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P9","v":0,"f":"=IF(E9=18, L9, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q9","v":0,"f":"=IF(E9=20, L9, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R9","v":0,"f":"=IF(E9=25, L9, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":10,"h":35.0,"cells":[{"c":"A10","v":"C1","bg":"#F8FAFC","al":"center"},{"c":"B10","v":"02","bg":"#F8FAFC","al":"center"},{"c":"C10","v":"أشاير رقاب الأعمدة بالقواعد","bg":"#F8FAFC"},{"c":"D10","v":"Code 11 (رجل زاوية)","bg":"#F8FAFC","al":"center"},{"c":"E10","v":16,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F10","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G10","v":8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H10","v":32,"f":"=F10*G10","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I10","v":2.3,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J10","v":73.6,"f":"=ROUND(H10*I10, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K10","v":1.58,"f":"=ROUND((E10^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L10","v":116.29,"f":"=ROUND(J10*K10, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M10","v":0,"f":"=IF(E10=8, L10, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N10","v":0,"f":"=IF(E10=10, L10, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O10","v":116.29,"f":"=IF(E10=16, L10, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P10","v":0,"f":"=IF(E10=18, L10, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q10","v":0,"f":"=IF(E10=20, L10, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R10","v":0,"f":"=IF(E10=25, L10, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":11,"h":35.0,"cells":[{"c":"A11","v":"C1","al":"center"},{"c":"B11","v":"03","al":"center"},{"c":"C11","v":"كانة خارجية صندوقية محيطية"},{"c":"D11","v":"Code 51 (كانة بقفل)","al":"center"},{"c":"E11","v":10,"in":true,"al":"center"},{"c":"F11","v":4,"in":true,"al":"center"},{"c":"G11","v":32,"in":true,"al":"center"},{"c":"H11","v":128,"f":"=F11*G11","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I11","v":1.8,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J11","v":230.4,"f":"=ROUND(H11*I11, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K11","v":0.617,"f":"=ROUND((E11^2)/162, 3)","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L11","v":142.16,"f":"=ROUND(J11*K11, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M11","v":0,"f":"=IF(E11=8, L11, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N11","v":142.16,"f":"=IF(E11=10, L11, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O11","v":0,"f":"=IF(E11=16, L11, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P11","v":0,"f":"=IF(E11=18, L11, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q11","v":0,"f":"=IF(E11=20, L11, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R11","v":0,"f":"=IF(E11=25, L11, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":12,"h":35.0,"cells":[{"c":"A12","v":"C1","bg":"#F8FAFC","al":"center"},{"c":"B12","v":"04","bg":"#F8FAFC","al":"center"},{"c":"C12","v":"كانة داخلية حجاب (ماسة)","bg":"#F8FAFC"},{"c":"D12","v":"Code 51 (كانة بقفل)","bg":"#F8FAFC","al":"center"},{"c":"E12","v":8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F12","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G12","v":24,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H12","v":96,"f":"=F12*G12","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I12","v":1.35,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J12","v":129.6,"f":"=ROUND(H12*I12, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K12","v":0.395,"f":"=ROUND((E12^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L12","v":51.19,"f":"=ROUND(J12*K12, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M12","v":51.19,"f":"=IF(E12=8, L12, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N12","v":0,"f":"=IF(E12=10, L12, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O12","v":0,"f":"=IF(E12=16, L12, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P12","v":0,"f":"=IF(E12=18, L12, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q12","v":0,"f":"=IF(E12=20, L12, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R12","v":0,"f":"=IF(E12=25, L12, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":13,"h":35.0,"cells":[{"c":"A13","v":"C2","al":"center"},{"c":"B13","v":"05","al":"center"},{"c":"C13","v":"حديد رأسي رئيسي (قوائم العمود)"},{"c":"D13","v":"Code 00 (مستقيم)","al":"center"},{"c":"E13","v":18,"in":true,"al":"center"},{"c":"F13","v":6,"in":true,"al":"center"},{"c":"G13","v":10,"in":true,"al":"center"},{"c":"H13","v":60,"f":"=F13*G13","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I13","v":4.55,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J13","v":273,"f":"=ROUND(H13*I13, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K13","v":2,"f":"=ROUND((E13^2)/162, 3)","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L13","v":546,"f":"=ROUND(J13*K13, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M13","v":0,"f":"=IF(E13=8, L13, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N13","v":0,"f":"=IF(E13=10, L13, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O13","v":0,"f":"=IF(E13=16, L13, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P13","v":546,"f":"=IF(E13=18, L13, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q13","v":0,"f":"=IF(E13=20, L13, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R13","v":0,"f":"=IF(E13=25, L13, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":14,"h":35.0,"cells":[{"c":"A14","v":"C2","bg":"#F8FAFC","al":"center"},{"c":"B14","v":"06","bg":"#F8FAFC","al":"center"},{"c":"C14","v":"أشاير رقاب الأعمدة بالقواعد","bg":"#F8FAFC"},{"c":"D14","v":"Code 11 (رجل زاوية)","bg":"#F8FAFC","al":"center"},{"c":"E14","v":18,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F14","v":6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G14","v":10,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H14","v":60,"f":"=F14*G14","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I14","v":2.45,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J14","v":147,"f":"=ROUND(H14*I14, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K14","v":2,"f":"=ROUND((E14^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L14","v":294,"f":"=ROUND(J14*K14, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M14","v":0,"f":"=IF(E14=8, L14, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N14","v":0,"f":"=IF(E14=10, L14, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O14","v":0,"f":"=IF(E14=16, L14, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P14","v":294,"f":"=IF(E14=18, L14, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q14","v":0,"f":"=IF(E14=20, L14, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R14","v":0,"f":"=IF(E14=25, L14, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":15,"h":35.0,"cells":[{"c":"A15","v":"C2","al":"center"},{"c":"B15","v":"07","al":"center"},{"c":"C15","v":"كانة خارجية صندوقية محيطية"},{"c":"D15","v":"Code 51 (كانة بقفل)","al":"center"},{"c":"E15","v":10,"in":true,"al":"center"},{"c":"F15","v":6,"in":true,"al":"center"},{"c":"G15","v":34,"in":true,"al":"center"},{"c":"H15","v":204,"f":"=F15*G15","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I15","v":2,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J15","v":408,"f":"=ROUND(H15*I15, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K15","v":0.617,"f":"=ROUND((E15^2)/162, 3)","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L15","v":251.74,"f":"=ROUND(J15*K15, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M15","v":0,"f":"=IF(E15=8, L15, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N15","v":251.74,"f":"=IF(E15=10, L15, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O15","v":0,"f":"=IF(E15=16, L15, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P15","v":0,"f":"=IF(E15=18, L15, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q15","v":0,"f":"=IF(E15=20, L15, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R15","v":0,"f":"=IF(E15=25, L15, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":16,"h":35.0,"cells":[{"c":"A16","v":"C2","bg":"#F8FAFC","al":"center"},{"c":"B16","v":"08","bg":"#F8FAFC","al":"center"},{"c":"C16","v":"كانة داخلية أوتوماتيكية 4 فروع","bg":"#F8FAFC"},{"c":"D16","v":"Code 51 (كانة بقفل)","bg":"#F8FAFC","al":"center"},{"c":"E16","v":10,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F16","v":6,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G16","v":34,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H16","v":204,"f":"=F16*G16","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I16","v":1.55,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J16","v":316.2,"f":"=ROUND(H16*I16, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K16","v":0.617,"f":"=ROUND((E16^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L16","v":195.1,"f":"=ROUND(J16*K16, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M16","v":0,"f":"=IF(E16=8, L16, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N16","v":195.1,"f":"=IF(E16=10, L16, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O16","v":0,"f":"=IF(E16=16, L16, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P16","v":0,"f":"=IF(E16=18, L16, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q16","v":0,"f":"=IF(E16=20, L16, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R16","v":0,"f":"=IF(E16=25, L16, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":17,"h":35.0,"cells":[{"c":"A17","v":"C3","al":"center"},{"c":"B17","v":"09","al":"center"},{"c":"C17","v":"حديد رأسي رئيسي (قوائم العمود)"},{"c":"D17","v":"Code 00 (مستقيم)","al":"center"},{"c":"E17","v":20,"in":true,"al":"center"},{"c":"F17","v":8,"in":true,"al":"center"},{"c":"G17","v":12,"in":true,"al":"center"},{"c":"H17","v":96,"f":"=F17*G17","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I17","v":4.7,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J17","v":451.2,"f":"=ROUND(H17*I17, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K17","v":2.469,"f":"=ROUND((E17^2)/162, 3)","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L17","v":1114.01,"f":"=ROUND(J17*K17, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M17","v":0,"f":"=IF(E17=8, L17, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N17","v":0,"f":"=IF(E17=10, L17, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O17","v":0,"f":"=IF(E17=16, L17, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P17","v":0,"f":"=IF(E17=18, L17, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q17","v":1114.01,"f":"=IF(E17=20, L17, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R17","v":0,"f":"=IF(E17=25, L17, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":18,"h":35.0,"cells":[{"c":"A18","v":"C3","bg":"#F8FAFC","al":"center"},{"c":"B18","v":"10","bg":"#F8FAFC","al":"center"},{"c":"C18","v":"أشاير رقاب الأعمدة بالقواعد","bg":"#F8FAFC"},{"c":"D18","v":"Code 11 (رجل زاوية)","bg":"#F8FAFC","al":"center"},{"c":"E18","v":20,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F18","v":8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G18","v":12,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H18","v":96,"f":"=F18*G18","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I18","v":2.6,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J18","v":249.6,"f":"=ROUND(H18*I18, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K18","v":2.469,"f":"=ROUND((E18^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L18","v":616.26,"f":"=ROUND(J18*K18, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M18","v":0,"f":"=IF(E18=8, L18, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N18","v":0,"f":"=IF(E18=10, L18, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O18","v":0,"f":"=IF(E18=16, L18, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P18","v":0,"f":"=IF(E18=18, L18, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q18","v":616.26,"f":"=IF(E18=20, L18, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R18","v":0,"f":"=IF(E18=25, L18, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":19,"h":35.0,"cells":[{"c":"A19","v":"C3","al":"center"},{"c":"B19","v":"11","al":"center"},{"c":"C19","v":"كانة خارجية صندوقية محيطية"},{"c":"D19","v":"Code 51 (كانة بقفل)","al":"center"},{"c":"E19","v":10,"in":true,"al":"center"},{"c":"F19","v":8,"in":true,"al":"center"},{"c":"G19","v":36,"in":true,"al":"center"},{"c":"H19","v":288,"f":"=F19*G19","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I19","v":2.3,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J19","v":662.4,"f":"=ROUND(H19*I19, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K19","v":0.617,"f":"=ROUND((E19^2)/162, 3)","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L19","v":408.7,"f":"=ROUND(J19*K19, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M19","v":0,"f":"=IF(E19=8, L19, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N19","v":408.7,"f":"=IF(E19=10, L19, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O19","v":0,"f":"=IF(E19=16, L19, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P19","v":0,"f":"=IF(E19=18, L19, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q19","v":0,"f":"=IF(E19=20, L19, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R19","v":0,"f":"=IF(E19=25, L19, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":20,"h":35.0,"cells":[{"c":"A20","v":"C3","bg":"#F8FAFC","al":"center"},{"c":"B20","v":"12","bg":"#F8FAFC","al":"center"},{"c":"C20","v":"كانات داخلية متصالبة وكلبسات","bg":"#F8FAFC"},{"c":"D20","v":"Code 51 (كانة بقفل)","bg":"#F8FAFC","al":"center"},{"c":"E20","v":10,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F20","v":8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G20","v":36,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H20","v":288,"f":"=F20*G20","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I20","v":1.85,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J20","v":532.8,"f":"=ROUND(H20*I20, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K20","v":0.617,"f":"=ROUND((E20^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L20","v":328.74,"f":"=ROUND(J20*K20, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M20","v":0,"f":"=IF(E20=8, L20, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N20","v":328.74,"f":"=IF(E20=10, L20, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O20","v":0,"f":"=IF(E20=16, L20, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P20","v":0,"f":"=IF(E20=18, L20, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q20","v":0,"f":"=IF(E20=20, L20, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R20","v":0,"f":"=IF(E20=25, L20, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":21,"h":35.0,"cells":[{"c":"A21","v":"C4","al":"center"},{"c":"B21","v":"13","al":"center"},{"c":"C21","v":"حديد رأسي رئيسي (قوائم العمود)"},{"c":"D21","v":"Code 00 (مستقيم)","al":"center"},{"c":"E21","v":20,"in":true,"al":"center"},{"c":"F21","v":4,"in":true,"al":"center"},{"c":"G21","v":16,"in":true,"al":"center"},{"c":"H21","v":64,"f":"=F21*G21","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I21","v":5.25,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J21","v":336,"f":"=ROUND(H21*I21, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K21","v":2.469,"f":"=ROUND((E21^2)/162, 3)","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L21","v":829.58,"f":"=ROUND(J21*K21, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M21","v":0,"f":"=IF(E21=8, L21, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N21","v":0,"f":"=IF(E21=10, L21, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O21","v":0,"f":"=IF(E21=16, L21, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P21","v":0,"f":"=IF(E21=18, L21, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q21","v":829.58,"f":"=IF(E21=20, L21, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R21","v":0,"f":"=IF(E21=25, L21, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":22,"h":35.0,"cells":[{"c":"A22","v":"C4","bg":"#F8FAFC","al":"center"},{"c":"B22","v":"14","bg":"#F8FAFC","al":"center"},{"c":"C22","v":"أشاير رقاب الأعمدة بالقواعد","bg":"#F8FAFC"},{"c":"D22","v":"Code 11 (رجل زاوية)","bg":"#F8FAFC","al":"center"},{"c":"E22","v":20,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F22","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G22","v":16,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H22","v":64,"f":"=F22*G22","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I22","v":2.8,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J22","v":179.2,"f":"=ROUND(H22*I22, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K22","v":2.469,"f":"=ROUND((E22^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L22","v":442.44,"f":"=ROUND(J22*K22, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M22","v":0,"f":"=IF(E22=8, L22, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N22","v":0,"f":"=IF(E22=10, L22, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O22","v":0,"f":"=IF(E22=16, L22, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P22","v":0,"f":"=IF(E22=18, L22, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q22","v":442.44,"f":"=IF(E22=20, L22, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R22","v":0,"f":"=IF(E22=25, L22, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":23,"h":35.0,"cells":[{"c":"A23","v":"C4","al":"center"},{"c":"B23","v":"15","al":"center"},{"c":"C23","v":"كانة خارجية صندوقية محيطية"},{"c":"D23","v":"Code 51 (كانة بقفل)","al":"center"},{"c":"E23","v":10,"in":true,"al":"center"},{"c":"F23","v":4,"in":true,"al":"center"},{"c":"G23","v":42,"in":true,"al":"center"},{"c":"H23","v":168,"f":"=F23*G23","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I23","v":2.6,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J23","v":436.8,"f":"=ROUND(H23*I23, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K23","v":0.617,"f":"=ROUND((E23^2)/162, 3)","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L23","v":269.51,"f":"=ROUND(J23*K23, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M23","v":0,"f":"=IF(E23=8, L23, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N23","v":269.51,"f":"=IF(E23=10, L23, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O23","v":0,"f":"=IF(E23=16, L23, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P23","v":0,"f":"=IF(E23=18, L23, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q23","v":0,"f":"=IF(E23=20, L23, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R23","v":0,"f":"=IF(E23=25, L23, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":24,"h":35.0,"cells":[{"c":"A24","v":"C4","bg":"#F8FAFC","al":"center"},{"c":"B24","v":"16","bg":"#F8FAFC","al":"center"},{"c":"C24","v":"كانات داخلية أوتوماتيكية مزدوجة","bg":"#F8FAFC"},{"c":"D24","v":"Code 51 (كانة بقفل)","bg":"#F8FAFC","al":"center"},{"c":"E24","v":10,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F24","v":4,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G24","v":42,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H24","v":168,"f":"=F24*G24","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I24","v":2.1,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J24","v":352.8,"f":"=ROUND(H24*I24, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K24","v":0.617,"f":"=ROUND((E24^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L24","v":217.68,"f":"=ROUND(J24*K24, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M24","v":0,"f":"=IF(E24=8, L24, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N24","v":217.68,"f":"=IF(E24=10, L24, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O24","v":0,"f":"=IF(E24=16, L24, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P24","v":0,"f":"=IF(E24=18, L24, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q24","v":0,"f":"=IF(E24=20, L24, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R24","v":0,"f":"=IF(E24=25, L24, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":25,"h":35.0,"cells":[{"c":"A25","v":"CC1","al":"center"},{"c":"B25","v":"17","al":"center"},{"c":"C25","v":"حديد رأسي رئيسي للعمود الدائري"},{"c":"D25","v":"Code 00 (مستقيم)","al":"center"},{"c":"E25","v":20,"in":true,"al":"center"},{"c":"F25","v":2,"in":true,"al":"center"},{"c":"G25","v":10,"in":true,"al":"center"},{"c":"H25","v":20,"f":"=F25*G25","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I25","v":5.65,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J25","v":113,"f":"=ROUND(H25*I25, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K25","v":2.469,"f":"=ROUND((E25^2)/162, 3)","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L25","v":279,"f":"=ROUND(J25*K25, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M25","v":0,"f":"=IF(E25=8, L25, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N25","v":0,"f":"=IF(E25=10, L25, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O25","v":0,"f":"=IF(E25=16, L25, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P25","v":0,"f":"=IF(E25=18, L25, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q25","v":279,"f":"=IF(E25=20, L25, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R25","v":0,"f":"=IF(E25=25, L25, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":26,"h":35.0,"cells":[{"c":"A26","v":"CC1","bg":"#F8FAFC","al":"center"},{"c":"B26","v":"18","bg":"#F8FAFC","al":"center"},{"c":"C26","v":"أشاير العمود الدائري بالقاعدة","bg":"#F8FAFC"},{"c":"D26","v":"Code 11 (رجل زاوية)","bg":"#F8FAFC","al":"center"},{"c":"E26","v":20,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F26","v":2,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G26","v":10,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H26","v":20,"f":"=F26*G26","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I26","v":2.7,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J26","v":54,"f":"=ROUND(H26*I26, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K26","v":2.469,"f":"=ROUND((E26^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L26","v":133.33,"f":"=ROUND(J26*K26, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M26","v":0,"f":"=IF(E26=8, L26, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N26","v":0,"f":"=IF(E26=10, L26, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O26","v":0,"f":"=IF(E26=16, L26, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P26","v":0,"f":"=IF(E26=18, L26, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q26","v":133.33,"f":"=IF(E26=20, L26, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R26","v":0,"f":"=IF(E26=25, L26, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":27,"h":35.0,"cells":[{"c":"A27","v":"CC1","al":"center"},{"c":"B27","v":"19","al":"center"},{"c":"C27","v":"كانة حلزونية متصلة مستمرة"},{"c":"D27","v":"Code 77 (حلزوني)","al":"center"},{"c":"E27","v":10,"in":true,"al":"center"},{"c":"F27","v":2,"in":true,"al":"center"},{"c":"G27","v":1,"in":true,"al":"center"},{"c":"H27","v":2,"f":"=F27*G27","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I27","v":142.5,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J27","v":285,"f":"=ROUND(H27*I27, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K27","v":0.617,"f":"=ROUND((E27^2)/162, 3)","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L27","v":175.84,"f":"=ROUND(J27*K27, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M27","v":0,"f":"=IF(E27=8, L27, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N27","v":175.84,"f":"=IF(E27=10, L27, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O27","v":0,"f":"=IF(E27=16, L27, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P27","v":0,"f":"=IF(E27=18, L27, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q27","v":0,"f":"=IF(E27=20, L27, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R27","v":0,"f":"=IF(E27=25, L27, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":28,"h":35.0,"cells":[{"c":"A28","v":"CC2","bg":"#F8FAFC","al":"center"},{"c":"B28","v":"20","bg":"#F8FAFC","al":"center"},{"c":"C28","v":"حديد رأسي رئيسي للعمود الدائري","bg":"#F8FAFC"},{"c":"D28","v":"Code 00 (مستقيم)","bg":"#F8FAFC","al":"center"},{"c":"E28","v":18,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F28","v":2,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"G28","v":8,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"H28","v":16,"f":"=F28*G28","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I28","v":4.85,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J28","v":77.6,"f":"=ROUND(H28*I28, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K28","v":2,"f":"=ROUND((E28^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L28","v":155.2,"f":"=ROUND(J28*K28, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M28","v":0,"f":"=IF(E28=8, L28, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N28","v":0,"f":"=IF(E28=10, L28, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O28","v":0,"f":"=IF(E28=16, L28, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P28","v":155.2,"f":"=IF(E28=18, L28, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q28","v":0,"f":"=IF(E28=20, L28, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R28","v":0,"f":"=IF(E28=25, L28, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":29,"h":35.0,"cells":[{"c":"A29","v":"CC2","al":"center"},{"c":"B29","v":"21","al":"center"},{"c":"C29","v":"كانة حلزونية متصلة مستمرة"},{"c":"D29","v":"Code 77 (حلزوني)","al":"center"},{"c":"E29","v":10,"in":true,"al":"center"},{"c":"F29","v":2,"in":true,"al":"center"},{"c":"G29","v":1,"in":true,"al":"center"},{"c":"H29","v":2,"f":"=F29*G29","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I29","v":98.2,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"J29","v":196.4,"f":"=ROUND(H29*I29, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K29","v":0.617,"f":"=ROUND((E29^2)/162, 3)","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L29","v":121.18,"f":"=ROUND(J29*K29, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M29","v":0,"f":"=IF(E29=8, L29, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N29","v":121.18,"f":"=IF(E29=10, L29, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O29","v":0,"f":"=IF(E29=16, L29, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P29","v":0,"f":"=IF(E29=18, L29, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q29","v":0,"f":"=IF(E29=20, L29, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R29","v":0,"f":"=IF(E29=25, L29, 0)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":30,"h":40.0,"cells":[{"c":"A30","v":"إجمالي الأوزان الصافية لكل قطر (Net Steel Weight - kg):","bg":"#E2E8F0","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"L30","v":6912.94,"f":"=SUM(L9:L29)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M30","v":51.19,"f":"=SUM(M9:M29)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N30","v":2110.65,"f":"=SUM(N9:N29)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O30","v":341.28,"f":"=SUM(O9:O29)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P30","v":995.2,"f":"=SUM(P9:P29)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q30","v":3414.62,"f":"=SUM(Q9:Q29)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R30","v":0,"f":"=SUM(R9:R29)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":31,"h":36.0,"cells":[{"c":"A31","v":"نسبة هالك وفواقد التقطيع الموقعية (Scrap Allowance 3.0%):","bg":"#F1F5F9","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"L31","v":207.39,"f":"=ROUND(L30*0.03, 2)","bg":"#F1F5F9","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M31","v":1.54,"f":"=ROUND(M30*0.03, 2)","bg":"#F1F5F9","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"N31","v":63.32,"f":"=ROUND(N30*0.03, 2)","bg":"#F1F5F9","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"O31","v":10.24,"f":"=ROUND(O30*0.03, 2)","bg":"#F1F5F9","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"P31","v":29.86,"f":"=ROUND(P30*0.03, 2)","bg":"#F1F5F9","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"Q31","v":102.44,"f":"=ROUND(Q30*0.03, 2)","bg":"#F1F5F9","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R31","v":0,"f":"=ROUND(R30*0.03, 2)","bg":"#F1F5F9","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]},{"r":32,"h":46.0,"cells":[{"c":"A32","v":"الإجمالي الكلي لطلبيات التوريد شامل الهالك بالأطنان (Gross Total in Metric Tons):","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"L32","v":7.12,"f":"=ROUND((L30+L31)/1000, 3)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"M32","v":0.053,"f":"=ROUND((M30+M31)/1000, 3)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"N32","v":2.174,"f":"=ROUND((N30+N31)/1000, 3)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"O32","v":0.352,"f":"=ROUND((O30+O31)/1000, 3)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"P32","v":1.025,"f":"=ROUND((P30+P31)/1000, 3)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"Q32","v":3.517,"f":"=ROUND((Q30+Q31)/1000, 3)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"R32","v":0,"f":"=ROUND((R30+R31)/1000, 3)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""}]}]},{"name":"حصر الكميات والتسعير وقائمة QC","maxRow":29,"maxCol":8,"colWidths":[12.0,52.0,16.0,20.0,24.0,13.0,34.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول الكميات والتسعير ومقايسة أعمال الأعمدة الخرسانية وقائمة الفحص والاستلام QC","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"جدول الكميات مرتبط ببيانات الحصر والـ BBS | الفئات تشمل الخرسانة والحديد والنجارة | قائمة فحص الجودة تضمن الاستلام وفق الكود","bg":"#F1F5F9","fg":"#475569","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":13.9,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: جدول الكميات والتسعير المالي لبنود الأعمدة الخرسانية (Bill of Quantities - BOQ)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":40.0,"cells":[{"c":"A5","v":"رقم البند","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"توصيف بند الأعمال والمواصفات الفنية","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"الوحدة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"الكمية المحصورة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"الفئة / السعر الإفرادي (SAR)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"الإجمالي الكلي (SAR)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"معادلة الحصر والمصدر","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"حالة البند","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":104.0,"cells":[{"c":"A6","v":1,"bg":"#F8FAFC","al":"center"},{"c":"B6","v":"توريد وصب خرسانة مسلحة جاهزة للأعمدة رتبة C35 (مقاومة أسطوانية f'c = 35 MPa) شاملة المواد والإضافات ومضخة الصب والهزازات والمعالجة بالخيش المبلل لمدة 7 أيام وفق الكود السعودي SBC 304.","bg":"#F8FAFC"},{"c":"C6","v":"م³","bg":"#F8FAFC","al":"center"},{"c":"D6","v":68.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E6","v":310,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F6","v":21235,"f":"=ROUND(D6*E6, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G6","v":"حصر هندسي صافي من المساقط","bg":"#F8FAFC","al":"center"},{"c":"H6","v":"بند رئيسي 🏗️","bg":"#F8FAFC","al":"center"}]},{"r":7,"h":104.0,"cells":[{"c":"A7","v":2,"al":"center"},{"c":"B7","v":"توريد وتقطيع وتشكيل وتركيب حديد تسليح عالي المقاومة صلب 420 (Grade 60) للأسياخ الطولية الرئيسية للأعمدة بكافة الأقطار (Φ16، Φ18، Φ20) شاملاً الهالك والوصلات والكراسي والتربيط بسلك رباط مجلفن."},{"c":"C7","v":"طن","al":"center"},{"c":"D7","v":8.42,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E7","v":3450,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F7","v":29049,"f":"=ROUND(D7*E7, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G7","v":0,"f":"='تفريد حديد الأعمدة BBS'!L32 - أقطار رئيسية","al":"center"},{"c":"H7","v":"بند رئيسي ⛓️","al":"center"}]},{"r":8,"h":104.0,"cells":[{"c":"A8","v":3,"bg":"#F8FAFC","al":"center"},{"c":"B8","v":"توريد وتشكيل وتركيب حديد تسليح الكانات الصندوقية والأوتوماتيكية والحلزونية صلب 280/420 بأقطار (Φ8، Φ10) شاملة الأقفال الزلزالية 135 درجة والكلبسات وتكثيف أطراف الأعمدة وفق المخططات.","bg":"#F8FAFC"},{"c":"C8","v":"طن","bg":"#F8FAFC","al":"center"},{"c":"D8","v":2.85,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E8","v":3550,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F8","v":10117.5,"f":"=ROUND(D8*E8, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G8","v":2.227,"f":"='تفريد حديد الأعمدة BBS'!M32+'تفريد حديد الأعمدة BBS'!N32","bg":"#F8FAFC","al":"center"},{"c":"H8","v":"بند رئيسي ⛓️","bg":"#F8FAFC","al":"center"}]},{"r":9,"h":104.0,"cells":[{"c":"A9","v":4,"al":"center"},{"c":"B9","v":"مصنعيات ومواد نجارة الأعمدة الخرسانية باستخدام ألواح خشب البلايوود المصفح عالي الجودة (Film-Faced Plywood) شاملة القمط والزراجين والدكم وتأكيس الحطات وضبط الرأسية تماماً بميزان الخيط والبلبل."},{"c":"C9","v":"م²","al":"center"},{"c":"D9","v":485,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E9","v":75,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F9","v":36375,"f":"=ROUND(D9*E9, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G9","v":"المساحة الملامسة للخرسانة لجميع الأعمدة","al":"center"},{"c":"H9","v":"بند رئيسي 📐","al":"center"}]},{"r":10,"h":104.0,"cells":[{"c":"A10","v":5,"bg":"#F8FAFC","al":"center"},{"c":"B10","v":"توريد وتركيب بسكوت خرساني أو بلاستيكي دائري ثقيل (Heavy-Duty Spacers) لضمان الغطاء الخرساني الصافي 40 مم للأعمدة من كافة الجهات بمعدل لا يقل عن 4 قطع لكل متر طولي.","bg":"#F8FAFC"},{"c":"C10","v":"مقطوعية","bg":"#F8FAFC","al":"center"},{"c":"D10","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E10","v":1200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F10","v":1200,"f":"=ROUND(D10*E10, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G10","v":"مقطوعية شاملة لكامل المشروع","bg":"#F8FAFC","al":"center"},{"c":"H10","v":"بند تكميلي ⚙️","bg":"#F8FAFC","al":"center"}]},{"r":11,"h":38.0,"cells":[{"c":"A11","v":"إجمالي التكلفة المباشرة لبنود الأعمدة (Total Direct Cost):","bg":"#E2E8F0","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F11","v":97976.5,"f":"=SUM(F6:F10)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G11","v":"","bg":"#E2E8F0","al":"center"},{"c":"H11","v":"","bg":"#E2E8F0","al":"center"}]},{"r":12,"h":38.0,"cells":[{"c":"A12","v":"المصاريف غير المباشرة للموقع والتأمينات وإدارة المشروع (Site Overheads 7%):","bg":"#F1F5F9","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F12","v":6858.35,"f":"=ROUND(F11*0.07, 2)","bg":"#F1F5F9","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G12","v":"","bg":"#F1F5F9","al":"center"},{"c":"H12","v":"","bg":"#F1F5F9","al":"center"}]},{"r":13,"h":38.0,"cells":[{"c":"A13","v":"هامش الربح التشغيلي لمقاول الهيكل الإنشائي (Profit Margin 8%):","bg":"#F1F5F9","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F13","v":7838.12,"f":"=ROUND(F11*0.08, 2)","bg":"#F1F5F9","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G13","v":"","bg":"#F1F5F9","al":"center"},{"c":"H13","v":"","bg":"#F1F5F9","al":"center"}]},{"r":14,"h":38.0,"cells":[{"c":"A14","v":"المجموع الإجمالي قبل ضريبة القيمة المضافة (Total Subtotal before Tax):","bg":"#E2E8F0","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F14","v":112672.97,"f":"=F11+F12+F13","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G14","v":"","bg":"#E2E8F0","al":"center"},{"c":"H14","v":"","bg":"#E2E8F0","al":"center"}]},{"r":15,"h":38.0,"cells":[{"c":"A15","v":"ضريبة القيمة المضافة (VAT 15%):","bg":"#F1F5F9","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F15","v":16900.95,"f":"=ROUND(F14*0.15, 2)","bg":"#F1F5F9","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G15","v":"","bg":"#F1F5F9","al":"center"},{"c":"H15","v":"","bg":"#F1F5F9","al":"center"}]},{"r":16,"h":46.0,"cells":[{"c":"A16","v":"الإجمالي العام الكلي لتنفيذ أعمدة المشروع (Grand Total Project Cost):","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F16","v":129573.92,"f":"=F14+F15","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G16","v":"","bg":"#1E3A8A","al":"center"},{"c":"H16","v":"","bg":"#1E3A8A","al":"center"}]},{"r":17,"h":28.0,"cells":[{"c":"A17","v":""},{"c":"B17","v":""},{"c":"C17","v":""},{"c":"D17","v":""},{"c":"E17","v":""},{"c":"F17","v":""},{"c":"G17","v":""},{"c":"H17","v":""}]},{"r":18,"h":38.0,"cells":[{"c":"A18","v":"ثانياً: قائمة فحص واستلام جودة حديد ونجارة وصب الأعمدة بالموقع (Quality Control Site Checklist)","bg":"#B45309","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":"م","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B19","v":"بند الفحص والاستلام الفني","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C19","v":"المعيار الهندسي والمحدد الكودي","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D19","v":"طريقة التحقق الموقعي","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E19","v":"حالة المطابقة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F19","v":"اسم مهندس الاستلام","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G19","v":"تاريخ الفحص","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H19","v":"ملاحظات الاستشاري","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":20,"h":104.0,"cells":[{"c":"A20","v":1,"bg":"#F8FAFC","al":"center"},{"c":"B20","v":"مطابقة تأكيس ومحاور حطات الأعمدة مع المخططات الإنشائية والمعمارية المعتمدة.","bg":"#F8FAFC"},{"c":"C20","v":"التفاوت المسموح ± 5 مم كحد أقصى (SBC 304 / ACI 117)","bg":"#F8FAFC"},{"c":"D20","v":"جهاز Total Station وميزان الخيط من المحاور","bg":"#F8FAFC","al":"center"},{"c":"E20","v":"مطابق ومقبول ✅","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"},{"c":"F20","v":"م. خالد الشمري","bg":"#F8FAFC","al":"center"},{"c":"G20","v":"2026/10/31","bg":"#F8FAFC","al":"center"},{"c":"H20","v":"تم التأكيس بدقة تامة","bg":"#F8FAFC","al":"center"}]},{"r":21,"h":104.0,"cells":[{"c":"A21","v":2,"al":"center"},{"c":"B21","v":"فحص رأسية واستقامة الشدة الخشبية للعمود في الاتجاهين المتعامدين بكامل الارتفاع."},{"c":"C21","v":"الانحراف عن الرأسية لا يتجاوز H/1000 ولا يزيد عن 6 مم"},{"c":"D21","v":"ميزان البلبل / ميزان الخيط المزدوج من زاويتين","al":"center"},{"c":"E21","v":"مطابق ومقبول ✅","fg":"#16A34A","b":true,"al":"center"},{"c":"F21","v":"م. أحمد عبد العزيز","al":"center"},{"c":"G21","v":"2026/10/31","al":"center"},{"c":"H21","v":"تم وزن الرأسية وضبط الدكم","al":"center"}]},{"r":22,"h":104.0,"cells":[{"c":"A22","v":3,"bg":"#F8FAFC","al":"center"},{"c":"B22","v":"مراجعة عدد وأقطار الأسياخ الطولية وتوزيعها المنتظم حول محيط العمود.","bg":"#F8FAFC"},{"c":"C22","v":"مطابقة تامة لجدول التسليح ونماذج C1-C8 و CC1-CC4","bg":"#F8FAFC"},{"c":"D22","v":"المعاينة البصرية والعد اليدوي للأسياخ","bg":"#F8FAFC","al":"center"},{"c":"E22","v":"مطابق ومقبول ✅","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"},{"c":"F22","v":"م. خالد الشمري","bg":"#F8FAFC","al":"center"},{"c":"G22","v":"2026/10/31","bg":"#F8FAFC","al":"center"},{"c":"H22","v":"توزيع منتظم مع كلبسات الربط","bg":"#F8FAFC","al":"center"}]},{"r":23,"h":52.0,"cells":[{"c":"A23","v":4,"al":"center"},{"c":"B23","v":"فحص أطوال وصلات تراكب الأسياخ الطولية ومراعاة تناوب الوصلات (Staggered Splices)."},{"c":"C23","v":"طول الوصلة لا يقل عن 60 مرة قطر السيخ (60Φ)"},{"c":"D23","v":"شريط القياس المعدني بدقة مم","al":"center"},{"c":"E23","v":"مطابق ومقبول ✅","fg":"#16A34A","b":true,"al":"center"},{"c":"F23","v":"م. أحمد عبد العزيز","al":"center"},{"c":"G23","v":"2026/10/31","al":"center"},{"c":"H23","v":"الوصلات متناوبة بنسبة 50%","al":"center"}]},{"r":24,"h":104.0,"cells":[{"c":"A24","v":5,"bg":"#F8FAFC","al":"center"},{"c":"B24","v":"مراجعة تكثيف الكانات في الثلث السفلي والعلوي للعمود (منطقة lo) وزاوية القفل 135°.","bg":"#F8FAFC"},{"c":"C24","v":"المسافة so ≤ 100 مم وقفل الكانة 135° بطول 10db بالتناوب","bg":"#F8FAFC"},{"c":"D24","v":"شريط القياس والتأكد من تبادل أماكن الأقفال","bg":"#F8FAFC","al":"center"},{"c":"E24","v":"مطابق ومقبول ✅","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"},{"c":"F24","v":"م. خالد الشمري","bg":"#F8FAFC","al":"center"},{"c":"G24","v":"2026/10/31","bg":"#F8FAFC","al":"center"},{"c":"H24","v":"تم التكثيف بقفل 135°","bg":"#F8FAFC","al":"center"}]},{"r":25,"h":104.0,"cells":[{"c":"A25","v":6,"al":"center"},{"c":"B25","v":"التأكد من تركيب البسكوت الخرساني/البلاستيكي لضمان الغطاء الخرساني الصافي (40 مم)."},{"c":"C25","v":"غطاء خرساني 40 مم في 4 أوجه العمود (SBC 304 Table 20.6)"},{"c":"D25","v":"فحص وجود البسكوت الدائري كل 80 سم","al":"center"},{"c":"E25","v":"مطابق ومقبول ✅","fg":"#16A34A","b":true,"al":"center"},{"c":"F25","v":"م. أحمد عبد العزيز","al":"center"},{"c":"G25","v":"2026/10/31","al":"center"},{"c":"H25","v":"مركب بسكوت بلاستيكي ثقيل","al":"center"}]},{"r":26,"h":104.0,"cells":[{"c":"A26","v":7,"bg":"#F8FAFC","al":"center"},{"c":"B26","v":"نظافة كعب وقاعدة العمود من نشارة الخشب والأتربة وبقايا الصب السابقة وفتح شباك نظافة.","bg":"#F8FAFC"},{"c":"C26","v":"خلو كعب العمود تماماً من المخلفات وترطيبه بالمياه","bg":"#F8FAFC"},{"c":"D26","v":"المعاينة بالعين وكشاف الإضاءة من شباك النظافة","bg":"#F8FAFC","al":"center"},{"c":"E26","v":"مطابق ومقبول ✅","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"},{"c":"F26","v":"م. خالد الشمري","bg":"#F8FAFC","al":"center"},{"c":"G26","v":"2026/10/31","bg":"#F8FAFC","al":"center"},{"c":"H26","v":"تم تنظيف الكعب بالهواء المضغوط","bg":"#F8FAFC","al":"center"}]},{"r":27,"h":104.0,"cells":[{"c":"A27","v":8,"al":"center"},{"c":"B27","v":"فحص متانة تقويات الشدة الخشبية والزراجين والدكم لمنع انفراج القالب أثناء الصب."},{"c":"C27","v":"الشدة تتحمل ضغط الخرسانة الطازجة الرأسي والجانبي (ACI 347)"},{"c":"D27","v":"فحص القمط والشنابر والدكم المائلة المشدودة","al":"center"},{"c":"E27","v":"مطابق ومقبول ✅","fg":"#16A34A","b":true,"al":"center"},{"c":"F27","v":"م. أحمد عبد العزيز","al":"center"},{"c":"G27","v":"2026/10/31","al":"center"},{"c":"H27","v":"التقويات مدعمة بدكم أرضية محكمة","al":"center"}]},{"r":28,"h":72.0,"cells":[{"c":"A28","v":9,"bg":"#F8FAFC","al":"center"},{"c":"B28","v":"استخدام ماسورة صب مرنة (Tremie / Drop chute) لمنع الانفصال الحبيبي من ارتفاع > 1.5 م.","bg":"#F8FAFC"},{"c":"C28","v":"أقصى ارتفاع سقوط حر للخرسانة لا يتجاوز 1.5 متر","bg":"#F8FAFC"},{"c":"D28","v":"التأكد من وصول خرطوم المضخة لداخل العمود","bg":"#F8FAFC","al":"center"},{"c":"E28","v":"مطابق ومقبول ✅","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"},{"c":"F28","v":"م. خالد الشمري","bg":"#F8FAFC","al":"center"},{"c":"G28","v":"2026/10/31","bg":"#F8FAFC","al":"center"},{"c":"H28","v":"خرطوم المضخة يدخل 2 م داخل العمود","bg":"#F8FAFC","al":"center"}]},{"r":29,"h":104.0,"cells":[{"c":"A29","v":10,"al":"center"},{"c":"B29","v":"التشغيل السليم للهزاز الميكانيكي على طبقات (40-50 سم) والمعالجة بالرش لمدة 7 أيام."},{"c":"C29","v":"اهتزاز كافٍ دون الإفراط لمنع الانفصال وتغطية بالخيش المبلل"},{"c":"D29","v":"مراقبة زمن الغرس وسحب الهزاز رأسياً ببطء","al":"center"},{"c":"E29","v":"مطابق ومقبول ✅","fg":"#16A34A","b":true,"al":"center"},{"c":"F29","v":"م. أحمد عبد العزيز","al":"center"},{"c":"G29","v":"2026/10/31","al":"center"},{"c":"H29","v":"تم التنبيه بالمعالجة الفورية بعد الفك","al":"center"}]}]}]}