{"slug":"retaining-walls-gabions-mechanically-stabilized-earth-mse-and-slope-protection-boq-sheet","sheets":[{"name":"مقايسة الحوائط والجابيون","maxRow":26,"maxCol":9,"colWidths":[12.0,22.0,54.0,10.0,16.0,14.0,20.0,15.0,22.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"مقايسة الحوائط الساندة الخرسانية والجابيونات والتربة المسلحة (MSE) وحماية الميول الصخرية","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"جدول الكميات والأسعار التفصيلي (BOQ) لمنشآت سند التربة وتكسية الميول وتصريف المياه الخلفية وفق ACI 318 و FHWA و ASTM A975 و SBC 303","bg":"#1B6B93","fg":"#E2E8F0","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"اسم المشروع:","bg":"#E2E8F0","b":true},{"c":"B4","v":"أعمال الحوائط الساندة وتثبيت الميول وحماية السيول بالمشروع","bg":"#FFFBEB","cs":2},{"skip":true},{"c":"D4","v":"الجهة المالكة:","bg":"#E2E8F0","b":true},{"c":"E4","v":"إدارة مشروعات البنية التحتية والأعمال المدنية","bg":"#FFFBEB","cs":2},{"skip":true},{"c":"G4","v":"تاريخ المقايسة:","bg":"#E2E8F0","b":true},{"c":"H4","v":"2026-11-07","bg":"#FFFBEB","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"الاستشاري الهندسي:","bg":"#E2E8F0","b":true},{"c":"B5","v":"مكتب الاستشارات الهندسية الجيوتقنية والإنشائية","bg":"#FFFBEB","cs":2},{"skip":true},{"c":"D5","v":"الكود المرجعي:","bg":"#E2E8F0","b":true},{"c":"E5","v":"ACI 318 / AASHTO LRFD / FHWA-NHI-10-024 / ASTM A975","bg":"#FFFBEB","cs":2},{"skip":true},{"c":"G5","v":"نسبة ضريبة القيمة المضافة:","bg":"#E2E8F0","b":true},{"c":"H5","v":0.15,"in":true,"bg":"#FFFBEB","b":true,"al":"center","nf":"0.0%","cs":2},{"skip":true}]},{"r":6,"h":28.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":""},{"c":"C6","v":""},{"c":"D6","v":""},{"c":"E6","v":""},{"c":"F6","v":""},{"c":"G6","v":""},{"c":"H6","v":""},{"c":"I6","v":""}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"كود البند","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B7","v":"قسم الأعمال","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C7","v":"بيان ومواصفات البند الفنية (شامل التوريد والمصنعية والشدات والاختبارات)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D7","v":"الوحدة","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E7","v":"الكمية الهندسية","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F7","v":"نسبة الهالك %","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G7","v":"الكمية شاملة الهالك [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H7","v":"سعر الوحدة","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I7","v":"الإجمالي الكلي [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":8,"h":72.0,"cells":[{"c":"A8","v":"RTW-01","b":true,"al":"center"},{"c":"B8","v":"الحوائط الساندة الخرسانية","al":"center"},{"c":"C8","v":"حفر وتسوية خنادق أساسات الحوائط الساندة في جميع أنواع التربة شاملة نزح المياه السطحية ودك قاع الحفر حتى 95% بروكتور معدل وترحيل الفائض"},{"c":"D8","v":"م3","al":"center"},{"c":"E8","v":3800,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F8","v":0,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G8","v":3800,"f":"=ROUND(E8*(1+F8),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H8","v":32,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I8","v":121600,"f":"=ROUND(G8*H8,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":9,"h":72.0,"cells":[{"c":"A9","v":"RTW-02","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B9","v":"الحوائط الساندة الخرسانية","bg":"#F4F7FA","al":"center"},{"c":"C9","v":"توريد وصب خرسانة عادية لفرشة النظافة أسفل قواعد الحوائط الساندة (Lean Concrete C15/20 سمك 10 سم) باستخدام أسمنت مقاوم للكبريتات","bg":"#F4F7FA"},{"c":"D9","v":"م3","bg":"#F4F7FA","al":"center"},{"c":"E9","v":280,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F9","v":0.03,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G9","v":288.4,"f":"=ROUND(E9*(1+F9),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H9","v":310,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I9","v":89404,"f":"=ROUND(G9*H9,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":10,"h":72.0,"cells":[{"c":"A10","v":"RTW-03","b":true,"al":"center"},{"c":"B10","v":"الحوائط الساندة الخرسانية","al":"center"},{"c":"C10","v":"توريد وصب خرسانة مسلحة لقواعد الحوائط الساندة وكعب مقاومة الانزلاق (RC Footing Base, Toe, Heel & Shear Key C35/45) شاملة الهز الميكانيكي والمعالجة"},{"c":"D10","v":"م3","al":"center"},{"c":"E10","v":1450,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F10","v":0.03,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G10","v":1493.5,"f":"=ROUND(E10*(1+F10),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H10","v":460,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I10","v":687010,"f":"=ROUND(G10*H10,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"RTW-04","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B11","v":"الحوائط الساندة الخرسانية","bg":"#F4F7FA","al":"center"},{"c":"C11","v":"توريد وصب خرسانة مسلحة لجذع الحائط الساند والدعامات الخلفية (RC Cantilever & Counterfort Wall Stem C35/45) بشدات ملساء Fair-Face وفواصل صب وتمدد","bg":"#F4F7FA"},{"c":"D11","v":"م3","bg":"#F4F7FA","al":"center"},{"c":"E11","v":1620,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F11","v":0.03,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G11","v":1668.6,"f":"=ROUND(E11*(1+F11),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H11","v":520,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I11","v":867672,"f":"=ROUND(G11*H11,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":12,"h":72.0,"cells":[{"c":"A12","v":"RTW-05","b":true,"al":"center"},{"c":"B12","v":"الحوائط الساندة الخرسانية","al":"center"},{"c":"C12","v":"توريد وتشكيل وتركيب حديد تسليح عالي المقاومة لقواعد وجذع الحوائط الساندة (Deformed Steel Rebar ASTM A615 Gr.60, fy = 420 MPa) شامل الكراسي والرباط"},{"c":"D12","v":"طن","al":"center"},{"c":"E12","v":385,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F12","v":0.04,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G12","v":400.4,"f":"=ROUND(E12*(1+F12),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H12","v":3450,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I12","v":1381380,"f":"=ROUND(G12*H12,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":13,"h":128.0,"cells":[{"c":"A13","v":"RTW-06","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B13","v":"الجابيونات الحجرية","bg":"#F4F7FA","al":"center"},{"c":"C13","v":"توريد وتركيب ورص صناديق جابيونات من الشبك الفولاذي المجدول سداسي الفتحات المجلفن بغلاف PVC (PVC-Coated Double-Twisted Gabion Boxes ASTM A975 مقاس 2×1×1 م، فتحة 8×10 سم، سلك 2.7/3.7 مم) مملوءة بأحجار بازلتية أو جرانيتية صلدة متدرجة (100-250 مم، وزن نوعي >= 2.6 طن/م3) مع أسلاك الشد الداخلية","bg":"#F4F7FA"},{"c":"D13","v":"م3","bg":"#F4F7FA","al":"center"},{"c":"E13","v":2400,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F13","v":0.03,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G13","v":2472,"f":"=ROUND(E13*(1+F13),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H13","v":380,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I13","v":939360,"f":"=ROUND(G13*H13,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":14,"h":72.0,"cells":[{"c":"A14","v":"RTW-07","b":true,"al":"center"},{"c":"B14","v":"الجابيونات الحجرية","al":"center"},{"c":"C14","v":"توريد وتركيب مراتب جابيون لتبطين القنوات وقدمات الميول (Reno Gabion Mattresses سمك 30 سم، مقاس 6×2×0.30 م) مملوءة بالأحجار الصلدة شاملة التدبيس المحكم"},{"c":"D14","v":"م2","al":"center"},{"c":"E14","v":1800,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F14","v":0.03,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G14","v":1854,"f":"=ROUND(E14*(1+F14),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H14","v":165,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I14","v":305910,"f":"=ROUND(G14*H14,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":15,"h":104.0,"cells":[{"c":"A15","v":"RTW-08","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B15","v":"حوائط التربة المسلحة MSE","bg":"#F4F7FA","al":"center"},{"c":"C15","v":"توريد وتركيب وحدات واجهات خرسانية مسبقة الصب أو بلوكات متداخلة لحوائط التربة المسلحة (Precast Concrete MSE Facing Panels / Modular Blocks C40) شاملة وسائد الارتكاز المطاطية EPDM ومشابك الربط","bg":"#F4F7FA"},{"c":"D15","v":"م2","bg":"#F4F7FA","al":"center"},{"c":"E15","v":1650,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F15","v":0.02,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G15","v":1683,"f":"=ROUND(E15*(1+F15),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H15","v":290,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I15","v":488070,"f":"=ROUND(G15*H15,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":16,"h":72.0,"cells":[{"c":"A16","v":"RTW-09","b":true,"al":"center"},{"c":"B16","v":"حوائط التربة المسلحة MSE","al":"center"},{"c":"C16","v":"توريد وفرش شبكات تسليح التربة البوليمرية أحادية الاتجاه عالية الشد (Uniaxial HDPE/PET Geogrid Reinforcement T_ult >= 80-120 kN/m) بطبقات متعاقبة حسب التصميم"},{"c":"D16","v":"م2","al":"center"},{"c":"E16","v":9800,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F16","v":0.08,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G16","v":10584,"f":"=ROUND(E16*(1+F16),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H16","v":26,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I16","v":275184,"f":"=ROUND(G16*H16,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":17,"h":104.0,"cells":[{"c":"A17","v":"RTW-10","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B17","v":"حوائط التربة المسلحة MSE","bg":"#F4F7FA","al":"center"},{"c":"C17","v":"توريد وفرش ودمك تربة ردم حبيبية منتقاة حرة التصريف خلف الحائط الساند وداخل منطقة الـ MSE (Select Free-Draining Granular Backfill, Fines <= 15%, φ >= 34°) على طبقات 25 سم بدمك >= 95%","bg":"#F4F7FA"},{"c":"D17","v":"م3","bg":"#F4F7FA","al":"center"},{"c":"E17","v":8500,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F17","v":0.05,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G17","v":8925,"f":"=ROUND(E17*(1+F17),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H17","v":62,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I17","v":553350,"f":"=ROUND(G17*H17,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":18,"h":72.0,"cells":[{"c":"A18","v":"RTW-11","b":true,"al":"center"},{"c":"B18","v":"العزل والتصريف الخلفي","al":"center"},{"c":"C18","v":"توريد وتنفيذ عزل مائي لوجه الحائط الخرساني الملامس للردم (Bituminous Waterproofing Coating + 4mm SBS Membrane + 6mm Dimpled Drainage Protection Board)"},{"c":"D18","v":"م2","al":"center"},{"c":"E18","v":2600,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F18","v":0.05,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G18","v":2730,"f":"=ROUND(E18*(1+F18),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H18","v":78,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I18","v":212940,"f":"=ROUND(G18*H18,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":19,"h":104.0,"cells":[{"c":"A19","v":"RTW-12","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B19","v":"العزل والتصريف الخلفي","bg":"#F4F7FA","al":"center"},{"c":"C19","v":"توريد وتركيب فلتر تصريف خلفي يشمل نسيج جيوتكستايل غير منسوج (Non-Woven Geotextile 250 g/m2) وفلتر حصوي متدرج مع مواسير تصريف مثقبة (Perforated uPVC Drain Pipe DN160) وميازيب تصريف (Weep Holes DN75 @ 2.0m c/c)","bg":"#F4F7FA"},{"c":"D19","v":"م.ط","bg":"#F4F7FA","al":"center"},{"c":"E19","v":480,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F19","v":0.04,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G19","v":499.2,"f":"=ROUND(E19*(1+F19),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H19","v":195,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I19","v":97344,"f":"=ROUND(G19*H19,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":20,"h":72.0,"cells":[{"c":"A20","v":"RTW-13","b":true,"al":"center"},{"c":"B20","v":"العزل والتصريف الخلفي","al":"center"},{"c":"C20","v":"توريد وتركيب شريط مانع مائي من الـ PVC عرض 250 مم عند فواصل الصب والتمدد (PVC Waterstop Internal & External + Polysulfide Joint Sealant)"},{"c":"D20","v":"م.ط","al":"center"},{"c":"E20","v":360,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F20","v":0.05,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G20","v":378,"f":"=ROUND(E20*(1+F20),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H20","v":115,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I20","v":43470,"f":"=ROUND(G20*H20,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":21,"h":104.0,"cells":[{"c":"A21","v":"RTW-14","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B21","v":"حماية وتثبيت الميول","bg":"#F4F7FA","al":"center"},{"c":"C21","v":"توريد وتنفيذ مسامير تثبيت التربة والصخور المائلة (Soil Nails / Rock Bolts Ø25-32mm Grade 500 بطول 6-9 م) شاملة التخريم والحقن بمونة الأسمنت غير القابل للانكماش ولوح الارتكاز","bg":"#F4F7FA"},{"c":"D21","v":"م.ط","bg":"#F4F7FA","al":"center"},{"c":"E21","v":1200,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F21","v":0.03,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G21","v":1236,"f":"=ROUND(E21*(1+F21),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H21","v":210,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I21","v":259560,"f":"=ROUND(G21*H21,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":22,"h":72.0,"cells":[{"c":"A22","v":"RTW-15","b":true,"al":"center"},{"c":"B22","v":"حماية وتثبيت الميول","al":"center"},{"c":"C22","v":"توريد ورش خرسانة مقذوفة لتثبيت أوجه الميول الصخرية (Mesh-Reinforced Shotcrete C30 سمك 10 سم) شاملة شبكة التسليح الملحومة BRC وميازيب تصريف ضغط المياه"},{"c":"D22","v":"م2","al":"center"},{"c":"E22","v":1400,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F22","v":0.05,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G22","v":1470,"f":"=ROUND(E22*(1+F22),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H22","v":185,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I22","v":271950,"f":"=ROUND(G22*H22,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":23,"h":72.0,"cells":[{"c":"A23","v":"RTW-16","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B23","v":"حماية وتثبيت الميول","bg":"#F4F7FA","al":"center"},{"c":"C23","v":"توريد ورص تكسيات حجرية بالدبش (Grouted / Loose Stone Riprap سمك 30-40 سم) فوق طبقة فلتر جيوتكستايل لحماية ميول الطرق ومخرات السيول","bg":"#F4F7FA"},{"c":"D23","v":"م2","bg":"#F4F7FA","al":"center"},{"c":"E23","v":2200,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F23","v":0.04,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G23","v":2288,"f":"=ROUND(E23*(1+F23),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H23","v":135,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I23","v":308880,"f":"=ROUND(G23*H23,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":"إجمالي قيمة أعمال الحوائط الساندة والجابيونات والتربة المسلحة وحماية الميول (غير شامل الضريبة)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I24","v":6903084,"f":"=SUM(I8:I23)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":"ضريبة القيمة المضافة المقررة (VAT 15%)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I25","v":1035462.6,"f":"=ROUND(I24*H5,2)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":"الإجمالي الكلي للمقايسة شامل ضريبة القيمة المضافة (Grand Total)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I26","v":7938546.6,"f":"=I24+I25","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"}]}]},{"name":"حصر القطاعات والاتزان","maxRow":10,"maxCol":9,"colWidths":[14.0,38.0,16.0,13.0,20.0,18.0,22.0,18.0,24.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"شيت الحصر الهندسي لقطاعات الحوائط الساندة والتحقق السريع من معاملات الأمان للاتزان","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"حساب أحجام خرسانة القاعدة والجذع وأوزان الحديد ومعاملات الأمان ضد الانقلاب والانزلاق (FS_overturning >= 2.0, FS_sliding >= 1.5)","bg":"#1B6B93","fg":"#E2E8F0","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"رمز القطاع","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"نوع ووصف الحائط الساند","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"طول القطاع L (م)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"ارتفاع السند H (م)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"عرض القاعدة B (م) [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"حجم خرسانة القاعدة (م3) [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"حجم خرسانة الجذع (م3) [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"إجمالي الخرسانة (م3) [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"وزن حديد التسليح (طن) [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"RW-01","b":true,"al":"center"},{"c":"B5","v":"حائط ساند كابولي خرساني مسلح (ارتفاع 4.0 م)"},{"c":"C5","v":120,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"D5","v":4,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"E5","v":2.6,"f":"=ROUND(D5*0.65,2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"F5","v":171.6,"f":"=ROUND(C5*E5*0.55,2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"G5","v":144.9,"f":"=ROUND(C5*(D5-0.55)*0.35,2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"H5","v":316.5,"f":"=ROUND(F5+G5,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"I5","v":39.56,"f":"=ROUND(H5*0.125,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"RW-02","b":true,"al":"center"},{"c":"B6","v":"حائط ساند كابولي خرساني مسلح (ارتفاع 5.5 م)"},{"c":"C6","v":95,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"D6","v":5.5,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"E6","v":3.58,"f":"=ROUND(D6*0.65,2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"F6","v":221.06,"f":"=ROUND(C6*E6*0.65,2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"G6","v":193.51,"f":"=ROUND(C6*(D6-0.65)*0.42,2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"H6","v":414.57,"f":"=ROUND(F6+G6,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"I6","v":51.82,"f":"=ROUND(H6*0.125,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"RW-03","b":true,"al":"center"},{"c":"B7","v":"حائط ساند ذو دعامات خلفية Counterfort (ارتفاع 7.0 م)"},{"c":"C7","v":65,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"D7","v":7,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"E7","v":4.55,"f":"=ROUND(D7*0.65,2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"F7","v":221.81,"f":"=ROUND(C7*E7*0.75,2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"G7","v":203.12,"f":"=ROUND(C7*(D7-0.75)*0.5,2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"H7","v":424.93,"f":"=ROUND(F7+G7,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"I7","v":53.12,"f":"=ROUND(H7*0.125,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"RW-04","b":true,"al":"center"},{"c":"B8","v":"حائط جابيونات متدرج 3 حطات (ارتفاع 3.0 م)"},{"c":"C8","v":160,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"D8","v":3,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"E8","v":1.95,"f":"=ROUND(D8*0.65,2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"F8","v":0,"f":"=ROUND(C8*E8*0,2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"G8","v":0,"in":true,"bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"H8","v":0,"f":"=ROUND(F8+G8,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"I8","v":0,"f":"=ROUND(H8*0.125,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"RW-05","b":true,"al":"center"},{"c":"B9","v":"حائط تربة مسلحة بالجيوجريد MSE Wall (ارتفاع 6.0 م)"},{"c":"C9","v":140,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"D9","v":6,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"E9","v":3.9,"f":"=ROUND(D9*0.65,2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"F9","v":163.8,"f":"=ROUND(C9*E9*0.3,2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"G9","v":0,"in":true,"bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"H9","v":163.8,"f":"=ROUND(F9+G9,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"I9","v":20.48,"f":"=ROUND(H9*0.125,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"إجمالي حصر قطاعات الحوائط الساندة","bg":"#E2E8F0","fg":"#0F2C59","b":true,"cs":2},{"skip":true},{"c":"C10","v":580,"f":"=SUM(C5:C9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"},{"c":"D10","v":5.1,"f":"=AVERAGE(D5:D9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"},{"c":"E10","v":3.316,"f":"=AVERAGE(E5:E9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"},{"c":"F10","v":778.27,"f":"=SUM(F5:F9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"},{"c":"G10","v":541.53,"f":"=SUM(G5:G9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"},{"c":"H10","v":1319.8,"f":"=SUM(H5:H9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"},{"c":"I10","v":164.98,"f":"=SUM(I5:I9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"}]}]},{"name":"الملخص وضوابط الجودة","maxRow":18,"maxCol":7,"colWidths":[14.0,26.0,36.0,24.0,34.0,28.0,24.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"الملخص التنفيذي لتكاليف أنظمة سند التربة ومعايير ضبط الجودة (Geotechnical & Structural QA/QC)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"تحليل التكلفة حسب النظام الإنشائي وجدول اختبارات استلام الحوائط الساندة والجابيونات والتربة المسلحة","bg":"#1B6B93","fg":"#E2E8F0","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"رقم القسم","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"قسم منشآت سند التربة وحماية الميول","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"عدد البنود","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"إجمالي التكلفة قبل الضريبة [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"نسبة القسم من الإجمالي % [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"قيمة ضريبة القيمة المضافة 15% [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"الإجمالي شامل الضريبة [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"01","b":true,"al":"center"},{"c":"B5","v":"الحوائط الساندة الخرسانية"},{"c":"C5","v":5,"in":true,"al":"center"},{"c":"D5","v":3147066,"f":"=SUMIF('مقايسة الحوائط والجابيون'!$B$8:$B$23, B5, 'مقايسة الحوائط والجابيون'!$I$8:$I$23)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E5","v":0,"f":"=IF($D$10>0, D5/$D$10, 0)","bg":"#EFF6FF","al":"center","nf":"0.0%"},{"c":"F5","v":472059.9,"f":"=ROUND(D5*0.15, 2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"G5","v":3619125.9,"f":"=D5+F5","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"02","b":true,"al":"center"},{"c":"B6","v":"الجابيونات الحجرية"},{"c":"C6","v":2,"in":true,"al":"center"},{"c":"D6","v":1245270,"f":"=SUMIF('مقايسة الحوائط والجابيون'!$B$8:$B$23, B6, 'مقايسة الحوائط والجابيون'!$I$8:$I$23)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E6","v":0,"f":"=IF($D$10>0, D6/$D$10, 0)","bg":"#EFF6FF","al":"center","nf":"0.0%"},{"c":"F6","v":186790.5,"f":"=ROUND(D6*0.15, 2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"G6","v":1432060.5,"f":"=D6+F6","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"03","b":true,"al":"center"},{"c":"B7","v":"حوائط التربة المسلحة MSE"},{"c":"C7","v":3,"in":true,"al":"center"},{"c":"D7","v":1316604,"f":"=SUMIF('مقايسة الحوائط والجابيون'!$B$8:$B$23, B7, 'مقايسة الحوائط والجابيون'!$I$8:$I$23)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E7","v":0,"f":"=IF($D$10>0, D7/$D$10, 0)","bg":"#EFF6FF","al":"center","nf":"0.0%"},{"c":"F7","v":197490.6,"f":"=ROUND(D7*0.15, 2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"G7","v":1514094.6,"f":"=D7+F7","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"04","b":true,"al":"center"},{"c":"B8","v":"العزل والتصريف الخلفي"},{"c":"C8","v":3,"in":true,"al":"center"},{"c":"D8","v":353754,"f":"=SUMIF('مقايسة الحوائط والجابيون'!$B$8:$B$23, B8, 'مقايسة الحوائط والجابيون'!$I$8:$I$23)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E8","v":0,"f":"=IF($D$10>0, D8/$D$10, 0)","bg":"#EFF6FF","al":"center","nf":"0.0%"},{"c":"F8","v":53063.1,"f":"=ROUND(D8*0.15, 2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"G8","v":406817.1,"f":"=D8+F8","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"05","b":true,"al":"center"},{"c":"B9","v":"حماية وتثبيت الميول"},{"c":"C9","v":3,"in":true,"al":"center"},{"c":"D9","v":840390,"f":"=SUMIF('مقايسة الحوائط والجابيون'!$B$8:$B$23, B9, 'مقايسة الحوائط والجابيون'!$I$8:$I$23)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E9","v":0,"f":"=IF($D$10>0, D9/$D$10, 0)","bg":"#EFF6FF","al":"center","nf":"0.0%"},{"c":"F9","v":126058.5,"f":"=ROUND(D9*0.15, 2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"G9","v":966448.5,"f":"=D9+F9","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"الإجمالي الكلي لأقسام الحوائط الساندة وحماية الميول","bg":"#E2E8F0","fg":"#0F2C59","b":true,"cs":2},{"skip":true},{"c":"C10","v":16,"f":"=SUM(C5:C9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center"},{"c":"D10","v":6903084,"f":"=SUM(D5:D9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"},{"c":"E10","v":0,"f":"=SUM(E5:E9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"0.0%"},{"c":"F10","v":1035462.6,"f":"=SUM(F5:F9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"},{"c":"G10","v":7938546.6,"f":"=SUM(G5:G9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"}]},{"r":11,"h":28.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":""},{"c":"C11","v":""},{"c":"D11","v":""},{"c":"E11","v":""},{"c":"F11","v":""},{"c":"G11","v":""}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"قائمة اختبارات ضبط الجودة الميدانية والمعملية للحوائط الساندة والجابيونات والتربة المسلحة (QA/QC Checklist)","bg":"#1B6B93","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"كود الفحص","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B13","v":"العنصر الهندسي","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C13","v":"اسم الاختبار الميداني / المعملي","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D13","v":"المواصفة المرجعية","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E13","v":"معيار القبول القياسي","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F13","v":"معدل التكرار","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G13","v":"الجهة المسؤولة","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"QC-01","b":true,"al":"center"},{"c":"B14","v":"قاع التأسيس والردم الخلفي","al":"center"},{"c":"C14","v":"اختبار قدرة تحمل التربة (Plate Load) ودمك طبقات الردم الحبيبي خلف الحائط"},{"c":"D14","v":"ASTM D1557 / D1556","al":"center"},{"c":"E14","v":"دمك >= 95% بروكتور معدل ونسبة المواد الناعمة <= 15%"},{"c":"F14","v":"اختبار لكل طبقة 25 سم كل 50 م.ط","al":"center"},{"c":"G14","v":"مختبر التربة والاستشاري","al":"center"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"QC-02","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B15","v":"أحجار وسلك الجابيونات","bg":"#F4F7FA","al":"center"},{"c":"C15","v":"فحص الوزن النوعي وامتصاص أحجار الجابيون وسمك جلفنة وغلاف PVC للشبك السداسي","bg":"#F4F7FA"},{"c":"D15","v":"ASTM A975 / EN 10223-3","bg":"#F4F7FA","al":"center"},{"c":"E15","v":"وزن نوعي للحجر >= 2.6 طن/م3، الامتصاص <= 2%، ونسبة الفراغات <= 30%","bg":"#F4F7FA"},{"c":"F15","v":"عينة لكل 500 م3 توريد","bg":"#F4F7FA","al":"center"},{"c":"G15","v":"مختبر المواد والاستشاري","bg":"#F4F7FA","al":"center"}]},{"r":16,"h":72.0,"cells":[{"c":"A16","v":"QC-03","b":true,"al":"center"},{"c":"B16","v":"شبكات الجيوجريد (MSE)","al":"center"},{"c":"C16","v":"اختبار مقاومة الشد الطولية ووصلات الربط مع البلوكات الأمامية في حوائط الـ MSE"},{"c":"D16","v":"ASTM D6637 / FHWA","al":"center"},{"c":"E16","v":"تحقيق قوة الشد طويلة الأمد (LTDS) وشد الشبكة بدون طيات"},{"c":"F16","v":"فحص لكل لفة وفحص بصري 100%","al":"center"},{"c":"G16","v":"مهندس الجودة والاستشاري","al":"center"}]},{"r":17,"h":72.0,"cells":[{"c":"A17","v":"QC-04","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B17","v":"نظام التصريف والميازيب","bg":"#F4F7FA","al":"center"},{"c":"C17","v":"فحص عمل المواسير المثقبة والفلتر الحصوي وميازيب التصريف (Weep Holes) وشريط Waterstop","bg":"#F4F7FA"},{"c":"D17","v":"BS 8002 / SBC 303","bg":"#F4F7FA","al":"center"},{"c":"E17","v":"خلو الميازيب من الانسداد وتغليف الفلتر بنسيج جيوتكستايل 250 جم/م2","bg":"#F4F7FA"},{"c":"F17","v":"100% قبل البدء بالردم الخلفي","bg":"#F4F7FA","al":"center"},{"c":"G17","v":"مهندس الموقع والاستشاري","bg":"#F4F7FA","al":"center"}]},{"r":18,"h":72.0,"cells":[{"c":"A18","v":"QC-05","b":true,"al":"center"},{"c":"B18","v":"مسمار التربة (Soil Nails)","al":"center"},{"c":"C18","v":"اختبار الشد والتحميل لمسامير التربة المحقونة بالمونة (Verification & Proof Pull-Out Test)"},{"c":"D18","v":"FHWA-NHI-14-007","al":"center"},{"c":"E18","v":"تحمل 1.50 مرة من حمل التصميم دون زحف يتجاوز 2 مم"},{"c":"F18","v":"5% من إجمالي المسامير المنفذة","al":"center"},{"c":"G18","v":"مختبر الجيوتكنيك والاستشاري","al":"center"}]}]}]}