{"slug":"saudi-building-code-sbc-setbacks-and-area-guide","sheets":[{"name":"لوحة التحكم وملخص كود البناء","maxRow":25,"maxCol":10,"colWidths":[8.0,24.0,20.0,24.0,20.0,14.0,12.0,24.0,20.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"لوحة المؤشرات التخطيطية والتدقيق الشامل لاشتراطات كود البناء السعودي SBC 201","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":54.0,"cells":[{"c":"A2","v":"قالب تشغيلي لحساب مساحات الأراضي، الارتدادات النظامية، نسبة البصمة (Footprint)، معامل البناء (FAR)، مواقف السيارات، والتحقق الآلي من الكود | الخلايا الصفراء مدخلات للمشروع","bg":"#334155","fg":"#E2E8F0","al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"بيانات الموقع والترخيص والاشتراطات التخطيطية العامة","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"اسم المشروع والمالك:","bg":"#F1F5F9","b":true,"cs":2},{"skip":true},{"c":"C5","v":"فيلا سكنية خاصة - حي النرجس شمال الرياض","bg":"#FEF9C3","fg":"#0000FF","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"F5","v":"المدينة والأمانة:","bg":"#F1F5F9","b":true},{"c":"G5","v":"أمانة منطقة الرياض - بلدية الشمال","bg":"#FEF9C3","fg":"#0000FF","b":true,"cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"رقم المخطط والقطعة:","bg":"#F1F5F9","b":true,"cs":2},{"skip":true},{"c":"C6","v":"مخطط 2450 / قطعة رقم 814","bg":"#FEF9C3","fg":"#0000FF","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"F6","v":"التصنيف التخطيطي:","bg":"#F1F5F9","b":true},{"c":"G6","v":"سكني فلل (R1) - كود SBC 1101","bg":"#FEF9C3","fg":"#0000FF","b":true,"cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"عرض الشارع الأمامي (م):","bg":"#F1F5F9","b":true,"cs":2},{"skip":true},{"c":"C7","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"nf":"#,##0.00","cs":3},{"skip":true},{"skip":true},{"c":"F7","v":"نظام البناء المعتمد:","bg":"#F1F5F9","b":true},{"c":"G7","v":"دور أرضي + أول + ملحق علوي (50%)","bg":"#FEF9C3","fg":"#0000FF","b":true,"cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":8,"h":28.0,"cells":[{"c":"A8","v":""},{"c":"B8","v":""},{"c":"C8","v":""},{"c":"D8","v":""},{"c":"E8","v":""},{"c":"F8","v":""},{"c":"G8","v":""},{"c":"H8","v":""},{"c":"I8","v":""},{"c":"J8","v":""}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"مساحة الأرض المعتمدة","bg":"#F1F5F9","fg":"#64748B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D9","v":"نسبة البناء الأرضي (بصمة المبنى)","bg":"#F1F5F9","fg":"#64748B","b":true,"al":"center","cs":2},{"skip":true},{"c":"F9","v":"معامل مسطحات البناء الإجمالي FAR","bg":"#F1F5F9","fg":"#64748B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"I9","v":"مواقف السيارات داخل الموقع","bg":"#F1F5F9","fg":"#64748B","b":true,"al":"center","cs":2},{"skip":true}]},{"r":10,"h":46.0,"cells":[{"c":"A10","v":626.4,"f":"='حاسبة مساحات الأراضي المضلعة'!B26","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00","cs":3},{"skip":true},{"skip":true},{"c":"D10","v":0.478927,"f":"='توزيع مسطحات البناء والمواقف'!F14","fg":"#1E293B","b":true,"al":"center","nf":"0.0%","cs":2},{"skip":true},{"c":"F10","v":1.101533,"f":"='توزيع مسطحات البناء والمواقف'!F16","fg":"#1E293B","b":true,"al":"center","nf":"0.00\"x\"","cs":3},{"skip":true},{"skip":true},{"c":"I10","v":1,"f":"='توزيع مسطحات البناء والمواقف'!H32","fg":"#1E293B","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\"","cs":2},{"skip":true}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"متر مربع (حساب إحداثيات وهيرون)","bg":"#F1F5F9","fg":"#047857","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D11","v":"الحد الأقصى المسموح: 60.0%","bg":"#F1F5F9","fg":"#047857","al":"center","cs":2},{"skip":true},{"c":"F11","v":"الحد النظامي الأقصى: 1.20x","bg":"#F1F5F9","fg":"#047857","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"I11","v":"مطابق للحد الأدنى (موقف لكل فيلا)","bg":"#F1F5F9","fg":"#047857","al":"center","cs":2},{"skip":true}]},{"r":12,"h":28.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":""},{"c":"C12","v":""},{"c":"D12","v":""},{"c":"E12","v":""},{"c":"F12","v":""},{"c":"G12","v":""},{"c":"H12","v":""},{"c":"I12","v":""},{"c":"J12","v":""}]},{"r":13,"h":38.0,"cells":[{"c":"A13","v":"جدول التحقق التنفيذي ومطابقة معايير كود البناء السعودي SBC 201","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":14,"h":42.0,"cells":[{"c":"A14","v":"م","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B14","v":"البند التخطيطي والمعماري","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"D14","v":"المرجع النظامي / الكود","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E14","v":"القيمة المطلوبة نظاماً","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F14","v":"القيمة التصميمية الفعلية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G14","v":"الوحدة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H14","v":"حالة المطابقة والامتثال","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"J14","v":"ملاحظات الفحص والاعتماد","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":1,"bg":"#F8FAFC","al":"center"},{"c":"B15","v":"نسبة البناء الأرضي (Footprint)","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"D15","v":"كود SBC 201 / لائحة بلدي","bg":"#F8FAFC","al":"center"},{"c":"E15","v":"<= 60.0%","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F15","v":0.478927,"f":"='توزيع مسطحات البناء والمواقف'!F14","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"0.0%"},{"c":"G15","v":"%","bg":"#F8FAFC","al":"center"},{"c":"H15","v":"مطابق للكود والاشتراطات (ناجح)","f":"=IF(F15<=0.6,\"مطابق للكود والاشتراطات (ناجح)\",\"مخالف - تجاوز نسبة البناء المسموحة\")","bg":"#DCFCE7","b":true,"al":"center","cs":2},{"skip":true},{"c":"J15","v":"مساحة البصمة مطابقة لنسبة تغطية الأرض","bg":"#F8FAFC"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":2,"al":"center"},{"c":"B16","v":"الارتداد الأمامي جهة الشارع","b":true,"cs":2},{"skip":true},{"c":"D16","v":"كود SBC 201 بند 503","al":"center"},{"c":"E16","v":">= 4.00","b":true,"al":"center"},{"c":"F16","v":4,"f":"='حاسبة الارتدادات النظامية SBC'!E12","fg":"#008000","b":true,"al":"center","nf":"#,##0.00"},{"c":"G16","v":"متر","al":"center"},{"c":"H16","v":"مطابق للارتداد الأمامي النظامي","f":"=IF(F16>=4,\"مطابق للارتداد الأمامي النظامي\",\"مخالف - الارتداد أقل من 1/5 الشارع\")","bg":"#DCFCE7","b":true,"al":"center","cs":2},{"skip":true},{"c":"J16","v":"خُمس عرض الشارع (20م / 5 = 4م)"}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":3,"bg":"#F8FAFC","al":"center"},{"c":"B17","v":"الارتداد الجانبي الأول (الجار الشرقي)","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"D17","v":"كود SBC 201 / بلدي","bg":"#F8FAFC","al":"center"},{"c":"E17","v":">= 2.00","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F17","v":2,"f":"='حاسبة الارتدادات النظامية SBC'!E13","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00"},{"c":"G17","v":"متر","bg":"#F8FAFC","al":"center"},{"c":"H17","v":"مطابق لارتداد الجار النظامي","f":"=IF(F17>=2,\"مطابق لارتداد الجار النظامي\",\"مخالف - ارتداد الجار أقل من 2م\")","bg":"#DCFCE7","b":true,"al":"center","cs":2},{"skip":true},{"c":"J17","v":"يحقق متطلبات التهوية وحق الخصوصية","bg":"#F8FAFC"}]},{"r":18,"h":36.0,"cells":[{"c":"A18","v":4,"al":"center"},{"c":"B18","v":"الارتداد الجانبي الثاني (الجار الغربي)","b":true,"cs":2},{"skip":true},{"c":"D18","v":"كود SBC 201 / بلدي","al":"center"},{"c":"E18","v":">= 2.00","b":true,"al":"center"},{"c":"F18","v":2,"f":"='حاسبة الارتدادات النظامية SBC'!E14","fg":"#008000","b":true,"al":"center","nf":"#,##0.00"},{"c":"G18","v":"متر","al":"center"},{"c":"H18","v":"مطابق لارتداد الجار النظامي","f":"=IF(F18>=2,\"مطابق لارتداد الجار النظامي\",\"مخالف - ارتداد الجار أقل من 2م\")","bg":"#DCFCE7","b":true,"al":"center","cs":2},{"skip":true},{"c":"J18","v":"مطابق أو بناء على الصامت وفق الضوابط"}]},{"r":19,"h":36.0,"cells":[{"c":"A19","v":5,"bg":"#F8FAFC","al":"center"},{"c":"B19","v":"الارتداد الخلفي النظامي","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"D19","v":"كود SBC 201 جدول 503","bg":"#F8FAFC","al":"center"},{"c":"E19","v":">= 2.00","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F19","v":2.5,"f":"='حاسبة الارتدادات النظامية SBC'!E15","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00"},{"c":"G19","v":"متر","bg":"#F8FAFC","al":"center"},{"c":"H19","v":"مطابق للارتداد الخلفي النظامي","f":"=IF(F19>=2,\"مطابق للارتداد الخلفي النظامي\",\"مخالف - الارتداد الخلفي أقل من 2م\")","bg":"#DCFCE7","b":true,"al":"center","cs":2},{"skip":true},{"c":"J19","v":"يوفر فناء خلفي وتهوية للغرف والخدمات","bg":"#F8FAFC"}]},{"r":20,"h":36.0,"cells":[{"c":"A20","v":6,"al":"center"},{"c":"B20","v":"نسبة مساحة الملحق العلوي (السطح)","b":true,"cs":2},{"skip":true},{"c":"D20","v":"كود SBC 201 / اشتراطات بلدي","al":"center"},{"c":"E20","v":"<= 50.0%","b":true,"al":"center"},{"c":"F20","v":0.444444,"f":"='توزيع مسطحات البناء والمواقف'!F15","fg":"#008000","b":true,"al":"center","nf":"0.0%"},{"c":"G20","v":"%","al":"center"},{"c":"H20","v":"مطابق لشرط الملحق 50% كود البناء","f":"=IF(F20<=0.5,\"مطابق لشرط الملحق 50% كود البناء\",\"مخالف - تجاوز سقف الـ 50% للدور\")","bg":"#DCFCE7","b":true,"al":"center","cs":2},{"skip":true},{"c":"J20","v":"محسوب كنسبة من مساحة الدور الأول"}]},{"r":21,"h":36.0,"cells":[{"c":"A21","v":7,"bg":"#F8FAFC","al":"center"},{"c":"B21","v":"معامل مسطحات البناء الإجمالي FAR","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"D21","v":"مخطط استعمالات الأراضي","bg":"#F8FAFC","al":"center"},{"c":"E21","v":"<= 1.20","bg":"#F8FAFC","b":true,"al":"center"},{"c":"F21","v":1.101533,"f":"='توزيع مسطحات البناء والمواقف'!F16","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"0.00\"x\""},{"c":"G21","v":"معامل","bg":"#F8FAFC","al":"center"},{"c":"H21","v":"مطابق لمعامل البناء النظامي FAR","f":"=IF(F21<=1.2,\"مطابق لمعامل البناء النظامي FAR\",\"مخالف - زيادة في مساحات البناء BUA\")","bg":"#DCFCE7","b":true,"al":"center","cs":2},{"skip":true},{"c":"J21","v":"يشمل كافة الأدوار الصافية عدا القبو","bg":"#F8FAFC"}]},{"r":22,"h":36.0,"cells":[{"c":"A22","v":8,"al":"center"},{"c":"B22","v":"مواقف السيارات داخل الملكية","b":true,"cs":2},{"skip":true},{"c":"D22","v":"لائحة مواقف السيارات بلدي","al":"center"},{"c":"E22","v":">= 1","b":true,"al":"center"},{"c":"F22","v":1,"f":"='توزيع مسطحات البناء والمواقف'!H32","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G22","v":"سيارة","al":"center"},{"c":"H22","v":"مطابق لمتطلبات مواقف السيارات","f":"=IF(F22>=1,\"مطابق لمتطلبات مواقف السيارات\",\"مخالف - يلزم توفير موقف سيارة داخل السور\")","bg":"#DCFCE7","b":true,"al":"center","cs":2},{"skip":true},{"c":"J22","v":"موقف مغطى داخل حدود قطعة الأرض"}]},{"r":23,"h":28.0,"cells":[{"c":"A23","v":""},{"c":"B23","v":""},{"c":"C23","v":""},{"c":"D23","v":""},{"c":"E23","v":""},{"c":"F23","v":""},{"c":"G23","v":""},{"c":"H23","v":""},{"c":"I23","v":""},{"c":"J23","v":""}]},{"r":24,"h":38.0,"cells":[{"c":"A24","v":"بيانات الاعتماد والتدقيق الهندسي لمطابقة كود البناء السعودي","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":25,"h":104.0,"cells":[{"c":"A25","v":"المهندس المعماري المصمم\nالاسم: م. سلطان القحطاني\nرقم الاعتماد: SCE-298104\nالتوقيع: .....................","bg":"#F1F5F9","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D25","v":"المكتب الاستشاري المصمم والمشرف\nالمكتب: دار الرؤية للاستشارات الهندسية\nالسجل: 1010482910 - ترخيص بلدي سارٍ\nالختم الرسمي: .....................","bg":"#F1F5F9","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"H25","v":"مهندس التدقيق ورخص البناء (بلدي)\nالمهندس الفاحص: م. عبد الإله الشمري\nحالة القرار: مطابق ومقبول لإصدار الرخصة\nتاريخ التدقيق: 2026/10/31","bg":"#F1F5F9","al":"center","cs":3},{"skip":true},{"skip":true}]}]},{"name":"حاسبة مساحات الأراضي المضلعة","maxRow":26,"maxCol":10,"colWidths":[14.0,32.0,20.0,13.0,22.0,13.0,16.0,24.0,20.0,13.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"محرك حساب مساحات الأراضي المنتظمة وغير المنتظمة وإحداثيات الرفع المساحي GPS","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":54.0,"cells":[{"c":"A2","v":"حساب المساحة الدقيقة للقطع غير المنتظمة باستخدام طريقة إحداثيات الرؤوس المساحية (Gauss Shoelace Formula) وصيغة هيرون للمثلثات (Heron's Formula)","bg":"#334155","fg":"#E2E8F0","al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"الطريقة الأولى: حساب مساحة الأرض بإحداثيات الرؤوس المساحية (UTM / GPS Coordinates)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"النقطة المساحية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"وصف الركن / الحد","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"الإحداثي السيني Easting (X)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"الإحداثي الصادي Northing (Y)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"حاصل ضرب (Xi × Yi+1)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"حاصل ضرب (Yi × Xi+1)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"طول الضلع (م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"الانحراف والزاوية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"الملاحظات المساحية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J5","v":"حالة الربط","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":"P1 (ركن أ)","b":true,"al":"center"},{"c":"B6","v":"الركن الجنوبي الغربي (شارع 20م)"},{"c":"C6","v":1000,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"D6","v":2000,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E6","v":2000000,"f":"=C6*D7","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F6","v":2050000,"f":"=D6*C7","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G6","v":25,"f":"=SQRT((C7-C6)^2+(D7-D6)^2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"H6","v":"الضلع الجنوبي الأمامي","al":"center"},{"c":"I6","v":"بداية الترافرس المغلق"},{"c":"J6","v":"معتمد","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":"P2 (ركن ب)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"الركن الجنوبي الشرقي (شارع 20م)","bg":"#F8FAFC"},{"c":"C7","v":1025,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"D7","v":2000,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E7","v":2074600,"f":"=C7*D8","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F7","v":2050000,"f":"=D7*C8","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G7","v":24,"f":"=SQRT((C8-C7)^2+(D8-D7)^2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"H7","v":"الضلع الشرقي مع الجار","bg":"#F8FAFC","al":"center"},{"c":"I7","v":"نقطة ربط على الشارع","bg":"#F8FAFC"},{"c":"J7","v":"معتمد","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":"P3 (ركن ج)","b":true,"al":"center"},{"c":"B8","v":"الركن الشمالي الشرقي (مع الجار)"},{"c":"C8","v":1025,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"D8","v":2024,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E8","v":2077162.5,"f":"=C8*D9","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F8","v":2048288,"f":"=D8*C9","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G8","v":29.516944,"f":"=SQRT((C9-C8)^2+(D9-D7)^2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"H8","v":"الحد الشمالي الخلفي","al":"center"},{"c":"I8","v":"ركن سور الجار القائم"},{"c":"J8","v":"معتمد","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":"P4 (ركن د)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"كسرة الحد الشمالي (شطفة خلفية)","bg":"#F8FAFC"},{"c":"C9","v":1012,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"D9","v":2026.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E9","v":2048794,"f":"=C9*D10","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F9","v":2026500,"f":"=D9*C10","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G9","v":12.165525,"f":"=SQRT((C10-C9)^2+(D10-D9)^2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"H9","v":"الضلع الشمالي المنكسر","bg":"#F8FAFC","al":"center"},{"c":"I9","v":"نقطة شطفة نظامية","bg":"#F8FAFC"},{"c":"J9","v":"معتمد","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":"P5 (ركن هـ)","b":true,"al":"center"},{"c":"B10","v":"الركن الشمالي الغربي (مع الجار)"},{"c":"C10","v":1000,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"D10","v":2024.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E10","v":2000000,"f":"=C10*D11","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F10","v":2024500,"f":"=D10*C11","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G10","v":24.5,"f":"=SQRT((C11-C10)^2+(D11-D10)^2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"H10","v":"الضلع الغربي مع الجار","al":"center"},{"c":"I10","v":"ركن سور الجار الغربي"},{"c":"J10","v":"معتمد","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":"P1 (إغلاق)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"نقطة البداية لإغلاق المضلع","bg":"#F8FAFC"},{"c":"C11","v":1000,"f":"=C6","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"D11","v":2000,"f":"=D6","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E11","v":"-","bg":"#F8FAFC","al":"center"},{"c":"F11","v":"-","bg":"#F8FAFC","al":"center"},{"c":"G11","v":"-","bg":"#F8FAFC","b":true,"al":"center"},{"c":"H11","v":"قفل المضلع الترافرسي","bg":"#F8FAFC","al":"center"},{"c":"I11","v":"نقطة القفل التلقائي","bg":"#F8FAFC"},{"c":"J11","v":"مغلق","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":12,"h":40.0,"cells":[{"c":"A12","v":"مجموع حوافظ الضرب التبادلي ومحيط الأضلاع:","bg":"#F1F5F9","b":true,"cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E12","v":10200556.5,"f":"=SUM(E6:E10)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F12","v":10199288,"f":"=SUM(F6:F10)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G12","v":115.182469,"f":"=SUM(G6:G10)","bg":"#DCFCE7","b":true,"al":"center","nf":"#,##0.00"},{"c":"H12","v":"محيط الأسوار الإجمالي (متر طولي)","bg":"#F1F5F9","al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":13,"h":28.0,"cells":[{"c":"A13","v":""},{"c":"B13","v":""},{"c":"C13","v":""},{"c":"D13","v":""},{"c":"E13","v":""},{"c":"F13","v":""},{"c":"G13","v":""},{"c":"H13","v":""},{"c":"I13","v":""},{"c":"J13","v":""}]},{"r":14,"h":44.0,"cells":[{"c":"A14","v":"المساحة المحسوبة بإحداثيات الرفع المساحي (Shoelace Formula):","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F14","v":634.25,"f":"=0.5*ABS(E12-F12)","bg":"#DCFCE7","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00","cs":3},{"skip":true},{"skip":true},{"c":"I14","v":"متر مربع (M²) صافي","bg":"#F1F5F9","b":true,"al":"center","cs":2},{"skip":true}]},{"r":15,"h":28.0,"cells":[{"c":"A15","v":""},{"c":"B15","v":""},{"c":"C15","v":""},{"c":"D15","v":""},{"c":"E15","v":""},{"c":"F15","v":""},{"c":"G15","v":""},{"c":"H15","v":""},{"c":"I15","v":""},{"c":"J15","v":""}]},{"r":16,"h":38.0,"cells":[{"c":"A16","v":"الطريقة الثانية: تقسيم قطعة الأرض إلى مثلثات وقياس الأوتار (صيغة هيرون - Heron's Formula)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":17,"h":42.0,"cells":[{"c":"A17","v":"رقم المثلث","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B17","v":"وصف المثلث والموقع","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C17","v":"الضلع الأول A (م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D17","v":"الضلع الثاني B (م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E17","v":"الوتر / الضلع C (م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F17","v":"نصف المحيط S (م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G17","v":"صيغة هيرون للمساحة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H17","v":"مساحة المثلث (م²)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I17","v":"نسبة المساحة %","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J17","v":"ملاحظات الفحص","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"مثلث T1","b":true,"al":"center"},{"c":"B18","v":"الجزء الأمامي الجنوبي (الضلع الأمامي مع الوتر الأول)"},{"c":"C18","v":25,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"D18","v":24,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E18","v":34.65,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F18","v":41.825,"f":"=(C18+D18+E18)/2","al":"center","nf":"#,##0.00"},{"c":"G18","v":"صيغة هيرون النشطة","al":"center"},{"c":"H18","v":299.999985,"f":"=SQRT(F18*(F18-C18)*(F18-D18)*(F18-E18))","bg":"#DCFCE7","b":true,"al":"center","nf":"#,##0.00"},{"c":"I18","v":0,"f":"=H18/$H$21","al":"center","nf":"0.0%"},{"c":"J18","v":"مثلث شبه قائم في الركن الجنوبي"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":"مثلث T2","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B19","v":"الجزء الأوسط والكسرة الشمالية (الوتر الأول والثاني)","bg":"#F8FAFC"},{"c":"C19","v":34.65,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"D19","v":12.25,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E19","v":29.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F19","v":38.2,"f":"=(C19+D19+E19)/2","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"G19","v":"صيغة هيرون النشطة","bg":"#F8FAFC","al":"center"},{"c":"H19","v":174.97426,"f":"=SQRT(F19*(F19-C19)*(F19-D19)*(F19-E19))","bg":"#DCFCE7","b":true,"al":"center","nf":"#,##0.00"},{"c":"I19","v":0,"f":"=H19/$H$21","bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"J19","v":"مثلث منفرج يغطي الكسرة الخلفية","bg":"#F8FAFC"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":"مثلث T3","b":true,"al":"center"},{"c":"B20","v":"الجزء الغربي الخلفي (الوتر الثاني مع ضلع الجار الغربي)"},{"c":"C20","v":29.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"D20","v":24.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E20","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F20","v":33,"f":"=(C20+D20+E20)/2","al":"center","nf":"#,##0.00"},{"c":"G20","v":"صيغة هيرون النشطة","al":"center"},{"c":"H20","v":143.58534,"f":"=SQRT(F20*(F20-C20)*(F20-D20)*(F20-E20))","bg":"#DCFCE7","b":true,"al":"center","nf":"#,##0.00"},{"c":"I20","v":0,"f":"=H20/$H$21","al":"center","nf":"0.0%"},{"c":"J20","v":"مثلث الضلع الغربي مع الشطفة"}]},{"r":21,"h":42.0,"cells":[{"c":"A21","v":"إجمالي مساحة الأرض المحسوبة بطريقة هيرون (مجموع المثلثات):","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H21","v":618.559585,"f":"=SUM(H18:H20)","bg":"#DCFCE7","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"I21","v":0,"f":"=SUM(I18:I20)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"J21","v":"مطابقة 100%","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":22,"h":28.0,"cells":[{"c":"A22","v":""},{"c":"B22","v":""},{"c":"C22","v":""},{"c":"D22","v":""},{"c":"E22","v":""},{"c":"F22","v":""},{"c":"G22","v":""},{"c":"H22","v":""},{"c":"I22","v":""},{"c":"J22","v":""}]},{"r":23,"h":38.0,"cells":[{"c":"A23","v":"المقارنة والمطابقة بين الطريقتين واعتماد مساحة المخطط والترخيص","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":24,"h":72.0,"cells":[{"c":"A24","v":"مساحة الرفع المساحي بالإحداثيات (GPS):","bg":"#F1F5F9","b":true},{"c":"B24","v":634.25,"f":"=F14","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"D24","v":"م²","bg":"#F1F5F9","al":"center"},{"c":"E24","v":"مساحة طريقة صيغة هيرون للمثلثات:","bg":"#F1F5F9","b":true},{"c":"F24","v":618.559585,"f":"=H21","b":true,"al":"center","nf":"#,##0.00","cs":3},{"skip":true},{"skip":true},{"c":"I24","v":"م²","bg":"#F1F5F9","b":true,"al":"center","cs":2},{"skip":true}]},{"r":25,"h":72.0,"cells":[{"c":"A25","v":"فرق المساحة المطلق بين الطريقتين:","bg":"#F1F5F9","b":true},{"c":"B25","v":15.690415,"f":"=ABS(F14-H21)","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"D25","v":"م²","bg":"#F1F5F9","al":"center"},{"c":"E25","v":"نسبة الخطأ النسبي المسموحة:","bg":"#F1F5F9","b":true},{"c":"F25","v":0.024739,"f":"=B25/F14","b":true,"al":"center","nf":"0.0%","cs":3},{"skip":true},{"skip":true},{"c":"I25","v":"%","bg":"#F1F5F9","b":true,"al":"center","cs":2},{"skip":true}]},{"r":26,"h":104.0,"cells":[{"c":"A26","v":"المساحة النهائية المعتمدة للتصميم والترخيص:","bg":"#F1F5F9","b":true},{"c":"B26","v":626.4,"f":"=ROUND(AVERAGE(F14,H21),2)","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"D26","v":"م²","bg":"#F1F5F9","al":"center"},{"c":"E26","v":"حالة القبول والاعتماد المساحي:","bg":"#F1F5F9","b":true},{"c":"F26","v":"يلزم إعادة تدقيق الرفع المساحي","f":"=IF(E25<=0.005,\"مقبول مساحياً ومطابق للمواصفات (خطأ < 0.5%)\",\"يلزم إعادة تدقيق الرفع المساحي\")","bg":"#DCFCE7","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"I26","v":"معتمد","bg":"#F1F5F9","b":true,"al":"center","cs":2},{"skip":true}]}]},{"name":"محول الوحدات العقارية والمساحية","maxRow":24,"maxCol":8,"colWidths":[8.0,26.0,18.0,24.0,20.0,16.0,38.0,26.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"محول الوحدات المساحية والعقارية التراثية والدولية (السعودية، مصر، بلاد الشام)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":54.0,"cells":[{"c":"A2","v":"تحويل فوري ودقيق بين المتر المربع، القدم المربع، الدونم، الفدان والقيراط والسهم، الهكتار، الأكر، والذراع المعماري | أدخل المساحة بالمتر المربع أو بأي وحدة ترغب بها","bg":"#334155","fg":"#E2E8F0","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"القيمة الأساسية المراد تحويلها (Base Input)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":44.0,"cells":[{"c":"A5","v":"المساحة الأساسية بالمتر المربع (م²):","bg":"#F1F5F9","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D5","v":626.4,"f":"='حاسبة مساحات الأراضي المضلعة'!B26","bg":"#FEF9C3","fg":"#008000","b":true,"al":"center","nf":"#,##0.00","cs":3},{"skip":true},{"skip":true},{"c":"G5","v":"متر مربع (مربوطة بقطعة الأرض)","bg":"#F1F5F9","al":"center","cs":2},{"skip":true}]},{"r":6,"h":28.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":""},{"c":"C6","v":""},{"c":"D6","v":""},{"c":"E6","v":""},{"c":"F6","v":""},{"c":"G6","v":""},{"c":"H6","v":""}]},{"r":7,"h":38.0,"cells":[{"c":"A7","v":"جدول التحويل التفصيلي لكافة الوحدات العقارية والمساحية الإقليمية","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":8,"h":42.0,"cells":[{"c":"A8","v":"م","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B8","v":"الوحدة المساحية والعقارية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C8","v":"الرمز / الاختصار","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D8","v":"معامل التحويل (م² لكل وحدة)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E8","v":"القيمة المكافئة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F8","v":"وحدة القياس","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G8","v":"نطاق الاستخدام الشائع","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H8","v":"المعادلة الرياضية المطبقة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":1,"bg":"#F8FAFC","al":"center"},{"c":"B9","v":"المتر المربع الدولي","bg":"#F8FAFC","b":true},{"c":"C9","v":"m²","bg":"#F8FAFC","al":"center"},{"c":"D9","v":1,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00000"},{"c":"E9","v":626.4,"f":"=D5/D9","bg":"#DCFCE7","b":true,"al":"center","nf":"#,##0.00"},{"c":"F9","v":"م²","bg":"#F8FAFC","al":"center"},{"c":"G9","v":"النظام الدولي ومعاملات البناء بالسعودية والخليج","bg":"#F8FAFC"},{"c":"H9","v":"المعادلة: المساحة بالمتر المربع","bg":"#F8FAFC","al":"center"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":2,"al":"center"},{"c":"B10","v":"القدم المربع الإنجليزي","b":true},{"c":"C10","v":"sq ft / ft²","al":"center"},{"c":"D10","v":0.092903,"in":true,"al":"center","nf":"#,##0.00000"},{"c":"E10","v":6742.516388,"f":"=D5/D10","bg":"#DCFCE7","b":true,"al":"center","nf":"#,##0.00"},{"c":"F10","v":"قدم²","al":"center"},{"c":"G10","v":"عقارات دبي، بريطانيا، أمريكا، والكتالوجات"},{"c":"H10","v":"المعادلة: م² × 10.76391","al":"center"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":3,"bg":"#F8FAFC","al":"center"},{"c":"B11","v":"الياردة المربعة","bg":"#F8FAFC","b":true},{"c":"C11","v":"sq yd / yd²","bg":"#F8FAFC","al":"center"},{"c":"D11","v":0.836127,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00000"},{"c":"E11","v":749.168488,"f":"=D5/D11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F11","v":"ياردة²","bg":"#F8FAFC","al":"center"},{"c":"G11","v":"أعمال الطرق والفرش واللاندسكيب","bg":"#F8FAFC"},{"c":"H11","v":"المعادلة: م² × 1.19599","bg":"#F8FAFC","al":"center"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":4,"al":"center"},{"c":"B12","v":"الدونم السعودي والشامي","b":true},{"c":"C12","v":"Donum (Levant)","al":"center"},{"c":"D12","v":1000,"in":true,"al":"center","nf":"#,##0.00000"},{"c":"E12","v":0.6264,"f":"=D5/D12","bg":"#DCFCE7","b":true,"al":"center","nf":"#,##0.00"},{"c":"F12","v":"دونم","al":"center"},{"c":"G12","v":"الأراضي الزراعية والمخططات بالسعودية والأردن وسوريا"},{"c":"H12","v":"المعادلة: م² ÷ 1,000","al":"center"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":5,"bg":"#F8FAFC","al":"center"},{"c":"B13","v":"الدونم العراقي","bg":"#F8FAFC","b":true},{"c":"C13","v":"Donum (Iraq)","bg":"#F8FAFC","al":"center"},{"c":"D13","v":2500,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00000"},{"c":"E13","v":0.25056,"f":"=D5/D13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F13","v":"دونم عراقي","bg":"#F8FAFC","al":"center"},{"c":"G13","v":"الأراضي الزراعية والعقارية في جمهورية العراق","bg":"#F8FAFC"},{"c":"H13","v":"المعادلة: م² ÷ 2,500","bg":"#F8FAFC","al":"center"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":6,"al":"center"},{"c":"B14","v":"الهكتار الدولي","b":true},{"c":"C14","v":"Hectare (ha)","al":"center"},{"c":"D14","v":10000,"in":true,"al":"center","nf":"#,##0.00000"},{"c":"E14","v":0.06264,"f":"=D5/D14","b":true,"al":"center","nf":"#,##0.00"},{"c":"F14","v":"هكتار","al":"center"},{"c":"G14","v":"المشاريع الكبرى والمخططات الإقليمية والتخطيط العمراني"},{"c":"H14","v":"المعادلة: م² ÷ 10,000","al":"center"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":7,"bg":"#F8FAFC","al":"center"},{"c":"B15","v":"الأكر الإنجليزي (الفدان الغربي)","bg":"#F8FAFC","b":true},{"c":"C15","v":"Acre","bg":"#F8FAFC","al":"center"},{"c":"D15","v":4046.85642,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00000"},{"c":"E15","v":0.154787,"f":"=D5/D15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F15","v":"أكر","bg":"#F8FAFC","al":"center"},{"c":"G15","v":"التقارير العقارية الدولية والمعايير البريطانية","bg":"#F8FAFC"},{"c":"H15","v":"المعادلة: م² ÷ 4,046.86","bg":"#F8FAFC","al":"center"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":8,"al":"center"},{"c":"B16","v":"الفدان المصري الزراعي","b":true},{"c":"C16","v":"Feddan","al":"center"},{"c":"D16","v":4200.83333,"in":true,"al":"center","nf":"#,##0.00000"},{"c":"E16","v":0.149113,"f":"=D5/D16","bg":"#DCFCE7","b":true,"al":"center","nf":"#,##0.00"},{"c":"F16","v":"فدان","al":"center"},{"c":"G16","v":"الأراضي الزراعية والعقارات في مصر والسودان"},{"c":"H16","v":"المعادلة: م² ÷ 4,200.83 (24 قيراط)","al":"center"}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":9,"bg":"#F8FAFC","al":"center"},{"c":"B17","v":"القيراط المصري","bg":"#F8FAFC","b":true},{"c":"C17","v":"Qirat","bg":"#F8FAFC","al":"center"},{"c":"D17","v":175.03472,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00000"},{"c":"E17","v":3.578719,"f":"=D5/D17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F17","v":"قيراط","bg":"#F8FAFC","al":"center"},{"c":"G17","v":"أجزاء الفدان (1 فدان = 24 قيراط)","bg":"#F8FAFC"},{"c":"H17","v":"المعادلة: م² ÷ 175.035 (24 سهم)","bg":"#F8FAFC","al":"center"}]},{"r":18,"h":36.0,"cells":[{"c":"A18","v":10,"al":"center"},{"c":"B18","v":"السهم المصري","b":true},{"c":"C18","v":"Sahm","al":"center"},{"c":"D18","v":7.29311,"in":true,"al":"center","nf":"#,##0.00000"},{"c":"E18","v":85.889285,"f":"=D5/D18","b":true,"al":"center","nf":"#,##0.00"},{"c":"F18","v":"سهم","al":"center"},{"c":"G18","v":"أصغر وحدات تقسيم الأراضي الزراعية في مصر"},{"c":"H18","v":"المعادلة: م² ÷ 7.293","al":"center"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":11,"bg":"#F8FAFC","al":"center"},{"c":"B19","v":"الذراع المعماري المربع","bg":"#F8FAFC","b":true},{"c":"C19","v":"Dhera' Memari","bg":"#F8FAFC","al":"center"},{"c":"D19","v":0.5625,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00000"},{"c":"E19","v":1113.6,"f":"=D5/D19","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"F19","v":"ذراع²","bg":"#F8FAFC","al":"center"},{"c":"G19","v":"حجج الاستحكام والوثائق العقارية التراثية القديمة","bg":"#F8FAFC"},{"c":"H19","v":"المعادلة: م² ÷ 0.5625 (0.75م × 0.75م)","bg":"#F8FAFC","al":"center"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":12,"al":"center"},{"c":"B20","v":"القصبة المربعة","b":true},{"c":"C20","v":"Qasaba²","al":"center"},{"c":"D20","v":12.6025,"in":true,"al":"center","nf":"#,##0.00000"},{"c":"E20","v":49.704424,"f":"=D5/D20","b":true,"al":"center","nf":"#,##0.00"},{"c":"F20","v":"قصبة²","al":"center"},{"c":"G20","v":"المساحة التراثية في الريف المصري (3.55م × 3.55م)"},{"c":"H20","v":"المعادلة: م² ÷ 12.6025","al":"center"}]},{"r":21,"h":28.0,"cells":[{"c":"A21","v":""},{"c":"B21","v":""},{"c":"C21","v":""},{"c":"D21","v":""},{"c":"E21","v":""},{"c":"F21","v":""},{"c":"G21","v":""},{"c":"H21","v":""}]},{"r":22,"h":38.0,"cells":[{"c":"A22","v":"نظام التحليل التفكيكي للمساحة (فدان + قيراط + سهم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":23,"h":128.0,"cells":[{"c":"A23","v":"المساحة الإجمالية بالمتر المربع","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B23","v":"عدد الفدادين الصحيحة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C23","v":"المتبقي بعد الفدادين (م²)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D23","v":"عدد القراريط الصحيحة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E23","v":"المتبقي بعد القراريط (م²)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F23","v":"عدد الأسهم الصافية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G23","v":"كسر السهم المتبقي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H23","v":"الصيغة العقارية المجمعة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":24,"h":44.0,"cells":[{"c":"A24","v":626.4,"f":"=D5","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.00"},{"c":"B24","v":0,"f":"=INT(A24/4200.83333)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"C24","v":626.4,"f":"=A24-(B24*4200.83333)","bg":"#F1F5F9","al":"center","nf":"#,##0.00"},{"c":"D24","v":3,"f":"=INT(C24/175.03472)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E24","v":101.29584,"f":"=C24-(D24*175.03472)","bg":"#F1F5F9","al":"center","nf":"#,##0.00"},{"c":"F24","v":13,"f":"=INT(E24/7.29311)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G24","v":0.89,"f":"=ROUND((E24-(F24*7.29311))/7.29311, 2)","bg":"#F1F5F9","al":"center","nf":"#,##0.00"},{"c":"H24","v":"0 فدان و 3 قيراط و 13 سهم","f":"=B24&\" فدان و \"&D24&\" قيراط و \"&F24&\" سهم\"","bg":"#DCFCE7","b":true,"al":"center"}]}]},{"name":"حاسبة الارتدادات النظامية SBC","maxRow":22,"maxCol":9,"colWidths":[26.0,24.0,13.0,18.0,13.0,13.0,24.0,26.0,30.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"حاسبة الارتدادات النظامية والأفنية الداخلية وفق كود البناء السعودي SBC 201 ولوائح بلدي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":54.0,"cells":[{"c":"A2","v":"تطبيق النسب النظامية لارتداد الشوارع (1/5 عرض الشارع)، ارتدادات الجيران، الارتداد الخلفي، أبعاد المناور والأفنية، وضوابط البناء على الصامت","bg":"#334155","fg":"#E2E8F0","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"المدخلات الأساسية لعروض الشوارع وارتفاعات المبنى","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":36.0,"cells":[{"c":"A5","v":"عرض الشارع الرئيسي الأمامي (م):","bg":"#F1F5F9","b":true,"cs":2},{"skip":true},{"c":"C5","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"D5","v":"متر","bg":"#F1F5F9","al":"center"},{"c":"E5","v":"ارتفاع المبنى الإجمالي الكلي H (م):","bg":"#F1F5F9","b":true,"cs":2},{"skip":true},{"c":"G5","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"I5","v":"متر","bg":"#F1F5F9","al":"center"}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":"عرض الشارع الجانبي الثاني (إن وجد):","bg":"#F1F5F9","b":true,"cs":2},{"skip":true},{"c":"C6","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"D6","v":"متر","bg":"#F1F5F9","al":"center"},{"c":"E6","v":"عدد الأدوار المصممة فوق الأرض:","bg":"#F1F5F9","b":true,"cs":2},{"skip":true},{"c":"G6","v":2.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"I6","v":"دور (أرضي+أول+ملحق)","bg":"#F1F5F9","al":"center"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":"طول حد القطعة مع الشارع الأمامي (م):","bg":"#F1F5F9","b":true,"cs":2},{"skip":true},{"c":"C7","v":25,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"D7","v":"متر","bg":"#F1F5F9","al":"center"},{"c":"E7","v":"طول حد القطعة مع الجار (عمق الأرض):","bg":"#F1F5F9","b":true,"cs":2},{"skip":true},{"c":"G7","v":25,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"I7","v":"متر","bg":"#F1F5F9","al":"center"}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":"هل مسموح البناء على الصامت (بلدي)؟","bg":"#F1F5F9","b":true,"cs":2},{"skip":true},{"c":"C8","v":"نعم (وفق ضوابط بلدي المحدثة)","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center"},{"c":"D8","v":"خيار","bg":"#F1F5F9","al":"center"},{"c":"E8","v":"نوع النشاط والاستخدام:","bg":"#F1F5F9","b":true,"cs":2},{"skip":true},{"c":"G8","v":"سكني فيلا خاصة","bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","cs":2},{"skip":true},{"c":"I8","v":"كود SBC 1101","bg":"#F1F5F9","al":"center"}]},{"r":9,"h":28.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":""},{"c":"C9","v":""},{"c":"D9","v":""},{"c":"E9","v":""},{"c":"F9","v":""},{"c":"G9","v":""},{"c":"H9","v":""},{"c":"I9","v":""}]},{"r":10,"h":38.0,"cells":[{"c":"A10","v":"جدول حسابات الارتدادات الخارجية الأربعة ومطابقتها لكود البناء السعودي SBC 201","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"جهة الارتداد","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B11","v":"الجهة المقابلة للحد","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C11","v":"معادلة كود البناء SBC والبلديات","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D11","v":"الحد الأدنى النظامي (م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E11","v":"الارتداد المقترح الفعلي (م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F11","v":"الفرق الفائض / العجز (م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G11","v":"حالة الامتثال والمطابقة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H11","v":"ضوابط الفتحات والشبابيك","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I11","v":"الملاحظات الإلزامية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":"الارتداد الأمامي (الواجهة الرئيسية)","b":true},{"c":"B12","v":"شارع بعرض 20 متر","al":"center"},{"c":"C12","v":4,"f":"=MAX(0.2*C5, 3)","al":"center","nf":"#,##0.00"},{"c":"D12","v":4,"f":"=C12","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.00"},{"c":"E12","v":4,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F12","v":0,"f":"=E12-D12","b":true,"al":"center","nf":"#,##0.00"},{"c":"G12","v":"مطابق للحد الأدنى النظامي (ناجح)","f":"=IF(F12>=0,\"مطابق للحد الأدنى النظامي (ناجح)\",\"مخالف - عجز في الارتداد الأمامي\")","bg":"#DCFCE7","b":true,"al":"center"},{"c":"H12","v":"مسموح فتحات رئيسية وبلكونات"},{"c":"I12","v":"خُمس عرض الشارع (20م / 5 = 4م)"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"الارتداد الجانبي 1 (الجهة الشرقية)","bg":"#F8FAFC","b":true},{"c":"B13","v":"مبنى الجار السكني القائم","bg":"#F8FAFC","al":"center"},{"c":"C13","v":2.4,"f":"=MAX(0.2*G5, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"D13","v":2.4,"f":"=C13","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.00"},{"c":"E13","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F13","v":-0.4,"f":"=E13-D13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G13","v":"مخالف - الارتداد أقل من 2م","f":"=IF(F13>=0,\"مطابق لاشتراطات الجار (ناجح)\",\"مخالف - الارتداد أقل من 2م\")","bg":"#DCFCE7","b":true,"al":"center"},{"c":"H13","v":"شبابيك غرف وخدمات مع مراعاة الخصوصية","bg":"#F8FAFC"},{"c":"I13","v":"حد أدنى 2م أو سدس الارتفاع","bg":"#F8FAFC"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"الارتداد الجانبي 2 (الجهة الغربية)","b":true},{"c":"B14","v":"مبنى الجار السكني الغربي","al":"center"},{"c":"C14","v":2.4,"f":"=MAX(0.2*G5, 2)","al":"center","nf":"#,##0.00"},{"c":"D14","v":2.4,"f":"=C14","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.00"},{"c":"E14","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F14","v":-0.4,"f":"=E14-D14","b":true,"al":"center","nf":"#,##0.00"},{"c":"G14","v":"مخالف - الارتداد أقل من 2م","f":"=IF(F14>=0,\"مطابق لاشتراطات الجار (ناجح)\",\"مخالف - الارتداد أقل من 2م\")","bg":"#DCFCE7","b":true,"al":"center"},{"c":"H14","v":"شبابيك غرف وخدمات مع مراعاة الخصوصية"},{"c":"I14","v":"حد أدنى 2م أو بناء على الصامت"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"الارتداد الخلفي (الفناء الخلفي)","bg":"#F8FAFC","b":true},{"c":"B15","v":"مبنى الجار من الخلف","bg":"#F8FAFC","al":"center"},{"c":"C15","v":2.4,"f":"=MAX(0.2*G5, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"D15","v":2.4,"f":"=C15","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.00"},{"c":"E15","v":2.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F15","v":0.1,"f":"=E15-D15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G15","v":"مطابق للاشتراطات الخلفية (ناجح)","f":"=IF(F15>=0,\"مطابق للاشتراطات الخلفية (ناجح)\",\"مخالف - الارتداد الخلفي أقل من 2م\")","bg":"#DCFCE7","b":true,"al":"center"},{"c":"H15","v":"تهوية مطابخ وحمامات وغرف خلفية","bg":"#F8FAFC"},{"c":"I15","v":"حد أدنى 2.0م - تم تطبيق 2.5م لمزيد من الراحة","bg":"#F8FAFC"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"الارتداد الجانبي للشارع الفرعي (إن وجد)","b":true},{"c":"B16","v":"شارع فرعي جانبي (زاوية)","al":"center"},{"c":"C16","v":"غير منطبق","f":"=IF(C6>0, MAX(0.2*C6, 2), \"غير منطبق\")","al":"center","nf":"#,##0.00"},{"c":"D16","v":"-","f":"=IF(C6>0, C16, \"-\")","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.00"},{"c":"E16","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F16","v":"-","f":"=IF(C6>0, E16-D16, \"-\")","b":true,"al":"center","nf":"#,##0.00"},{"c":"G16","v":"غير منطبق - قطعة وسطية","f":"=IF(C6>0, IF(F16>=0,\"مطابق\",\"مخالف\"), \"غير منطبق - قطعة وسطية\")","bg":"#F1F5F9","b":true,"al":"center"},{"c":"H16","v":"مسموح مداخل سيارات ثانوية"},{"c":"I16","v":"ينطبق فقط على الأراضي الزاوية (شوارع متعددة)"}]},{"r":17,"h":28.0,"cells":[{"c":"A17","v":""},{"c":"B17","v":""},{"c":"C17","v":""},{"c":"D17","v":""},{"c":"E17","v":""},{"c":"F17","v":""},{"c":"G17","v":""},{"c":"H17","v":""},{"c":"I17","v":""}]},{"r":18,"h":38.0,"cells":[{"c":"A18","v":"اشتراطات وأبعاد الأفنية الداخلية والمناور السكنية وفق كود البناء السعودي SBC 201 (البند 1206)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":19,"h":42.0,"cells":[{"c":"A19","v":"نوع الفناء / المنور","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B19","v":"الغرض والوظيفة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C19","v":"معادلة العرض الأدنى (م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D19","v":"الحد الأدنى للعرض","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E19","v":"العرض المقترح (م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F19","v":"معادلة المساحة الصغرى","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G19","v":"المساحة المقترحة (م²)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H19","v":"حالة المطابقة SBC","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I19","v":"الملاحظات الإنشائية والمعمارية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":"فناء داخلي رئيسي (Inner Courtyard)","b":true},{"c":"B20","v":"إنارة وتهوية غرف المعيشة والنوم"},{"c":"C20","v":3,"f":"=MAX(0.166*G5, 3)","al":"center","nf":"#,##0.00"},{"c":"D20","v":3,"f":"=C20","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.00"},{"c":"E20","v":3.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F20","v":18.375,"f":"=1.5*E20^2","al":"center","nf":"#,##0.00"},{"c":"G20","v":15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H20","v":"مخالف - أبعاد المنور أقل من الكود","f":"=IF(AND(E20>=D20, G20>=F20),\"مطابق لاشتراطات SBC 1206\",\"مخالف - أبعاد المنور أقل من الكود\")","bg":"#DCFCE7","b":true,"al":"center"},{"c":"I20","v":"يخدم غرف رئيسية ومطابق للاشتراطات"}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":"منور خدمات (Service Lightwell)","bg":"#F8FAFC","b":true},{"c":"B21","v":"إنارة وتهوية المطابخ والحمامات","bg":"#F8FAFC"},{"c":"C21","v":2,"f":"=MAX(0.125*G5, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"D21","v":2,"f":"=C21","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.00"},{"c":"E21","v":2.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F21","v":7.5,"f":"=1.2*E21^2","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"G21","v":7.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H21","v":"مطابق لاشتراطات SBC 1206","f":"=IF(AND(E21>=D21, G21>=F21),\"مطابق لاشتراطات SBC 1206\",\"مخالف - أبعاد المنور أقل من الكود\")","bg":"#DCFCE7","b":true,"al":"center"},{"c":"I21","v":"يخدم خدمات ومطابخ فقط - عزل مائي إلزامي","bg":"#F8FAFC"}]},{"r":22,"h":52.0,"cells":[{"c":"A22","v":"منور تغذية ميكانيكية وسباكة","b":true},{"c":"B22","v":"مرور مواسير الصرف والتكييف والدكت"},{"c":"C22","v":1.2,"f":"=1.2","al":"center"},{"c":"D22","v":1.2,"f":"=C22","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.00"},{"c":"E22","v":1.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F22","v":1.5,"f":"=E22*1","al":"center","nf":"#,##0.00"},{"c":"G22","v":2.25,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H22","v":"مطابق لاشتراطات الخدمات","f":"=IF(AND(E22>=D22, G22>=F22),\"مطابق لاشتراطات الخدمات\",\"مخالف - مساحة دكت السباكة غير كافية\")","bg":"#DCFCE7","b":true,"al":"center"},{"c":"I22","v":"دكت كهروميكانيكي مع باب كشف وصيانة دورية"}]}]},{"name":"توزيع مسطحات البناء والمواقف","maxRow":32,"maxCol":10,"colWidths":[8.0,28.0,34.0,18.0,13.0,13.0,20.0,26.0,20.0,36.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول توزيع مسطحات البناء الإجمالية BUA ونسبة البصمة وحساب مواقف السيارات","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":54.0,"cells":[{"c":"A2","v":"حساب مساحات كل دور (القبو، الأرضي، الأول، الملحق 50%) ومعامل البناء FAR ومواقف السيارات الإلزامية حسب كود البناء السعودي ولوائح بلدي","bg":"#334155","fg":"#E2E8F0","al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"برنامج مساحات الأدوار وتوزيع مسطحات البناء BUA","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"م","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"الدور / المنسوب المعماري","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"الاستخدام الوظيفي المعتمد","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"المساحة الداخلية المغلقة (م²)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"البروزات والبلكونات (م²)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"الخدمات والممرات (م²)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"المساحة الإجمالية للدور (م²)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"هل تدخل في معامل البناء FAR؟","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"نسبة الدور من إجمالي BUA","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J5","v":"الاشتراطات الحاكمة للكود","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":1,"al":"center"},{"c":"B6","v":"القبو / السرداب (Basement)","b":true},{"c":"C6","v":"مواقف سيارات وخدمات وترفيه وصالة ألعاب"},{"c":"D6","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E6","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F6","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G6","v":0,"f":"=D6+E6+F6","b":true,"al":"center","nf":"#,##0.00"},{"c":"H6","v":"لا (مستثنى نظاماً إذا لم يبرز > 1.2م)","al":"center"},{"c":"I6","v":0,"f":"=G6/$G$11","al":"center","nf":"0.0%"},{"c":"J6","v":"يستثنى من FAR إذا كان مخصصاً للمواقف والخدمات"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":2,"bg":"#F8FAFC","al":"center"},{"c":"B7","v":"الدور الأرضي (Ground Floor)","bg":"#F8FAFC","b":true},{"c":"C7","v":"مجالس استقبال، صالة معيشة، مطبخ، دورات مياه","bg":"#F8FAFC"},{"c":"D7","v":250,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E7","v":15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F7","v":15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G7","v":280,"f":"=D7+E7+F7","bg":"#DCFCE7","b":true,"al":"center","nf":"#,##0.00"},{"c":"H7","v":"نعم (أساس حساب البصمة الأرضية)","bg":"#F8FAFC","al":"center"},{"c":"I7","v":0,"f":"=G7/$G$11","bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"J7","v":"يحكم نسبة البصمة Footprint (حد أقصى 60%)","bg":"#F8FAFC"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":3,"al":"center"},{"c":"B8","v":"الدور الأول / المتكرر (First Floor)","b":true},{"c":"C8","v":"غرف نوم رئيسية، أجنحة عائلية، صالة معيشة"},{"c":"D8","v":240,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E8","v":15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F8","v":15,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G8","v":270,"f":"=D8+E8+F8","bg":"#DCFCE7","b":true,"al":"center","nf":"#,##0.00"},{"c":"H8","v":"نعم (يدخل بالكامل في مساحات FAR)","al":"center"},{"c":"I8","v":0,"f":"=G8/$G$11","al":"center","nf":"0.0%"},{"c":"J8","v":"بروز البلكونات لا يتجاوز 1.2م على الشارع >= 12م"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":4,"bg":"#F8FAFC","al":"center"},{"c":"B9","v":"الملحق العلوي (Roof Annex)","bg":"#F8FAFC","b":true},{"c":"C9","v":"غرفتي نوم إضافية، غرفة غسيل، صالة متعددة","bg":"#F8FAFC"},{"c":"D9","v":100,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E9","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F9","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G9","v":120,"f":"=D9+E9+F9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"H9","v":"نعم (بشرط ألا يتجاوز 50% من الدور الأول)","bg":"#F8FAFC","al":"center"},{"c":"I9","v":0,"f":"=G9/$G$11","bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"J9","v":"شرط كود البناء: المساحة <= 50% من مساحة الدور الأول","bg":"#F8FAFC"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":5,"al":"center"},{"c":"B10","v":"غرف السائق والخدم والملحق الأرضي","b":true},{"c":"C10","v":"غرفة سائق بمدخل خارجي وغرفة خادمة"},{"c":"D10","v":18,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E10","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F10","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"G10","v":20,"f":"=D10+E10+F10","b":true,"al":"center","nf":"#,##0.00"},{"c":"H10","v":"نعم (ضمن التغطية الأرضية)","al":"center"},{"c":"I10","v":0,"f":"=G10/$G$11","al":"center","nf":"0.0%"},{"c":"J10","v":"ضمن الارتداد المسموح به للملاحق الأرضية (بلدي)"}]},{"r":11,"h":42.0,"cells":[{"c":"A11","v":"إجمالي مسطحات البناء لكامل المشروع (Total BUA):","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D11","v":608,"f":"=SUM(D6:D10)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.00"},{"c":"E11","v":40,"f":"=SUM(E6:E10)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.00"},{"c":"F11","v":42,"f":"=SUM(F6:F10)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.00"},{"c":"G11","v":690,"f":"=SUM(G6:G10)","bg":"#DCFCE7","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.00"},{"c":"H11","v":"مجموع المساحات","bg":"#F1F5F9","b":true,"al":"center"},{"c":"I11","v":0,"f":"=SUM(I6:I10)","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0%"},{"c":"J11","v":"100% من المسطحات","bg":"#F1F5F9","al":"center"}]},{"r":12,"h":28.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":""},{"c":"C12","v":""},{"c":"D12","v":""},{"c":"E12","v":""},{"c":"F12","v":""},{"c":"G12","v":""},{"c":"H12","v":""},{"c":"I12","v":""},{"c":"J12","v":""}]},{"r":13,"h":38.0,"cells":[{"c":"A13","v":"تحليل نسبة البصمة الأرضية (Ground Footprint %) ومعامل البناء (FAR) وشرط الملحق 50%","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"مساحة البصمة الأرضية الفعلية (أرضي + ملحق أرضي):","bg":"#F1F5F9","b":true,"cs":2},{"skip":true},{"c":"C14","v":300,"f":"=G7+G10","b":true,"al":"center","nf":"#,##0.00"},{"c":"D14","v":"م²","bg":"#F1F5F9","al":"center"},{"c":"E14","v":"نسبة البصمة الأرضية الفعلية:","bg":"#F1F5F9","b":true},{"c":"F14","v":0.478927,"f":"=C14/'حاسبة مساحات الأراضي المضلعة'!B26","bg":"#DCFCE7","b":true,"al":"center","nf":"0.0%"},{"c":"G14","v":"%","bg":"#F1F5F9","al":"center"},{"c":"H14","v":"الحد الأقصى المسموح (بلدي): 60.0%","bg":"#F1F5F9","al":"center"},{"c":"I14","v":"مطابق للحد الأقصى المسموح (ناجح)","f":"=IF(F14<=0.6,\"مطابق للحد الأقصى المسموح (ناجح)\",\"مخالف - تجاوز نسبة البصمة 60%\")","bg":"#DCFCE7","b":true,"al":"center","cs":2},{"skip":true}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"مساحة الملحق العلوي الفعلية المصممة:","bg":"#F1F5F9","b":true,"cs":2},{"skip":true},{"c":"C15","v":120,"f":"=G9","b":true,"al":"center","nf":"#,##0.00"},{"c":"D15","v":"م²","bg":"#F1F5F9","al":"center"},{"c":"E15","v":"نسبة الملحق العلوي من الدور الأول:","bg":"#F1F5F9","b":true},{"c":"F15","v":0.444444,"f":"=C15/G8","bg":"#DCFCE7","b":true,"al":"center","nf":"0.0%"},{"c":"G15","v":"%","bg":"#F1F5F9","al":"center"},{"c":"H15","v":"الحد الأقصى المسموح (كود SBC): 50.0%","bg":"#F1F5F9","al":"center"},{"c":"I15","v":"مطابق لشرط كود البناء 50% (ناجح)","f":"=IF(F15<=0.5,\"مطابق لشرط كود البناء 50% (ناجح)\",\"مخالف - تجاوز نسبة الملحق 50%\")","bg":"#DCFCE7","b":true,"al":"center","cs":2},{"skip":true}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"مساحات البناء الداخلة في معامل البناء FAR:","bg":"#F1F5F9","b":true,"cs":2},{"skip":true},{"c":"C16","v":690,"f":"=SUM(G7:G10)","b":true,"al":"center","nf":"#,##0.00"},{"c":"D16","v":"م²","bg":"#F1F5F9","al":"center"},{"c":"E16","v":"معامل مسطحات البناء الفعلي (FAR):","bg":"#F1F5F9","b":true},{"c":"F16","v":1.101533,"f":"=C16/'حاسبة مساحات الأراضي المضلعة'!B26","bg":"#DCFCE7","b":true,"al":"center","nf":"0.00\"x\""},{"c":"G16","v":"معامل","bg":"#F1F5F9","al":"center"},{"c":"H16","v":"الحد الأقصى النظامي المسموح: 1.20x","bg":"#F1F5F9","al":"center"},{"c":"I16","v":"مطابق لمعامل البناء النظامي (ناجح)","f":"=IF(F16<=1.2,\"مطابق لمعامل البناء النظامي (ناجح)\",\"مخالف - تجاوز معامل مسطحات البناء\")","bg":"#DCFCE7","b":true,"al":"center","cs":2},{"skip":true}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"المساحة البنائية الفائضة غير المستغلة:","bg":"#F1F5F9","b":true,"cs":2},{"skip":true},{"c":"C17","v":61.68,"f":"=1.2*'حاسبة مساحات الأراضي المضلعة'!B26-C16","b":true,"al":"center","nf":"#,##0.00"},{"c":"D17","v":"م²","bg":"#F1F5F9","al":"center"},{"c":"E17","v":"نسبة الاستغلال العقاري من الحد المتاح:","bg":"#F1F5F9","b":true},{"c":"F17","v":0.917944,"f":"=C16/(1.2*'حاسبة مساحات الأراضي المضلعة'!B26)","bg":"#DCFCE7","b":true,"al":"center","nf":"0.0%"},{"c":"G17","v":"%","bg":"#F1F5F9","al":"center"},{"c":"H17","v":"أقصى مساحة مسموحة = 1.2 × مساحة الأرض","bg":"#F1F5F9","al":"center"},{"c":"I17","v":"استغلال اقتصادي ممتاز لمعامل البناء","bg":"#F1F5F9","b":true,"al":"center","cs":2},{"skip":true}]},{"r":18,"h":28.0,"cells":[{"c":"A18","v":""},{"c":"B18","v":""},{"c":"C18","v":""},{"c":"D18","v":""},{"c":"E18","v":""},{"c":"F18","v":""},{"c":"G18","v":""},{"c":"H18","v":""},{"c":"I18","v":""},{"c":"J18","v":""}]},{"r":19,"h":28.0,"cells":[{"c":"A19","v":""},{"c":"B19","v":""},{"c":"C19","v":""},{"c":"D19","v":""},{"c":"E19","v":""},{"c":"F19","v":""},{"c":"G19","v":""},{"c":"H19","v":""},{"c":"I19","v":""},{"c":"J19","v":""}]},{"r":20,"h":28.0,"cells":[{"c":"A20","v":""},{"c":"B20","v":""},{"c":"C20","v":""},{"c":"D20","v":""},{"c":"E20","v":""},{"c":"F20","v":""},{"c":"G20","v":""},{"c":"H20","v":""},{"c":"I20","v":""},{"c":"J20","v":""}]},{"r":21,"h":28.0,"cells":[{"c":"A21","v":""},{"c":"B21","v":""},{"c":"C21","v":""},{"c":"D21","v":""},{"c":"E21","v":""},{"c":"F21","v":""},{"c":"G21","v":""},{"c":"H21","v":""},{"c":"I21","v":""},{"c":"J21","v":""}]},{"r":22,"h":28.0,"cells":[{"c":"A22","v":""},{"c":"B22","v":""},{"c":"C22","v":""},{"c":"D22","v":""},{"c":"E22","v":""},{"c":"F22","v":""},{"c":"G22","v":""},{"c":"H22","v":""},{"c":"I22","v":""},{"c":"J22","v":""}]},{"r":23,"h":28.0,"cells":[{"c":"A23","v":""},{"c":"B23","v":""},{"c":"C23","v":""},{"c":"D23","v":""},{"c":"E23","v":""},{"c":"F23","v":""},{"c":"G23","v":""},{"c":"H23","v":""},{"c":"I23","v":""},{"c":"J23","v":""}]},{"r":24,"h":28.0,"cells":[{"c":"A24","v":""},{"c":"B24","v":""},{"c":"C24","v":""},{"c":"D24","v":""},{"c":"E24","v":""},{"c":"F24","v":""},{"c":"G24","v":""},{"c":"H24","v":""},{"c":"I24","v":""},{"c":"J24","v":""}]},{"r":25,"h":38.0,"cells":[{"c":"A25","v":"حاسبة مواقف السيارات الإلزامية وفق اشتراطات كود البناء ولوائح وزارة البلديات والإسكان","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":26,"h":52.0,"cells":[{"c":"A26","v":"م","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B26","v":"التصنيف والنشاط المعماري","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C26","v":"معيار حساب المواقف (بلدي)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D26","v":"حجم النشاط / عدد الوحدات","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E26","v":"المواقف المطلوبة نظاماً","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F26","v":"المواقف الموفرة داخل الموقع","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G26","v":"المواقف الموفرة بالقبو","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H26","v":"إجمالي المواقف المتوفرة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I26","v":"حالة الامتثال والمطابقة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J26","v":"الملاحظات التخطيطية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":27,"h":36.0,"cells":[{"c":"A27","v":1,"bg":"#F8FAFC","al":"center"},{"c":"B27","v":"فيلا سكنية خاصة منفصلة","bg":"#F8FAFC","b":true},{"c":"C27","v":"1 موقف لكل وحدة سكنية","bg":"#F8FAFC","al":"center"},{"c":"D27","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E27","v":1,"f":"=D27*1","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F27","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G27","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H27","v":1,"f":"=F27+G27","bg":"#DCFCE7","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I27","v":"مطابق للاشتراطات البلدية (ناجح)","f":"=IF(H27>=E27,\"مطابق للاشتراطات البلدية (ناجح)\",\"مخالف - عجز في مواقف السيارات\")","bg":"#DCFCE7","b":true,"al":"center"},{"c":"J27","v":"موقف مغطى داخل حدود الملكية","bg":"#F8FAFC"}]},{"r":28,"h":36.0,"cells":[{"c":"A28","v":2,"al":"center"},{"c":"B28","v":"شقق سكنية داخل الفيلا (إن وجدت)","b":true},{"c":"C28","v":"1 موقف لكل شقة مستقلة","al":"center"},{"c":"D28","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E28","v":0,"f":"=D28*1","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F28","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G28","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H28","v":0,"f":"=F28+G28","bg":"#DCFCE7","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I28","v":"مطابق","f":"=IF(H28>=E28,\"مطابق\",\"عجز\")","bg":"#F1F5F9","b":true,"al":"center"},{"c":"J28","v":"في حال وجود شقة مسروقة بالملحق"}]},{"r":29,"h":36.0,"cells":[{"c":"A29","v":3,"bg":"#F8FAFC","al":"center"},{"c":"B29","v":"مكاتب إدارية ملحقة (إن وجدت)","bg":"#F8FAFC","b":true},{"c":"C29","v":"1 موقف لكل 50 م² صافي","bg":"#F8FAFC","al":"center"},{"c":"D29","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E29","v":0,"f":"=ROUNDUP(D29/50, 0)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F29","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G29","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H29","v":0,"f":"=F29+G29","bg":"#DCFCE7","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I29","v":"مطابق","f":"=IF(H29>=E29,\"مطابق\",\"عجز\")","bg":"#F1F5F9","b":true,"al":"center"},{"c":"J29","v":"ينطبق على المباني الإدارية والتجارية","bg":"#F8FAFC"}]},{"r":30,"h":36.0,"cells":[{"c":"A30","v":4,"al":"center"},{"c":"B30","v":"معارض ومحلات تجارية (إن وجدت)","b":true},{"c":"C30","v":"1 موقف لكل 35 م² مساحة تأجيرية","al":"center"},{"c":"D30","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E30","v":0,"f":"=ROUNDUP(D30/35, 0)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F30","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G30","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H30","v":0,"f":"=F30+G30","bg":"#DCFCE7","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I30","v":"مطابق","f":"=IF(H30>=E30,\"مطابق\",\"عجز\")","bg":"#F1F5F9","b":true,"al":"center"},{"c":"J30","v":"ينطبق على الشوارع التجارية"}]},{"r":31,"h":28.0,"cells":[{"c":"A31","v":""},{"c":"B31","v":""},{"c":"C31","v":""},{"c":"D31","v":""},{"c":"E31","v":""},{"c":"F31","v":""},{"c":"G31","v":""},{"c":"H31","v":""},{"c":"I31","v":""},{"c":"J31","v":""}]},{"r":32,"h":42.0,"cells":[{"c":"A32","v":"إجمالي مواقف السيارات للمشروع:","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E32","v":1,"f":"=SUM(E27:E30)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F32","v":1,"f":"=SUM(F27:F30)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G32","v":0,"f":"=SUM(G27:G30)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H32","v":1,"f":"=SUM(H27:H30)","bg":"#DCFCE7","fg":"#1E293B","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I32","v":"مطابق تماماً لاشتراطات المواقف البلدية","f":"=IF(H32>=E32,\"مطابق تماماً لاشتراطات المواقف البلدية\",\"عجز في عدد مواقف السيارات\")","bg":"#DCFCE7","b":true,"al":"center","cs":2},{"skip":true}]}]},{"name":"قائمة تدقيق واعتماد كود البناء","maxRow":23,"maxCol":8,"colWidths":[8.0,22.0,13.0,48.0,16.0,28.0,38.0,16.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"قائمة الفحص والتدقيق الهندسي الشامل لمطابقة متطلبات كود البناء السعودي SBC","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":54.0,"cells":[{"c":"A2","v":"قائمة تحقق معيارية شاملة تغطي الأكواد المعمارية (SBC 201)، الإنشائية (SBC 301-306)، الكهربائية (SBC 401)، الميكانيكية (SBC 501)، ترشيد الطاقة (SBC 601)، الحماية من الحريق (SBC 801)، وكود المباني السكنية (SBC 1101)","bg":"#334155","fg":"#E2E8F0","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"م","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"التخصص والمجال الهندسي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"رقم الكود والفقرة المرجعية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"المعيار والاشتراط الفني المطلوب التحقق منه","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"حالة الفحص والامتثال","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"طريقة التحقق والإثبات الهندسي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"ملاحظات الفاحص والاستشاري","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"الاعتماد النهائي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":1,"bg":"#F8FAFC","al":"center"},{"c":"B5","v":"المخططات المعمارية","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C5","v":"SBC 201 بند 503","bg":"#F8FAFC","al":"center"},{"c":"D5","v":"الالتزام بالارتدادات النظامية (الأمامي 1/5 الشارع، والجانبي والخلفي >= 2م)","bg":"#F8FAFC"},{"c":"E5","v":"مطابق","bg":"#DCFCE7","b":true,"al":"center"},{"c":"F5","v":"مراجعة المخططات ومساقط الأدوار","bg":"#F8FAFC"},{"c":"G5","v":"تم التحقق ومطابق للجداول التخطيطية","bg":"#F8FAFC"},{"c":"H5","v":"معتمد","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":2,"al":"center"},{"c":"B6","v":"المخططات المعمارية","b":true,"al":"center"},{"c":"C6","v":"SBC 201 بند 1208","al":"center"},{"c":"D6","v":"الحد الأدنى لارتفاع الأسقف الصافي لا يقل عن 2.70م للغرف السكنية"},{"c":"E6","v":"مطابق","bg":"#DCFCE7","b":true,"al":"center"},{"c":"F6","v":"القطاعات الرأسية والواجهات المعمارية"},{"c":"G6","v":"الارتفاع الصافي 3.10م بالأرضي و 2.90م بالمتكرر"},{"c":"H6","v":"معتمد","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":3,"bg":"#F8FAFC","al":"center"},{"c":"B7","v":"المخططات المعمارية","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C7","v":"SBC 1101 بند 311","bg":"#F8FAFC","al":"center"},{"c":"D7","v":"أبعاد الدرج: القائمة (Riser) <= 18 سم، والنائمة (Tread) >= 27 سم، وعرض البسطة >= 1.0م","bg":"#F8FAFC"},{"c":"E7","v":"مطابق","bg":"#DCFCE7","b":true,"al":"center"},{"c":"F7","v":"مخططات تفاصيل السلالم المعمارية","bg":"#F8FAFC"},{"c":"G7","v":"القائمة 15 سم والنائمة 30 سم (معادلة بلونديل)","bg":"#F8FAFC"},{"c":"H7","v":"معتمد","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":4,"al":"center"},{"c":"B8","v":"المخططات المعمارية","b":true,"al":"center"},{"c":"C8","v":"SBC 201 بند 1206","al":"center"},{"c":"D8","v":"مساحة الأفنية والمناور الداخلية تحقق الحد الأدنى للتهوية الطبيعية والإنارة"},{"c":"E8","v":"مطابق","bg":"#DCFCE7","b":true,"al":"center"},{"c":"F8","v":"حاسبة مساحات المناور والأفنية"},{"c":"G8","v":"الفناء 15م² ومنور الخدمات 7.5م² مطابق"},{"c":"H8","v":"معتمد","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":5,"bg":"#F8FAFC","al":"center"},{"c":"B9","v":"المخططات الإنشائية","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C9","v":"SBC 301 / SBC 302","bg":"#F8FAFC","al":"center"},{"c":"D9","v":"تقديم تقرير فحص التربة واستكشاف الموقع معتمد وتحديد إجهاد التأسيس","bg":"#F8FAFC"},{"c":"E9","v":"مطابق","bg":"#DCFCE7","b":true,"al":"center"},{"c":"F9","v":"تقرير تربة معتمد من مختبر معتمد","bg":"#F8FAFC"},{"c":"G9","v":"إجهاد التربة المسموح 1.80 كجم/سم² عند منسوب -2.5م","bg":"#F8FAFC"},{"c":"H9","v":"معتمد","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":6,"al":"center"},{"c":"B10","v":"المخططات الإنشائية","b":true,"al":"center"},{"c":"C10","v":"SBC 304 الخرسانة","al":"center"},{"c":"D10","v":"رتبة الخرسانة المسلحة لا تقل عن C30 (مقاومة 30 نيوتن/مم²) للأساسات والأعمدة"},{"c":"E10","v":"مطابق","bg":"#DCFCE7","b":true,"al":"center"},{"c":"F10","v":"المذكرات الإنشائية وجدول النماذج"},{"c":"G10","v":"مقاومة الخرسانة المحددة 35 ميجاباسكال للأساسات"},{"c":"H10","v":"معتمد","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":7,"bg":"#F8FAFC","al":"center"},{"c":"B11","v":"المخططات الإنشائية","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C11","v":"SBC 304 بند 20","bg":"#F8FAFC","al":"center"},{"c":"D11","v":"الغطاء الخرساني الصافي لا يقل عن 7.5 سم للأساسات الملامسة للتربة و 4 سم للأعمدة","bg":"#F8FAFC"},{"c":"E11","v":"مطابق","bg":"#DCFCE7","b":true,"al":"center"},{"c":"F11","v":"جداول تفريد حديد التسليح والمقاطع","bg":"#F8FAFC"},{"c":"G11","v":"توفير بسكوت خرساني معتمد 7.5 سم بالأساسات","bg":"#F8FAFC"},{"c":"H11","v":"معتمد","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":8,"al":"center"},{"c":"B12","v":"العزل والترشيد","b":true,"al":"center"},{"c":"C12","v":"SBC 601 كود الطاقة","al":"center"},{"c":"D12","v":"معامل الانتقال الحراري للجدران الخارجية (U-Value) لا يتجاوز 0.342 W/m²·K"},{"c":"E12","v":"مطابق","bg":"#DCFCE7","b":true,"al":"center"},{"c":"F12","v":"حسابات العزل الحراري والقطاعات"},{"c":"G12","v":"استخدام بلوك بركاني معزول بالصوف الصخري 7 سم"},{"c":"H12","v":"معتمد","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":9,"bg":"#F8FAFC","al":"center"},{"c":"B13","v":"العزل والترشيد","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C13","v":"SBC 601 كود الطاقة","bg":"#F8FAFC","al":"center"},{"c":"D13","v":"معامل الانتقال الحراري لزجاج النوافذ (U-Value) والـ SHGC مطابق لنطاق المنطقة","bg":"#F8FAFC"},{"c":"E13","v":"مطابق","bg":"#DCFCE7","b":true,"al":"center"},{"c":"F13","v":"مواصفات الزجاج المزدوج (Double Glazed)","bg":"#F8FAFC"},{"c":"G13","v":"زجاج مزدوج 6+12+6 مع طبقة Low-E","bg":"#F8FAFC"},{"c":"H13","v":"معتمد","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":10,"al":"center"},{"c":"B14","v":"العزل المائي والرطوبة","b":true,"al":"center"},{"c":"C14","v":"SBC 201 الفصل 18","al":"center"},{"c":"D14","v":"عزل الأساسات والقواعد والرقاب بممبرين بتوميني محمي، وعزل الأسطح والحمامات"},{"c":"E14","v":"مطابق","bg":"#DCFCE7","b":true,"al":"center"},{"c":"F14","v":"مخططات تفاصيل العزل المائي واختبار الغمر"},{"c":"G14","v":"عزل أساسات ممبرين 4 مم وعزل أسطح بولي يوريثان"},{"c":"H14","v":"معتمد","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":11,"bg":"#F8FAFC","al":"center"},{"c":"B15","v":"الوقاية من الحريق","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C15","v":"SBC 801 السلامة","bg":"#F8FAFC","al":"center"},{"c":"D15","v":"توفر كواشف الدخان ومخارج الهروب ومطفآت الحريق اليدوية ومضخات الحريق إن لزم","bg":"#F8FAFC"},{"c":"E15","v":"مطابق","bg":"#DCFCE7","b":true,"al":"center"},{"c":"F15","v":"مخطط السلامة واعتماد الدفاع المدني","bg":"#F8FAFC"},{"c":"G15","v":"كواشف دخان بجميع الغرف ومطفآت 6 كجم بودرة","bg":"#F8FAFC"},{"c":"H15","v":"معتمد","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":12,"al":"center"},{"c":"B16","v":"التمديدات الكهربائية","b":true,"al":"center"},{"c":"C16","v":"SBC 401 كود الكهرباء","al":"center"},{"c":"D16","v":"التأريض الوقائي العام وحماية القواطع بنظام التفريغ والتسريب الأرضي ELCB/RCD"},{"c":"E16","v":"مطابق","bg":"#DCFCE7","b":true,"al":"center"},{"c":"F16","v":"المخطط الأحادي SLD وجداول الأحمال"},{"c":"G16","v":"تأريض رئيسي بمقاومة أقل من 2 أوم وقواطع 30mA"},{"c":"H16","v":"معتمد","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":13,"bg":"#F8FAFC","al":"center"},{"c":"B17","v":"التمديدات الصحية","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C17","v":"SBC 701 السباكة","bg":"#F8FAFC","al":"center"},{"c":"D17","v":"فصل شبكة الصرف الصحي عن تصريف مياه الأمطار وميول المواسير لا تقل عن 1%","bg":"#F8FAFC"},{"c":"E17","v":"مطابق","bg":"#DCFCE7","b":true,"al":"center"},{"c":"F17","v":"مخططات التغذية والصرف وغرف التفتيش","bg":"#F8FAFC"},{"c":"G17","v":"ميول 1.5% مع جالتراب ورداد منع ارتداد الروائح","bg":"#F8FAFC"},{"c":"H17","v":"معتمد","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":14,"al":"center"},{"c":"B18","v":"التكييف والتهوية","b":true,"al":"center"},{"c":"C18","v":"SBC 501 الميكانيك","al":"center"},{"c":"D18","v":"معدلات تبديل الهواء النقي (Fresh Air CFM) ومخارج هواء الحمامات والمطابخ"},{"c":"E18","v":"مطابق","bg":"#DCFCE7","b":true,"al":"center"},{"c":"F18","v":"حسابات الأحمال وتوزيع مجاري الهواء"},{"c":"G18","v":"مراوح شفط طاردة مركزية منفصلة مع دنابر مانعة للرجوع"},{"c":"H18","v":"معتمد","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":15,"bg":"#F8FAFC","al":"center"},{"c":"B19","v":"مواقف السيارات والبلديات","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C19","v":"لائحة بلدي للمواقف","bg":"#F8FAFC","al":"center"},{"c":"D19","v":"توفير موقف سيارة مغطى داخل حدود الملكية بأبعاد لا تقل عن 2.75م × 5.50م","bg":"#F8FAFC"},{"c":"E19","v":"مطابق","bg":"#DCFCE7","b":true,"al":"center"},{"c":"F19","v":"المسقط الأفقي للدور الأرضي والموقع العام","bg":"#F8FAFC"},{"c":"G19","v":"موقف سيارة داخلي 3.0م × 6.0م مع بوابة كهربائية","bg":"#F8FAFC"},{"c":"H19","v":"معتمد","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":16,"al":"center"},{"c":"B20","v":"حق الجار والخصوصية","b":true,"al":"center"},{"c":"C20","v":"اشتراطات رخص بلدي","al":"center"},{"c":"D20","v":"ارتفاع سترة السطح (Parapet) لا يقل عن 1.80م إلى 2.0م لمنع كشف الجيران"},{"c":"E20","v":"مطابق","bg":"#DCFCE7","b":true,"al":"center"},{"c":"F20","v":"مخطط سترة السطح والواجهات"},{"c":"G20","v":"سترة مباني بارتفاع 2.0م مطابقة لاشتراطات الخصوصية"},{"c":"H20","v":"معتمد","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":21,"h":28.0,"cells":[{"c":"A21","v":""},{"c":"B21","v":""},{"c":"C21","v":""},{"c":"D21","v":""},{"c":"E21","v":""},{"c":"F21","v":""},{"c":"G21","v":""},{"c":"H21","v":""}]},{"r":22,"h":38.0,"cells":[{"c":"A22","v":"محضر التدقيق والاعتماد الفني النهائي لمنح رخصة البناء","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":23,"h":104.0,"cells":[{"c":"A23","v":"المهندس الفاحص المدقق\nالاسم: م. عبد العزيز الرويلي\nرقم العضوية: SCE-301928\nالتوقيع: .....................","bg":"#F1F5F9","al":"center","cs":2},{"skip":true},{"c":"C23","v":"مدير إدارة رخص البناء والرقابة الفنية\nالمهندس: م. خالد بن منصور التميمي\nالقرار: مطابق لكود البناء السعودي SBC\nالختم الرسمي: .....................","bg":"#F1F5F9","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F23","v":"المكتب الاستشاري المشرف على التنفيذ\nالمكتب: شركة المنار للاستشارات الهندسية\nتأكيد الالتزام بالإشراف الدوري وتطبيق الكود\nالتاريخ: 2026/10/31","bg":"#F1F5F9","al":"center","cs":3},{"skip":true},{"skip":true}]}]}]}