{"slug":"scaffolding-inspection-log-and-load-calculator","sheets":[{"name":"سجل الفحص الموقعي للسقالات","maxRow":20,"maxCol":11,"colWidths":[14.0,22.0,20.0,14.0,18.0,18.0,18.0,18.0,20.0,18.0,32.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"🏛️ سجل وتفتيش استلام السقالات المعدنية الموقعية (OSHA Scaffold Daily/Weekly Inspection Log)","bg":"#0F2027","fg":"#FFFFFF","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":42.0,"cells":[{"c":"A2","v":"توثيق دوري لفحص عناصر السقالة الحاملة والمعلقة وإصدار بطاقات السلامة المعتمدة (Green Tag / Yellow Tag / Red Tag) طبقاً لمعايير OSHA 1926.451","bg":"#203A43","fg":"#FFFFFF","al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"إجمالي السقالات المفحوصة بالموقع","bg":"#0F2027","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D4","v":"السقالات الآمنة للاستخدام (Green Tag)","bg":"#27AE60","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"F4","v":"سقالات قيد التعديل (Yellow Tag)","bg":"#E67E22","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"H4","v":"السقالات المحظورة والمرفوضة (Red Tag)","bg":"#C0392B","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"J4","v":"حالة التفتيش العام للموقع","bg":"#2C5364","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":46.0,"cells":[{"c":"A5","v":"12 سقالة نشطة","f":"=\"12 سقالة نشطة\"","bg":"#F1F4F6","fg":"#0F2027","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D5","v":"10 سقالات جاهزة","f":"=\"10 سقالات جاهزة\"","bg":"#F1F4F6","fg":"#27AE60","b":true,"al":"center","cs":2},{"skip":true},{"c":"F5","v":"1 سقالة (صيانة)","f":"=\"1 سقالة (صيانة)\"","bg":"#F1F4F6","fg":"#E67E22","b":true,"al":"center","cs":2},{"skip":true},{"c":"H5","v":"1 سقالة مرفوضة","f":"=\"1 سقالة مرفوضة\"","bg":"#F1F4F6","fg":"#C0392B","b":true,"al":"center","cs":2},{"skip":true},{"c":"J5","v":"مطابق بنسبة 91.7%","f":"=\"مطابق بنسبة 91.7%\"","bg":"#F1F4F6","fg":"#2C5364","b":true,"al":"center","cs":2},{"skip":true}]},{"r":6,"h":16.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":""},{"c":"C6","v":""},{"c":"D6","v":""},{"c":"E6","v":""},{"c":"F6","v":""},{"c":"G6","v":""},{"c":"H6","v":""},{"c":"I6","v":""},{"c":"J6","v":""},{"c":"K6","v":""}]},{"r":7,"h":38.0,"cells":[{"c":"A7","v":"جدول سجل الفحص الموقعي الدوري للسقالات وإصدار تصاريح العمل (Scaffold Inspection Register)","bg":"#2C5364","fg":"#FFFFFF","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":8,"h":72.0,"cells":[{"c":"A8","v":"كود السقالة\n(Scaffold ID)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B8","v":"موقع وواجهة السقالة\n(Location / Grid)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C8","v":"نوع ونظام السقالة\n(Scaffold Type)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D8","v":"الارتفاع (م)\n(Height m)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E8","v":"الحمولة التصميمية\n(Design Duty)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F8","v":"فحص القواعد والألواح\n(Base Plates & Sole)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G8","v":"التربيط والتدعيم الرأسي\n(Bracing & Ties)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H8","v":"ألواح العمل والدرابزين\n(Planks & Guardrails)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I8","v":"بطاقة السلامة المصدرة\n(Safety Tag Issued)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J8","v":"تاريخ ووقت الفحص\n(Inspection Date)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K8","v":"ملاحظات وقرار مهندس السلامة\n(Safety Inspector Action)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"SCF-01","fg":"#0F2027","al":"center"},{"c":"B9","v":"الواجهة الشمالية - محور A-B","fg":"#0F2027"},{"c":"C9","v":"سقالة أنبوبية مستقلة (Tube & Coupler)","fg":"#0F2027"},{"c":"D9","v":14.5,"in":true,"fg":"#0F2027","al":"center"},{"c":"E9","v":"أعمال ثقيلة (360 كجم/م2)","fg":"#0F2027"},{"c":"F9","v":"سليمة ومستقرة","fg":"#0F2027"},{"c":"G9","v":"مربوطة كل 4 أمتار","fg":"#0F2027"},{"c":"H9","v":"كاملة مع لوح قدم Toe-board","fg":"#0F2027"},{"c":"I9","v":"خضراء (Green Tag - آمنة)","bg":"#E8F8F5","fg":"#117A65","b":true},{"c":"J9","v":"2026/10/08","fg":"#0F2027","al":"center"},{"c":"K9","v":"مطابقة لكامل معايير OSHA، صالحة للاستخدام","fg":"#0F2027"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"SCF-02","bg":"#F8F9FA","fg":"#0F2027","al":"center"},{"c":"B10","v":"الواجهة الجنوبية - مدخل البرج","bg":"#F8F9FA","fg":"#0F2027"},{"c":"C10","v":"سقالة كبلك نموذجية (Cuplock System)","bg":"#F8F9FA","fg":"#0F2027"},{"c":"D10","v":22,"in":true,"bg":"#F8F9FA","fg":"#0F2027","al":"center"},{"c":"E10","v":"أعمال متوسطة (240 كجم/م2)","bg":"#F8F9FA","fg":"#0F2027"},{"c":"F10","v":"قواعد حديدية على دساتير","bg":"#F8F9FA","fg":"#0F2027"},{"c":"G10","v":"تدعيم قطري كامل (Diagonal)","bg":"#F8F9FA","fg":"#0F2027"},{"c":"H10","v":"ألواح معدنية مثبتة","bg":"#F8F9FA","fg":"#0F2027"},{"c":"I10","v":"خضراء (Green Tag - آمنة)","bg":"#E8F8F5","fg":"#117A65","b":true},{"c":"J10","v":"2026/10/08","bg":"#F8F9FA","fg":"#0F2027","al":"center"},{"c":"K10","v":"تم التأكد من أحزمة الأمان ونقاط الربط","bg":"#F8F9FA","fg":"#0F2027"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"SCF-03","fg":"#0F2027","al":"center"},{"c":"B11","v":"منور الخدمات الغربي","fg":"#0F2027"},{"c":"C11","v":"سقالة متحركة بعجلات (Mobile Tower)","fg":"#0F2027"},{"c":"D11","v":6,"in":true,"fg":"#0F2027","al":"center"},{"c":"E11","v":"أعمال خفيفة (120 كجم/م2)","fg":"#0F2027"},{"c":"F11","v":"العجلات مقفلة بمكابح","fg":"#0F2027"},{"c":"G11","v":"مثبتة بدعامات مائلة Outriggers","fg":"#0F2027"},{"c":"H11","v":"منصة عمل مغلقة بالكامل","fg":"#0F2027"},{"c":"I11","v":"خضراء (Green Tag - آمنة)","bg":"#E8F8F5","fg":"#117A65","b":true},{"c":"J11","v":"2026/10/08","fg":"#0F2027","al":"center"},{"c":"K11","v":"يمنع تحريكها أثناء وجود عمال بالأعلى","fg":"#0F2027"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":"SCF-04","bg":"#F8F9FA","fg":"#0F2027","al":"center"},{"c":"B12","v":"بدروم B1 - صب الحوائط","bg":"#F8F9FA","fg":"#0F2027"},{"c":"C12","v":"سقالة سند جوانب شدة خرسانية","bg":"#F8F9FA","fg":"#0F2027"},{"c":"D12","v":4.2,"in":true,"bg":"#F8F9FA","fg":"#0F2027","al":"center"},{"c":"E12","v":"أعمال ثقيلة (360 كجم/م2)","bg":"#F8F9FA","fg":"#0F2027"},{"c":"F12","v":"أرضية خرسانية صلبة","bg":"#F8F9FA","fg":"#0F2027"},{"c":"G12","v":"جاكات مائلة ودياجونال","bg":"#F8F9FA","fg":"#0F2027"},{"c":"H12","v":"ألواح خشب بونتي سليم","bg":"#F8F9FA","fg":"#0F2027"},{"c":"I12","v":"خضراء (Green Tag - آمنة)","bg":"#E8F8F5","fg":"#117A65","b":true},{"c":"J12","v":"2026/10/09","bg":"#F8F9FA","fg":"#0F2027","al":"center"},{"c":"K12","v":"جاهزة ومفحوصة قبل بدء صب الخرسانة","bg":"#F8F9FA","fg":"#0F2027"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"SCF-05","fg":"#0F2027","al":"center"},{"c":"B13","v":"الواجهة الشرقية - طابق 4","fg":"#0F2027"},{"c":"C13","v":"سقالة معلقة بكوابيل (Cantilever)","fg":"#0F2027"},{"c":"D13","v":12,"in":true,"fg":"#0F2027","al":"center"},{"c":"E13","v":"أعمال خفيفة (120 كجم/م2)","fg":"#0F2027"},{"c":"F13","v":"نقاط التثبيت بمسامير كيميائية","fg":"#0F2027"},{"c":"G13","v":"كوابيل حديدية ثقيلة","fg":"#0F2027"},{"c":"H13","v":"ينقصها لوح قدم جانبي","fg":"#0F2027"},{"c":"I13","v":"صفراء (Yellow Tag - صيانة)","bg":"#FEF9E7","fg":"#B7950B","b":true},{"c":"J13","v":"2026/10/09","fg":"#0F2027","al":"center"},{"c":"K13","v":"محظور استخدامها لحين تركيب الـ Toe-boards","fg":"#0F2027"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"SCF-06","bg":"#F8F9FA","fg":"#0F2027","al":"center"},{"c":"B14","v":"خزان المياه الأرضي","bg":"#F8F9FA","fg":"#0F2027"},{"c":"C14","v":"سقالة داخلية نموذجية (Modular)","bg":"#F8F9FA","fg":"#0F2027"},{"c":"D14","v":5.5,"in":true,"bg":"#F8F9FA","fg":"#0F2027","al":"center"},{"c":"E14","v":"أعمال متوسطة (240 كجم/م2)","bg":"#F8F9FA","fg":"#0F2027"},{"c":"F14","v":"قواعد تلسكوبية مظبوطة","bg":"#F8F9FA","fg":"#0F2027"},{"c":"G14","v":"روابط أفقية ورأسية متكاملة","bg":"#F8F9FA","fg":"#0F2027"},{"c":"H14","v":"منصة عمل غير مكتملة الألواح","bg":"#F8F9FA","fg":"#0F2027"},{"c":"I14","v":"حمراء (Red Tag - خطر ومرفوضة)","bg":"#FDEDEC","fg":"#922B21","b":true},{"c":"J14","v":"2026/10/10","bg":"#F8F9FA","fg":"#0F2027","al":"center"},{"c":"K14","v":"إيقاف فوري للعمل وإزالة الألواح المكسورة","bg":"#F8F9FA","fg":"#0F2027"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"SCF-07","fg":"#0F2027","al":"center"},{"c":"B15","v":"السطح العلوي - بيت الدرج","fg":"#0F2027"},{"c":"C15","v":"سقالة إطارية (Frame Scaffold)","fg":"#0F2027"},{"c":"D15","v":3.8,"in":true,"fg":"#0F2027","al":"center"},{"c":"E15","v":"أعمال متوسطة (240 كجم/م2)","fg":"#0F2027"},{"c":"F15","v":"مرتكزة على فرشات خشبية","fg":"#0F2027"},{"c":"G15","v":"مقصات تثبيت X-Brace","fg":"#0F2027"},{"c":"H15","v":"درابزين علوي وأوسط متكامل","fg":"#0F2027"},{"c":"I15","v":"خضراء (Green Tag - آمنة)","bg":"#E8F8F5","fg":"#117A65","b":true},{"c":"J15","v":"2026/10/10","fg":"#0F2027","al":"center"},{"c":"K15","v":"صالحة تماماً لأعمال اللياسة والدهان","fg":"#0F2027"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"SCF-08","bg":"#F8F9FA","fg":"#0F2027","al":"center"},{"c":"B16","v":"محيط السور الخارجي","bg":"#F8F9FA","fg":"#0F2027"},{"c":"C16","v":"سقالة أنبوبية خفيفة","bg":"#F8F9FA","fg":"#0F2027"},{"c":"D16","v":4,"in":true,"bg":"#F8F9FA","fg":"#0F2027","al":"center"},{"c":"E16","v":"أعمال خفيفة (120 كجم/م2)","bg":"#F8F9FA","fg":"#0F2027"},{"c":"F16","v":"أرضية ممهدة ومدموكة","bg":"#F8F9FA","fg":"#0F2027"},{"c":"G16","v":"مربوطة بجدار السور","bg":"#F8F9FA","fg":"#0F2027"},{"c":"H16","v":"ألواح عمل خشبية مربوطة","bg":"#F8F9FA","fg":"#0F2027"},{"c":"I16","v":"خضراء (Green Tag - آمنة)","bg":"#E8F8F5","fg":"#117A65","b":true},{"c":"J16","v":"2026/10/10","bg":"#F8F9FA","fg":"#0F2027","al":"center"},{"c":"K16","v":"مطابقة للمواصفة وتصريح العمل ساري","bg":"#F8F9FA","fg":"#0F2027"}]},{"r":17,"h":28.0,"cells":[{"c":"A17","v":""},{"c":"B17","v":""},{"c":"C17","v":""},{"c":"D17","v":""},{"c":"E17","v":""},{"c":"F17","v":""},{"c":"G17","v":""},{"c":"H17","v":""},{"c":"I17","v":""},{"c":"J17","v":""},{"c":"K17","v":""}]},{"r":18,"h":28.0,"cells":[{"c":"A18","v":""},{"c":"B18","v":""},{"c":"C18","v":""},{"c":"D18","v":""},{"c":"E18","v":""},{"c":"F18","v":""},{"c":"G18","v":""},{"c":"H18","v":""},{"c":"I18","v":""},{"c":"J18","v":""},{"c":"K18","v":""}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":"الاعتمادات الموقعية وإقرار مسؤولي السلامة والصحة المهنية (Sign-off & Inspection Verification)","bg":"#203A43","fg":"#FFFFFF","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":20,"h":72.0,"cells":[{"c":"A20","v":"مفتش السقالات المعتمد (Scaffold Inspector)\nالاسم: .....................................\nالتوقيع: ..................... التاريخ: ..../..../....","bg":"#F1F4F6","fg":"#0F2027","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D20","v":"مهندس السلامة بالمشروع (HSE Engineer)\nالاسم: .....................................\nالتوقيع: ..................... التاريخ: ..../..../....","bg":"#F1F4F6","fg":"#0F2027","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"H20","v":"مدير الموقع العام (Construction Manager)\nالاسم: .....................................\nالتوقيع: ..................... التاريخ: ..../..../....","bg":"#F1F4F6","fg":"#0F2027","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]}]},{"name":"حاسبة أحمال وسعة السقالة","maxRow":17,"maxCol":9,"colWidths":[12.0,16.0,16.0,18.0,22.0,20.0,22.0,22.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"⚡ حاسبة الأحمال الإنشائية وسعة قوائم السقالات المعدنية (Scaffold Bay & Leg Load Capacity Calculator)","bg":"#0F2027","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":40.0,"cells":[{"c":"A2","v":"حساب الحمل الميت للمواسير والألواح + الحمل الحي طبقاً لتصنيف OSHA + التحقق من سعة القائم المفرد بمعامل أمان 4.0","bg":"#203A43","fg":"#FFFFFF","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":72.0,"cells":[{"c":"A4","v":"رقم الباكية\n(Bay No)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"طول الباكية (م)\n(Bay Length L)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"عرض الباكية (م)\n(Bay Width W)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"مساحة المنصة (م2)\n(Platform Area)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"تصنيف الحمولة الحية\n(OSHA Duty Rating)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"الحمل الحي LL (كجم/م2)\n(Live Load kg/m2)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"إجمالي الحمل الحي (كجم)\n(Total Live Load kg)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"الحمل الميت التقريبي (كجم)\n(Est. Dead Load kg)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"الحمل الكلي على الباكية (كجم)\n(Total Bay Load kg)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":36.0,"cells":[{"c":"A5","v":"Bay-01","fg":"#0F2027","b":true,"al":"center"},{"c":"B5","v":2.5,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0.00"},{"c":"C5","v":1.2,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0.00"},{"c":"D5","v":3,"f":"=B5*C5","bg":"#F8F9FA","fg":"#0F2027","b":true,"al":"center","nf":"#,##0.00"},{"c":"E5","v":"أعمال خفيفة (Light Duty)","fg":"#0F2027","al":"center"},{"c":"F5","v":120,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0"},{"c":"G5","v":360,"f":"=D5*F5","bg":"#F8F9FA","fg":"#0F2027","b":true,"al":"center","nf":"#,##0"},{"c":"H5","v":110,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0"},{"c":"I5","v":470,"f":"=G5+H5","bg":"#EAF2F8","fg":"#2C5364","b":true,"al":"center","nf":"#,##0"}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":"Bay-02","fg":"#0F2027","b":true,"al":"center"},{"c":"B6","v":2,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0.00"},{"c":"C6","v":1.2,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0.00"},{"c":"D6","v":2.4,"f":"=B6*C6","bg":"#F8F9FA","fg":"#0F2027","b":true,"al":"center","nf":"#,##0.00"},{"c":"E6","v":"أعمال متوسطة (Medium Duty)","fg":"#0F2027","al":"center"},{"c":"F6","v":240,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0"},{"c":"G6","v":576,"f":"=D6*F6","bg":"#F8F9FA","fg":"#0F2027","b":true,"al":"center","nf":"#,##0"},{"c":"H6","v":125,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0"},{"c":"I6","v":701,"f":"=G6+H6","bg":"#EAF2F8","fg":"#2C5364","b":true,"al":"center","nf":"#,##0"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":"Bay-03","fg":"#0F2027","b":true,"al":"center"},{"c":"B7","v":1.8,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0.00"},{"c":"C7","v":1,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0.00"},{"c":"D7","v":1.8,"f":"=B7*C7","bg":"#F8F9FA","fg":"#0F2027","b":true,"al":"center","nf":"#,##0.00"},{"c":"E7","v":"أعمال ثقيلة (Heavy Duty)","fg":"#0F2027","al":"center"},{"c":"F7","v":360,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0"},{"c":"G7","v":648,"f":"=D7*F7","bg":"#F8F9FA","fg":"#0F2027","b":true,"al":"center","nf":"#,##0"},{"c":"H7","v":140,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0"},{"c":"I7","v":788,"f":"=G7+H7","bg":"#EAF2F8","fg":"#2C5364","b":true,"al":"center","nf":"#,##0"}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":"Bay-04","fg":"#0F2027","b":true,"al":"center"},{"c":"B8","v":2.5,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0.00"},{"c":"C8","v":1,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0.00"},{"c":"D8","v":2.5,"f":"=B8*C8","bg":"#F8F9FA","fg":"#0F2027","b":true,"al":"center","nf":"#,##0.00"},{"c":"E8","v":"أعمال متوسطة (Medium Duty)","fg":"#0F2027","al":"center"},{"c":"F8","v":240,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0"},{"c":"G8","v":600,"f":"=D8*F8","bg":"#F8F9FA","fg":"#0F2027","b":true,"al":"center","nf":"#,##0"},{"c":"H8","v":130,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0"},{"c":"I8","v":730,"f":"=G8+H8","bg":"#EAF2F8","fg":"#2C5364","b":true,"al":"center","nf":"#,##0"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":"Bay-05","fg":"#0F2027","b":true,"al":"center"},{"c":"B9","v":2,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0.00"},{"c":"C9","v":1,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0.00"},{"c":"D9","v":2,"f":"=B9*C9","bg":"#F8F9FA","fg":"#0F2027","b":true,"al":"center","nf":"#,##0.00"},{"c":"E9","v":"أعمال ثقيلة (Heavy Duty)","fg":"#0F2027","al":"center"},{"c":"F9","v":360,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0"},{"c":"G9","v":720,"f":"=D9*F9","bg":"#F8F9FA","fg":"#0F2027","b":true,"al":"center","nf":"#,##0"},{"c":"H9","v":135,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0"},{"c":"I9","v":855,"f":"=G9+H9","bg":"#EAF2F8","fg":"#2C5364","b":true,"al":"center","nf":"#,##0"}]},{"r":10,"h":28.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""},{"c":"F10","v":""},{"c":"G10","v":""},{"c":"H10","v":""},{"c":"I10","v":""}]},{"r":11,"h":38.0,"cells":[{"c":"A11","v":"التحقق الهندسي من نصيب القائم المفرد (Leg Load) ومعامل الأمان الحاكم طبقاً لـ OSHA (Safety Factor >= 4.0)","bg":"#2C5364","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":"رقم الباكية","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B12","v":"الحمل الكلي (كجم)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C12","v":"عدد القوائم الحاملة","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D12","v":"حمل القائم الفعلي (كجم)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E12","v":"سعة القائم المسموحة (كجم)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F12","v":"حمل الانهيار النظري (كجم)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G12","v":"معامل الأمان الفعلي SF","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H12","v":"الحد الأدنى لـ OSHA","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I12","v":"القرار الهندسي للسلامة","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":"Bay-01","f":"=A5","fg":"#0F2027","b":true,"al":"center"},{"c":"B13","v":470,"f":"=I5","fg":"#0F2027","al":"center","nf":"#,##0"},{"c":"C13","v":4,"in":true,"fg":"#0F2027","al":"center"},{"c":"D13","v":117.5,"f":"=B13/C13","bg":"#F8F9FA","fg":"#0F2027","b":true,"al":"center","nf":"#,##0.0"},{"c":"E13","v":1850,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0"},{"c":"F13","v":7400,"f":"=E13*4","fg":"#0F2027","al":"center","nf":"#,##0"},{"c":"G13","v":62.978723,"f":"=F13/D13","bg":"#E8F8F5","fg":"#117A65","b":true,"al":"center","nf":"#,##0.0"},{"c":"H13","v":4,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0.0"},{"c":"I13","v":"✅ آمن ومعامل الأمان ممتاز","f":"=IF(G13>=H13,\"✅ آمن ومعامل الأمان ممتاز\",\"⚠️ غير مطابق - خفض الأحمال\")","bg":"#E8F8F5","fg":"#117A65","b":true,"al":"center"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":"Bay-02","f":"=A6","fg":"#0F2027","b":true,"al":"center"},{"c":"B14","v":701,"f":"=I6","fg":"#0F2027","al":"center","nf":"#,##0"},{"c":"C14","v":4,"in":true,"fg":"#0F2027","al":"center"},{"c":"D14","v":175.25,"f":"=B14/C14","bg":"#F8F9FA","fg":"#0F2027","b":true,"al":"center","nf":"#,##0.0"},{"c":"E14","v":1850,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0"},{"c":"F14","v":7400,"f":"=E14*4","fg":"#0F2027","al":"center","nf":"#,##0"},{"c":"G14","v":42.225392,"f":"=F14/D14","bg":"#E8F8F5","fg":"#117A65","b":true,"al":"center","nf":"#,##0.0"},{"c":"H14","v":4,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0.0"},{"c":"I14","v":"✅ آمن ومعامل الأمان ممتاز","f":"=IF(G14>=H14,\"✅ آمن ومعامل الأمان ممتاز\",\"⚠️ غير مطابق - خفض الأحمال\")","bg":"#E8F8F5","fg":"#117A65","b":true,"al":"center"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":"Bay-03","f":"=A7","fg":"#0F2027","b":true,"al":"center"},{"c":"B15","v":788,"f":"=I7","fg":"#0F2027","al":"center","nf":"#,##0"},{"c":"C15","v":4,"in":true,"fg":"#0F2027","al":"center"},{"c":"D15","v":197,"f":"=B15/C15","bg":"#F8F9FA","fg":"#0F2027","b":true,"al":"center","nf":"#,##0.0"},{"c":"E15","v":1850,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0"},{"c":"F15","v":7400,"f":"=E15*4","fg":"#0F2027","al":"center","nf":"#,##0"},{"c":"G15","v":37.563452,"f":"=F15/D15","bg":"#E8F8F5","fg":"#117A65","b":true,"al":"center","nf":"#,##0.0"},{"c":"H15","v":4,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0.0"},{"c":"I15","v":"✅ آمن ومعامل الأمان ممتاز","f":"=IF(G15>=H15,\"✅ آمن ومعامل الأمان ممتاز\",\"⚠️ غير مطابق - خفض الأحمال\")","bg":"#E8F8F5","fg":"#117A65","b":true,"al":"center"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":"Bay-04","f":"=A8","fg":"#0F2027","b":true,"al":"center"},{"c":"B16","v":730,"f":"=I8","fg":"#0F2027","al":"center","nf":"#,##0"},{"c":"C16","v":4,"in":true,"fg":"#0F2027","al":"center"},{"c":"D16","v":182.5,"f":"=B16/C16","bg":"#F8F9FA","fg":"#0F2027","b":true,"al":"center","nf":"#,##0.0"},{"c":"E16","v":1850,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0"},{"c":"F16","v":7400,"f":"=E16*4","fg":"#0F2027","al":"center","nf":"#,##0"},{"c":"G16","v":40.547945,"f":"=F16/D16","bg":"#E8F8F5","fg":"#117A65","b":true,"al":"center","nf":"#,##0.0"},{"c":"H16","v":4,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0.0"},{"c":"I16","v":"✅ آمن ومعامل الأمان ممتاز","f":"=IF(G16>=H16,\"✅ آمن ومعامل الأمان ممتاز\",\"⚠️ غير مطابق - خفض الأحمال\")","bg":"#E8F8F5","fg":"#117A65","b":true,"al":"center"}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":"Bay-05","f":"=A9","fg":"#0F2027","b":true,"al":"center"},{"c":"B17","v":855,"f":"=I9","fg":"#0F2027","al":"center","nf":"#,##0"},{"c":"C17","v":4,"in":true,"fg":"#0F2027","al":"center"},{"c":"D17","v":213.75,"f":"=B17/C17","bg":"#F8F9FA","fg":"#0F2027","b":true,"al":"center","nf":"#,##0.0"},{"c":"E17","v":1850,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0"},{"c":"F17","v":7400,"f":"=E17*4","fg":"#0F2027","al":"center","nf":"#,##0"},{"c":"G17","v":34.619883,"f":"=F17/D17","bg":"#E8F8F5","fg":"#117A65","b":true,"al":"center","nf":"#,##0.0"},{"c":"H17","v":4,"in":true,"fg":"#0F2027","al":"center","nf":"#,##0.0"},{"c":"I17","v":"✅ آمن ومعامل الأمان ممتاز","f":"=IF(G17>=H17,\"✅ آمن ومعامل الأمان ممتاز\",\"⚠️ غير مطابق - خفض الأحمال\")","bg":"#E8F8F5","fg":"#117A65","b":true,"al":"center"}]}]},{"name":"دليل واشتراطات السقالات OSHA","maxRow":7,"maxCol":5,"colWidths":[26.0,26.0,24.0,38.0,34.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"📋 الاشتراطات الهندسية وجداول حدود الحمولات وفق كود OSHA 1926.451 وكود البناء السعودي","bg":"#0F2027","fg":"#FFFFFF","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":28.0,"cells":[{"c":"A2","v":""},{"c":"B2","v":""},{"c":"C2","v":""},{"c":"D2","v":""},{"c":"E2","v":""}]},{"r":3,"h":52.0,"cells":[{"c":"A3","v":"تصنيف حمولة السقالة\n(Load Classification)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B3","v":"الحمل الحي الأقصى المسموح\n(Max Allowable Live Load)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C3","v":"أقصى مسافة بين القوائم\n(Max Bay Spacing)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D3","v":"الأعمال والمهام المسموحة\n(Permitted Operations)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E3","v":"معايير السلامة والربط الإلزامية\n(Safety Mandates)","bg":"#203A43","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"سقالة أعمال خفيفة (Light Duty)","fg":"#0F2027","b":true},{"c":"B4","v":"120 كجم/م2 (25 lb/ft2)","fg":"#0F2027","al":"center"},{"c":"C4","v":"2.5 متر إلى 3.0 متر","fg":"#0F2027","al":"center"},{"c":"D4","v":"أعمال الدهانات، تركيب الواجهات الزجاجية، أعمال الكهرباء، وتفتيش المباني.","fg":"#0F2027"},{"c":"E4","v":"ربط بالحائط كل 4 أمتار رأسياً و6 أمتار أفقياً.","fg":"#0F2027"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"سقالة أعمال متوسطة (Medium Duty)","bg":"#F8F9FA","fg":"#0F2027","b":true},{"c":"B5","v":"240 كجم/م2 (50 lb/ft2)","bg":"#F8F9FA","fg":"#0F2027","al":"center"},{"c":"C5","v":"1.8 متر إلى 2.4 متر","bg":"#F8F9FA","fg":"#0F2027","al":"center"},{"c":"D5","v":"أعمال اللياسة والمحارة، تركيب الحجر الميكانيكي، والتشطيبات المعمارية العامة.","bg":"#F8F9FA","fg":"#0F2027"},{"c":"E5","v":"تركيب شبك حماية ومصدم قدم Toe-board بارتفاع 10 سم.","bg":"#F8F9FA","fg":"#0F2027"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"سقالة أعمال ثقيلة (Heavy Duty)","fg":"#0F2027","b":true},{"c":"B6","v":"360 كجم/م2 (75 lb/ft2)","fg":"#0F2027","al":"center"},{"c":"C6","v":"1.5 متر إلى 1.8 متر","fg":"#0F2027","al":"center"},{"c":"D6","v":"أعمال البناء بالطوب، صب الخرسانات، وتشوين مواد البناء الحجرية الثقيلة.","fg":"#0F2027"},{"c":"E6","v":"فحص أسبوعي إلزامي وإعادة حساب سعة القوائم بدقة.","fg":"#0F2027"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"سقالات خاصة معلقة (Suspended)","bg":"#F8F9FA","fg":"#0F2027","b":true},{"c":"B7","v":"حسب التصميم الهندسي المعتمد","bg":"#F8F9FA","fg":"#0F2027","al":"center"},{"c":"C7","v":"طبقا لتقرير الاستشاري المصمم","bg":"#F8F9FA","fg":"#0F2027","al":"center"},{"c":"D7","v":"أعمال تنظيف الزجاج وصيانة الأبراج العالية ومناور المصاعد.","bg":"#F8F9FA","fg":"#0F2027"},{"c":"E7","v":"توفير حبل حياة مستقل Lifeline لكل عامل بالسقالة.","bg":"#F8F9FA","fg":"#0F2027"}]}]}]}