{"slug":"scaffolding-load-capacity-and-tubular-frame-safety-design-sheet","sheets":[{"name":"إعدادات المشروع والمواصفات","maxRow":45,"maxCol":8,"colWidths":[10.0,14.0,62.0,18.0,16.0,28.0,30.0,34.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت حساب أحمال وقدرة تحمل السقالات الإنشائية المعدنية واشتراطات الأمان والسلامة وفق BS EN 12811 و OSHA 1926","fg":"#1E3A8A","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"⚠️ تنبيه استرشادي: البيانات والمواصفات وفئات الأسعار المدخلة في هذا الشيت هي قيم هندسية واسترشادية وفق معايير BS EN 12811 وكود OSHA 1926. يرجى تعديل فئات الأسعار وأحمال التشغيل طبقاً لمتطلبات الموقع وتقرير فحص التربة وشهادات اختبار المواد لمشروعك.","fg":"#475569","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":34.0,"cells":[{"c":"A3","v":"فئة الحمل التشغيلي للمنصة","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C3","v":"أقصى حمل رأسي على القائم المفرد","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E3","v":"معامل أمان انبعاج القائم","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"G3","v":"إجمالي تكلفة السقالة والتركيب والفحص","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true}]},{"r":4,"h":46.0,"cells":[{"c":"A4","v":0,"f":"='حساب الأحمال والتصميم الإنشائي'!C18","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00","cs":2},{"skip":true},{"c":"C4","v":132.4,"f":"='حساب الأحمال والتصميم الإنشائي'!D36","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00","cs":2},{"skip":true},{"c":"E4","v":"القيمة","f":"='حساب الأحمال والتصميم الإنشائي'!D44","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00","cs":2},{"skip":true},{"c":"G4","v":53218.389,"f":"='مقايسة الكميات وتكاليف السقالة'!G22","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"كيلو نيوتن/م² (BS EN 12811)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C5","v":"كيلو نيوتن (Leg Vertical Load)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E5","v":"الحد الأدنى الآمن: FOS >= 3.0","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"G5","v":"القيمة الإجمالية شاملة الضريبة","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true}]},{"r":6,"h":28.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":""},{"c":"C6","v":""},{"c":"D6","v":""},{"c":"E6","v":""},{"c":"F6","v":""},{"c":"G6","v":""},{"c":"H6","v":""}]},{"r":7,"h":38.0,"cells":[{"c":"A7","v":"أولاً: بيانات المشروع والتوصيف التعاقدي والعملة المعتمدة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"اسم المشروع الإنشائي:","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"C8","v":"مشروع المجمع التجاري والإداري (برج الأعمال الأوسط)","al":"center","cs":2},{"skip":true},{"c":"E8","v":"الجهة المالكة للمشروع:","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"G8","v":"شركة التطوير العمراني والاستثمار الإنشائي","al":"center","cs":2},{"skip":true}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"المقاول العام المنفذ:","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"C9","v":"شركة البنيان للمقاولات العامة والإنشاءات المتطورة","al":"center","cs":2},{"skip":true},{"c":"E9","v":"استشاري السلامة والإشراف الهندسي:","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"G9","v":"المكتب الاستشاري لخدمات السلامة وضبط الجودة","al":"center","cs":2},{"skip":true}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"كود وتوصيف منطقة السقالة بالموقع:","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"C10","v":"Scaffold Zone SC-04 (West Elevation Facade)","al":"center","cs":2},{"skip":true},{"c":"E10","v":"تاريخ فحص وتصريح العمل الموقعي:","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"G10","v":"2026-10-18","al":"center","cs":2},{"skip":true}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"العملة المعتمدة للشيت:","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"C11","v":"SAR","al":"center","cs":2},{"skip":true},{"c":"E11","v":"نوع نظام السقالة المعتمد:","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"G11","v":"سقالة مواسير وكلبسات فولاذية Tube & Coupler Heavy Duty","al":"center","cs":2},{"skip":true}]},{"r":12,"h":28.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":""},{"c":"C12","v":""},{"c":"D12","v":""},{"c":"E12","v":""},{"c":"F12","v":""},{"c":"G12","v":""},{"c":"H12","v":""}]},{"r":13,"h":38.0,"cells":[{"c":"A13","v":"ثانياً: المعايير الفنية ومواصفات مقاطع السقالة وأبعاد الواجهة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":14,"h":40.0,"cells":[{"c":"A14","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B14","v":"الكود","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C14","v":"المعلمة الهندسية وتوصيف المقطع","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D14","v":"القيمة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E14","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F14","v":"المرجعية القياسية واشتراطات الكود","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G14","v":"التطبيق الإنشائي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H14","v":"ملاحظات وتدقيق","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":1,"al":"center"},{"c":"B15","v":"P-01","al":"center"},{"c":"C15","v":"القطر الخارجي لمواسير السقالة (Outside Diameter D)"},{"c":"D15","v":48.3,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"E15","v":"مم","al":"center"},{"c":"F15","v":"BS EN 39 / ASTM A500","al":"center"},{"c":"G15","v":"قوائم وبرندات وعوارض السقالة"},{"c":"H15","v":"قطر قياسي 1.5 بوصة"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":2,"al":"center"},{"c":"B16","v":"P-02","al":"center"},{"c":"C16","v":"سماكة جدار الماسورة الفولاذية (Wall Thickness t)"},{"c":"D16","v":3.2,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"E16","v":"مم","al":"center"},{"c":"F16","v":"Grade S235 / Type 4 Standard","al":"center"},{"c":"G16","v":"سماكة المواسير الفولاذية المعتمدة"},{"c":"H16","v":"سماكة إنشائية قياسية"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":3,"al":"center"},{"c":"B17","v":"P-03","al":"center"},{"c":"C17","v":"إجهاد الخضوع لصلب المواسير (Yield Strength fy)"},{"c":"D17","v":235,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"E17","v":"نيوتن/مم²","al":"center"},{"c":"F17","v":"EN 10025-2 Structural Steel","al":"center"},{"c":"G17","v":"مقاومة خضوع صلب السقالات"},{"c":"H17","v":"صلب كربوني إنشائي S235"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":4,"al":"center"},{"c":"B18","v":"P-04","al":"center"},{"c":"C18","v":"معامل المرونة لصلب المواسير (Elastic Modulus E)"},{"c":"D18","v":210000,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"E18","v":"نيوتن/مم²","al":"center"},{"c":"F18","v":"Standard Modulus of Elasticity","al":"center"},{"c":"G18","v":"حسابات الانبعاج والترخيم"},{"c":"H18","v":"قيمة قياسية ثابتة للصلب"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":5,"al":"center"},{"c":"B19","v":"P-05","al":"center"},{"c":"C19","v":"مساحة مقطع الماسورة العرضي (Cross-Section Area A)"},{"c":"D19","v":453.4,"f":"=ROUND(PI()*(D15^2-(D15-2*D16)^2)/4, 1)","b":true,"al":"center","nf":"0.0"},{"c":"E19","v":"مم²","al":"center"},{"c":"F19","v":"Geometric Section Property","al":"center"},{"c":"G19","v":"حساب الإجهادات المحورية"},{"c":"H19","v":"محسوبة هندسياً بالمعادلة"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":6,"al":"center"},{"c":"B20","v":"P-06","al":"center"},{"c":"C20","v":"عزم القصور الذاتي للماسورة (Moment of Inertia I)"},{"c":"D20","v":115857,"f":"=ROUND(PI()*(D15^4-(D15-2*D16)^4)/64, 0)","b":true,"al":"center","nf":"#,##0"},{"c":"E20","v":"مم⁴","al":"center"},{"c":"F20","v":"Geometric Section Property","al":"center"},{"c":"G20","v":"حساب جساءة الانحناء والانبعاج"},{"c":"H20","v":"محسوبة هندسياً بالمعادلة"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":7,"al":"center"},{"c":"B21","v":"P-07","al":"center"},{"c":"C21","v":"نصف قطر القصور الذاتي (Radius of Gyration r)"},{"c":"D21","v":15.99,"f":"=ROUND(SQRT(D20/D19), 2)","b":true,"al":"center","nf":"0.00"},{"c":"E21","v":"مم","al":"center"},{"c":"F21","v":"Geometric Section Property","al":"center"},{"c":"G21","v":"حساب نسبة النحافة للقوائم"},{"c":"H21","v":"محسوبة هندسياً بالمعادلة"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":8,"al":"center"},{"c":"B22","v":"P-08","al":"center"},{"c":"C22","v":"طول الباكية الطولي للسقالة (Bay Length L_bay)"},{"c":"D22","v":2.4,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E22","v":"متر","al":"center"},{"c":"F22","v":"BS EN 12811-1 Bay Spacing","al":"center"},{"c":"G22","v":"المسافة الأفقية بين القوائم الطولية"},{"c":"H22","v":"بحر قياسي مريح للأعمال"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":9,"al":"center"},{"c":"B23","v":"P-09","al":"center"},{"c":"C23","v":"عرض السقالة العرضي للمنصة (Bay Width W_bay)"},{"c":"D23","v":1.2,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E23","v":"متر","al":"center"},{"c":"F23","v":"BS EN 12811-1 Width Class W09-W12","al":"center"},{"c":"G23","v":"المسافة العرضية بين القائمين"},{"c":"H23","v":"يتسع لعدد 5 ألواح خشبية"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":10,"al":"center"},{"c":"B24","v":"P-10","al":"center"},{"c":"C24","v":"ارتفاع الحطة الرأسية الواحدة (Lift Height H_lift)"},{"c":"D24","v":2,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E24","v":"متر","al":"center"},{"c":"F24","v":"OSHA 1926.451 Headroom","al":"center"},{"c":"G24","v":"المسافة الرأسية بين البرندات"},{"c":"H24","v":"ارتفاع قياسي لراحة الحركة"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":11,"al":"center"},{"c":"B25","v":"P-11","al":"center"},{"c":"C25","v":"إجمالي ارتفاع السقالة الكلي (Total Height H_tot)"},{"c":"D25","v":18,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E25","v":"متر","al":"center"},{"c":"F25","v":"Building Facade Elevation","al":"center"},{"c":"G25","v":"الارتفاع الإجمالي حتى أعلى حطة"},{"c":"H25","v":"يتضمن 9 حطات عمل كاملة"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":12,"al":"center"},{"c":"B26","v":"P-12","al":"center"},{"c":"C26","v":"عدد حطات العمل المحملة بالعمال (Loaded Working Lifts)"},{"c":"D26","v":1,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"E26","v":"حطة","al":"center"},{"c":"F26","v":"BS EN 12811 Simultaneous Work","al":"center"},{"c":"G26","v":"منصة العمل الرئيسية النشطة"},{"c":"H26","v":"حطة واحدة بكامل الحمل الحي"}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":13,"al":"center"},{"c":"B27","v":"P-13","al":"center"},{"c":"C27","v":"عدد الحطات المفروشة للتخزين (Boarded Storage Lifts)"},{"c":"D27","v":2,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"E27","v":"حطة","al":"center"},{"c":"F27","v":"BS EN 12811 Secondary Lifts","al":"center"},{"c":"G27","v":"حطات مفروشة بدون عمال"},{"c":"H27","v":"حمل تخزين مخفض 0.75 kN/m²"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":14,"al":"center"},{"c":"B28","v":"P-14","al":"center"},{"c":"C28","v":"قدرة التحمل المسموحة لأرضية الموقع (Soil Bearing Capacity)"},{"c":"D28","v":180,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"E28","v":"كيلو نيوتن/م²","al":"center"},{"c":"F28","v":"تقرير فحص التربة المعتمد","al":"center"},{"c":"G28","v":"فحص استقرار ألواح التوزيع الأرضية"},{"c":"H28","v":"تربة مدموكة أو خرسانة عادية"}]},{"r":29,"h":28.0,"cells":[{"c":"A29","v":""},{"c":"B29","v":""},{"c":"C29","v":""},{"c":"D29","v":""},{"c":"E29","v":""},{"c":"F29","v":""},{"c":"G29","v":""},{"c":"H29","v":""}]},{"r":30,"h":38.0,"cells":[{"c":"A30","v":"ثالثاً: فئات الأسعار والتكاليف المرجعية لمكونات السقالة والعمالة (Setup Rates)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":31,"h":40.0,"cells":[{"c":"A31","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B31","v":"كود البند","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C31","v":"بيان المادة والتوريد والمصنعية واشتراطات الموقع","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D31","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E31","v":"فئة السعر","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F31","v":"العملة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G31","v":"التصنيف التكلفي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H31","v":"ملاحظات التسعير","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":32,"h":34.0,"cells":[{"c":"A32","v":1,"al":"center"},{"c":"B32","v":"R-01","al":"center"},{"c":"C32","v":"توريد وتركيب مواسير السقالة الفولاذية قطر 48.3 مم سماكة 3.2 مم"},{"c":"D32","v":"م.ط","al":"center"},{"c":"E32","v":14.5,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F32","v":"SAR","al":"center"},{"c":"G32","v":"مواسير وهيكل السقالة","al":"center"},{"c":"H32","v":"سعر إيجار وتركيب شهري شامل الفك"}]},{"r":33,"h":34.0,"cells":[{"c":"A33","v":2,"al":"center"},{"c":"B33","v":"R-02","al":"center"},{"c":"C33","v":"توريد كلبسات وصل ثابتة 90 درجة ومتحركة معتمدة EN 74"},{"c":"D33","v":"عدد","al":"center"},{"c":"E33","v":18,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F33","v":"SAR","al":"center"},{"c":"G33","v":"كلبسات ووصلات الربط","al":"center"},{"c":"H33","v":"كلبسات مجلفنة عالية التحمل"}]},{"r":34,"h":34.0,"cells":[{"c":"A34","v":3,"al":"center"},{"c":"B34","v":"R-03","al":"center"},{"c":"C34","v":"توريد ألواح منصات العمل المعدنية/الخشبية المعالجة المقاومة للحريق"},{"c":"D34","v":"لوح","al":"center"},{"c":"E34","v":65,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F34","v":"SAR","al":"center"},{"c":"G34","v":"ألواح وفرش المنصات","al":"center"},{"c":"H34","v":"لوح خشبي معالج 3.90 م × 225 مم"}]},{"r":35,"h":34.0,"cells":[{"c":"A35","v":4,"al":"center"},{"c":"B35","v":"R-04","al":"center"},{"c":"C35","v":"توريد قواعد ارتكاز سفلية قابلة للضبط Base Jacks مع مسامير التعديل"},{"c":"D35","v":"عدد","al":"center"},{"c":"E35","v":42,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F35","v":"SAR","al":"center"},{"c":"G35","v":"قواعد الارتكاز الأرضية","al":"center"},{"c":"H35","v":"قواعد فولاذية مجلفنة طول 60 سم"}]},{"r":36,"h":34.0,"cells":[{"c":"A36","v":5,"al":"center"},{"c":"B36","v":"R-05","al":"center"},{"c":"C36","v":"توريد ألواح توزيع الأحمال الأرضية الخشبية Sole Boards قياس 225×38 مم"},{"c":"D36","v":"م.ط","al":"center"},{"c":"E36","v":28,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F36","v":"SAR","al":"center"},{"c":"G36","v":"ألواح التوزيع على التربة","al":"center"},{"c":"H36","v":"أخشاب إنشائية معالجة لتوزيع الإجهاد"}]},{"r":37,"h":34.0,"cells":[{"c":"A37","v":6,"al":"center"},{"c":"B37","v":"R-06","al":"center"},{"c":"C37","v":"توريد وتثبيت نقاط ربط جدارية Wall Ties ومسامير صلب كيميائية M16"},{"c":"D37","v":"نقطة","al":"center"},{"c":"E37","v":55,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F37","v":"SAR","al":"center"},{"c":"G37","v":"أنظمة التثبيت بالهيكل","al":"center"},{"c":"H37","v":"شامل المسمار والأنبوب واختبار الشد"}]},{"r":38,"h":34.0,"cells":[{"c":"A38","v":7,"al":"center"},{"c":"B38","v":"R-07","al":"center"},{"c":"C38","v":"توريد وتثبيت شبك حماية ومصدات غبار وسقوط Debris Netting كامل الواجهة"},{"c":"D38","v":"م²","al":"center"},{"c":"E38","v":8.5,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F38","v":"SAR","al":"center"},{"c":"G38","v":"أنظمة السلامة والوقاية","al":"center"},{"c":"H38","v":"شبك بولي إيثيلين كثيف مقاوم للرياح"}]},{"r":39,"h":34.0,"cells":[{"c":"A39","v":8,"al":"center"},{"c":"B39","v":"R-08","al":"center"},{"c":"C39","v":"توريد وتثبيت مصدات قدم وحواجز حماية سفلية Toeboards بارتفاع 15 سم"},{"c":"D39","v":"م.ط","al":"center"},{"c":"E39","v":16,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F39","v":"SAR","al":"center"},{"c":"G39","v":"حواجز منع سقوط الأدوات","al":"center"},{"c":"H39","v":"ألواح خشبية مثبتة بإحكام بالكلبسات"}]},{"r":40,"h":34.0,"cells":[{"c":"A40","v":9,"al":"center"},{"c":"B40","v":"R-09","al":"center"},{"c":"C40","v":"توريد وتركيب سلالم صعود ونزول داخلية آمنة مجهزة بدرابزينات حماية"},{"c":"D40","v":"مجموعة","al":"center"},{"c":"E40","v":350,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F40","v":"SAR","al":"center"},{"c":"G40","v":"وسائل الوصول الآمن","al":"center"},{"c":"H40","v":"سلم ألومنيوم/صلب مع منصة استراحة"}]},{"r":41,"h":34.0,"cells":[{"c":"A41","v":10,"al":"center"},{"c":"B41","v":"R-10","al":"center"},{"c":"C41","v":"خدمات الفحص الإنشائي المستمر وإصدار بطاقات التفتيش Scafftag والاعتماد"},{"c":"D41","v":"مقطوعية","al":"center"},{"c":"E41","v":1200,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F41","v":"SAR","al":"center"},{"c":"G41","v":"الفحص والاعتماد الهندسي","al":"center"},{"c":"H41","v":"فحص أسبوعي وبطاقات تفتيش خضراء"}]},{"r":42,"h":28.0,"cells":[{"c":"A42","v":""},{"c":"B42","v":""},{"c":"C42","v":""},{"c":"D42","v":""},{"c":"E42","v":""},{"c":"F42","v":""},{"c":"G42","v":""},{"c":"H42","v":""}]},{"r":43,"h":28.0,"cells":[{"c":"A43","v":""},{"c":"B43","v":""},{"c":"C43","v":""},{"c":"D43","v":""},{"c":"E43","v":""},{"c":"F43","v":""},{"c":"G43","v":""},{"c":"H43","v":""}]},{"r":44,"h":34.0,"cells":[{"c":"A44","v":"مهندس السلامة والصحة المهنية (HSE Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D44","v":"مشرف تركيب السقالات الإنشائية (Scaffold Supervisor)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G44","v":"المهندس الاستشاري المقيم (Resident Consultant)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true}]},{"r":45,"h":76.0,"cells":[{"c":"A45","v":"الاسم والتوقيع:\nرقم الترخيص المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true},{"c":"D45","v":"الاسم والتوقيع:\nرقم الترخيص المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true},{"c":"G45","v":"الاسم والتوقيع:\nرقم الترخيص المهني:\nالتاريخ والختم:","cs":2},{"skip":true}]}]},{"name":"حساب الأحمال والتصميم الإنشائي","maxRow":55,"maxCol":8,"colWidths":[10.0,14.0,62.0,18.0,18.0,30.0,30.0,34.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"التحليل الإنشائي للأحمال الميتة والحية والرياح وفحص انبعاج القوائم وفق BS EN 12811 و OSHA 1926","fg":"#1E3A8A","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"⚠️ تنبيه استرشادي: المعادلات الحسابية المضمنة في هذا الشيت تحسب تلقائياً ردود أفعال القوائم وانبعاج الأعمدة وسهم ترخيم المنصات وقوى الشد في الروابط الجدارية بناءً على الأبعاد المدخلة في شيت الإعدادات.","fg":"#475569","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: تصنيف وحساب الأحمال الميتة والحية والرياح وفق BS EN 12811 و OSHA 1926","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":40.0,"cells":[{"c":"A5","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"كود الحمل","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"توصيف الحمل والمصدر الإنشائي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"القيمة التصميمية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"المعادلة والمرجعية القياسية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"حالة التحميل","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"التحقق والأمان","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":1,"al":"center"},{"c":"B6","v":"DL-01","al":"center"},{"c":"C6","v":"الوزن الذاتي لمواسير السقالة والكلبسات (Self-Weight)"},{"c":"D6","v":0.18,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E6","v":"كيلو نيوتن/م²","al":"center"},{"c":"F6","v":"EN 12811-1 Cl. 6.2.1","al":"center"},{"c":"G6","v":"أحمال ميتة دائمة","al":"center"},{"c":"H6","v":"مواسير 48.3×3.2 مم مع الكلبسات"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":2,"al":"center"},{"c":"B7","v":"DL-02","al":"center"},{"c":"C7","v":"وزن ألواح منصات العمل الخشبية/المعدنية (Planks Dead Load)"},{"c":"D7","v":0.25,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E7","v":"كيلو نيوتن/م²","al":"center"},{"c":"F7","v":"Timber / Steel Deck Planks","al":"center"},{"c":"G7","v":"أحمال ميتة دائمة","al":"center"},{"c":"H7","v":"ألواح خشبية معالجة سماكة 38 مم"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":3,"al":"center"},{"c":"B8","v":"DL-03","al":"center"},{"c":"C8","v":"وزن الدرابزينات وحواجز القدم والشباك الواقية (Guardrails & Net)"},{"c":"D8","v":0.12,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E8","v":"كيلو نيوتن/م²","al":"center"},{"c":"F8","v":"OSHA 1926.451 Toeboards","al":"center"},{"c":"G8","v":"أحمال ميتة دائمة","al":"center"},{"c":"H8","v":"درابزين علوي وأوسط وحاجز قدم 15سم"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":4,"al":"center"},{"c":"B9","v":"DL-TOT","al":"center"},{"c":"C9","v":"إجمالي الحمل الميت لكل متر مربع من المنصة (Total Dead Load)"},{"c":"D9","v":0.55,"f":"=D6+D7+D8","b":true,"al":"center","nf":"0.00"},{"c":"E9","v":"كيلو نيوتن/م²","al":"center"},{"c":"F9","v":0,"f":"=DL-01 + DL-02 + DL-03","al":"center"},{"c":"G9","v":"مجموع الأحمال الميتة","al":"center"},{"c":"H9","v":"حمل ميت تراكمي للمنصة"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":5,"al":"center"},{"c":"B10","v":"LL-CLS","al":"center"},{"c":"C10","v":"تصنيف فئة الحمل الحي التشغيلي المعتمد (Service Load Class)"},{"c":"D10","v":"Class 3","b":true,"al":"center"},{"c":"E10","v":"فئة الكود","al":"center"},{"c":"F10","v":"BS EN 12811-1 Table 1","al":"center"},{"c":"G10","v":"أعمال التشطيبات والمحارة","al":"center"},{"c":"H10","v":"توصيف الأعمال الإنشائية بالموقع"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":6,"al":"center"},{"c":"B11","v":"LL-01","al":"center"},{"c":"C11","v":"الحمل الحي التشغيلي لمنصة العمل الرئيسية (Working Live Load)"},{"c":"D11","v":2,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E11","v":"كيلو نيوتن/م²","al":"center"},{"c":"F11","v":"BS EN 12811-1 Class 3 (2.0 kN/m²)","al":"center"},{"c":"G11","v":"أحمال حية متغيرة","al":"center"},{"c":"H11","v":"حمل العمال والمونة ومعدات البياض"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":7,"al":"center"},{"c":"B12","v":"LL-02","al":"center"},{"c":"C12","v":"حمل حطة التخزين الإضافية المفروشة (Storage Platform Load)"},{"c":"D12","v":0.75,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E12","v":"كيلو نيوتن/م²","al":"center"},{"c":"F12","v":"EN 12811 Secondary Lift (25-50%)","al":"center"},{"c":"G12","v":"أحمال حية مخفضة","al":"center"},{"c":"H12","v":"حمل تخزين مؤقت لمواد البناء"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":8,"al":"center"},{"c":"B13","v":"WL-01","al":"center"},{"c":"C13","v":"سرعة الرياح الأساسية التصميمية للموقع (Basic Wind Speed)"},{"c":"D13","v":28,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E13","v":"م/ث (100.8 كم/س)","al":"center"},{"c":"F13","v":"SBC 301 Basic Wind Map","al":"center"},{"c":"G13","v":"أحمال بيئية ديناميكية","al":"center"},{"c":"H13","v":"سرعة الرياح القصوى المعتمدة"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":9,"al":"center"},{"c":"B14","v":"WL-02","al":"center"},{"c":"C14","v":"ضغط الرياح الديناميكي الأساسي (Velocity Wind Pressure q_w)"},{"c":"D14","v":0.481,"f":"=ROUND(0.613*D13^2/1000, 3)","b":true,"al":"center","nf":"0.000"},{"c":"E14","v":"كيلو نيوتن/م²","al":"center"},{"c":"F14","v":"q_w = 0.613 * V_b^2 / 1000","al":"center"},{"c":"G14","v":"ضغط الرياح الأساسي","al":"center"},{"c":"H14","v":"محسوبة هندسياً وفق كود الرياح"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":10,"al":"center"},{"c":"B15","v":"WL-03","al":"center"},{"c":"C15","v":"معامل صلادة السقالة المغطاة بالشباك (Netting Solidity Factor Cf)"},{"c":"D15","v":0.7,"in":true,"b":true,"al":"center"},{"c":"E15","v":"معامل خالي","al":"center"},{"c":"F15","v":"EN 12811-1 Cl. 6.2.7.4","al":"center"},{"c":"G15","v":"مقاومة الهواء للشباك","al":"center"},{"c":"H15","v":"نسبة إعاقة الرياح للشباك 70%"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":11,"al":"center"},{"c":"B16","v":"WL-TOT","al":"center"},{"c":"C16","v":"أقصى ضغط رياح جانبي تصميمي على الواجهة (Design Wind Pressure)"},{"c":"D16","v":0.337,"f":"=ROUND(D14*D15, 3)","b":true,"al":"center","nf":"0.000"},{"c":"E16","v":"كيلو نيوتن/م²","al":"center"},{"c":"F16","v":"w_wind = q_w * C_f","al":"center"},{"c":"G16","v":"رياح عاصفة عمودية","al":"center"},{"c":"H16","v":"الحمل الحاكم لحساب الروابط الجدارية"}]},{"r":17,"h":28.0,"cells":[{"c":"A17","v":""},{"c":"B17","v":""},{"c":"C17","v":""},{"c":"D17","v":""},{"c":"E17","v":""},{"c":"F17","v":""},{"c":"G17","v":""},{"c":"H17","v":""}]},{"r":18,"h":28.0,"cells":[{"c":"A18","v":""},{"c":"B18","v":""},{"c":"C18","v":""},{"c":"D18","v":""},{"c":"E18","v":""},{"c":"F18","v":""},{"c":"G18","v":""},{"c":"H18","v":""}]},{"r":19,"h":38.0,"cells":[{"c":"A19","v":"ثانياً: حساب وتجميع القوى الرأسية القصوى على القائم المفرد (Standard Leg Load Analysis)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":20,"h":40.0,"cells":[{"c":"A20","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B20","v":"كود التحليل","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C20","v":"العنصر التحليلي ومصدر القوة الرأسية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D20","v":"القيمة المحسوبة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E20","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F20","v":"المعادلة الهندسية المعتمدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G20","v":"الاشتراط القياسي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H20","v":"ملاحظات الفحص","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":1,"al":"center"},{"c":"B21","v":"LEG-01","al":"center"},{"c":"C21","v":"المساحة التحميلية الأفقية للقائم المفرد (Leg Tributary Area)"},{"c":"D21","v":0.72,"f":"=ROUND(('إعدادات المشروع والمواصفات'!D22/2)*('إعدادات المشروع والمواصفات'!D23/2), 2)","b":true,"al":"center","nf":"0.00"},{"c":"E21","v":"م²","al":"center"},{"c":"F21","v":"A_trib = (L_bay/2) * (W_bay/2)","al":"center"},{"c":"G21","v":"مساحة تأثير القائم الواحد","al":"center"},{"c":"H21","v":"نصف بحر طولي × نصف بحر عرضي"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":2,"al":"center"},{"c":"B22","v":"LEG-02","al":"center"},{"c":"C22","v":"الوزن الذاتي لمواسير القائم بكامل الارتفاع (Standards Self-Weight)"},{"c":"D22","v":0.64,"f":"=ROUND(('إعدادات المشروع والمواصفات'!D25 * 0.0357), 2)","b":true,"al":"center","nf":"0.00"},{"c":"E22","v":"كيلو نيوتن","al":"center"},{"c":"F22","v":"W_tube = H_tot * 3.57 kg/m * g","al":"center"},{"c":"G22","v":"وزن الماسورة الرأسية","al":"center"},{"c":"H22","v":"ارتفاع 18 م × 3.57 كجم/م"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":3,"al":"center"},{"c":"B23","v":"LEG-03","al":"center"},{"c":"C23","v":"وزن البرندات والعوارض والكلبسات للحطة الواحدة (Ledgers & Transoms)"},{"c":"D23","v":0.1,"f":"=ROUND((('إعدادات المشروع والمواصفات'!D22/2 + 'إعدادات المشروع والمواصفات'!D23/2) * 0.0357 + 0.04), 2)","b":true,"al":"center","nf":"0.00"},{"c":"E23","v":"كيلو نيوتن/حطة","al":"center"},{"c":"F23","v":"W_frame = (L/2 + W/2)*w + joints","al":"center"},{"c":"G23","v":"أوزان المواسير الأفقية","al":"center"},{"c":"H23","v":"حصة القائم من البرندات والكلبسات"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":4,"al":"center"},{"c":"B24","v":"LEG-04","al":"center"},{"c":"C24","v":"إجمالي الحمل الميت التراكمي على القائم المفرد (Total Leg Dead Load G_k)"},{"c":"D24","v":2.73,"f":"=ROUND(D22 + D23 * ('إعدادات المشروع والمواصفات'!D25 / 'إعدادات المشروع والمواصفات'!D24) + D9 * D21 * ('إعدادات المشروع والمواصفات'!D26 + 'إعدادات المشروع والمواصفات'!D27), 2)","b":true,"al":"center","nf":"0.00"},{"c":"E24","v":"كيلو نيوتن","al":"center"},{"c":"F24","v":"G_k = W_std + W_frames + W_decks","al":"center"},{"c":"G24","v":"الحمل الميت الكلي","al":"center"},{"c":"H24","v":"يشمل الهيكل والألواح والشباك"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":5,"al":"center"},{"c":"B25","v":"LEG-05","al":"center"},{"c":"C25","v":"الحمل الحي التشغيلي من حطة العمل الرئيسية (Working Live Load Q_k1)"},{"c":"D25","v":1.44,"f":"=ROUND(D11 * D21 * 'إعدادات المشروع والمواصفات'!D26, 2)","b":true,"al":"center","nf":"0.00"},{"c":"E25","v":"كيلو نيوتن","al":"center"},{"c":"F25","v":"Q_k1 = q_work * A_trib * N_work","al":"center"},{"c":"G25","v":"حطة العمل النشطة","al":"center"},{"c":"H25","v":"حمل العمال والمعدات المباشرة"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":6,"al":"center"},{"c":"B26","v":"LEG-06","al":"center"},{"c":"C26","v":"الحمل الحي من حطات التخزين الإضافية (Storage Live Load Q_k2)"},{"c":"D26","v":1.08,"f":"=ROUND(D12 * D21 * 'إعدادات المشروع والمواصفات'!D27, 2)","b":true,"al":"center","nf":"0.00"},{"c":"E26","v":"كيلو نيوتن","al":"center"},{"c":"F26","v":"Q_k2 = q_store * A_trib * N_store","al":"center"},{"c":"G26","v":"حطات التخزين المفروشة","al":"center"},{"c":"H26","v":"حمل تخزين المواد المؤقتة"}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":7,"al":"center"},{"c":"B27","v":"LEG-07","al":"center"},{"c":"C27","v":"إجمالي الحمل الحي التشغيلي التراكمي على القائم (Total Live Load Q_k)"},{"c":"D27","v":2.52,"f":"=ROUND(D25 + D26, 2)","b":true,"al":"center","nf":"0.00"},{"c":"E27","v":"كيلو نيوتن","al":"center"},{"c":"F27","v":"Q_k = Q_k1 + Q_k2","al":"center"},{"c":"G27","v":"إجمالي الأحمال الحية","al":"center"},{"c":"H27","v":"مجموع الأحمال الحية المؤثرة"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":8,"al":"center"},{"c":"B28","v":"LEG-SER","al":"center"},{"c":"C28","v":"الحمل الرأسي التشغيلي غير المصعد على القائم (Service Leg Load P_serv)"},{"c":"D28","v":5.25,"f":"=ROUND(D24 + D27, 2)","b":true,"al":"center","nf":"0.00"},{"c":"E28","v":"كيلو نيوتن","al":"center"},{"c":"F28","v":"P_serv = G_k + Q_k","al":"center"},{"c":"G28","v":"أحمال التشغيل في الخدمة","al":"center"},{"c":"H28","v":"الحمل المستخدم لفحص إجهاد التربة"}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":9,"al":"center"},{"c":"B29","v":"LEG-ULT","al":"center"},{"c":"C29","v":"أقصى حمل رأسي تصميمي مصعد على القائم (Ultimate Leg Load P_ult)"},{"c":"D29","v":7.47,"f":"=ROUND(1.35 * D24 + 1.50 * D27, 2)","b":true,"al":"center","nf":"0.00"},{"c":"E29","v":"كيلو نيوتن","al":"center"},{"c":"F29","v":"P_ult = 1.35 G_k + 1.50 Q_k","al":"center"},{"c":"G29","v":"BS EN 12811 Factored Load","al":"center"},{"c":"H29","v":"الحمل الحاكم لفحص انبعاج القائم"}]},{"r":30,"h":28.0,"cells":[{"c":"A30","v":""},{"c":"B30","v":""},{"c":"C30","v":""},{"c":"D30","v":""},{"c":"E30","v":""},{"c":"F30","v":""},{"c":"G30","v":""},{"c":"H30","v":""}]},{"r":31,"h":28.0,"cells":[{"c":"A31","v":""},{"c":"B31","v":""},{"c":"C31","v":""},{"c":"D31","v":""},{"c":"E31","v":""},{"c":"F31","v":""},{"c":"G31","v":""},{"c":"H31","v":""}]},{"r":32,"h":38.0,"cells":[{"c":"A32","v":"ثالثاً: التحقق من انبعاج القائم المفرد وسعة التحمل المحورية (Leg Buckling Capacity Check)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":33,"h":40.0,"cells":[{"c":"A33","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B33","v":"كود التحقق","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C33","v":"المعلمة الإنشائية وحسابات الانبعاج","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D33","v":"القيمة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E33","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F33","v":"المعادلة الهندسية والرمز","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G33","v":"الحد الآمن والمسموح","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H33","v":"قرار الاعتماد والتحقق","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":34,"h":34.0,"cells":[{"c":"A34","v":1,"al":"center"},{"c":"B34","v":"BCK-01","al":"center"},{"c":"C34","v":"طول الانبعاج الفعال للقائم المفرد (Effective Length L_e)"},{"c":"D34","v":2000,"f":"=ROUND(('إعدادات المشروع والمواصفات'!D24 * 1000 * 1.0), 0)","b":true,"al":"center","nf":"#,##0"},{"c":"E34","v":"مم","al":"center"},{"c":"F34","v":"L_e = K * H_lift (K = 1.0)","al":"center"},{"c":"G34","v":"المسافة الرأسية بين البرندات","al":"center"},{"c":"H34","v":"تدعيم قطري كامل بالواجهة","al":"center"}]},{"r":35,"h":34.0,"cells":[{"c":"A35","v":2,"al":"center"},{"c":"B35","v":"BCK-02","al":"center"},{"c":"C35","v":"نسبة النحافة للقائم الإنشائي (Slenderness Ratio λ)"},{"c":"D35","v":125.1,"f":"=ROUND(D34 / 'إعدادات المشروع والمواصفات'!D21, 1)","b":true,"al":"center","nf":"0.0"},{"c":"E35","v":"قيمة خالية","al":"center"},{"c":"F35","v":"λ = L_e / r","al":"center"},{"c":"G35","v":"الحد الأقصى المسموح λ <= 180","al":"center"},{"c":"H35","v":"ضمن الحدود الآمنة للصلب","al":"center"}]},{"r":36,"h":34.0,"cells":[{"c":"A36","v":3,"al":"center"},{"c":"B36","v":"BCK-03","al":"center"},{"c":"C36","v":"إجهاد أويلر الحرج للانبعاج المرن (Euler Critical Stress F_e)"},{"c":"D36","v":132.4,"f":"=ROUND(PI()^2 * 'إعدادات المشروع والمواصفات'!D18 / (D35^2), 1)","b":true,"al":"center","nf":"0.0"},{"c":"E36","v":"نيوتن/مم²","al":"center"},{"c":"F36","v":"F_e = π² * E / λ²","al":"center"},{"c":"G36","v":"إجهاد الانبعاج النظري","al":"center"},{"c":"H36","v":"محسوبة بالمعادلة الكلاسيكية","al":"center"}]},{"r":37,"h":34.0,"cells":[{"c":"A37","v":4,"al":"center"},{"c":"B37","v":"BCK-04","al":"center"},{"c":"C37","v":"حمل أويلر الحرج للانبعاج للقائم المفرد (Euler Buckling Load P_cr)"},{"c":"D37","v":60.03,"f":"=ROUND(D36 * 'إعدادات المشروع والمواصفات'!D19 / 1000, 2)","b":true,"al":"center","nf":"0.00"},{"c":"E37","v":"كيلو نيوتن","al":"center"},{"c":"F37","v":"P_cr = F_e * A / 1000","al":"center"},{"c":"G37","v":"الحمل الحرج الأقصى النظري","al":"center"},{"c":"H37","v":"سعة الانبعاج المحورية النظرية","al":"center"}]},{"r":38,"h":34.0,"cells":[{"c":"A38","v":5,"al":"center"},{"c":"B38","v":"BCK-05","al":"center"},{"c":"C38","v":"سعة التحمل المحورية التصميمية المسموحة للقائم (Allowable Capacity P_all)"},{"c":"D38","v":24.5,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E38","v":"كيلو نيوتن","al":"center"},{"c":"F38","v":"BS 5973 / EN 12811 Tube Capacity","al":"center"},{"c":"G38","v":"P_all = 24.50 kN للقائم 3.2 مم","al":"center"},{"c":"H38","v":"سعة معتمدة وفق الكود البريطاني","al":"center"}]},{"r":39,"h":34.0,"cells":[{"c":"A39","v":6,"al":"center"},{"c":"B39","v":"BCK-06","al":"center"},{"c":"C39","v":"نسبة استغلال سعة القائم المصعدة (Utilization Ratio P_ult / P_all)"},{"c":"D39","v":30.5,"f":"=ROUND(D29 / D38 * 100, 1)","b":true,"al":"center","nf":"0.0"},{"c":"E39","v":"%","al":"center"},{"c":"F39","v":"UR = (P_ult / P_all) * 100","al":"center"},{"c":"G39","v":"الحد الآمن: UR <= 100.0%","al":"center"},{"c":"H39","v":"محقق وآمن إنشائياً (UR <= 100%)","f":"=IF(D39<=100, \"محقق وآمن إنشائياً (UR <= 100%)\", \"تحذير: تجاوز السعة المسموحة!\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":40,"h":34.0,"cells":[{"c":"A40","v":7,"al":"center"},{"c":"B40","v":"BCK-07","al":"center"},{"c":"C40","v":"معامل أمان انبعاج القائم الفعلي (Factor of Safety FOS)"},{"c":"D40","v":11.43,"f":"=ROUND(D37 / D28, 2)","b":true,"al":"center","nf":"0.00"},{"c":"E40","v":"معامل أمان","al":"center"},{"c":"F40","v":"FOS = P_cr / P_serv","al":"center"},{"c":"G40","v":"الحد الأدنى الآمن: FOS >= 3.0","al":"center"},{"c":"H40","v":"محقق وآمن تماماً (FOS >= 3.0)","f":"=IF(D40>=3.0, \"محقق وآمن تماماً (FOS >= 3.0)\", \"تحذير: معامل الأمان أقل من 3.0!\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":41,"h":28.0,"cells":[{"c":"A41","v":""},{"c":"B41","v":""},{"c":"C41","v":""},{"c":"D41","v":""},{"c":"E41","v":""},{"c":"F41","v":""},{"c":"G41","v":""},{"c":"H41","v":""}]},{"r":42,"h":28.0,"cells":[{"c":"A42","v":""},{"c":"B42","v":""},{"c":"C42","v":""},{"c":"D42","v":""},{"c":"E42","v":""},{"c":"F42","v":""},{"c":"G42","v":""},{"c":"H42","v":""}]},{"r":43,"h":38.0,"cells":[{"c":"A43","v":"رابعاً: التحقق من انحناء وسهم هبوط كمرات وألواح المنصة (Transom & Plank Check)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":44,"h":40.0,"cells":[{"c":"A44","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B44","v":"كود الفحص","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C44","v":"العنصر الإنشائي ومعيار التحقق","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D44","v":"القيمة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E44","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F44","v":"المعادلة الهندسية الحاكمة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G44","v":"الحد الأقصى المسموح","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H44","v":"قرار الاعتماد والتحقق","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":45,"h":34.0,"cells":[{"c":"A45","v":1,"al":"center"},{"c":"B45","v":"TRN-01","al":"center"},{"c":"C45","v":"الحمل الخطي المنتظم على عارضة المنصة (Transom Linear Load w)"},{"c":"D45","v":3.06,"f":"=ROUND((D9 + D11) * ('إعدادات المشروع والمواصفات'!D22 / 2), 2)","b":true,"al":"center","nf":"0.00"},{"c":"E45","v":"كيلو نيوتن/م.ط","al":"center"},{"c":"F45","v":"w = (q_dead + q_live) * (L_bay / 2)","al":"center"},{"c":"G45","v":"حمل العارضة العرضية","al":"center"},{"c":"H45","v":"مجموع الأحمال الميتة والحية","al":"center"}]},{"r":46,"h":34.0,"cells":[{"c":"A46","v":2,"al":"center"},{"c":"B46","v":"TRN-02","al":"center"},{"c":"C46","v":"أقصى عزم انحناء على عارضة المنصة (Max Bending Moment M_max)"},{"c":"D46","v":0.551,"f":"=ROUND(D45 * ('إعدادات المشروع والمواصفات'!D23^2) / 8, 3)","b":true,"al":"center","nf":"0.000"},{"c":"E46","v":"كيلو نيوتن.متر","al":"center"},{"c":"F46","v":"M_max = w * W_bay² / 8","al":"center"},{"c":"G46","v":"العزم الأقصى بمنتصف البحر","al":"center"},{"c":"H46","v":"بحر العارضة 1.20 متر","al":"center"}]},{"r":47,"h":34.0,"cells":[{"c":"A47","v":3,"al":"center"},{"c":"B47","v":"TRN-03","al":"center"},{"c":"C47","v":"معيار المقطع المرن لماسورة العارضة (Section Modulus Z)"},{"c":"D47","v":4797,"f":"=ROUND('إعدادات المشروع والمواصفات'!D20 / ('إعدادات المشروع والمواصفات'!D15 / 2), 0)","b":true,"al":"center","nf":"#,##0"},{"c":"E47","v":"مم³","al":"center"},{"c":"F47","v":"Z = I / (D / 2)","al":"center"},{"c":"G47","v":"معيار مقطع الماسورة","al":"center"},{"c":"H47","v":"4,805 مم³ للقطاع 48.3×3.2 مم","al":"center"}]},{"r":48,"h":52.0,"cells":[{"c":"A48","v":4,"al":"center"},{"c":"B48","v":"TRN-04","al":"center"},{"c":"C48","v":"إجهاد الانحناء الفعلي في ماسورة العارضة (Actual Bending Stress f_b)"},{"c":"D48","v":114.9,"f":"=ROUND((D46 * 10^6) / D47, 1)","b":true,"al":"center","nf":"0.0"},{"c":"E48","v":"نيوتن/مم²","al":"center"},{"c":"F48","v":"f_b = M_max / Z","al":"center"},{"c":"G48","v":"الحد المسموح Fb = 0.66*fy = 155.1 N/mm²","al":"center"},{"c":"H48","v":"محقق وآمن إنشائياً (fb <= Fb)","f":"=IF(D48<=155.1, \"محقق وآمن إنشائياً (fb <= Fb)\", \"غير محقق - تجاوز الإجهاد!\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":49,"h":34.0,"cells":[{"c":"A49","v":5,"al":"center"},{"c":"B49","v":"PLK-01","al":"center"},{"c":"C49","v":"سهم الهبوط الأقصى المسموح لألواح المنصة (Allowable Deflection δ_all)"},{"c":"D49","v":40,"f":"=ROUND(('إعدادات المشروع والمواصفات'!D22 * 1000) / 60, 1)","b":true,"al":"center","nf":"0.0"},{"c":"E49","v":"مم","al":"center"},{"c":"F49","v":"δ_all = L_bay / 60 (OSHA 1926.451)","al":"center"},{"c":"G49","v":"الحد المسموح OSHA (L/60)","al":"center"},{"c":"H49","v":"40.0 مم لبحر 2.40 متر","al":"center"}]},{"r":50,"h":34.0,"cells":[{"c":"A50","v":6,"al":"center"},{"c":"B50","v":"PLK-02","al":"center"},{"c":"C50","v":"سهم الهبوط الفعلي المحسوب لألواح الخشب (Calculated Deflection δ_act)"},{"c":"D50","v":10.6,"f":"=ROUND(5 * D45 * ('إعدادات المشروع والمواصفات'!D22*1000)^4 / (384 * 10000 * 12500000), 1)","b":true,"al":"center","nf":"0.0"},{"c":"E50","v":"مم","al":"center"},{"c":"F50","v":"δ_act = 5 * w * L⁴ / (384 * E * I)","al":"center"},{"c":"G50","v":"سهم الهبوط الفعلي بالألواح","al":"center"},{"c":"H50","v":"محسوب بالمعادلة المرنة للكمرات","al":"center"}]},{"r":51,"h":34.0,"cells":[{"c":"A51","v":7,"al":"center"},{"c":"B51","v":"PLK-03","al":"center"},{"c":"C51","v":"التحقق من سهم هبوط ألواح المنصة وفق كود OSHA (Plank Deflection Check)"},{"c":"D51","v":"محقق ومطابق لكود 0","f":"=IF(D50<=D49, \"محقق ومطابق لكود OSHA (δ <= L/60)\", \"تحذير: سهم الهبوط يتجاوز المسموح!\")","b":true,"al":"center"},{"c":"E51","v":"قرار هندسي","al":"center"},{"c":"F51","v":"δ_act <= δ_allow","al":"center"},{"c":"G51","v":"اشتراط كود OSHA 1926.451","al":"center"},{"c":"H51","v":"آمن ومحقق تحت كامل الأحمال","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":52,"h":28.0,"cells":[{"c":"A52","v":""},{"c":"B52","v":""},{"c":"C52","v":""},{"c":"D52","v":""},{"c":"E52","v":""},{"c":"F52","v":""},{"c":"G52","v":""},{"c":"H52","v":""}]},{"r":53,"h":28.0,"cells":[{"c":"A53","v":""},{"c":"B53","v":""},{"c":"C53","v":""},{"c":"D53","v":""},{"c":"E53","v":""},{"c":"F53","v":""},{"c":"G53","v":""},{"c":"H53","v":""}]},{"r":54,"h":34.0,"cells":[{"c":"A54","v":"مهندس السلامة والصحة المهنية (HSE Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D54","v":"مشرف تركيب السقالات الإنشائية (Scaffold Supervisor)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G54","v":"المهندس الاستشاري المقيم (Resident Consultant)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true}]},{"r":55,"h":76.0,"cells":[{"c":"A55","v":"الاسم والتوقيع:\nرقم الترخيص المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true},{"c":"D55","v":"الاسم والتوقيع:\nرقم الترخيص المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true},{"c":"G55","v":"الاسم والتوقيع:\nرقم الترخيص المهني:\nالتاريخ والختم:","cs":2},{"skip":true}]}]},{"name":"نقاط التثبيت وألواح التوزيع","maxRow":39,"maxCol":8,"colWidths":[10.0,14.0,62.0,18.0,18.0,30.0,30.0,34.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"تصميم نقاط التثبيت الجدارية Wall Ties وفحص إجهاد التربة وألواح التوزيع Sole Boards وفق BS EN 12811 و OSHA","fg":"#1E3A8A","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"⚠️ تنبيه استرشادي: اشتراطات السلامة الدولية تلزم بربط السقالة بالهيكل عند تجاوز نسبة الارتفاع إلى القاعدة 4:1 وتوزيع أحمال القوائم على ألواح خشبية صلبة لمنع أي هبوط تفاضلي قد يؤدي لانهيار السقالة.","fg":"#475569","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: تصميم قوى نقاط التثبيت الجدارية بالهيكل الإنشائي (Scaffolding Wall Ties Design)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":40.0,"cells":[{"c":"A5","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"كود التصميم","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"المعلمة الإنشائية وحسابات التثبيت الجداري","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"القيمة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"المعادلة الهندسية المعتمدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"الاشتراط القياسي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"التحقق والقرار الهندسي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":1,"al":"center"},{"c":"B6","v":"TIE-01","al":"center"},{"c":"C6","v":"نسبة الارتفاع الكلي لعرض السقالة (Height-to-Base Ratio)"},{"c":"D6","v":15,"f":"=ROUND('إعدادات المشروع والمواصفات'!D25 / 'إعدادات المشروع والمواصفات'!D23, 2)","b":true,"al":"center","nf":"0.00"},{"c":"E6","v":":1","al":"center"},{"c":"F6","v":"H_tot / W_bay","al":"center"},{"c":"G6","v":"الحد الأقصى للقائم بذاته 4.0:1","al":"center"},{"c":"H6","v":"يلزم تثبيت جداري إلزامي كل 4 أمتار رأسياً","f":"=IF(D6>4.0, \"يلزم تثبيت جداري إلزامي كل 4 أمتار رأسياً\", \"سقالة قائمة بذاتها آمنة\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":2,"al":"center"},{"c":"B7","v":"TIE-02","al":"center"},{"c":"C7","v":"المسافة الرأسية بين نقاط التثبيت الجدارية (Vertical Tie Spacing)"},{"c":"D7","v":4,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E7","v":"متر","al":"center"},{"c":"F7","v":"BS EN 12811 Vertical Frequency","al":"center"},{"c":"G7","v":"كل حطتين رأسياً (4.00 م)","al":"center"},{"c":"H7","v":"مسافة قياسية مطابقة للكود","al":"center"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":3,"al":"center"},{"c":"B8","v":"TIE-03","al":"center"},{"c":"C8","v":"المسافة الأفقية بين نقاط التثبيت الجدارية (Horizontal Tie Spacing)"},{"c":"D8","v":4.8,"f":"=ROUND('إعدادات المشروع والمواصفات'!D22 * 2, 2)","b":true,"al":"center","nf":"0.00"},{"c":"E8","v":"متر","al":"center"},{"c":"F8","v":"Horizontal Spacing (2 Bays)","al":"center"},{"c":"G8","v":"كل باكيتين أفقياً (4.80 م)","al":"center"},{"c":"H8","v":"توزيع تبادلي شطرنجي Staggered","al":"center"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":4,"al":"center"},{"c":"B9","v":"TIE-04","al":"center"},{"c":"C9","v":"مساحة الواجهة المخدومة بنقطة الربط الواحدة (Tributary Tie Area)"},{"c":"D9","v":19.2,"f":"=ROUND(D7 * D8, 2)","b":true,"al":"center","nf":"0.00"},{"c":"E9","v":"م²","al":"center"},{"c":"F9","v":"A_tie = S_vert * S_horiz","al":"center"},{"c":"G9","v":"مساحة التأثير لكل نقطة ربط","al":"center"},{"c":"H9","v":"19.20 م² لكل رابط جداري","al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":5,"al":"center"},{"c":"B10","v":"TIE-05","al":"center"},{"c":"C10","v":"قوة الشد الأفقية الناتجة عن الرياح على نقطة التثبيت (Wind Tie Force F_w)"},{"c":"D10","v":6.47,"f":"=ROUND('حساب الأحمال والتصميم الإنشائي'!D16 * D9, 2)","b":true,"al":"center","nf":"0.00"},{"c":"E10","v":"كيلو نيوتن","al":"center"},{"c":"F10","v":"F_w = w_wind * A_tie","al":"center"},{"c":"G10","v":"قوة شد وضغط أفقية مباشرة","al":"center"},{"c":"H10","v":"ناتجة عن الرياح العاصفة على الشباك","al":"center"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":6,"al":"center"},{"c":"B11","v":"TIE-06","al":"center"},{"c":"C11","v":"قوة الشد الإضافية للأمان والاهتزاز الديناميكي (Dynamic Safety Load)"},{"c":"D11","v":2.5,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E11","v":"كيلو نيوتن","al":"center"},{"c":"F11","v":"EN 12811 Cl. 6.2.7 Minimum Load","al":"center"},{"c":"G11","v":"الحد الأدنى لقوة الرابط 2.5 kN","al":"center"},{"c":"H11","v":"قوة إضافية لمنع الإجهاد الديناميكي","al":"center"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":7,"al":"center"},{"c":"B12","v":"TIE-07","al":"center"},{"c":"C12","v":"إجمالي قوة الشد التصميمية على نقطة التثبيت (Design Tie Pull-Out Force)"},{"c":"D12","v":8.97,"f":"=ROUND(D10 + D11, 2)","b":true,"al":"center","nf":"0.00"},{"c":"E12","v":"كيلو نيوتن","al":"center"},{"c":"F12","v":"P_tie = F_w + F_dynamic","al":"center"},{"c":"G12","v":"الحمل التصميمي الكلي للرابط","al":"center"},{"c":"H12","v":"القوة الحاكمة لاختبار الشد M16","al":"center"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":8,"al":"center"},{"c":"B13","v":"TIE-08","al":"center"},{"c":"C13","v":"سعة التحمل المسموحة لمسمار التثبيت الميكانيكي/الكيميائي M16 (Anchor Capacity)"},{"c":"D13","v":18.5,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E13","v":"كيلو نيوتن","al":"center"},{"c":"F13","v":"ETA / ACI 355 Anchor Rating","al":"center"},{"c":"G13","v":"سعة المسمار في الخرسانة C30","al":"center"},{"c":"H13","v":"مسمار تثبيت صلب كيميائي M16","al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":9,"al":"center"},{"c":"B14","v":"TIE-09","al":"center"},{"c":"C14","v":"معامل أمان نقطة التثبيت الجدارية ضد الاقتلاع (Anchor Pull-Out FOS)"},{"c":"D14","v":2.06,"f":"=ROUND(D13 / D12, 2)","b":true,"al":"center","nf":"0.00"},{"c":"E14","v":"معامل أمان","al":"center"},{"c":"F14","v":"FOS = P_anchor / P_tie","al":"center"},{"c":"G14","v":"الحد الأدنى الآمن: FOS >= 2.0","al":"center"},{"c":"H14","v":"محقق وآمن (معامل أمان الاقتلاع FOS >= 2.0)","f":"=IF(D14>=2.0, \"محقق وآمن (معامل أمان الاقتلاع FOS >= 2.0)\", \"تحذير: يلزم تقريب المسافات أو زيادة القطر!\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":15,"h":28.0,"cells":[{"c":"A15","v":""},{"c":"B15","v":""},{"c":"C15","v":""},{"c":"D15","v":""},{"c":"E15","v":""},{"c":"F15","v":""},{"c":"G15","v":""},{"c":"H15","v":""}]},{"r":16,"h":28.0,"cells":[{"c":"A16","v":""},{"c":"B16","v":""},{"c":"C16","v":""},{"c":"D16","v":""},{"c":"E16","v":""},{"c":"F16","v":""},{"c":"G16","v":""},{"c":"H16","v":""}]},{"r":17,"h":38.0,"cells":[{"c":"A17","v":"ثانياً: التحقق من قواعد الارتكاز وألواح التوزيع الخشبية الأرضية (Base Plates & Sole Boards)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":18,"h":40.0,"cells":[{"c":"A18","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B18","v":"كود القاعدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C18","v":"المعلمة الهندسية لقواعد التوزيع الأرضية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D18","v":"القيمة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E18","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F18","v":"المعادلة والرمز الحسابي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G18","v":"المرجعية القياسية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H18","v":"التحقق والقرار الهندسي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":1,"al":"center"},{"c":"B19","v":"BAS-01","al":"center"},{"c":"C19","v":"طول لوح التوزيع الخشبي أسفل القائم (Sole Board Length L_sole)"},{"c":"D19","v":0.6,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E19","v":"متر","al":"center"},{"c":"F19","v":"Standard Timber Sole Board","al":"center"},{"c":"G19","v":"BS 5973 Min Length 450 mm","al":"center"},{"c":"H19","v":"يمتد 225 مم على جانبي القاعدة","al":"center"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":2,"al":"center"},{"c":"B20","v":"BAS-02","al":"center"},{"c":"C20","v":"عرض لوح التوزيع الخشبي القياسي (Sole Board Width B_sole)"},{"c":"D20","v":0.225,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E20","v":"متر (225 مم)","al":"center"},{"c":"F20","v":"Standard 9 inch Scaffold Plank","al":"center"},{"c":"G20","v":"عرض اللوح الإنشائي القياسي","al":"center"},{"c":"H20","v":"لوح خشب معالج خالي من العيوب","al":"center"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":3,"al":"center"},{"c":"B21","v":"BAS-03","al":"center"},{"c":"C21","v":"سماكة لوح التوزيع الخشبي الإنشائي (Sole Board Thickness t)"},{"c":"D21","v":38,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"E21","v":"مم (1.5 بوصة)","al":"center"},{"c":"F21","v":"Standard Plank Thickness","al":"center"},{"c":"G21","v":"BS EN 12811 Timber Thickness","al":"center"},{"c":"H21","v":"سماكة قياسية لمقاومة القص والكسر","al":"center"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":4,"al":"center"},{"c":"B22","v":"BAS-04","al":"center"},{"c":"C22","v":"المساحة الفعالة لتوزيع الحمل على التربة (Effective Bearing Area)"},{"c":"D22","v":0.135,"f":"=ROUND(D19 * D20, 4)","b":true,"al":"center","nf":"0.0000"},{"c":"E22","v":"م²","al":"center"},{"c":"F22","v":"A_bearing = L_sole * B_sole","al":"center"},{"c":"G22","v":"مساحة التماس المباشر مع التربة","al":"center"},{"c":"H22","v":"0.1350 م² أسفل كل قائم","al":"center"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":5,"al":"center"},{"c":"B23","v":"BAS-05","al":"center"},{"c":"C23","v":"الحمل الرأسي التشغيلي الأقصى المنقول من القائم (Service Leg Load)"},{"c":"D23","v":5.25,"f":"='حساب الأحمال والتصميم الإنشائي'!D28","b":true,"al":"center","nf":"0.00"},{"c":"E23","v":"كيلو نيوتن","al":"center"},{"c":"F23","v":"P_serv = G_k + Q_k","al":"center"},{"c":"G23","v":"أحمال التشغيل غير المصعدة","al":"center"},{"c":"H23","v":"منقول من جدول تحليل القوائم","al":"center"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":6,"al":"center"},{"c":"B24","v":"BAS-06","al":"center"},{"c":"C24","v":"أقصى ضغط تلامس فعلي على تربة التأسيس (Actual Soil Contact Pressure)"},{"c":"D24","v":38.89,"f":"=ROUND(D23 / D22, 2)","b":true,"al":"center","nf":"0.00"},{"c":"E24","v":"كيلو نيوتن/م² (kPa)","al":"center"},{"c":"F24","v":"q_act = P_serv / A_bearing","al":"center"},{"c":"G24","v":"إجهاد التلامس المحسوب","al":"center"},{"c":"H24","v":"ينتقل من لوح التوزيع للأرض","al":"center"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":7,"al":"center"},{"c":"B25","v":"BAS-07","al":"center"},{"c":"C25","v":"قدرة التحمل المسموحة لتربة التأسيس بالموقع (Allowable Soil Bearing)"},{"c":"D25","v":180,"f":"='إعدادات المشروع والمواصفات'!D28","b":true,"al":"center","nf":"0.00"},{"c":"E25","v":"كيلو نيوتن/م² (kPa)","al":"center"},{"c":"F25","v":"q_allow (Soil Report)","al":"center"},{"c":"G25","v":"قدرة تحمل الأرضية المعتمدة","al":"center"},{"c":"H25","v":"180.0 kPa وفق تقرير الجسات","al":"center"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":8,"al":"center"},{"c":"B26","v":"BAS-08","al":"center"},{"c":"C26","v":"نسبة استغلال قدرة تحمل التربة (Soil Bearing Utilization Ratio)"},{"c":"D26","v":21.6,"f":"=ROUND(D24 / D25 * 100, 1)","b":true,"al":"center","nf":"0.0"},{"c":"E26","v":"%","al":"center"},{"c":"F26","v":"UR_soil = (q_act / q_allow) * 100","al":"center"},{"c":"G26","v":"الحد الآمن: UR <= 100.0%","al":"center"},{"c":"H26","v":"ضمن الحدود الآمنة للتربة","al":"center"}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":9,"al":"center"},{"c":"B27","v":"BAS-09","al":"center"},{"c":"C27","v":"قرار التحقق من كفاءة ألواح التوزيع الأرضية (Sole Board Check)"},{"c":"D27","v":"محقق وآمن تماماً - إجهاد التربة آمن (Safe Bearing)","f":"=IF(D24<=D25, \"محقق وآمن تماماً - إجهاد التربة آمن (Safe Bearing)\", \"تحذير: خطر هبوط تفاضلي - يلزم مضاعفة طول لوح التوزيع!\")","b":true,"al":"center","nf":"0.00"},{"c":"E27","v":"قرار هندسي","al":"center"},{"c":"F27","v":"q_act <= q_allow","al":"center"},{"c":"G27","v":"اشتراطات السلامة لمنع الهبوط","al":"center"},{"c":"H27","v":"ألواح التوزيع 60 سم كافية وآمنة","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":28,"h":28.0,"cells":[{"c":"A28","v":""},{"c":"B28","v":""},{"c":"C28","v":""},{"c":"D28","v":""},{"c":"E28","v":""},{"c":"F28","v":""},{"c":"G28","v":""},{"c":"H28","v":""}]},{"r":29,"h":28.0,"cells":[{"c":"A29","v":""},{"c":"B29","v":""},{"c":"C29","v":""},{"c":"D29","v":""},{"c":"E29","v":""},{"c":"F29","v":""},{"c":"G29","v":""},{"c":"H29","v":""}]},{"r":30,"h":38.0,"cells":[{"c":"A30","v":"ثالثاً: مصفوفة فحص منظومة التدعيم القطري والربط والاستقرار العام (Bracing & Stability)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":31,"h":40.0,"cells":[{"c":"A31","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B31","v":"عنصر المنظومة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C31","v":"الاشتراط الفني وفق كود BS EN 12811 و OSHA","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D31","v":"الموقع والتردد المطلوب","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E31","v":"زاوية التدعيم","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F31","v":"حالة التطبيق بالمشروع","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G31","v":"كود المعيار","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H31","v":"حالة التحقق","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":32,"h":72.0,"cells":[{"c":"A32","v":1,"al":"center"},{"c":"B32","v":"التدعيم القطري للواجهة (Facade Bracing)"},{"c":"C32","v":"تركيب مواسير قطرية مستمرة من القاع حتى القمة على طول واجهة السقالة"},{"c":"D32","v":"كل 5 بواكي كحد أقصى وعند طرفي السقالة","al":"center"},{"c":"E32","v":"45° إلى 55° مع الأفق","al":"center"},{"c":"F32","v":"مطبق ومحدد بالمخططات التنفيذية","al":"center"},{"c":"G32","v":"EN 12811-1 Cl. 5.4","al":"center"},{"c":"H32","v":"محقق ومطابق للكود","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":33,"h":72.0,"cells":[{"c":"A33","v":2,"al":"center"},{"c":"B33","v":"التدعيم العرضي للحطات (Ledger / Transom Bracing)"},{"c":"C33","v":"تركيب مواسير مائلة عرضية بين القائم الداخلي والخارجي على كامل الارتفاع"},{"c":"D33","v":"في كل حطة عند أطراف السقالة وكل باكتين","al":"center"},{"c":"E33","v":"شكل حرف X أو V مائل","al":"center"},{"c":"F33","v":"مطبق بالكلبسات الثابتة 90 درجة","al":"center"},{"c":"G33","v":"BS 5973 Clause 24","al":"center"},{"c":"H33","v":"محقق ومطابق للكود","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":34,"h":72.0,"cells":[{"c":"A34","v":3,"al":"center"},{"c":"B34","v":"بوابات وحواجز السلالم (Self-Closing Swing Gates)"},{"c":"C34","v":"تزويد فتحات صعود السلالم ببوابات مفصلية ذاتية الغلق لمنع السقوط الخلفي"},{"c":"D34","v":"عند كل منسوب منصة وصول","al":"center"},{"c":"E34","v":"حاجز بارتفاع 1.05 م","al":"center"},{"c":"F34","v":"بوابات نابضية معتمدة ذاتية الغلق","al":"center"},{"c":"G34","v":"OSHA 1926.451(e)","al":"center"},{"c":"H34","v":"محقق ومطابق للكود","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":35,"h":104.0,"cells":[{"c":"A35","v":4,"al":"center"},{"c":"B35","v":"نظام بطاقات الفحص والتفتيش (Scafftag Safety System)"},{"c":"C35","v":"تركيب حامل بطاقات السلامة عند نقاط الدخول مع فحص أسبوعي وتحديث البطاقة"},{"c":"D35","v":"عند كل نقطة وصول رئيسية للسقالة","al":"center"},{"c":"E35","v":"بطاقة خضراء سارية الصلاحية","al":"center"},{"c":"F35","v":"تفتيش أسبوعي أو بعد العواصف والأمطار","al":"center"},{"c":"G35","v":"OSHA 1926.451(f)","al":"center"},{"c":"H35","v":"محقق ومطابق للكود","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":36,"h":28.0,"cells":[{"c":"A36","v":""},{"c":"B36","v":""},{"c":"C36","v":""},{"c":"D36","v":""},{"c":"E36","v":""},{"c":"F36","v":""},{"c":"G36","v":""},{"c":"H36","v":""}]},{"r":37,"h":28.0,"cells":[{"c":"A37","v":""},{"c":"B37","v":""},{"c":"C37","v":""},{"c":"D37","v":""},{"c":"E37","v":""},{"c":"F37","v":""},{"c":"G37","v":""},{"c":"H37","v":""}]},{"r":38,"h":34.0,"cells":[{"c":"A38","v":"مهندس السلامة والصحة المهنية (HSE Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D38","v":"مشرف تركيب السقالات الإنشائية (Scaffold Supervisor)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G38","v":"المهندس الاستشاري المقيم (Resident Consultant)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true}]},{"r":39,"h":76.0,"cells":[{"c":"A39","v":"الاسم والتوقيع:\nرقم الترخيص المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true},{"c":"D39","v":"الاسم والتوقيع:\nرقم الترخيص المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true},{"c":"G39","v":"الاسم والتوقيع:\nرقم الترخيص المهني:\nالتاريخ والختم:","cs":2},{"skip":true}]}]},{"name":"مقايسة الكميات وتكاليف السقالة","maxRow":26,"maxCol":8,"colWidths":[10.0,16.0,64.0,14.0,18.0,18.0,22.0,36.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول حصر الكميات والمقايسة التقديرية لتوريد وتركيب وفحص السقالة الإنشائية (Scaffolding BOQ)","fg":"#1E3A8A","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"⚠️ تنبيه استرشادي: الكميات محسوبة ديناميكياً بناءً على أبعاد السقالة وحسابات الحطات والواجهات في التبويبات السابقة. ترتبط فئات الأسعار بشيت الإعدادات لتحديث إجمالي تكلفة السقالة فورياً عند تعديل أي فئة سعرية.","fg":"#475569","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":40.0,"cells":[{"c":"A4","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"كود البند","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"بيان وتوصيف أعمال ومكونات السقالة واشتراطات السلامة الموقعية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"الكمية التقديرية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"فئة السعر","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"الإجمالي التقديري","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"ملاحظات واعتماد الموقع","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":1,"al":"center"},{"c":"B5","v":"BOQ-HSE-01","al":"center"},{"c":"C5","v":"توريد وتركيب مواسير السقالة المعدنية المجلفنة قطر 48.3 مم سماكة 3.2 مم للقوائم والبرندات"},{"c":"D5","v":"م.ط","al":"center"},{"c":"E5","v":662,"f":"=ROUND(('إعدادات المشروع والمواصفات'!D25/'إعدادات المشروع والمواصفات'!D24 + 1) * 2 * ('إعدادات المشروع والمواصفات'!D22 + 'إعدادات المشروع والمواصفات'!D23) * 8 * 1.15, 0)","b":true,"al":"center","nf":"#,##0"},{"c":"F5","v":14.5,"f":"='إعدادات المشروع والمواصفات'!E32","al":"center","nf":"#,##0.00"},{"c":"G5","v":9599,"f":"=E5*F5","b":true,"al":"center","nf":"#,##0.00"},{"c":"H5","v":"مواسير فولاذية معتمدة EN 39 شاملة 15% هالك"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":2,"al":"center"},{"c":"B6","v":"BOQ-HSE-02","al":"center"},{"c":"C6","v":"توريد كلبسات وصل ثابتة 90 درجة ومتحركة معتمدة EN 74 لتجميع مفاصل السقالة"},{"c":"D6","v":"عدد","al":"center"},{"c":"E6","v":368,"f":"=ROUND(E5 / 1.8, 0)","b":true,"al":"center","nf":"#,##0"},{"c":"F6","v":18,"f":"='إعدادات المشروع والمواصفات'!E33","al":"center","nf":"#,##0.00"},{"c":"G6","v":6624,"f":"=E6*F6","b":true,"al":"center","nf":"#,##0.00"},{"c":"H6","v":"كلبسات مجلفنة عالية التحمل ومقاومة للانزلاق"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":3,"al":"center"},{"c":"B7","v":"BOQ-HSE-03","al":"center"},{"c":"C7","v":"توريد وتركيب ألواح منصات العمل الخشبية/المعدنية المعالجة المقاومة للحريق والانزلاق"},{"c":"D7","v":"لوح","al":"center"},{"c":"E7","v":256,"f":"=ROUND(('إعدادات المشروع والمواصفات'!D22 / 0.225) * 8 * ('إعدادات المشروع والمواصفات'!D26 + 'إعدادات المشروع والمواصفات'!D27), 0)","b":true,"al":"center","nf":"#,##0"},{"c":"F7","v":65,"f":"='إعدادات المشروع والمواصفات'!E34","al":"center","nf":"#,##0.00"},{"c":"G7","v":16640,"f":"=E7*F7","b":true,"al":"center","nf":"#,##0.00"},{"c":"H7","v":"ألواح خشبية معالجة سماكة 38 مم قياسية"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":4,"al":"center"},{"c":"B8","v":"BOQ-HSE-04","al":"center"},{"c":"C8","v":"توريد وتركيب قواعد ارتكاز سفلية قابلة للضبط Base Jacks مع مسامير الضبط الشاقولي"},{"c":"D8","v":"عدد","al":"center"},{"c":"E8","v":18,"f":"=ROUND((8 + 1) * 2, 0)","b":true,"al":"center","nf":"#,##0"},{"c":"F8","v":42,"f":"='إعدادات المشروع والمواصفات'!E35","al":"center","nf":"#,##0.00"},{"c":"G8","v":756,"f":"=E8*F8","b":true,"al":"center","nf":"#,##0.00"},{"c":"H8","v":"قواعد فولاذية مجلفنة طول 60 سم لضبط المنسوب"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":5,"al":"center"},{"c":"B9","v":"BOQ-HSE-05","al":"center"},{"c":"C9","v":"توريد وفرش ألواح توزيع الأحمال الأرضية الخشبية Sole Boards قياس 225×38 مم أسفل القواعد"},{"c":"D9","v":"م.ط","al":"center"},{"c":"E9","v":11.9,"f":"=ROUND(E8 * 0.60 * 1.10, 1)","b":true,"al":"center","nf":"#,##0.0"},{"c":"F9","v":28,"f":"='إعدادات المشروع والمواصفات'!E36","al":"center","nf":"#,##0.00"},{"c":"G9","v":333.2,"f":"=E9*F9","b":true,"al":"center","nf":"#,##0.00"},{"c":"H9","v":"أخشاب صلبة معالجة لتوزيع الإجهاد على التربة"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":6,"al":"center"},{"c":"B10","v":"BOQ-HSE-06","al":"center"},{"c":"C10","v":"توريد وتثبيت نقاط ربط جدارية Wall Ties ومسامير صلب كيميائية M16 واختبار الشد"},{"c":"D10","v":"نقطة","al":"center"},{"c":"E10","v":18,"f":"=ROUND(('إعدادات المشروع والمواصفات'!D25 / 4) * (8 / 2), 0)","b":true,"al":"center","nf":"#,##0"},{"c":"F10","v":55,"f":"='إعدادات المشروع والمواصفات'!E37","al":"center","nf":"#,##0.00"},{"c":"G10","v":990,"f":"=E10*F10","b":true,"al":"center","nf":"#,##0.00"},{"c":"H10","v":"توزيع شطرنجي كل 4 أمتار مع فحص الشد الموقعي"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":7,"al":"center"},{"c":"B11","v":"BOQ-HSE-07","al":"center"},{"c":"C11","v":"توريد وتثبيت شبك حماية ومصدات غبار وسقوط المواد Debris Netting كامل مسطح الواجهة"},{"c":"D11","v":"م²","al":"center"},{"c":"E11","v":346,"f":"=ROUND('إعدادات المشروع والمواصفات'!D25 * (8 * 'إعدادات المشروع والمواصفات'!D22), 0)","b":true,"al":"center","nf":"#,##0"},{"c":"F11","v":8.5,"f":"='إعدادات المشروع والمواصفات'!E38","al":"center","nf":"#,##0.00"},{"c":"G11","v":2941,"f":"=E11*F11","b":true,"al":"center","nf":"#,##0.00"},{"c":"H11","v":"شبك بولي إيثيلين كثيف مقاوم للرياح والأشعة"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":8,"al":"center"},{"c":"B12","v":"BOQ-HSE-08","al":"center"},{"c":"C12","v":"توريد وتركيب مصدات قدم وحواجز حماية سفلية Toeboards بارتفاع 15 سم على داير المنصات"},{"c":"D12","v":"م.ط","al":"center"},{"c":"E12","v":115,"f":"=ROUND(8 * 'إعدادات المشروع والمواصفات'!D22 * 2 * ('إعدادات المشروع والمواصفات'!D26 + 'إعدادات المشروع والمواصفات'!D27), 0)","b":true,"al":"center","nf":"#,##0"},{"c":"F12","v":16,"f":"='إعدادات المشروع والمواصفات'!E39","al":"center","nf":"#,##0.00"},{"c":"G12","v":1840,"f":"=E12*F12","b":true,"al":"center","nf":"#,##0.00"},{"c":"H12","v":"حواجز لمنع سقوط الأدوات والمواد من المنصات"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":9,"al":"center"},{"c":"B13","v":"BOQ-HSE-09","al":"center"},{"c":"C13","v":"توريد وتركيب سلالم صعود ونزول داخلية آمنة مجهزة بدرابزينات حماية وبوابات ذاتية الغلق"},{"c":"D13","v":"مجموعة","al":"center"},{"c":"E13","v":9,"f":"=ROUND('إعدادات المشروع والمواصفات'!D25 / 'إعدادات المشروع والمواصفات'!D24, 0)","b":true,"al":"center","nf":"#,##0"},{"c":"F13","v":350,"f":"='إعدادات المشروع والمواصفات'!E40","al":"center","nf":"#,##0.00"},{"c":"G13","v":3150,"f":"=E13*F13","b":true,"al":"center","nf":"#,##0.00"},{"c":"H13","v":"برج سلم داخلي كامل لكل حطة مع منصة استراحة"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":10,"al":"center"},{"c":"B14","v":"BOQ-HSE-10","al":"center"},{"c":"C14","v":"خدمات الفحص الإنشائي المستمر واختبار الشد وإصدار بطاقات التفتيش Scafftag وتصاريح العمل"},{"c":"D14","v":"مقطوعية","al":"center"},{"c":"E14","v":1,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"F14","v":1200,"f":"='إعدادات المشروع والمواصفات'!E41","al":"center","nf":"#,##0.00"},{"c":"G14","v":1200,"f":"=E14*F14","b":true,"al":"center","nf":"#,##0.00"},{"c":"H14","v":"إصدار بطاقات السلامة الأسبوعية وتصاريح العمل"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":"إجمالي أعمال الهيكل المعدني والمواسير والكلبسات (Scaffold Structure):","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"left","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G15","v":16223,"f":"=SUM(G5:G6)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"H15","v":"قيمة إجمالية","bg":"#DBEAFE","al":"center"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":"إجمالي منصات العمل والألواح وقواعد الارتكاز الأرضية (Decks & Base):","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"left","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G16","v":17729.2,"f":"=SUM(G7:G9)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"H16","v":"قيمة إجمالية","bg":"#DBEAFE","al":"center"}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":"إجمالي أنظمة التثبيت وشبك الأمان ومصدات السقوط والسلالم (Safety Systems):","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"left","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G17","v":8921,"f":"=SUM(G10:G13)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"H17","v":"قيمة إجمالية","bg":"#DBEAFE","al":"center"}]},{"r":18,"h":36.0,"cells":[{"c":"A18","v":"إجمالي خدمات الفحص والاختبار واعتماد بطاقات السلامة (Inspection & Tags):","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"left","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G18","v":1200,"f":"=G14","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"H18","v":"قيمة إجمالية","bg":"#DBEAFE","al":"center"}]},{"r":19,"h":36.0,"cells":[{"c":"A19","v":"المجموع الصافي للأعمال التقديرية للسقالة (Subtotal):","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"left","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G19","v":44073.2,"f":"=SUM(G15:G18)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"H19","v":"قيمة إجمالية","bg":"#EFF6FF","al":"center"}]},{"r":20,"h":36.0,"cells":[{"c":"A20","v":"نسبة الطوارئ والاحتياطي الفني للأعمال الموقعية (5% Contingency):","b":true,"al":"left","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G20","v":2203.66,"f":"=G19*0.05","b":true,"al":"center","nf":"#,##0.00"},{"c":"H20","v":"قيمة إجمالية","al":"center"}]},{"r":21,"h":36.0,"cells":[{"c":"A21","v":"ضريبة القيمة المضافة النظامية (15% VAT):","b":true,"al":"left","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G21","v":6941.529,"f":"=(G19+G20)*0.15","b":true,"al":"center","nf":"#,##0.00"},{"c":"H21","v":"قيمة إجمالية","al":"center"}]},{"r":22,"h":42.0,"cells":[{"c":"A22","v":"الإجمالي العام الشامل للضريبة والتنفيذ (Grand Total):","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"left","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G22","v":53218.389,"f":"=G19+G20+G21","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H22","v":"قيمة إجمالية","bg":"#1E3A8A","al":"center"}]},{"r":23,"h":28.0,"cells":[{"c":"A23","v":""},{"c":"B23","v":""},{"c":"C23","v":""},{"c":"D23","v":""},{"c":"E23","v":""},{"c":"F23","v":""},{"c":"G23","v":""},{"c":"H23","v":""}]},{"r":24,"h":28.0,"cells":[{"c":"A24","v":""},{"c":"B24","v":""},{"c":"C24","v":""},{"c":"D24","v":""},{"c":"E24","v":""},{"c":"F24","v":""},{"c":"G24","v":""},{"c":"H24","v":""}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":"مهندس السلامة والصحة المهنية (HSE Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D25","v":"مشرف تركيب السقالات الإنشائية (Scaffold Supervisor)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G25","v":"المهندس الاستشاري المقيم (Resident Consultant)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true}]},{"r":26,"h":76.0,"cells":[{"c":"A26","v":"الاسم والتوقيع:\nرقم الترخيص المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true},{"c":"D26","v":"الاسم والتوقيع:\nرقم الترخيص المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true},{"c":"G26","v":"الاسم والتوقيع:\nرقم الترخيص المهني:\nالتاريخ والختم:","cs":2},{"skip":true}]}]}]}