{"slug":"shallow-foundation-bearing-capacity-and-settlement-calculation-sheet","sheets":[{"name":"إعدادات المشروع وخواص التربة","maxRow":35,"maxCol":9,"colWidths":[8.0,42.0,18.0,16.0,28.0,26.0,32.0,24.0,38.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت حساب قدرة تحمل التربة للأساسات السطحية وهبوط القواعد وفق ترزاجي وهانسن وميرشوف وكود SBC 303 و ECP 202","fg":"#1E3A8A","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"⚠️ تنبيه استرشادي: المعادلات والبارامترات الجيوتقنية في هذا الشيت مطابقة لنظريات ميكانيكا التربة المعيارية (Terzaghi 1943, Meyerhof 1963, Hansen 1970) ومتطلبات كود البناء السعودي (SBC 303) والكود المصري (ECP 202). يرجى إدخال قيم فحص الجسات الفعلية المعتمدة لمشروعك.","fg":"#475569","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"1. بيانات المشروع والتقرير الجيوتقني وفحص الموقع","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"اسم المشروع الإنشائي:","b":true},{"c":"B5","v":"مشروع المجمع التجاري السكني - برج الأفق","cs":3},{"skip":true},{"skip":true},{"c":"E5","v":"المالك / جهة العمل:","b":true},{"c":"F5","v":"شركة التطوير العقاري الحديثة","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":6,"h":104.0,"cells":[{"c":"A6","v":"المكتب الاستشاري المصمم:","b":true},{"c":"B6","v":"دار الهندسة والاستشارات الإنشائية","cs":3},{"skip":true},{"skip":true},{"c":"E6","v":"مختبر ميكانيكا التربة:","b":true},{"c":"F6","v":"المختبر المركزي لفحص التربة والأساسات","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":7,"h":104.0,"cells":[{"c":"A7","v":"رقم تقرير الجسات المعتمد:","b":true},{"c":"B7","v":"GEO-REP-2026-088","cs":3},{"skip":true},{"skip":true},{"c":"E7","v":"تاريخ إصدار التقرير:","b":true},{"c":"F7","v":"2026-08-15","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":8,"h":72.0,"cells":[{"c":"A8","v":"رقم الجسة المرجعية الرئيسية:","b":true},{"c":"B8","v":"BH-03 (قطاع الأساسات السطحية)","cs":3},{"skip":true},{"skip":true},{"c":"E8","v":"منسوب التأسيس المقترح (Df):","b":true},{"c":"F8","v":"2.00 م أسفل سطح الأرض الطبيعية","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":104.0,"cells":[{"c":"A9","v":"كود التصميم الجيوتقني المعتمد:","b":true},{"c":"B9","v":"كود البناء السعودي للتربة والأساسات SBC 303","cs":3},{"skip":true},{"skip":true},{"c":"E9","v":"معامل الأمان المطلوب (FS):","b":true},{"c":"F9","v":3,"in":true,"cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":10,"h":28.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""},{"c":"F10","v":""},{"c":"G10","v":""},{"c":"H10","v":""},{"c":"I10","v":""}]},{"r":11,"h":38.0,"cells":[{"c":"A11","v":"2. الخصائص الفيزيائية والميكانيكية للتربة عند منسوب التأسيس وما دونه","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":12,"h":40.0,"cells":[{"c":"A12","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B12","v":"الخاصية الجيوتقنية للتربة (Soil Property)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C12","v":"الرمز الهندسي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D12","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E12","v":"القيمة التصميمية المدخلة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F12","v":"المدى الشائع للكود","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G12","v":"طريقة التحديد / الفحص المخبري","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H12","v":"المرجع القياسي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I12","v":"ملاحظات وتوجيهات الكود","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":1,"al":"center"},{"c":"B13","v":"نوع التربة السائدة عند منسوب التأسيس"},{"c":"C13","v":"Soil Type","al":"center"},{"c":"D13","v":"-","al":"center"},{"c":"E13","v":"رمل متوسط إلى كثيف مع قليل من الطمي","bg":"#DBEAFE","b":true,"al":"center"},{"c":"F13","v":"رمل / طين / طمي","al":"center"},{"c":"G13","v":"التصنيف الموحد للتربة USCS"},{"c":"H13","v":"ASTM D2487"},{"c":"I13","v":"تربة غير متماسكة جيدة التصريف"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":2,"al":"center"},{"c":"B14","v":"التماسك الفعال للتربة (Effective Cohesion)"},{"c":"C14","v":"c'","al":"center"},{"c":"D14","v":"kN/m² (kPa)","al":"center"},{"c":"E14","v":5,"in":true,"bg":"#DBEAFE","b":true,"al":"center"},{"c":"F14","v":"0 - 15 للرمل / 20 - 100 للطين","al":"center"},{"c":"G14","v":"اختبار القص المباشر / ثلاثي المحاور"},{"c":"H14","v":"ASTM D3080"},{"c":"I14","v":"قيمة تماسك اسمية للرمل السلتي"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":3,"al":"center"},{"c":"B15","v":"زاوية الاحتكاك الداخلي الفعالة (Friction Angle)"},{"c":"C15","v":"φ'","al":"center"},{"c":"D15","v":"درجة (°)","al":"center"},{"c":"E15","v":34,"in":true,"bg":"#DBEAFE","b":true,"al":"center"},{"c":"F15","v":"28° - 42° للرمل","al":"center"},{"c":"G15","v":"Direct Shear Test / Triaxial CU"},{"c":"H15","v":"ASTM D3080 / D4767"},{"c":"I15","v":"تحدد معاملات قدرة التحمل Nc, Nq, Nγ"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":4,"al":"center"},{"c":"B16","v":"الوزن الحجمي الكلي الرطب (Bulk Unit Weight)"},{"c":"C16","v":"γ_bulk","al":"center"},{"c":"D16","v":"kN/m³","al":"center"},{"c":"E16","v":18.5,"in":true,"bg":"#DBEAFE","b":true,"al":"center"},{"c":"F16","v":"16.0 - 20.0","al":"center"},{"c":"G16","v":"الكثافة الحقلية بالمخروط الرملي"},{"c":"H16","v":"ASTM D1556"},{"c":"I16","v":"يستخدم لحساب ضغط التراكب السطحي q"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":5,"al":"center"},{"c":"B17","v":"الوزن الحجمي المشبع للتربة (Saturated Unit Weight)"},{"c":"C17","v":"γ_sat","al":"center"},{"c":"D17","v":"kN/m³","al":"center"},{"c":"E17","v":20,"in":true,"bg":"#DBEAFE","b":true,"al":"center"},{"c":"F17","v":"18.0 - 22.0","al":"center"},{"c":"G17","v":"فحص الكثافة المشبعة المخبرية"},{"c":"H17","v":"ASTM D7263"},{"c":"I17","v":"يستخدم لحساب الوزن الفعال تحت المياه"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":6,"al":"center"},{"c":"B18","v":"عمق منسوب المياه الجوفية من سطح الأرض"},{"c":"C18","v":"Dw","al":"center"},{"c":"D18","v":"م (m)","al":"center"},{"c":"E18","v":4.5,"in":true,"bg":"#DBEAFE","b":true,"al":"center"},{"c":"F18","v":"0.5 - 20.0","al":"center"},{"c":"G18","v":"أنبوب البيزوميتر الموقعي"},{"c":"H18","v":"SBC 303 Cl. 4.2"},{"c":"I18","v":"Dw = 4.5م > Df+B (لا تأثير للمياه الجوفية)"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":7,"al":"center"},{"c":"B19","v":"معامل المرونة للتربة (Modulus of Elasticity)"},{"c":"C19","v":"Es","al":"center"},{"c":"D19","v":"kN/m² (kPa)","al":"center"},{"c":"E19","v":35000,"in":true,"bg":"#DBEAFE","b":true,"al":"center"},{"c":"F19","v":"15000 - 80000 للرمل الكثيف","al":"center"},{"c":"G19","v":"معايرة دقات SPT و Triaxial"},{"c":"H19","v":"Bowles Table 5-6"},{"c":"I19","v":"البارامتر الأساسي لحساب الهبوط الفوري"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":8,"al":"center"},{"c":"B20","v":"نسبة بواسون للتربة (Poisson's Ratio)"},{"c":"C20","v":"ν","al":"center"},{"c":"D20","v":"-","al":"center"},{"c":"E20","v":0.3,"in":true,"bg":"#DBEAFE","b":true,"al":"center"},{"c":"F20","v":"0.20 - 0.35 للرمل","al":"center"},{"c":"G20","v":"القيم المعيارية لكود ميكانيكا التربة"},{"c":"H20","v":"ECP 202 Table 4.1"},{"c":"I20","v":"تستخدم لحساب تأثير المرونة الثلاثية"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":9,"al":"center"},{"c":"B21","v":"عدد دقات اختبار الاختراق القياسي المصحح"},{"c":"C21","v":"N60","al":"center"},{"c":"D21","v":"دقة / 30 سم","al":"center"},{"c":"E21","v":24,"in":true,"bg":"#DBEAFE","b":true,"al":"center"},{"c":"F21","v":"10 - 40 للتربة المتوسطة والكثيفة","al":"center"},{"c":"G21","v":"Standard Penetration Test (SPT)"},{"c":"H21","v":"ASTM D1586"},{"c":"I21","v":"تستخدم للتحقق التجريبي من قدرة التحمل"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":10,"al":"center"},{"c":"B22","v":"معامل الانضغاط لطبقات الطين (Compression Index)"},{"c":"C22","v":"Cc","al":"center"},{"c":"D22","v":"-","al":"center"},{"c":"E22","v":0.18,"in":true,"bg":"#DBEAFE","b":true,"al":"center"},{"c":"F22","v":"0.15 - 0.40 للطين","al":"center"},{"c":"G22","v":"اختبار التصلب أحادي البعد Oedometer"},{"c":"H22","v":"ASTM D2435"},{"c":"I22","v":"لحساب هبوط التصلب الأولي للطين"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":11,"al":"center"},{"c":"B23","v":"نسبة الفراغات الابتدائية (Initial Void Ratio)"},{"c":"C23","v":"e0","al":"center"},{"c":"D23","v":"-","al":"center"},{"c":"E23","v":0.65,"in":true,"bg":"#DBEAFE","b":true,"al":"center"},{"c":"F23","v":"0.50 - 0.90","al":"center"},{"c":"G23","v":"الوزن النوعي والكثافة الجافة"},{"c":"H23","v":"ASTM D854"},{"c":"I23","v":"تستخدم في معادلة هبوط التصلب"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":12,"al":"center"},{"c":"B24","v":"معامل الأمان الإنشائي المطلوب (Factor of Safety)"},{"c":"C24","v":"FS","al":"center"},{"c":"D24","v":"-","al":"center"},{"c":"E24","v":3,"in":true,"bg":"#DBEAFE","b":true,"al":"center"},{"c":"F24","v":"2.5 - 3.0 للأحمال الدائمة","al":"center"},{"c":"G24","v":"اشتراطات كود البناء السعودي SBC 303"},{"c":"H24","v":"SBC 303 Cl. 5.1"},{"c":"I24","v":"يحول قدرة التحمل القصوى إلى مسموحة"}]},{"r":25,"h":28.0,"cells":[{"c":"A25","v":""},{"c":"B25","v":""},{"c":"C25","v":""},{"c":"D25","v":""},{"c":"E25","v":""},{"c":"F25","v":""},{"c":"G25","v":""},{"c":"H25","v":""},{"c":"I25","v":""}]},{"r":26,"h":38.0,"cells":[{"c":"A26","v":"3. ملخص حدود ومعايير الهبوط المسموحة كودياً وفق SBC 303 و ECP 202","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":27,"h":52.0,"cells":[{"c":"A27","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B27","v":"نوع الأساس الإنشائي (Foundation Type)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C27","v":"نوع التربة المرتكز عليها","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D27","v":"أقصى هبوط كلي مسموح (S_total)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E27","v":"أقصى هبوط تفاضلي مسموح (ΔS)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F27","v":"أقصى انحراف زاوي مسموح (δ/L)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G27","v":"مرجعية الكود القياسية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H27","v":"حالة الأمان للمشروع","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I27","v":"إجراءات التحكم والتصميم","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":28,"h":52.0,"cells":[{"c":"A28","v":1,"al":"center"},{"c":"B28","v":"قواعد منفصلة ومشتركة (Isolated & Combined)"},{"c":"C28","v":"تربة رملية / زلطية متماسكة"},{"c":"D28","v":"25.0 مم (1.0 بوصة)","al":"center"},{"c":"E28","v":"19.0 مم (0.75 بوصة)","al":"center"},{"c":"F28","v":"1 / 500 (0.002 rad)","al":"center"},{"c":"G28","v":"SBC 303 Cl. 5.3.2"},{"c":"H28","v":"معياري حاكم للتصميم","bg":"#DCFCE7","b":true,"al":"center"},{"c":"I28","v":"فحص الهبوط الفوري المرن وتجانس الإجهاد"}]},{"r":29,"h":52.0,"cells":[{"c":"A29","v":2,"al":"center"},{"c":"B29","v":"قواعد منفصلة ومشتركة (Isolated & Combined)"},{"c":"C29","v":"تربة طينية متماسكة إلى صلبة"},{"c":"D29","v":"40.0 مم (1.6 بوصة)","al":"center"},{"c":"E29","v":"25.0 مم (1.00 بوصة)","al":"center"},{"c":"F29","v":"1 / 500 (0.002 rad)","al":"center"},{"c":"G29","v":"ECP 202 Table 4-3"},{"c":"H29","v":"مطبق في حالة طبقات الطين","bg":"#DCFCE7","b":true,"al":"center"},{"c":"I29","v":"حساب هبوط التصلب الأولي طويل الأمد"}]},{"r":30,"h":52.0,"cells":[{"c":"A30","v":3,"al":"center"},{"c":"B30","v":"لبشة خرسانية مسلحة كاملة (Mat / Raft)"},{"c":"C30","v":"تربة رملية / حبيبية مدموكة"},{"c":"D30","v":"50.0 مم (2.0 بوصة)","al":"center"},{"c":"E30","v":"25.0 مم (1.00 بوصة)","al":"center"},{"c":"F30","v":"1 / 300 (0.003 rad)","al":"center"},{"c":"G30","v":"SBC 303 Cl. 5.3.3"},{"c":"H30","v":"مطبق لأساسات الأبراج","bg":"#DCFCE7","b":true,"al":"center"},{"c":"I30","v":"اللبشة تمنع الهبوط التفاضلي بين الأعمدة"}]},{"r":31,"h":34.0,"cells":[{"c":"A31","v":4,"al":"center"},{"c":"B31","v":"لبشة خرسانية مسلحة كاملة (Mat / Raft)"},{"c":"C31","v":"تربة طينية متماسكة"},{"c":"D31","v":"75.0 مم (3.0 بوصة)","al":"center"},{"c":"E31","v":"38.0 مم (1.50 بوصة)","al":"center"},{"c":"F31","v":"1 / 300 (0.003 rad)","al":"center"},{"c":"G31","v":"Bowles Table 5-8"},{"c":"H31","v":"حرج جداً ويتطلب فحص دقيق","bg":"#DCFCE7","b":true,"al":"center"},{"c":"I31","v":"متابعة منسوب التأسيس وتفريغ المياه الجوفية"}]},{"r":32,"h":28.0,"cells":[{"c":"A32","v":""},{"c":"B32","v":""},{"c":"C32","v":""},{"c":"D32","v":""},{"c":"E32","v":""},{"c":"F32","v":""},{"c":"G32","v":""},{"c":"H32","v":""},{"c":"I32","v":""}]},{"r":33,"h":28.0,"cells":[{"c":"A33","v":""},{"c":"B33","v":""},{"c":"C33","v":""},{"c":"D33","v":""},{"c":"E33","v":""},{"c":"F33","v":""},{"c":"G33","v":""},{"c":"H33","v":""},{"c":"I33","v":""}]},{"r":34,"h":34.0,"cells":[{"c":"A34","v":"مهندس فحص التربة والأساسات (Geotechnical Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D34","v":"مهندس التصميم الإنشائي (Structural Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G34","v":"المهندس الاستشاري المشرف (Supervising Consultant)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":35,"h":76.0,"cells":[{"c":"A35","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true},{"c":"D35","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true},{"c":"G35","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true}]}]},{"name":"قدرة التحمل القصوى والمسموحة","maxRow":34,"maxCol":9,"colWidths":[8.0,38.0,22.0,16.0,22.0,20.0,22.0,28.0,38.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"تحليل وحساب قدرة تحمل التربة القصوى والمسموحة (Terzaghi, Meyerhof, Hansen) للقواعد السطحية","fg":"#1E3A8A","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"مقارنة متقدمة بين معادلات ترزاجي وهانسن وميرشوف، وتأثير شكل القاعدة وعمق التأسيس ومنسوب المياه الجوفية ومعامل الأمان وفق كود SBC 303 و ECP 202","fg":"#475569","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"قدرة التحمل القصوى (Hansen q_ult)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"قدرة التحمل المسموحة الإجمالية (q_all)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"قدرة التحمل المسموحة بالكيلوجرام (q_all)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"G4","v":"قدرة التحمل الصافية المسموحة (q_net,all)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":5,"h":44.0,"cells":[{"c":"A5","v":0,"f":"=G24","bg":"#DCFCE7","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"C5","v":0,"f":"=G25","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"E5","v":"قدرة التحمل الصافية q_net,all (kPa)","f":"=G26","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"G5","v":133.8,"f":"=G27","bg":"#DCFCE7","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"kN/m² (kPa)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C6","v":"kN/m² (معامل أمان 3.0)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E6","v":"kg/cm² (الوحدة العملية الموقعية)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"G6","v":"kN/m² (مطروحاً منها وزن الردم)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"1. الأبعاد الهندسية للقاعدة قيد الدراسة ومنسوب التأسيس والردم","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":152.0,"cells":[{"c":"A9","v":"عرض القاعدة الفعال (Footing Width - B):","b":true},{"c":"B9","v":2.5,"in":true,"bg":"#DBEAFE","b":true,"al":"center"},{"c":"C9","v":"م (m)","al":"center"},{"c":"D9","v":"طول القاعدة الفعال (Footing Length - L):","b":true},{"c":"E9","v":3,"in":true,"bg":"#DBEAFE","b":true,"al":"center"},{"c":"F9","v":"م (m)","al":"center"},{"c":"G9","v":"مساحة ارتكاز القاعدة (A = B x L):","b":true},{"c":"H9","v":7.5,"f":"=B9*E9","bg":"#EFF6FF","b":true,"al":"center"},{"c":"I9","v":"م² (m²)","al":"center"}]},{"r":10,"h":128.0,"cells":[{"c":"A10","v":"عمق منسوب التأسيس من سطح الأرض (Df):","b":true},{"c":"B10","v":2,"in":true,"bg":"#DBEAFE","b":true,"al":"center"},{"c":"C10","v":"م (m)","al":"center"},{"c":"D10","v":"شكل القاعدة الإنشائي (Geometry Shape):","b":true},{"c":"E10","v":"مستطيلة (Rectangular)","al":"center"},{"c":"F10","v":"-","al":"center"},{"c":"G10","v":"نسبة العرض إلى الطول (B / L):","b":true},{"c":"H10","v":0.833333,"f":"=B9/E9","bg":"#EFF6FF","b":true,"al":"center"},{"c":"I10","v":"-","al":"center"}]},{"r":11,"h":128.0,"cells":[{"c":"A11","v":"وزن الردم فوق منسوب التأسيس (γ_bulk):","b":true},{"c":"B11","v":18.5,"f":"='إعدادات المشروع وخواص التربة'!E16","b":true,"al":"center"},{"c":"C11","v":"kN/m³","al":"center"},{"c":"D11","v":"ضغط التراكب الفعال عند التأسيس (q = γ.Df):","b":true},{"c":"E11","v":37,"f":"=B11*B10","b":true,"al":"center"},{"c":"F11","v":"kN/m² (kPa)","al":"center"},{"c":"G11","v":"عمق المياه الجوفية الفعلي (Dw):","b":true},{"c":"H11","v":4.5,"f":"='إعدادات المشروع وخواص التربة'!E18","bg":"#EFF6FF","b":true,"al":"center"},{"c":"I11","v":"م (m)","al":"center"}]},{"r":12,"h":28.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":""},{"c":"C12","v":""},{"c":"D12","v":""},{"c":"E12","v":""},{"c":"F12","v":""},{"c":"G12","v":""},{"c":"H12","v":""},{"c":"I12","v":""}]},{"r":13,"h":38.0,"cells":[{"c":"A13","v":"2. معاملات قدرة التحمل وتصحيح الشكل والعمق والمياه الجوفية (Hansen, Meyerhof, Terzaghi)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"المعامل الهندسي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B14","v":"معادلة ترزاجي (Terzaghi 1943)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C14","v":"معادلة ميرشوف (Meyerhof 1963)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D14","v":"معادلة هانسن (Hansen 1970)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E14","v":"معامل فيسيك (Vesic 1973)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F14","v":"القيمة المعتمدة بالحساب","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G14","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H14","v":"معادلة الاشتقاق الرياضية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I14","v":"ملاحظات الاستخدام في الكود","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":15,"h":72.0,"cells":[{"c":"A15","v":"معامل الحمل الزائد (Nq)"},{"c":"B15","v":29.44,"in":true,"al":"center"},{"c":"C15","v":29.44,"in":true,"al":"center"},{"c":"D15","v":29.44,"in":true,"al":"center"},{"c":"E15","v":29.44,"in":true,"al":"center"},{"c":"F15","v":0,"f":"=ROUND(EXP(PI()*TAN('إعدادات المشروع وخواص التربة'!E15*PI()/180))*(TAN((45+'إعدادات المشروع وخواص التربة'!E15/2)*PI()/180))^2, 2)","bg":"#DBEAFE","b":true,"al":"center"},{"c":"G15","v":"-","al":"center"},{"c":"H15","v":"Nq = e^(π.tanφ) . tan²(45 + φ/2)"},{"c":"I15","v":"معامل ثابت وموحد لمعظم النظريات الحديثة"}]},{"r":16,"h":104.0,"cells":[{"c":"A16","v":"معامل التماسك للتربة (Nc)"},{"c":"B16","v":42.16,"in":true,"al":"center"},{"c":"C16","v":42.16,"in":true,"al":"center"},{"c":"D16","v":42.16,"in":true,"al":"center"},{"c":"E16","v":42.16,"in":true,"al":"center"},{"c":"F16","v":-1.48,"f":"=ROUND((F15-1)/TAN('إعدادات المشروع وخواص التربة'!E15*PI()/180), 2)","bg":"#DBEAFE","b":true,"al":"center"},{"c":"G16","v":"-","al":"center"},{"c":"H16","v":"Nc = (Nq - 1) / tan(φ)"},{"c":"I16","v":"يعبر عن مساهمة تماسك التربة في الاتزان"}]},{"r":17,"h":128.0,"cells":[{"c":"A17","v":"معامل وزن التربة أسفل القاعدة (Nγ)"},{"c":"B17","v":31.15,"in":true,"al":"center"},{"c":"C17","v":31.15,"in":true,"al":"center"},{"c":"D17","v":28.77,"in":true,"al":"center"},{"c":"E17","v":34.42,"in":true,"al":"center"},{"c":"F17","v":28.77,"in":true,"bg":"#DBEAFE","b":true,"al":"center"},{"c":"G17","v":"-","al":"center"},{"c":"H17","v":"Nγ (Hansen) = 1.5 . (Nq - 1) . tan(φ)"},{"c":"I17","v":"معامل هانسن يعطي قيماً واقعية ومتحفظة"}]},{"r":18,"h":72.0,"cells":[{"c":"A18","v":"معامل شكل التماسك (sc)"},{"c":"B18","v":1.3,"in":true,"al":"center"},{"c":"C18","v":1.25,"in":true,"al":"center"},{"c":"D18","v":1.27,"in":true,"al":"center"},{"c":"E18","v":1.25,"in":true,"al":"center"},{"c":"F18","v":1,"f":"=ROUND(1 + (B9/E9)*(F15/F16), 2)","bg":"#DBEAFE","b":true,"al":"center"},{"c":"G18","v":"-","al":"center"},{"c":"H18","v":"sc = 1 + (B/L) . (Nq/Nc)"},{"c":"I18","v":"تصحيح تأثير الأبعاد الثلاثية للقاعدة"}]},{"r":19,"h":104.0,"cells":[{"c":"A19","v":"معامل شكل الحمل الزائد (sq)"},{"c":"B19","v":1,"in":true,"al":"center"},{"c":"C19","v":1.2,"in":true,"al":"center"},{"c":"D19","v":1.21,"in":true,"al":"center"},{"c":"E19","v":1.2,"in":true,"al":"center"},{"c":"F19","v":1.56,"f":"=ROUND(1 + (B9/E9)*TAN('إعدادات المشروع وخواص التربة'!E15*PI()/180), 2)","bg":"#DBEAFE","b":true,"al":"center"},{"c":"G19","v":"-","al":"center"},{"c":"H19","v":"sq = 1 + (B/L) . tan(φ)"},{"c":"I19","v":"يزيد سعة التحمل للقواعد المربعة والمستطيلة"}]},{"r":20,"h":104.0,"cells":[{"c":"A20","v":"معامل شكل وزن التربة (sγ)"},{"c":"B20","v":0.8,"in":true,"al":"center"},{"c":"C20","v":0.67,"in":true,"al":"center"},{"c":"D20","v":0.67,"in":true,"al":"center"},{"c":"E20","v":0.67,"in":true,"al":"center"},{"c":"F20","v":0.67,"f":"=ROUND(1 - 0.4*(B9/E9), 2)","bg":"#DBEAFE","b":true,"al":"center"},{"c":"G20","v":"-","al":"center"},{"c":"H20","v":"sγ = 1 - 0.4 . (B/L)"},{"c":"I20","v":"يقلل مساهمة الوزن في الأطراف للقواعد المحدودة"}]},{"r":21,"h":72.0,"cells":[{"c":"A21","v":"معامل عمق التأسيس (dc)"},{"c":"B21","v":1,"in":true,"al":"center"},{"c":"C21","v":1.24,"in":true,"al":"center"},{"c":"D21","v":1.24,"in":true,"al":"center"},{"c":"E21","v":1.24,"in":true,"al":"center"},{"c":"F21","v":1.32,"f":"=ROUND(1 + 0.4*(B10/B9), 2)","bg":"#DBEAFE","b":true,"al":"center"},{"c":"G21","v":"-","al":"center"},{"c":"H21","v":"dc = 1 + 0.4 . (Df/B)"},{"c":"I21","v":"يعبر عن مقاومة القص للتربة أعلى منسوب التأسيس"}]},{"r":22,"h":104.0,"cells":[{"c":"A22","v":"معامل عمق الحمل الزائد (dq)"},{"c":"B22","v":1,"in":true,"al":"center"},{"c":"C22","v":1.18,"in":true,"al":"center"},{"c":"D22","v":1.18,"in":true,"al":"center"},{"c":"E22","v":1.18,"in":true,"al":"center"},{"c":"F22","v":1.21,"f":"=ROUND(1 + 2*TAN('إعدادات المشروع وخواص التربة'!E15*PI()/180)*(1-SIN('إعدادات المشروع وخواص التربة'!E15*PI()/180))^2*(B10/B9), 2)","bg":"#DBEAFE","b":true,"al":"center"},{"c":"G22","v":"-","al":"center"},{"c":"H22","v":"dq = 1 + 2.tanφ.(1-sinφ)².(Df/B)"},{"c":"I22","v":"يزيد سعة التحمل مع زيادة عمق التأسيس Df"}]},{"r":23,"h":128.0,"cells":[{"c":"A23","v":"معامل تصحيح المياه الجوفية (Cw)"},{"c":"B23","v":1,"in":true,"al":"center"},{"c":"C23","v":1,"in":true,"al":"center"},{"c":"D23","v":1,"in":true,"al":"center"},{"c":"E23","v":1,"in":true,"al":"center"},{"c":"F23","v":1,"f":"=IF('إعدادات المشروع وخواص التربة'!E18>=(B10+B9), 1.0, 0.5)","bg":"#DBEAFE","b":true,"al":"center"},{"c":"G23","v":"-","al":"center"},{"c":"H23","v":"Cw = 1.0 if Dw >= Df+B else 0.5"},{"c":"I23","v":"Dw=4.5م >= Df+B=4.5م (التربة جافة أسفل القاعدة)"}]},{"r":24,"h":28.0,"cells":[{"c":"A24","v":""},{"c":"B24","v":""},{"c":"C24","v":""},{"c":"D24","v":""},{"c":"E24","v":""},{"c":"F24","v":""},{"c":"G24","v":""},{"c":"H24","v":""},{"c":"I24","v":""}]},{"r":25,"h":38.0,"cells":[{"c":"A25","v":"3. ملخص ومقارنة قدرة تحمل التربة القصوى والمسموحة وفق النظريات الهندسية المختلفة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":26,"h":52.0,"cells":[{"c":"A26","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B26","v":"النظرية / الطريقة الحسابية (Method)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C26","v":"قدرة التحمل القصوى q_ult (kPa)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D26","v":"معامل الأمان (FS)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E26","v":"قدرة التحمل المسموحة q_all (kPa)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F26","v":"قدرة التحمل المسموحة (kg/cm²)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G26","v":"قدرة التحمل الصافية q_net,all (kPa)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H26","v":"حالة التقييم والاعتماد","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I26","v":"ملاحظات كود البناء والمكتب الفني","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":27,"h":52.0,"cells":[{"c":"A27","v":1,"al":"center"},{"c":"B27","v":"معادلة ترزاجي العامة (Terzaghi 1943 Formulation)"},{"c":"C27","v":438.355188,"f":"='إعدادات المشروع وخواص التربة'!E14*F16*F18 + E11*F15 + 0.5*B11*B9*F17*F20","b":true,"al":"center"},{"c":"D27","v":3,"f":"='إعدادات المشروع وخواص التربة'!E24","al":"center"},{"c":"E27","v":146.1,"f":"=ROUND(C27/D27, 1)","b":true,"al":"center"},{"c":"F27","v":1.46,"f":"=ROUND(E27/100, 2)","b":true,"al":"center"},{"c":"G27","v":133.8,"f":"=ROUND((C27-E11)/D27, 1)","b":true,"al":"center"},{"c":"H27","v":"معيار كلاسيكي متحفظ","b":true,"al":"center"},{"c":"I27","v":"تصلح للقواعد الشريطية وتفترض سطح انهيار عام"}]},{"r":28,"h":36.0,"cells":[{"c":"A28","v":2,"al":"center"},{"c":"B28","v":"معادلة ميرشوف العامة (Meyerhof 1963 General)"},{"c":"C28","v":435.987188,"f":"='إعدادات المشروع وخواص التربة'!E14*F16*F18*F21 + E11*F15*F19*F22 + 0.5*B11*B9*F17*F20*F23","b":true,"al":"center"},{"c":"D28","v":3,"f":"='إعدادات المشروع وخواص التربة'!E24","al":"center"},{"c":"E28","v":145.3,"f":"=ROUND(C28/D28, 1)","b":true,"al":"center"},{"c":"F28","v":1.45,"f":"=ROUND(E28/100, 2)","b":true,"al":"center"},{"c":"G28","v":133,"f":"=ROUND((C28-E11)/D28, 1)","b":true,"al":"center"},{"c":"H28","v":"تأخذ في الاعتبار عمق التأسيس","b":true,"al":"center"},{"c":"I28","v":"تمدد سطح الانهيار إلى ما فوق منسوب التأسيس"}]},{"r":29,"h":52.0,"cells":[{"c":"A29","v":3,"al":"center"},{"c":"B29","v":"معادلة هانسن المعتمدة (Hansen 1970 SBC/ECP Code)"},{"c":"C29","v":435.987188,"f":"='إعدادات المشروع وخواص التربة'!E14*F16*F18*F21 + E11*F15*F19*F22 + 0.5*B11*B9*F17*F20*F23*F23","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"D29","v":3,"f":"='إعدادات المشروع وخواص التربة'!E24","al":"center"},{"c":"E29","v":145.3,"f":"=ROUND(C29/D29, 1)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"F29","v":1.45,"f":"=ROUND(E29/100, 2)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"G29","v":133,"f":"=ROUND((C29-E11)/D29, 1)","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"H29","v":"المعتمدة أساساً في هذا الشيت","bg":"#DBEAFE","b":true,"al":"center"},{"c":"I29","v":"الأكثر دقة وشيوعاً في كود SBC 303 وكود ECP 202"}]},{"r":30,"h":52.0,"cells":[{"c":"A30","v":4,"al":"center"},{"c":"B30","v":"الطريقة التجريبية من اختبار الاختراق القياسي (SPT N60)"},{"c":"C30","v":1050,"in":true,"b":true,"al":"center"},{"c":"D30","v":3,"in":true,"al":"center"},{"c":"E30","v":350,"f":"=ROUND(350.0, 1)","b":true,"al":"center"},{"c":"F30","v":3.5,"f":"=ROUND(E30/100, 2)","b":true,"al":"center"},{"c":"G30","v":313,"f":"=ROUND(E30 - E11, 1)","b":true,"al":"center"},{"c":"H30","v":"تحقق تجريبي استرشادي","b":true,"al":"center"},{"c":"I30","v":"معادلة Bowles: q_all = (N60/0.05)*((B+0.3)/B)² . Fd (لهبوط 25 مم)"}]},{"r":31,"h":28.0,"cells":[{"c":"A31","v":""},{"c":"B31","v":""},{"c":"C31","v":""},{"c":"D31","v":""},{"c":"E31","v":""},{"c":"F31","v":""},{"c":"G31","v":""},{"c":"H31","v":""},{"c":"I31","v":""}]},{"r":32,"h":28.0,"cells":[{"c":"A32","v":""},{"c":"B32","v":""},{"c":"C32","v":""},{"c":"D32","v":""},{"c":"E32","v":""},{"c":"F32","v":""},{"c":"G32","v":""},{"c":"H32","v":""},{"c":"I32","v":""}]},{"r":33,"h":34.0,"cells":[{"c":"A33","v":"مهندس فحص التربة والأساسات (Geotechnical Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D33","v":"مهندس التصميم الإنشائي (Structural Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G33","v":"المهندس الاستشاري المشرف (Supervising Consultant)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":34,"h":76.0,"cells":[{"c":"A34","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true},{"c":"D34","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true},{"c":"G34","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true}]}]},{"name":"حسابات الهبوط الفوري والتصلب","maxRow":31,"maxCol":9,"colWidths":[8.0,38.0,22.0,14.0,24.0,18.0,20.0,26.0,38.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"حسابات وتحليل الهبوط الفوري المرن وهبوط التصلب الأولي للقواعد السطحية (Settlement Analysis)","fg":"#1E3A8A","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"التحقق من عدم تجاوز الهبوط الكلي والتفاضلي والانحراف الزاوي للحدود المسموحة وفق كود البناء السعودي SBC 303 والكود المصري ECP 202","fg":"#475569","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"الهبوط الفوري المرن المتوقع (Se)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"هبوط التصلب الأولي المتوقع (Sc)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"إجمالي الهبوط الكلي المتوقع (S_total)","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"G4","v":"حالة الفحص الإنشائي للهبوط","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":5,"h":44.0,"cells":[{"c":"A5","v":11.61,"f":"=F13","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"C5","v":55.4,"f":"=F19","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"E5","v":0,"f":"=ROUND(B5+D5, 2)","bg":"#DCFCE7","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"G5","v":"مطابق وآمن إنشائياً (<= 25 مم)","f":"=IF(F5<=25.0, \"مطابق وآمن إنشائياً (<= 25 مم)\", \"غير مطابق - يلزم تكبير القاعدة\")","bg":"#DCFCE7","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"مم (mm) في التربة الرملية","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C6","v":"مم (mm) في طبقات الطين","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E6","v":"مم (mm) للأحمال التشغيلية","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"G6","v":"اشتراط كود SBC 303 (أقصى هبوط 25 مم)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"1. حساب الهبوط الفوري المرن للتربة الرملية (Elastic Immediate Settlement - Schmertmann / Bowles)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":72.0,"cells":[{"c":"A9","v":"البارامتر الهندسي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"الرمز","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"القيمة المدخلة / المحسوبة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"معادلة الاشتقاق / المرجع","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"النتيجة الجزئية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H9","v":"الحد المسموح كودياً","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I9","v":"حالة الفحص والتقييم","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":176.0,"cells":[{"c":"A10","v":"الحمل المحوري التشغيلي على العمود (P_service)"},{"c":"B10","v":"P","al":"center"},{"c":"C10","v":1800,"in":true,"b":true,"al":"center"},{"c":"D10","v":"kN","al":"center"},{"c":"E10","v":"أحمال التشغيل غير المصعدة من الموديل الإنشائي"},{"c":"F10","v":1800,"in":true,"b":true,"al":"center"},{"c":"G10","v":"kN","al":"center"},{"c":"H10","v":"-","al":"center"},{"c":"I10","v":"حمولة الخدمة الفعلية","bg":"#DBEAFE","b":true,"al":"center"}]},{"r":11,"h":176.0,"cells":[{"c":"A11","v":"إجهاد التماس الإجمالي أسفل القاعدة (q0 = P/A)"},{"c":"B11","v":"q0","al":"center"},{"c":"C11","v":240,"f":"=ROUND(C10/('قدرة التحمل القصوى والمسموحة'!B9*'قدرة التحمل القصوى والمسموحة'!E9), 1)","b":true,"al":"center"},{"c":"D11","v":"kN/m²","al":"center"},{"c":"E11","v":"q0 = P / (B x L)"},{"c":"F11","v":240,"f":"=C11","b":true,"al":"center"},{"c":"G11","v":"kPa","al":"center"},{"c":"H11","v":"<= 350.0 kPa","al":"center"},{"c":"I11","v":"ضمن قدرة التحمل المسموحة","bg":"#DBEAFE","b":true,"al":"center"}]},{"r":12,"h":176.0,"cells":[{"c":"A12","v":"الإجهاد الصافي المسبب للهبوط (Δq = q0 - γ.Df)"},{"c":"B12","v":"Δq","al":"center"},{"c":"C12","v":203,"f":"=ROUND(C11 - 'قدرة التحمل القصوى والمسموحة'!E11, 1)","b":true,"al":"center"},{"c":"D12","v":"kN/m²","al":"center"},{"c":"E12","v":"Δq = q0 - γ . Df"},{"c":"F12","v":203,"f":"=C12","b":true,"al":"center"},{"c":"G12","v":"kPa","al":"center"},{"c":"H12","v":"-","al":"center"},{"c":"I12","v":"الإجهاد الفعال الإضافي على التربة","bg":"#DBEAFE","b":true,"al":"center"}]},{"r":13,"h":152.0,"cells":[{"c":"A13","v":"الهبوط الفوري المحسوب بنظرية المرونة (Se)"},{"c":"B13","v":"Se","al":"center"},{"c":"C13","v":11.61,"f":"=ROUND(C12*'قدرة التحمل القصوى والمسموحة'!B9*(1-('إعدادات المشروع وخواص التربة'!E20)^2)/'إعدادات المشروع وخواص التربة'!E19 * 0.88 * 1000, 2)","b":true,"al":"center"},{"c":"D13","v":"مم (mm)","al":"center"},{"c":"E13","v":"Se = Δq . B . (1 - ν²) / Es . Is . If"},{"c":"F13","v":11.61,"f":"=C13","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"G13","v":"مم","al":"center"},{"c":"H13","v":"<= 25.0 مم","al":"center"},{"c":"I13","v":"آمن ومحقق للكود","f":"=IF(F13<=25.0, \"آمن ومحقق للكود\", \"غير محقق\")","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":14,"h":28.0,"cells":[{"c":"A14","v":""},{"c":"B14","v":""},{"c":"C14","v":""},{"c":"D14","v":""},{"c":"E14","v":""},{"c":"F14","v":""},{"c":"G14","v":""},{"c":"H14","v":""},{"c":"I14","v":""}]},{"r":15,"h":38.0,"cells":[{"c":"A15","v":"2. حساب هبوط التصلب الأولي لطبقات الطين (Primary Consolidation Settlement - Terzaghi 1D)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":16,"h":128.0,"cells":[{"c":"A16","v":"البارامتر الجيوتقني لطبقة الطين","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B16","v":"الرمز","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C16","v":"القيمة المدخلة / المحسوبة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D16","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E16","v":"معادلة الاشتقاق / المصدر","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F16","v":"القيمة المحسوبة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G16","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H16","v":"التأثير الإنشائي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I16","v":"ملاحظات الفحص الجيوتقني","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":17,"h":152.0,"cells":[{"c":"A17","v":"سمك طبقة الطين القابلة للانضغاط أسفل التأسيس"},{"c":"B17","v":"H_clay","al":"center"},{"c":"C17","v":3,"in":true,"b":true,"al":"center"},{"c":"D17","v":"م (m)","al":"center"},{"c":"E17","v":"من واقع قطاع الجسة الاستكشافية المعتمدة"},{"c":"F17","v":3,"in":true,"b":true,"al":"center"},{"c":"G17","v":"م","al":"center"},{"c":"H17","v":"تحدد حجم الانضغاط الكلي"},{"c":"I17","v":"طبقة طين سلتي متوسط الصلابة","bg":"#DBEAFE","b":true,"al":"center"}]},{"r":18,"h":152.0,"cells":[{"c":"A18","v":"عمق منتصف طبقة الطين أسفل منسوب التأسيس"},{"c":"B18","v":"z_mid","al":"center"},{"c":"C18","v":2.5,"in":true,"b":true,"al":"center"},{"c":"D18","v":"م (m)","al":"center"},{"c":"E18","v":"z = Df + (H_clay / 2)"},{"c":"F18","v":2.5,"in":true,"b":true,"al":"center"},{"c":"G18","v":"م","al":"center"},{"c":"H18","v":"نقطة حساب متوسط الزيادة في الإجهاد"},{"c":"I18","v":"Df = 2.0م، منتصف الطبقة عند 3.5م","bg":"#DBEAFE","b":true,"al":"center"}]},{"r":19,"h":176.0,"cells":[{"c":"A19","v":"الزيادة في الإجهاد عند منتصف الطبقة بطريقة (2:1)"},{"c":"B19","v":"Δσ_z","al":"center"},{"c":"C19","v":55.4,"f":"=ROUND((C12*'قدرة التحمل القصوى والمسموحة'!B9*'قدرة التحمل القصوى والمسموحة'!E9)/(('قدرة التحمل القصوى والمسموحة'!B9+C18)*('قدرة التحمل القصوى والمسموحة'!E9+C18)), 1)","b":true,"al":"center"},{"c":"D19","v":"kN/m²","al":"center"},{"c":"E19","v":"Δσ = (Δq . B . L) / ((B + z)(L + z))"},{"c":"F19","v":55.4,"f":"=C19","b":true,"al":"center"},{"c":"G19","v":"kPa","al":"center"},{"c":"H19","v":"توزيع الإجهاد بميل 2 رأسي إلى 1 أفقي"},{"c":"I19","v":"تخامد الإجهاد مع العمق","bg":"#DBEAFE","b":true,"al":"center"}]},{"r":20,"h":128.0,"cells":[{"c":"A20","v":"هبوط التصلب الأولي المحسوب (Sc)"},{"c":"B20","v":"Sc","al":"center"},{"c":"C20","v":0,"f":"=ROUND(('إعدادات المشروع وخواص التربة'!E22*C17/(1+'إعدادات المشروع وخواص التربة'!E23))*LOG10(('إعدادات المشروع وخواص التربة'!E16*3.5 + C19)/('إعدادات المشروع وخواص التربة'!E16*3.5))*1000, 2)","b":true,"al":"center"},{"c":"D20","v":"مم (mm)","al":"center"},{"c":"E20","v":"Sc = (Cc.H / (1+e0)) . log10((σ'0 + Δσ)/σ'0)"},{"c":"F20","v":0,"f":"=C20","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"G20","v":"مم","al":"center"},{"c":"H20","v":"<= 40.0 مم لطين"},{"c":"I20","v":"آمن ومحقق للكود","f":"=IF(F20<=40.0, \"آمن ومحقق للكود\", \"غير محقق\")","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":21,"h":28.0,"cells":[{"c":"A21","v":""},{"c":"B21","v":""},{"c":"C21","v":""},{"c":"D21","v":""},{"c":"E21","v":""},{"c":"F21","v":""},{"c":"G21","v":""},{"c":"H21","v":""},{"c":"I21","v":""}]},{"r":22,"h":38.0,"cells":[{"c":"A22","v":"3. ملخص الهبوط الكلي والانحراف الزاوي التفاضلي ومطابقة كود SBC 303","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":23,"h":40.0,"cells":[{"c":"A23","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B23","v":"عنصر التحقق الإنشائي للهبوط","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C23","v":"القيمة التصميمية المحسوبة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D23","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E23","v":"الحد الأقصى المسموح بالكود","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F23","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G23","v":"نسبة الاستنفاد (UR)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H23","v":"حالة التحقق والمطابقة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I23","v":"الإجراء الهندسي الواجب اتخاذه","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":24,"h":52.0,"cells":[{"c":"A24","v":1,"al":"center"},{"c":"B24","v":"الهبوط الفوري المرن للرمل (Immediate Settlement - Se)"},{"c":"C24","v":11.61,"f":"=F13","b":true,"al":"center"},{"c":"D24","v":"مم","al":"center"},{"c":"E24","v":25,"in":true,"b":true,"al":"center"},{"c":"F24","v":"مم","al":"center"},{"c":"G24","v":0.46,"f":"=ROUND(C24/E24, 2)","bg":"#DBEAFE","b":true,"al":"center"},{"c":"H24","v":"مطابق وآمن إنشائياً","f":"=IF(G24<=1.0, \"مطابق وآمن إنشائياً\", \"غير مطابق\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"I24","v":"الأبعاد الحالية للقاعدة تحقق متطلبات الهبوط"}]},{"r":25,"h":52.0,"cells":[{"c":"A25","v":2,"al":"center"},{"c":"B25","v":"هبوط التصلب الأولي لطبقة الطين (Consolidation - Sc)"},{"c":"C25","v":0,"f":"=F20","b":true,"al":"center"},{"c":"D25","v":"مم","al":"center"},{"c":"E25","v":40,"in":true,"b":true,"al":"center"},{"c":"F25","v":"مم","al":"center"},{"c":"G25","v":0,"f":"=ROUND(C25/E25, 2)","bg":"#DBEAFE","b":true,"al":"center"},{"c":"H25","v":"مطابق وآمن إنشائياً","f":"=IF(G25<=1.0, \"مطابق وآمن إنشائياً\", \"غير مطابق\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"I25","v":"هبوط التصلب يحدث تدريجياً خلال فترة البناء"}]},{"r":26,"h":52.0,"cells":[{"c":"A26","v":3,"al":"center"},{"c":"B26","v":"إجمالي الهبوط الكلي التراكمي (Total Settlement - Stot)"},{"c":"C26","v":11.61,"f":"=ROUND(C24+C25, 2)","b":true,"al":"center"},{"c":"D26","v":"مم","al":"center"},{"c":"E26","v":50,"in":true,"b":true,"al":"center"},{"c":"F26","v":"مم","al":"center"},{"c":"G26","v":0.23,"f":"=ROUND(C26/E26, 2)","bg":"#DBEAFE","b":true,"al":"center"},{"c":"H26","v":"مطابق وآمن إنشائياً","f":"=IF(G26<=1.0, \"مطابق وآمن إنشائياً\", \"غير مطابق\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"I26","v":"الهبوط الكلي آمن ومطابق لاشتراطات SBC 303"}]},{"r":27,"h":52.0,"cells":[{"c":"A27","v":4,"al":"center"},{"c":"B27","v":"الانحراف الزاوي التفاضلي بين عمودين متجاورين (δ/L)"},{"c":"C27","v":0.00097,"f":"=ROUND((C26*0.5)/(6.0*1000), 5)","b":true,"al":"center"},{"c":"D27","v":"rad","al":"center"},{"c":"E27","v":0.002,"in":true,"b":true,"al":"center"},{"c":"F27","v":"rad (1/500)","al":"center"},{"c":"G27","v":0.48,"f":"=ROUND(C27/E27, 2)","bg":"#DBEAFE","b":true,"al":"center"},{"c":"H27","v":"مطابق وآمن إنشائياً","f":"=IF(G27<=1.0, \"مطابق وآمن إنشائياً\", \"غير مطابق\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"I27","v":"يمنع حدوث أي شروخ تشطيبات أو ميلان في الكمرات"}]},{"r":28,"h":28.0,"cells":[{"c":"A28","v":""},{"c":"B28","v":""},{"c":"C28","v":""},{"c":"D28","v":""},{"c":"E28","v":""},{"c":"F28","v":""},{"c":"G28","v":""},{"c":"H28","v":""},{"c":"I28","v":""}]},{"r":29,"h":28.0,"cells":[{"c":"A29","v":""},{"c":"B29","v":""},{"c":"C29","v":""},{"c":"D29","v":""},{"c":"E29","v":""},{"c":"F29","v":""},{"c":"G29","v":""},{"c":"H29","v":""},{"c":"I29","v":""}]},{"r":30,"h":34.0,"cells":[{"c":"A30","v":"مهندس فحص التربة والأساسات (Geotechnical Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D30","v":"مهندس التصميم الإنشائي (Structural Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G30","v":"المهندس الاستشاري المشرف (Supervising Consultant)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":31,"h":76.0,"cells":[{"c":"A31","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true},{"c":"D31","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true},{"c":"G31","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true}]}]},{"name":"جدول فحص نماذج القواعد","maxRow":19,"maxCol":12,"colWidths":[8.0,18.0,44.0,22.0,16.0,16.0,18.0,22.0,18.0,22.0,22.0,26.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول تصميم وفحص نماذج القواعد المنفصلة والمشتركة واللبشة (Footings Schedule & Capacity Check)","fg":"#1E3A8A","b":true,"al":"center","cs":12},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"فحص إجهادات التماس الفعلية لكل نموذج قاعدة بالمشروع ومقارنتها بقدرة تحمل التربة المسموحة وحدود الهبوط الكلي وفق SBC 303 و ECP 202","fg":"#475569","al":"center","cs":12},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"كود النموذج الإنشائي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"بيان الموقع واستخدام القاعدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"حمل العمود التشغيلي P (kN)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"عرض القاعدة B (م)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"طول القاعدة L (م)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"مساحة الارتكاز A (م²)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"إجهاد التماس الفعلي q_act (kPa)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"إجهاد التماس (kg/cm²)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"قدرة التحمل المسموحة q_all (kPa)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"نسبة التحميل (UR = q_act / q_all)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L4","v":"حالة التحقق الإنشائي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":1,"al":"center"},{"c":"B5","v":"F1","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C5","v":"قاعدة منفصلة - أعمدة السور الخارجي والمظلات"},{"c":"D5","v":450,"in":true,"b":true,"al":"center"},{"c":"E5","v":1.4,"in":true,"al":"center"},{"c":"F5","v":1.4,"in":true,"al":"center"},{"c":"G5","v":1.96,"f":"=ROUND(E5*F5, 2)","al":"center"},{"c":"H5","v":229.6,"f":"=ROUND(D5/G5, 1)","b":true,"al":"center"},{"c":"I5","v":2.3,"f":"=ROUND(H5/100, 2)","al":"center"},{"c":"J5","v":145.3,"f":"='قدرة التحمل القصوى والمسموحة'!E29","al":"center"},{"c":"K5","v":1.58,"f":"=ROUND(H5/J5, 2)","bg":"#EFF6FF","b":true,"al":"center"},{"c":"L5","v":"غير مطابق - تكبير مطلوب","f":"=IF(K5<=1.0, \"مطابق وآمن إنشائياً\", \"غير مطابق - تكبير مطلوب\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":2,"al":"center"},{"c":"B6","v":"F2","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C6","v":"قاعدة منفصلة - أعمدة الواجهة والزوايا الطرفية"},{"c":"D6","v":850,"in":true,"b":true,"al":"center"},{"c":"E6","v":1.8,"in":true,"al":"center"},{"c":"F6","v":2,"in":true,"al":"center"},{"c":"G6","v":3.6,"f":"=ROUND(E6*F6, 2)","al":"center"},{"c":"H6","v":236.1,"f":"=ROUND(D6/G6, 1)","b":true,"al":"center"},{"c":"I6","v":2.36,"f":"=ROUND(H6/100, 2)","al":"center"},{"c":"J6","v":145.3,"f":"='قدرة التحمل القصوى والمسموحة'!E29","al":"center"},{"c":"K6","v":1.62,"f":"=ROUND(H6/J6, 2)","bg":"#EFF6FF","b":true,"al":"center"},{"c":"L6","v":"غير مطابق - تكبير مطلوب","f":"=IF(K6<=1.0, \"مطابق وآمن إنشائياً\", \"غير مطابق - تكبير مطلوب\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":3,"al":"center"},{"c":"B7","v":"F3","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C7","v":"قاعدة منفصلة - أعمدة داخلية متوسطة الأحمال"},{"c":"D7","v":1350,"in":true,"b":true,"al":"center"},{"c":"E7","v":2.2,"in":true,"al":"center"},{"c":"F7","v":2.4,"in":true,"al":"center"},{"c":"G7","v":5.28,"f":"=ROUND(E7*F7, 2)","al":"center"},{"c":"H7","v":255.7,"f":"=ROUND(D7/G7, 1)","b":true,"al":"center"},{"c":"I7","v":2.56,"f":"=ROUND(H7/100, 2)","al":"center"},{"c":"J7","v":145.3,"f":"='قدرة التحمل القصوى والمسموحة'!E29","al":"center"},{"c":"K7","v":1.76,"f":"=ROUND(H7/J7, 2)","bg":"#EFF6FF","b":true,"al":"center"},{"c":"L7","v":"غير مطابق - تكبير مطلوب","f":"=IF(K7<=1.0, \"مطابق وآمن إنشائياً\", \"غير مطابق - تكبير مطلوب\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":4,"al":"center"},{"c":"B8","v":"F4","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C8","v":"قاعدة منفصلة - أعمدة رئيسية للصالات المفتوحة"},{"c":"D8","v":1850,"in":true,"b":true,"al":"center"},{"c":"E8","v":2.5,"in":true,"al":"center"},{"c":"F8","v":2.8,"in":true,"al":"center"},{"c":"G8","v":7,"f":"=ROUND(E8*F8, 2)","al":"center"},{"c":"H8","v":264.3,"f":"=ROUND(D8/G8, 1)","b":true,"al":"center"},{"c":"I8","v":2.64,"f":"=ROUND(H8/100, 2)","al":"center"},{"c":"J8","v":145.3,"f":"='قدرة التحمل القصوى والمسموحة'!E29","al":"center"},{"c":"K8","v":1.82,"f":"=ROUND(H8/J8, 2)","bg":"#EFF6FF","b":true,"al":"center"},{"c":"L8","v":"غير مطابق - تكبير مطلوب","f":"=IF(K8<=1.0, \"مطابق وآمن إنشائياً\", \"غير مطابق - تكبير مطلوب\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":5,"al":"center"},{"c":"B9","v":"F5","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C9","v":"قاعدة منفصلة - أعمدة مركزية ثقيلة للبرج"},{"c":"D9","v":2400,"in":true,"b":true,"al":"center"},{"c":"E9","v":2.8,"in":true,"al":"center"},{"c":"F9","v":3.2,"in":true,"al":"center"},{"c":"G9","v":8.96,"f":"=ROUND(E9*F9, 2)","al":"center"},{"c":"H9","v":267.9,"f":"=ROUND(D9/G9, 1)","b":true,"al":"center"},{"c":"I9","v":2.68,"f":"=ROUND(H9/100, 2)","al":"center"},{"c":"J9","v":145.3,"f":"='قدرة التحمل القصوى والمسموحة'!E29","al":"center"},{"c":"K9","v":1.84,"f":"=ROUND(H9/J9, 2)","bg":"#EFF6FF","b":true,"al":"center"},{"c":"L9","v":"غير مطابق - تكبير مطلوب","f":"=IF(K9<=1.0, \"مطابق وآمن إنشائياً\", \"غير مطابق - تكبير مطلوب\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":6,"al":"center"},{"c":"B10","v":"CF1","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C10","v":"قاعدة مشتركة - عمودين متقاربين بالمحور (A-B)"},{"c":"D10","v":3100,"in":true,"b":true,"al":"center"},{"c":"E10","v":2.6,"in":true,"al":"center"},{"c":"F10","v":4.5,"in":true,"al":"center"},{"c":"G10","v":11.7,"f":"=ROUND(E10*F10, 2)","al":"center"},{"c":"H10","v":265,"f":"=ROUND(D10/G10, 1)","b":true,"al":"center"},{"c":"I10","v":2.65,"f":"=ROUND(H10/100, 2)","al":"center"},{"c":"J10","v":145.3,"f":"='قدرة التحمل القصوى والمسموحة'!E29","al":"center"},{"c":"K10","v":1.82,"f":"=ROUND(H10/J10, 2)","bg":"#EFF6FF","b":true,"al":"center"},{"c":"L10","v":"غير مطابق - تكبير مطلوب","f":"=IF(K10<=1.0, \"مطابق وآمن إنشائياً\", \"غير مطابق - تكبير مطلوب\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":7,"al":"center"},{"c":"B11","v":"CF2","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C11","v":"قاعدة جار مشتركة بشداد - عمود حد الجار"},{"c":"D11","v":2650,"in":true,"b":true,"al":"center"},{"c":"E11","v":2.4,"in":true,"al":"center"},{"c":"F11","v":4.2,"in":true,"al":"center"},{"c":"G11","v":10.08,"f":"=ROUND(E11*F11, 2)","al":"center"},{"c":"H11","v":262.9,"f":"=ROUND(D11/G11, 1)","b":true,"al":"center"},{"c":"I11","v":2.63,"f":"=ROUND(H11/100, 2)","al":"center"},{"c":"J11","v":145.3,"f":"='قدرة التحمل القصوى والمسموحة'!E29","al":"center"},{"c":"K11","v":1.81,"f":"=ROUND(H11/J11, 2)","bg":"#EFF6FF","b":true,"al":"center"},{"c":"L11","v":"غير مطابق - تكبير مطلوب","f":"=IF(K11<=1.0, \"مطابق وآمن إنشائياً\", \"غير مطابق - تكبير مطلوب\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":8,"al":"center"},{"c":"B12","v":"SF1","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C12","v":"قاعدة شريطية مستمرة - جدران القص والمصاعد"},{"c":"D12","v":3800,"in":true,"b":true,"al":"center"},{"c":"E12","v":2,"in":true,"al":"center"},{"c":"F12","v":7,"in":true,"al":"center"},{"c":"G12","v":14,"f":"=ROUND(E12*F12, 2)","al":"center"},{"c":"H12","v":271.4,"f":"=ROUND(D12/G12, 1)","b":true,"al":"center"},{"c":"I12","v":2.71,"f":"=ROUND(H12/100, 2)","al":"center"},{"c":"J12","v":145.3,"f":"='قدرة التحمل القصوى والمسموحة'!E29","al":"center"},{"c":"K12","v":1.87,"f":"=ROUND(H12/J12, 2)","bg":"#EFF6FF","b":true,"al":"center"},{"c":"L12","v":"غير مطابق - تكبير مطلوب","f":"=IF(K12<=1.0, \"مطابق وآمن إنشائياً\", \"غير مطابق - تكبير مطلوب\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":9,"al":"center"},{"c":"B13","v":"SF2","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C13","v":"قاعدة شريطية - سياج السند الخرساني للمنحدر"},{"c":"D13","v":1950,"in":true,"b":true,"al":"center"},{"c":"E13","v":1.6,"in":true,"al":"center"},{"c":"F13","v":5,"in":true,"al":"center"},{"c":"G13","v":8,"f":"=ROUND(E13*F13, 2)","al":"center"},{"c":"H13","v":243.8,"f":"=ROUND(D13/G13, 1)","b":true,"al":"center"},{"c":"I13","v":2.44,"f":"=ROUND(H13/100, 2)","al":"center"},{"c":"J13","v":145.3,"f":"='قدرة التحمل القصوى والمسموحة'!E29","al":"center"},{"c":"K13","v":1.68,"f":"=ROUND(H13/J13, 2)","bg":"#EFF6FF","b":true,"al":"center"},{"c":"L13","v":"غير مطابق - تكبير مطلوب","f":"=IF(K13<=1.0, \"مطابق وآمن إنشائياً\", \"غير مطابق - تكبير مطلوب\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":10,"al":"center"},{"c":"B14","v":"Mat-1","bg":"#DBEAFE","b":true,"al":"center"},{"c":"C14","v":"لبشة خرسانية جزئية - خزان المياه الأرضي والمضخات"},{"c":"D14","v":4800,"in":true,"b":true,"al":"center"},{"c":"E14","v":4.5,"in":true,"al":"center"},{"c":"F14","v":5.5,"in":true,"al":"center"},{"c":"G14","v":24.75,"f":"=ROUND(E14*F14, 2)","al":"center"},{"c":"H14","v":193.9,"f":"=ROUND(D14/G14, 1)","b":true,"al":"center"},{"c":"I14","v":1.94,"f":"=ROUND(H14/100, 2)","al":"center"},{"c":"J14","v":145.3,"f":"='قدرة التحمل القصوى والمسموحة'!E29","al":"center"},{"c":"K14","v":1.33,"f":"=ROUND(H14/J14, 2)","bg":"#EFF6FF","b":true,"al":"center"},{"c":"L14","v":"غير مطابق - تكبير مطلوب","f":"=IF(K14<=1.0, \"مطابق وآمن إنشائياً\", \"غير مطابق - تكبير مطلوب\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":15,"h":38.0,"cells":[{"c":"A15","v":"الإجمالي العام وإحصائيات الأساسات السطحية للمشروع:","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"D15","v":23200,"f":"=SUM(D5:D14)","bg":"#DBEAFE","b":true,"al":"center"},{"c":"E15","v":"-","al":"center"},{"c":"F15","v":"-","al":"center"},{"c":"G15","v":95.33,"f":"=ROUND(SUM(G5:G14), 2)","bg":"#DBEAFE","b":true,"al":"center"},{"c":"H15","v":243.4,"f":"=ROUND(D15/G15, 1)","b":true,"al":"center"},{"c":"I15","v":2.43,"f":"=ROUND(H15/100, 2)","b":true,"al":"center"},{"c":"J15","v":145.3,"f":"='قدرة التحمل القصوى والمسموحة'!E29","b":true,"al":"center"},{"c":"K15","v":1.87,"f":"=MAX(K5:K14)","bg":"#DCFCE7","b":true,"al":"center"},{"c":"L15","v":"يوجد نماذج بحاجة لتكبير","f":"=IF(K15<=1.0, \"كافة النماذج آمنة ومحققة\", \"يوجد نماذج بحاجة لتكبير\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":16,"h":28.0,"cells":[{"c":"A16","v":""},{"c":"B16","v":""},{"c":"C16","v":""},{"c":"D16","v":""},{"c":"E16","v":""},{"c":"F16","v":""},{"c":"G16","v":""},{"c":"H16","v":""},{"c":"I16","v":""},{"c":"J16","v":""},{"c":"K16","v":""},{"c":"L16","v":""}]},{"r":17,"h":28.0,"cells":[{"c":"A17","v":""},{"c":"B17","v":""},{"c":"C17","v":""},{"c":"D17","v":""},{"c":"E17","v":""},{"c":"F17","v":""},{"c":"G17","v":""},{"c":"H17","v":""},{"c":"I17","v":""},{"c":"J17","v":""},{"c":"K17","v":""},{"c":"L17","v":""}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"مهندس فحص التربة والأساسات (Geotechnical Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D18","v":"مهندس التصميم الإنشائي (Structural Engineer)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G18","v":"المهندس الاستشاري المشرف (Supervising Consultant)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J18","v":""},{"c":"K18","v":""},{"c":"L18","v":""}]},{"r":19,"h":76.0,"cells":[{"c":"A19","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true},{"c":"D19","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true},{"c":"G19","v":"الاسم والتوقيع:\nرقم الاعتماد المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true},{"c":"J19","v":""},{"c":"K19","v":""},{"c":"L19","v":""}]}]}]}