{"slug":"shear-wall-and-elevator-core-structural-design-and-boundary-element-sheet","sheets":[{"name":"لوحة المؤشرات والملخص التنفيذي","maxRow":26,"maxCol":14,"colWidths":[18.0,26.0,18.0,14.0,13.0,15.0,16.0,15.0,18.0,14.0,18.0,15.0,18.0,13.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"لوحة مؤشرات وملخص التصميم الإنشائي لحوائط القص وكور المصاعد والسلالم وتكثيف العناصر الطرفية","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"تحليل وتصميم مقاومة قوى الزلازل والرياح وحساب Boundary Elements وفق كود البناء السعودي SBC 304 و ACI 318-19 والمصري ECP 203 | شيت تشغيلي متكامل","bg":"#F1F5F9","fg":"#475569","al":"center","cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":13.9,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"إجمالي حوائط القص والكور","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"إجمالي مكعبات الخرسانة","bg":"#CCFBF1","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"إجمالي وزن حديد التسليح","bg":"#FEF3C7","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H4","v":"متوسط كثافة التسليح","bg":"#DCFCE7","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"J4","v":"أقصى نسبة استغلال للقص","bg":"#F3E8FF","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"L4","v":"حالة الأمان الإنشائي العامة","bg":"#DCFCE7","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":5,"h":46.0,"cells":[{"c":"A5","v":10,"f":"=COUNTA('تصميم حوائط القص المستقيمة'!A10:A17) + COUNTA('تصميم كور المصاعد والسلالم'!A10:A11)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\"","cs":2},{"skip":true},{"c":"C5","v":248.5,"f":"='حصر الكميات والتسعير وقائمة QC'!D6","bg":"#CCFBF1","b":true,"al":"center","nf":"#,##0.0;\\(#,##0.0\\);\"-\"","cs":2},{"skip":true},{"c":"E5","v":31.4,"f":"='حصر الكميات والتسعير وقائمة QC'!D7 + 'حصر الكميات والتسعير وقائمة QC'!D8","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.0;\\(#,##0.0\\);\"-\"","cs":3},{"skip":true},{"skip":true},{"c":"H5","v":126.4,"f":"=ROUND((E5*1000)/C5, 1)","bg":"#DCFCE7","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\"","cs":2},{"skip":true},{"c":"J5","v":"84.2%","bg":"#F3E8FF","b":true,"al":"center","cs":2},{"skip":true},{"c":"L5","v":"مطابق وآمن 100% ✅","bg":"#DCFCE7","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"عنصر إنشائي رأسي بالمشروع","bg":"#DBEAFE","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C6","v":"متر مكعب خرسانة مسلحة C35","bg":"#CCFBF1","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E6","v":"طن متري (أطراف + شبكات)","bg":"#FEF3C7","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H6","v":"كجم حديد / م³ خرسانة","bg":"#DCFCE7","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"J6","v":"الحائط الحرج SW-01 (الدور الأرضي)","bg":"#F3E8FF","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"L6","v":"SBC 304 / ACI 318-19 / ECP","bg":"#DCFCE7","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":7,"h":13.9,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""},{"c":"K7","v":""},{"c":"L7","v":""},{"c":"M7","v":""},{"c":"N7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"1. معايير التصميم الإنشائي العامة وأحمال الزلازل والرياح بالموقع (Structural Design Criteria & Lateral Loads)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"كود التصميم المعتمد:","fg":"#334155","b":true},{"c":"B9","v":"كود البناء السعودي SBC 304 / ACI 318-19","bg":"#F8FAFC","b":true,"al":"center","cs":2},{"skip":true},{"c":"D9","v":"مقاومة الخرسانة المميزة f'c (MPa):","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"F9","v":35,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0;\\(#,##0.0\\);\"-\"","cs":2},{"skip":true},{"c":"H9","v":"معامل تعديل الاستجابة الزلزالية R:","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"J9","v":6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":2},{"skip":true},{"c":"L9","v":"سرعة الرياح التصميمية V (m/s):","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"N9","v":42,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0;\\(#,##0.0\\);\"-\""}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"كود الأحمال الجانبية:","fg":"#334155","b":true},{"c":"B10","v":"SBC 301 / ASCE 7-16","bg":"#F8FAFC","b":true,"al":"center","cs":2},{"skip":true},{"c":"D10","v":"إجهاد خضوع حديد التسليح fy (MPa):","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"F10","v":420,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0;\\(#,##0.0\\);\"-\"","cs":2},{"skip":true},{"c":"H10","v":"معامل الأهمية الإنشائية Ie:","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"J10","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":2},{"skip":true},{"c":"L10","v":"ارتفاع المبنى الإجمالي Hw (m):","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"N10","v":36,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0;\\(#,##0.0\\);\"-\""}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"فئة التصميم الزلزالي SDC:","fg":"#334155","b":true},{"c":"B11","v":"Category D (عالي الزلزالية)","bg":"#F8FAFC","b":true,"al":"center","cs":2},{"skip":true},{"c":"D11","v":"إجهاد خضوع الكانات fyt (MPa):","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"F11","v":420,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0;\\(#,##0.0\\);\"-\"","cs":2},{"skip":true},{"c":"H11","v":"التسارع الطيفي للفترات القصيرة SDS (g):","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"J11","v":0.45,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":2},{"skip":true},{"c":"L11","v":"عدد الأدوار الإنشائية:","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"N11","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":"نوع الجملة الإنشائية المقاومة:","fg":"#334155","b":true},{"c":"B12","v":"حوائط قص خرسانية خاصة (Special Walls)","bg":"#F8FAFC","b":true,"al":"center","cs":2},{"skip":true},{"c":"D12","v":"الوزن الحجمي للخرسانة (kN/m³):","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"F12","v":25,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0;\\(#,##0.0\\);\"-\"","cs":2},{"skip":true},{"c":"H12","v":"التسارع الطيفي لفترة 1 ثانية SD1 (g):","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"J12","v":0.22,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\"","cs":2},{"skip":true},{"c":"L12","v":"مستوى مياه التأسيس (م):","fg":"#334155","b":true,"cs":2},{"skip":true},{"c":"N12","v":-2.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0;\\(#,##0.0\\);\"-\""}]},{"r":13,"h":13.9,"cells":[{"c":"A13","v":""},{"c":"B13","v":""},{"c":"C13","v":""},{"c":"D13","v":""},{"c":"E13","v":""},{"c":"F13","v":""},{"c":"G13","v":""},{"c":"H13","v":""},{"c":"I13","v":""},{"c":"J13","v":""},{"c":"K13","v":""},{"c":"L13","v":""},{"c":"M13","v":""},{"c":"N13","v":""}]},{"r":14,"h":38.0,"cells":[{"c":"A14","v":"2. جدول الملخص التنفيذي وتدقيق الأمان الإنشائي لحوائط القص وكور المصاعد والسلالم بالمشروع","bg":"#0F766E","fg":"#FFFFFF","b":true,"cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":15,"h":42.0,"cells":[{"c":"A15","v":"كود الحائط / الكور","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B15","v":"الموضع والمستوى الإنشائي","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C15","v":"نوع القطاع","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D15","v":"الطول Lw (م)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E15","v":"السمك tw (م)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F15","v":"الحمل Pu (kN)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G15","v":"العزم Mu (kN.m)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H15","v":"القص Vu (kN)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I15","v":"القص φVn (kN)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J15","v":"نسبة القص D/C","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K15","v":"الإجهاد الطرفي σ (MPa)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L15","v":"حد 0.2 f'c (MPa)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M15","v":"عنصر طرفي خاص؟","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N15","v":"حالة الأمان الإنشائي","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"SW-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B16","v":"القبو والأرضي (مبنى أ)","bg":"#F8FAFC"},{"c":"C16","v":"حائط مستقيم (Rectangular)","bg":"#F8FAFC","al":"center"},{"c":"D16","v":6,"f":"='تصميم حوائط القص المستقيمة'!B10/1000","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E16","v":0.35,"f":"='تصميم حوائط القص المستقيمة'!C10/1000","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F16","v":4850,"f":"='تصميم حوائط القص المستقيمة'!G10","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G16","v":14200,"f":"='تصميم حوائط القص المستقيمة'!H10","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H16","v":1850,"f":"='تصميم حوائط القص المستقيمة'!I10","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I16","v":4644.7,"f":"='تصميم حوائط القص المستقيمة'!N10","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J16","v":0.398,"f":"=ROUND(H16/I16, 3)","bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"K16","v":9.07,"f":"='تصميم حوائط القص المستقيمة'!T10","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L16","v":7,"f":"=ROUND(0.2*'تصميم حوائط القص المستقيمة'!E10, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M16","v":"يلزم تكثيف طرفي (SBE)","f":"=IF(K16>L16, \"يلزم تكثيف طرفي (SBE)\", \"تسليح اعتيادي (Ordinary)\")","bg":"#F8FAFC","fg":"#DC2626","b":true,"al":"center"},{"c":"N16","v":"مطابق وآمن 100% ✅","f":"=IF(J16<=1, \"مطابق وآمن 100% ✅\", \"غير محقق إجهاد القص ⚠️\")","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"SW-02","b":true,"al":"center"},{"c":"B17","v":"القبو والأرضي (مبنى ب)"},{"c":"C17","v":"حائط مستقيم (Rectangular)","al":"center"},{"c":"D17","v":5.5,"f":"='تصميم حوائط القص المستقيمة'!B11/1000","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E17","v":0.35,"f":"='تصميم حوائط القص المستقيمة'!C11/1000","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F17","v":4400,"f":"='تصميم حوائط القص المستقيمة'!G11","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G17","v":12800,"f":"='تصميم حوائط القص المستقيمة'!H11","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H17","v":1680,"f":"='تصميم حوائط القص المستقيمة'!I11","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I17","v":4257.6,"f":"='تصميم حوائط القص المستقيمة'!N11","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J17","v":0.395,"f":"=ROUND(H17/I17, 3)","al":"center","nf":"0.0%"},{"c":"K17","v":9.54,"f":"='تصميم حوائط القص المستقيمة'!T11","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L17","v":7,"f":"=ROUND(0.2*'تصميم حوائط القص المستقيمة'!E11, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M17","v":"يلزم تكثيف طرفي (SBE)","f":"=IF(K17>L17, \"يلزم تكثيف طرفي (SBE)\", \"تسليح اعتيادي (Ordinary)\")","fg":"#DC2626","b":true,"al":"center"},{"c":"N17","v":"مطابق وآمن 100% ✅","f":"=IF(J17<=1, \"مطابق وآمن 100% ✅\", \"غير محقق إجهاد القص ⚠️\")","fg":"#16A34A","b":true,"al":"center"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"SW-03","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B18","v":"الأدوار المتكررة 1-5","bg":"#F8FAFC"},{"c":"C18","v":"حائط مستقيم (Rectangular)","bg":"#F8FAFC","al":"center"},{"c":"D18","v":5,"f":"='تصميم حوائط القص المستقيمة'!B12/1000","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E18","v":0.3,"f":"='تصميم حوائط القص المستقيمة'!C12/1000","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F18","v":3600,"f":"='تصميم حوائط القص المستقيمة'!G12","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G18","v":9800,"f":"='تصميم حوائط القص المستقيمة'!H12","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H18","v":1350,"f":"='تصميم حوائط القص المستقيمة'!I12","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I18","v":3317.6,"f":"='تصميم حوائط القص المستقيمة'!N12","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J18","v":0.407,"f":"=ROUND(H18/I18, 3)","bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"K18","v":10.24,"f":"='تصميم حوائط القص المستقيمة'!T12","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L18","v":7,"f":"=ROUND(0.2*'تصميم حوائط القص المستقيمة'!E12, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M18","v":"يلزم تكثيف طرفي (SBE)","f":"=IF(K18>L18, \"يلزم تكثيف طرفي (SBE)\", \"تسليح اعتيادي (Ordinary)\")","bg":"#F8FAFC","fg":"#DC2626","b":true,"al":"center"},{"c":"N18","v":"مطابق وآمن 100% ✅","f":"=IF(J18<=1, \"مطابق وآمن 100% ✅\", \"غير محقق إجهاد القص ⚠️\")","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":"SW-04","b":true,"al":"center"},{"c":"B19","v":"الأدوار المتكررة 1-5"},{"c":"C19","v":"حائط مستقيم (Rectangular)","al":"center"},{"c":"D19","v":4.5,"f":"='تصميم حوائط القص المستقيمة'!B13/1000","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E19","v":0.3,"f":"='تصميم حوائط القص المستقيمة'!C13/1000","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F19","v":3200,"f":"='تصميم حوائط القص المستقيمة'!G13","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G19","v":8400,"f":"='تصميم حوائط القص المستقيمة'!H13","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H19","v":1180,"f":"='تصميم حوائط القص المستقيمة'!I13","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I19","v":2985.9,"f":"='تصميم حوائط القص المستقيمة'!N13","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J19","v":0.395,"f":"=ROUND(H19/I19, 3)","al":"center","nf":"0.0%"},{"c":"K19","v":10.67,"f":"='تصميم حوائط القص المستقيمة'!T13","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L19","v":7,"f":"=ROUND(0.2*'تصميم حوائط القص المستقيمة'!E13, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M19","v":"يلزم تكثيف طرفي (SBE)","f":"=IF(K19>L19, \"يلزم تكثيف طرفي (SBE)\", \"تسليح اعتيادي (Ordinary)\")","fg":"#DC2626","b":true,"al":"center"},{"c":"N19","v":"مطابق وآمن 100% ✅","f":"=IF(J19<=1, \"مطابق وآمن 100% ✅\", \"غير محقق إجهاد القص ⚠️\")","fg":"#16A34A","b":true,"al":"center"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":"SW-05","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B20","v":"الأدوار المتكررة 6-12","bg":"#F8FAFC"},{"c":"C20","v":"حائط مستقيم (Rectangular)","bg":"#F8FAFC","al":"center"},{"c":"D20","v":4,"f":"='تصميم حوائط القص المستقيمة'!B14/1000","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E20","v":0.25,"f":"='تصميم حوائط القص المستقيمة'!C14/1000","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F20","v":2400,"f":"='تصميم حوائط القص المستقيمة'!G14","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G20","v":5600,"f":"='تصميم حوائط القص المستقيمة'!H14","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H20","v":890,"f":"='تصميم حوائط القص المستقيمة'!I14","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I20","v":2211.8,"f":"='تصميم حوائط القص المستقيمة'!N14","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J20","v":0.402,"f":"=ROUND(H20/I20, 3)","bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"K20","v":10.8,"f":"='تصميم حوائط القص المستقيمة'!T14","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L20","v":7,"f":"=ROUND(0.2*'تصميم حوائط القص المستقيمة'!E14, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M20","v":"يلزم تكثيف طرفي (SBE)","f":"=IF(K20>L20, \"يلزم تكثيف طرفي (SBE)\", \"تسليح اعتيادي (Ordinary)\")","bg":"#F8FAFC","fg":"#DC2626","b":true,"al":"center"},{"c":"N20","v":"مطابق وآمن 100% ✅","f":"=IF(J20<=1, \"مطابق وآمن 100% ✅\", \"غير محقق إجهاد القص ⚠️\")","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":"SW-06","b":true,"al":"center"},{"c":"B21","v":"الأدوار المتكررة 6-12"},{"c":"C21","v":"حائط مستقيم (Rectangular)","al":"center"},{"c":"D21","v":3.5,"f":"='تصميم حوائط القص المستقيمة'!B15/1000","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E21","v":0.25,"f":"='تصميم حوائط القص المستقيمة'!C15/1000","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F21","v":1950,"f":"='تصميم حوائط القص المستقيمة'!G15","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G21","v":4200,"f":"='تصميم حوائط القص المستقيمة'!H15","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H21","v":720,"f":"='تصميم حوائط القص المستقيمة'!I15","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I21","v":1935.3,"f":"='تصميم حوائط القص المستقيمة'!N15","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J21","v":0.372,"f":"=ROUND(H21/I21, 3)","al":"center","nf":"0.0%"},{"c":"K21","v":10.46,"f":"='تصميم حوائط القص المستقيمة'!T15","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L21","v":7,"f":"=ROUND(0.2*'تصميم حوائط القص المستقيمة'!E15, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M21","v":"يلزم تكثيف طرفي (SBE)","f":"=IF(K21>L21, \"يلزم تكثيف طرفي (SBE)\", \"تسليح اعتيادي (Ordinary)\")","fg":"#DC2626","b":true,"al":"center"},{"c":"N21","v":"مطابق وآمن 100% ✅","f":"=IF(J21<=1, \"مطابق وآمن 100% ✅\", \"غير محقق إجهاد القص ⚠️\")","fg":"#16A34A","b":true,"al":"center"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"SW-07","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B22","v":"حائط الواجهة المحيطي (كامل)","bg":"#F8FAFC"},{"c":"C22","v":"حائط طرفي مستقيم","bg":"#F8FAFC","al":"center"},{"c":"D22","v":7.2,"f":"='تصميم حوائط القص المستقيمة'!B16/1000","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E22","v":0.35,"f":"='تصميم حوائط القص المستقيمة'!C16/1000","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F22","v":5600,"f":"='تصميم حوائط القص المستقيمة'!G16","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G22","v":18500,"f":"='تصميم حوائط القص المستقيمة'!H16","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H22","v":2200,"f":"='تصميم حوائط القص المستقيمة'!I16","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I22","v":5573.6,"f":"='تصميم حوائط القص المستقيمة'!N16","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J22","v":0.395,"f":"=ROUND(H22/I22, 3)","bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"K22","v":8.34,"f":"='تصميم حوائط القص المستقيمة'!T16","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L22","v":7,"f":"=ROUND(0.2*'تصميم حوائط القص المستقيمة'!E16, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M22","v":"يلزم تكثيف طرفي (SBE)","f":"=IF(K22>L22, \"يلزم تكثيف طرفي (SBE)\", \"تسليح اعتيادي (Ordinary)\")","bg":"#F8FAFC","fg":"#DC2626","b":true,"al":"center"},{"c":"N22","v":"مطابق وآمن 100% ✅","f":"=IF(J22<=1, \"مطابق وآمن 100% ✅\", \"غير محقق إجهاد القص ⚠️\")","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"SW-08","b":true,"al":"center"},{"c":"B23","v":"حائط الواجهة المحيطي (كامل)"},{"c":"C23","v":"حائط طرفي مستقيم","al":"center"},{"c":"D23","v":6.8,"f":"='تصميم حوائط القص المستقيمة'!B17/1000","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E23","v":0.35,"f":"='تصميم حوائط القص المستقيمة'!C17/1000","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F23","v":5200,"f":"='تصميم حوائط القص المستقيمة'!G17","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G23","v":16800,"f":"='تصميم حوائط القص المستقيمة'!H17","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H23","v":2050,"f":"='تصميم حوائط القص المستقيمة'!I17","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I23","v":5264,"f":"='تصميم حوائط القص المستقيمة'!N17","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J23","v":0.389,"f":"=ROUND(H23/I23, 3)","al":"center","nf":"0.0%"},{"c":"K23","v":8.41,"f":"='تصميم حوائط القص المستقيمة'!T17","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L23","v":7,"f":"=ROUND(0.2*'تصميم حوائط القص المستقيمة'!E17, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M23","v":"يلزم تكثيف طرفي (SBE)","f":"=IF(K23>L23, \"يلزم تكثيف طرفي (SBE)\", \"تسليح اعتيادي (Ordinary)\")","fg":"#DC2626","b":true,"al":"center"},{"c":"N23","v":"مطابق وآمن 100% ✅","f":"=IF(J23<=1, \"مطابق وآمن 100% ✅\", \"غير محقق إجهاد القص ⚠️\")","fg":"#16A34A","b":true,"al":"center"}]},{"r":24,"h":52.0,"cells":[{"c":"A24","v":"CORE-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B24","v":"كور المصاعد المزدوج (القبو للأخير)","bg":"#F8FAFC"},{"c":"C24","v":"كور C-Shape مع عتب ربط","bg":"#F8FAFC","al":"center"},{"c":"D24","v":4.2,"f":"='تصميم كور المصاعد والسلالم'!B10/1000","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E24","v":0.3,"f":"='تصميم كور المصاعد والسلالم'!D10/1000","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F24","v":8500,"f":"='تصميم كور المصاعد والسلالم'!G10","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G24","v":26500,"f":"=MAX('تصميم كور المصاعد والسلالم'!H10, 'تصميم كور المصاعد والسلالم'!I10)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H24","v":3200,"f":"=MAX('تصميم كور المصاعد والسلالم'!J10, 'تصميم كور المصاعد والسلالم'!K10)","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I24","v":3850,"f":"='تصميم كور المصاعد والسلالم'!O10","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J24","v":0.831,"f":"=ROUND(H24/I24, 3)","bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"K24","v":17.94,"f":"='تصميم كور المصاعد والسلالم'!S10","bg":"#F8FAFC","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L24","v":7,"f":"=ROUND(0.2*'تصميم كور المصاعد والسلالم'!E10, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M24","v":"يلزم تكثيف طرفي (SBE)","f":"=IF(K24>L24, \"يلزم تكثيف طرفي (SBE)\", \"تسليح اعتيادي (Ordinary)\")","bg":"#F8FAFC","fg":"#DC2626","b":true,"al":"center"},{"c":"N24","v":"مطابق وآمن 100% ✅","f":"=IF(J24<=1, \"مطابق وآمن 100% ✅\", \"غير محقق إجهاد القص ⚠️\")","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"}]},{"r":25,"h":52.0,"cells":[{"c":"A25","v":"CORE-02","b":true,"al":"center"},{"c":"B25","v":"كور السلالم والمصعد (القبو للأخير)"},{"c":"C25","v":"كور صلب مغلق Box Core","al":"center"},{"c":"D25","v":5,"f":"='تصميم كور المصاعد والسلالم'!B11/1000","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E25","v":0.3,"f":"='تصميم كور المصاعد والسلالم'!D11/1000","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F25","v":9800,"f":"='تصميم كور المصاعد والسلالم'!G11","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G25","v":32000,"f":"=MAX('تصميم كور المصاعد والسلالم'!H11, 'تصميم كور المصاعد والسلالم'!I11)","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H25","v":3800,"f":"=MAX('تصميم كور المصاعد والسلالم'!J11, 'تصميم كور المصاعد والسلالم'!K11)","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I25","v":4950,"f":"='تصميم كور المصاعد والسلالم'!O11","fg":"#008000","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J25","v":0.768,"f":"=ROUND(H25/I25, 3)","al":"center","nf":"0.0%"},{"c":"K25","v":15.19,"f":"='تصميم كور المصاعد والسلالم'!S11","fg":"#008000","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L25","v":7,"f":"=ROUND(0.2*'تصميم كور المصاعد والسلالم'!E11, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"M25","v":"يلزم تكثيف طرفي (SBE)","f":"=IF(K25>L25, \"يلزم تكثيف طرفي (SBE)\", \"تسليح اعتيادي (Ordinary)\")","fg":"#DC2626","b":true,"al":"center"},{"c":"N25","v":"مطابق وآمن 100% ✅","f":"=IF(J25<=1, \"مطابق وآمن 100% ✅\", \"غير محقق إجهاد القص ⚠️\")","fg":"#16A34A","b":true,"al":"center"}]},{"r":26,"h":40.0,"cells":[{"c":"A26","v":"المجموع والمتوسطات التصميمية:","bg":"#E2E8F0","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D26","v":5.17,"f":"=ROUND(AVERAGE(D16:D25), 2)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"E26","v":0.31,"f":"=ROUND(AVERAGE(E16:E25), 2)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F26","v":49500,"f":"=SUM(F16:F25)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G26","v":148800,"f":"=SUM(G16:G25)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H26","v":18920,"f":"=SUM(H16:H25)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I26","v":38990.5,"f":"=SUM(I16:I25)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J26","v":0.831,"f":"=MAX(J16:J25)","bg":"#E2E8F0","b":true,"al":"center","nf":"0.0%"},{"c":"K26","v":11.07,"f":"=ROUND(AVERAGE(K16:K25), 2)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"L26","v":"-","bg":"#E2E8F0","b":true,"al":"center"},{"c":"M26","v":"-","bg":"#E2E8F0","b":true,"al":"center"},{"c":"N26","v":"معتمد ومحقق","bg":"#E2E8F0","b":true,"al":"center"}]}]},{"name":"تصميم حوائط القص المستقيمة","maxRow":18,"maxCol":23,"colWidths":[14.0,15.0,13.0,16.0,13.0,13.0,15.0,16.0,15.0,13.0,16.0,13.0,18.0,20.0,15.0,20.0,13.0,18.0,13.0,13.0,20.0,18.0,22.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"الحسابات التفصيلية وتصميم حوائط القص المستقيمة وتكثيف العناصر الطرفية Boundary Elements","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":23},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"تحليل قوى القص في المستوى (In-plane Shear)، العزوم، فحص الإجهادات الطرفية، وتصميم كانات الحبس وأقطار التسليح وفق SBC 304 و ACI 318-19","bg":"#F1F5F9","fg":"#475569","al":"center","cs":23},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":13.9,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""},{"c":"O3","v":""},{"c":"P3","v":""},{"c":"Q3","v":""},{"c":"R3","v":""},{"c":"S3","v":""},{"c":"T3","v":""},{"c":"U3","v":""},{"c":"V3","v":""},{"c":"W3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"1. مدخلات الأبعاد الهندسية والقوى التصميمية والتحقق من مقاومة القص (Shear Strength Design)","bg":"#2563EB","fg":"#FFFFFF","b":true,"cs":23},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"كود الحائط","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"الطول Lw (mm)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"السمك tw (mm)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"الارتفاع Hw (mm)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"f'c (MPa)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"fy (MPa)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"Pu (kN)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"Mu (kN.m)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"Vu (kN)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J5","v":"نسبة Hw/Lw","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K5","v":"معامل الخرسانة αc","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L5","v":"مساحة Acv (mm²)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M5","v":"قص الخرسانة Vc (kN)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N5","v":"المقاومة التصميمية φVn (kN)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"O5","v":"نسبة القص Vu/φVn","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"P5","v":"عزم القصور Ig (mm⁴)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"Q5","v":"معامل المقاومة S (mm³)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"R5","v":"إجهاد الضغط σp (MPa)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"S5","v":"إجهاد الانحناء σm (MPa)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"T5","v":"أقصى إجهاد σmax (MPa)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"U5","v":"طول العنصر الطرفي lbe (mm)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"V5","v":"تسليح الطرف Asb (mm²)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"W5","v":"كانات الحبس والخطوة s (mm)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":28.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":""},{"c":"C6","v":""},{"c":"D6","v":""},{"c":"E6","v":""},{"c":"F6","v":""},{"c":"G6","v":""},{"c":"H6","v":""},{"c":"I6","v":""},{"c":"J6","v":""},{"c":"K6","v":""},{"c":"L6","v":""},{"c":"M6","v":""},{"c":"N6","v":""},{"c":"O6","v":""},{"c":"P6","v":""},{"c":"Q6","v":""},{"c":"R6","v":""},{"c":"S6","v":""},{"c":"T6","v":""},{"c":"U6","v":""},{"c":"V6","v":""},{"c":"W6","v":""}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""},{"c":"K7","v":""},{"c":"L7","v":""},{"c":"M7","v":""},{"c":"N7","v":""},{"c":"O7","v":""},{"c":"P7","v":""},{"c":"Q7","v":""},{"c":"R7","v":""},{"c":"S7","v":""},{"c":"T7","v":""},{"c":"U7","v":""},{"c":"V7","v":""},{"c":"W7","v":""}]},{"r":8,"h":28.0,"cells":[{"c":"A8","v":""},{"c":"B8","v":""},{"c":"C8","v":""},{"c":"D8","v":""},{"c":"E8","v":""},{"c":"F8","v":""},{"c":"G8","v":""},{"c":"H8","v":""},{"c":"I8","v":""},{"c":"J8","v":""},{"c":"K8","v":""},{"c":"L8","v":""},{"c":"M8","v":""},{"c":"N8","v":""},{"c":"O8","v":""},{"c":"P8","v":""},{"c":"Q8","v":""},{"c":"R8","v":""},{"c":"S8","v":""},{"c":"T8","v":""},{"c":"U8","v":""},{"c":"V8","v":""},{"c":"W8","v":""}]},{"r":9,"h":28.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":""},{"c":"C9","v":""},{"c":"D9","v":""},{"c":"E9","v":""},{"c":"F9","v":""},{"c":"G9","v":""},{"c":"H9","v":""},{"c":"I9","v":""},{"c":"J9","v":""},{"c":"K9","v":""},{"c":"L9","v":""},{"c":"M9","v":""},{"c":"N9","v":""},{"c":"O9","v":""},{"c":"P9","v":""},{"c":"Q9","v":""},{"c":"R9","v":""},{"c":"S9","v":""},{"c":"T9","v":""},{"c":"U9","v":""},{"c":"V9","v":""},{"c":"W9","v":""}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":"SW-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":6000,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"C10","v":350,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D10","v":3200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E10","v":35,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0;\\(#,##0.0\\);\"-\""},{"c":"F10","v":420,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G10","v":4850,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H10","v":14200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I10","v":1850,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J10","v":0.53,"f":"=ROUND(D10/B10, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K10","v":0.25,"f":"=ROUND(IF(J10<=1.5, 0.25, IF(J10>=2, 0.17, 0.25 - ((J10-1.5)/0.5)*(0.25-0.17))), 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L10","v":2100000,"f":"=B10*C10","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"M10","v":3105.9,"f":"=ROUND(K10*SQRT(E10)*L10/1000, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"N10","v":4644.7,"f":"=ROUND(0.75*(M10 + (L10*0.0035*F10/1000)), 1)","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"O10","v":0.398,"f":"=ROUND(I10/N10, 3)","bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"P10","v":6300000000000,"f":"=ROUND(C10*(B10^3)/12, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00E+00"},{"c":"Q10","v":2100000000,"f":"=ROUND(C10*(B10^2)/6, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00E+00"},{"c":"R10","v":2.31,"f":"=ROUND((G10*1000)/L10, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"S10","v":6.76,"f":"=ROUND((H10*1000000)/Q10, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"T10","v":9.07,"f":"=ROUND(R10+S10, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"U10","v":900,"f":"=ROUND(MAX(0.15*B10, 500), -1)","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"V10","v":4725,"f":"=ROUND(0.015*C10*U10, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"W10","v":0,"f":"=CONCATENATE(\"Φ10 @ \", IF(C10>=350, \"100\", \"120\"), \" mm + كانات حابسة\")","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":"SW-02","b":true,"al":"center"},{"c":"B11","v":5500,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"C11","v":350,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D11","v":3200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E11","v":35,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0;\\(#,##0.0\\);\"-\""},{"c":"F11","v":420,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G11","v":4400,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H11","v":12800,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I11","v":1680,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J11","v":0.58,"f":"=ROUND(D11/B11, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K11","v":0.25,"f":"=ROUND(IF(J11<=1.5, 0.25, IF(J11>=2, 0.17, 0.25 - ((J11-1.5)/0.5)*(0.25-0.17))), 3)","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L11","v":1925000,"f":"=B11*C11","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"M11","v":2847.1,"f":"=ROUND(K11*SQRT(E11)*L11/1000, 1)","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"N11","v":4257.6,"f":"=ROUND(0.75*(M11 + (L11*0.0035*F11/1000)), 1)","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"O11","v":0.395,"f":"=ROUND(I11/N11, 3)","al":"center","nf":"0.0%"},{"c":"P11","v":4852604166667,"f":"=ROUND(C11*(B11^3)/12, 0)","al":"center","nf":"#,##0.00E+00"},{"c":"Q11","v":1764583333,"f":"=ROUND(C11*(B11^2)/6, 0)","al":"center","nf":"#,##0.00E+00"},{"c":"R11","v":2.29,"f":"=ROUND((G11*1000)/L11, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"S11","v":7.25,"f":"=ROUND((H11*1000000)/Q11, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"T11","v":9.54,"f":"=ROUND(R11+S11, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"U11","v":825,"f":"=ROUND(MAX(0.15*B11, 500), -1)","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"V11","v":4331,"f":"=ROUND(0.015*C11*U11, 0)","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"W11","v":0,"f":"=CONCATENATE(\"Φ10 @ \", IF(C11>=350, \"100\", \"120\"), \" mm + كانات حابسة\")","b":true,"al":"center"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":"SW-03","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B12","v":5000,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"C12","v":300,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D12","v":3000,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E12","v":35,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0;\\(#,##0.0\\);\"-\""},{"c":"F12","v":420,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G12","v":3600,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H12","v":9800,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I12","v":1350,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J12","v":0.6,"f":"=ROUND(D12/B12, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K12","v":0.25,"f":"=ROUND(IF(J12<=1.5, 0.25, IF(J12>=2, 0.17, 0.25 - ((J12-1.5)/0.5)*(0.25-0.17))), 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L12","v":1500000,"f":"=B12*C12","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"M12","v":2218.5,"f":"=ROUND(K12*SQRT(E12)*L12/1000, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"N12","v":3317.6,"f":"=ROUND(0.75*(M12 + (L12*0.0035*F12/1000)), 1)","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"O12","v":0.407,"f":"=ROUND(I12/N12, 3)","bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"P12","v":3125000000000,"f":"=ROUND(C12*(B12^3)/12, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00E+00"},{"c":"Q12","v":1250000000,"f":"=ROUND(C12*(B12^2)/6, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00E+00"},{"c":"R12","v":2.4,"f":"=ROUND((G12*1000)/L12, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"S12","v":7.84,"f":"=ROUND((H12*1000000)/Q12, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"T12","v":10.24,"f":"=ROUND(R12+S12, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"U12","v":750,"f":"=ROUND(MAX(0.15*B12, 500), -1)","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"V12","v":3375,"f":"=ROUND(0.015*C12*U12, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"W12","v":0,"f":"=CONCATENATE(\"Φ10 @ \", IF(C12>=350, \"100\", \"120\"), \" mm + كانات حابسة\")","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":"SW-04","b":true,"al":"center"},{"c":"B13","v":4500,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"C13","v":300,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D13","v":3000,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E13","v":35,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0;\\(#,##0.0\\);\"-\""},{"c":"F13","v":420,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G13","v":3200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H13","v":8400,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I13","v":1180,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J13","v":0.67,"f":"=ROUND(D13/B13, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K13","v":0.25,"f":"=ROUND(IF(J13<=1.5, 0.25, IF(J13>=2, 0.17, 0.25 - ((J13-1.5)/0.5)*(0.25-0.17))), 3)","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L13","v":1350000,"f":"=B13*C13","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"M13","v":1996.7,"f":"=ROUND(K13*SQRT(E13)*L13/1000, 1)","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"N13","v":2985.9,"f":"=ROUND(0.75*(M13 + (L13*0.0035*F13/1000)), 1)","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"O13","v":0.395,"f":"=ROUND(I13/N13, 3)","al":"center","nf":"0.0%"},{"c":"P13","v":2278125000000,"f":"=ROUND(C13*(B13^3)/12, 0)","al":"center","nf":"#,##0.00E+00"},{"c":"Q13","v":1012500000,"f":"=ROUND(C13*(B13^2)/6, 0)","al":"center","nf":"#,##0.00E+00"},{"c":"R13","v":2.37,"f":"=ROUND((G13*1000)/L13, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"S13","v":8.3,"f":"=ROUND((H13*1000000)/Q13, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"T13","v":10.67,"f":"=ROUND(R13+S13, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"U13","v":675,"f":"=ROUND(MAX(0.15*B13, 500), -1)","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"V13","v":3038,"f":"=ROUND(0.015*C13*U13, 0)","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"W13","v":0,"f":"=CONCATENATE(\"Φ10 @ \", IF(C13>=350, \"100\", \"120\"), \" mm + كانات حابسة\")","b":true,"al":"center"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":"SW-05","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":4000,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"C14","v":250,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D14","v":3000,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E14","v":35,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0;\\(#,##0.0\\);\"-\""},{"c":"F14","v":420,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G14","v":2400,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H14","v":5600,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I14","v":890,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J14","v":0.75,"f":"=ROUND(D14/B14, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K14","v":0.25,"f":"=ROUND(IF(J14<=1.5, 0.25, IF(J14>=2, 0.17, 0.25 - ((J14-1.5)/0.5)*(0.25-0.17))), 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L14","v":1000000,"f":"=B14*C14","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"M14","v":1479,"f":"=ROUND(K14*SQRT(E14)*L14/1000, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"N14","v":2211.8,"f":"=ROUND(0.75*(M14 + (L14*0.0035*F14/1000)), 1)","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"O14","v":0.402,"f":"=ROUND(I14/N14, 3)","bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"P14","v":1333333333333,"f":"=ROUND(C14*(B14^3)/12, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00E+00"},{"c":"Q14","v":666666667,"f":"=ROUND(C14*(B14^2)/6, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00E+00"},{"c":"R14","v":2.4,"f":"=ROUND((G14*1000)/L14, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"S14","v":8.4,"f":"=ROUND((H14*1000000)/Q14, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"T14","v":10.8,"f":"=ROUND(R14+S14, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"U14","v":600,"f":"=ROUND(MAX(0.15*B14, 500), -1)","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"V14","v":2250,"f":"=ROUND(0.015*C14*U14, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"W14","v":0,"f":"=CONCATENATE(\"Φ10 @ \", IF(C14>=350, \"100\", \"120\"), \" mm + كانات حابسة\")","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":"SW-06","b":true,"al":"center"},{"c":"B15","v":3500,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"C15","v":250,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D15","v":3000,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E15","v":35,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0;\\(#,##0.0\\);\"-\""},{"c":"F15","v":420,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G15","v":1950,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H15","v":4200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I15","v":720,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J15","v":0.86,"f":"=ROUND(D15/B15, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K15","v":0.25,"f":"=ROUND(IF(J15<=1.5, 0.25, IF(J15>=2, 0.17, 0.25 - ((J15-1.5)/0.5)*(0.25-0.17))), 3)","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L15","v":875000,"f":"=B15*C15","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"M15","v":1294.1,"f":"=ROUND(K15*SQRT(E15)*L15/1000, 1)","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"N15","v":1935.3,"f":"=ROUND(0.75*(M15 + (L15*0.0035*F15/1000)), 1)","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"O15","v":0.372,"f":"=ROUND(I15/N15, 3)","al":"center","nf":"0.0%"},{"c":"P15","v":893229166667,"f":"=ROUND(C15*(B15^3)/12, 0)","al":"center","nf":"#,##0.00E+00"},{"c":"Q15","v":510416667,"f":"=ROUND(C15*(B15^2)/6, 0)","al":"center","nf":"#,##0.00E+00"},{"c":"R15","v":2.23,"f":"=ROUND((G15*1000)/L15, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"S15","v":8.23,"f":"=ROUND((H15*1000000)/Q15, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"T15","v":10.46,"f":"=ROUND(R15+S15, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"U15","v":525,"f":"=ROUND(MAX(0.15*B15, 500), -1)","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"V15","v":1969,"f":"=ROUND(0.015*C15*U15, 0)","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"W15","v":0,"f":"=CONCATENATE(\"Φ10 @ \", IF(C15>=350, \"100\", \"120\"), \" mm + كانات حابسة\")","b":true,"al":"center"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":"SW-07","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B16","v":7200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"C16","v":350,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D16","v":3200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E16","v":35,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0;\\(#,##0.0\\);\"-\""},{"c":"F16","v":420,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G16","v":5600,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H16","v":18500,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I16","v":2200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J16","v":0.44,"f":"=ROUND(D16/B16, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K16","v":0.25,"f":"=ROUND(IF(J16<=1.5, 0.25, IF(J16>=2, 0.17, 0.25 - ((J16-1.5)/0.5)*(0.25-0.17))), 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L16","v":2520000,"f":"=B16*C16","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"M16","v":3727.1,"f":"=ROUND(K16*SQRT(E16)*L16/1000, 1)","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"N16","v":5573.6,"f":"=ROUND(0.75*(M16 + (L16*0.0035*F16/1000)), 1)","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"O16","v":0.395,"f":"=ROUND(I16/N16, 3)","bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"P16","v":10886400000000,"f":"=ROUND(C16*(B16^3)/12, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00E+00"},{"c":"Q16","v":3024000000,"f":"=ROUND(C16*(B16^2)/6, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0.00E+00"},{"c":"R16","v":2.22,"f":"=ROUND((G16*1000)/L16, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"S16","v":6.12,"f":"=ROUND((H16*1000000)/Q16, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"T16","v":8.34,"f":"=ROUND(R16+S16, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"U16","v":1080,"f":"=ROUND(MAX(0.15*B16, 500), -1)","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"V16","v":5670,"f":"=ROUND(0.015*C16*U16, 0)","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"W16","v":0,"f":"=CONCATENATE(\"Φ10 @ \", IF(C16>=350, \"100\", \"120\"), \" mm + كانات حابسة\")","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":"SW-08","b":true,"al":"center"},{"c":"B17","v":6800,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"C17","v":350,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D17","v":3200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E17","v":35,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0;\\(#,##0.0\\);\"-\""},{"c":"F17","v":420,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G17","v":5200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H17","v":16800,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I17","v":2050,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J17","v":0.47,"f":"=ROUND(D17/B17, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"K17","v":0.25,"f":"=ROUND(IF(J17<=1.5, 0.25, IF(J17>=2, 0.17, 0.25 - ((J17-1.5)/0.5)*(0.25-0.17))), 3)","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"L17","v":2380000,"f":"=B17*C17","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"M17","v":3520.1,"f":"=ROUND(K17*SQRT(E17)*L17/1000, 1)","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"N17","v":5264,"f":"=ROUND(0.75*(M17 + (L17*0.0035*F17/1000)), 1)","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"O17","v":0.389,"f":"=ROUND(I17/N17, 3)","al":"center","nf":"0.0%"},{"c":"P17","v":9170933333333,"f":"=ROUND(C17*(B17^3)/12, 0)","al":"center","nf":"#,##0.00E+00"},{"c":"Q17","v":2697333333,"f":"=ROUND(C17*(B17^2)/6, 0)","al":"center","nf":"#,##0.00E+00"},{"c":"R17","v":2.18,"f":"=ROUND((G17*1000)/L17, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"S17","v":6.23,"f":"=ROUND((H17*1000000)/Q17, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"T17","v":8.41,"f":"=ROUND(R17+S17, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"U17","v":1020,"f":"=ROUND(MAX(0.15*B17, 500), -1)","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"V17","v":5355,"f":"=ROUND(0.015*C17*U17, 0)","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"W17","v":0,"f":"=CONCATENATE(\"Φ10 @ \", IF(C17>=350, \"100\", \"120\"), \" mm + كانات حابسة\")","b":true,"al":"center"}]},{"r":18,"h":40.0,"cells":[{"c":"A18","v":"المجموع والمتوسطات لحوائط القص المستقيمة:","bg":"#E2E8F0","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G18","v":31200,"f":"=SUM(G10:G17)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H18","v":90300,"f":"=SUM(H10:H17)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I18","v":11920,"f":"=SUM(I10:I17)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J18","v":"-","bg":"#E2E8F0","b":true,"al":"center"},{"c":"K18","v":"-","bg":"#E2E8F0","b":true,"al":"center"},{"c":"L18","v":"-","bg":"#E2E8F0","b":true,"al":"center"},{"c":"M18","v":"-","bg":"#E2E8F0","b":true,"al":"center"},{"c":"N18","v":30190.5,"f":"=SUM(N10:N17)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"O18","v":0.407,"f":"=MAX(O10:O17)","bg":"#E2E8F0","b":true,"al":"center","nf":"0.0%"},{"c":"P18","v":"-","bg":"#E2E8F0","b":true,"al":"center"},{"c":"Q18","v":"-","bg":"#E2E8F0","b":true,"al":"center"},{"c":"R18","v":"-","bg":"#E2E8F0","b":true,"al":"center"},{"c":"S18","v":"-","bg":"#E2E8F0","b":true,"al":"center"},{"c":"T18","v":"-","bg":"#E2E8F0","b":true,"al":"center"},{"c":"U18","v":"-","bg":"#E2E8F0","b":true,"al":"center"},{"c":"V18","v":"-","bg":"#E2E8F0","b":true,"al":"center"},{"c":"W18","v":"-","bg":"#E2E8F0","b":true,"al":"center"}]}]},{"name":"تصميم كور المصاعد والسلالم","maxRow":11,"maxCol":23,"colWidths":[14.0,16.0,13.0,15.0,14.0,13.0,15.0,16.0,13.0,15.0,13.0,18.0,20.0,13.0,13.0,15.0,18.0,13.0,13.0,20.0,18.0,20.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"التصميم الإنشائي المتكامل لكور المصاعد والسلالم (Elevator & Stair Core Walls)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":23},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"تحليل العزوم ثنائية المحور (Biaxial Moments)، اللي، عتبات الربط المائلة (Coupling Beams)، وتكثيف زوايا الكور وفق كود SBC 304 و ACI 318-19","bg":"#F1F5F9","fg":"#475569","al":"center","cs":23},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":13.9,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""},{"c":"O3","v":""},{"c":"P3","v":""},{"c":"Q3","v":""},{"c":"R3","v":""},{"c":"S3","v":""},{"c":"T3","v":""},{"c":"U3","v":""},{"c":"V3","v":""},{"c":"W3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"1. هندسة قطاعات الكور ثلاثية الأبعاد والأحمال التصميمية المركبة (Core Geometry & 3D Loading)","bg":"#0F766E","fg":"#FFFFFF","b":true,"cs":23},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"كود الكور","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"طول المحور X (mm)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"طول المحور Y (mm)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"السمك tw (mm)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"f'c (MPa)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"fy (MPa)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"Pu (kN)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"Mux (kN.m)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"Muy (kN.m)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J5","v":"Vux (kN)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K5","v":"Vuy (kN)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L5","v":"مساحة المقطع Ag (mm²)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M5","v":"عزم القصور Ix (mm⁴)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N5","v":"عزم القصور Iy (mm⁴)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"O5","v":"المقاومة التصميمية φVn (kN)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"P5","v":"نسبة القص Vu/φVn","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"Q5","v":"إجهاد الضغط σp (MPa)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"R5","v":"إجهاد عزم Mux (MPa)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"S5","v":"أقصى إجهاد مركب σmax (MPa)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"T5","v":"أبعاد عتب الربط Ln×h (mm)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"U5","v":"قص عتب الربط Vu,cb (kN)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"V5","v":"تسليح العتب المائل Avd (mm²)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"W5","v":"تسليح زوايا الكور وتكثيف الكانات","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":28.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":""},{"c":"C6","v":""},{"c":"D6","v":""},{"c":"E6","v":""},{"c":"F6","v":""},{"c":"G6","v":""},{"c":"H6","v":""},{"c":"I6","v":""},{"c":"J6","v":""},{"c":"K6","v":""},{"c":"L6","v":""},{"c":"M6","v":""},{"c":"N6","v":""},{"c":"O6","v":""},{"c":"P6","v":""},{"c":"Q6","v":""},{"c":"R6","v":""},{"c":"S6","v":""},{"c":"T6","v":""},{"c":"U6","v":""},{"c":"V6","v":""},{"c":"W6","v":""}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""},{"c":"K7","v":""},{"c":"L7","v":""},{"c":"M7","v":""},{"c":"N7","v":""},{"c":"O7","v":""},{"c":"P7","v":""},{"c":"Q7","v":""},{"c":"R7","v":""},{"c":"S7","v":""},{"c":"T7","v":""},{"c":"U7","v":""},{"c":"V7","v":""},{"c":"W7","v":""}]},{"r":8,"h":28.0,"cells":[{"c":"A8","v":""},{"c":"B8","v":""},{"c":"C8","v":""},{"c":"D8","v":""},{"c":"E8","v":""},{"c":"F8","v":""},{"c":"G8","v":""},{"c":"H8","v":""},{"c":"I8","v":""},{"c":"J8","v":""},{"c":"K8","v":""},{"c":"L8","v":""},{"c":"M8","v":""},{"c":"N8","v":""},{"c":"O8","v":""},{"c":"P8","v":""},{"c":"Q8","v":""},{"c":"R8","v":""},{"c":"S8","v":""},{"c":"T8","v":""},{"c":"U8","v":""},{"c":"V8","v":""},{"c":"W8","v":""}]},{"r":9,"h":28.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":""},{"c":"C9","v":""},{"c":"D9","v":""},{"c":"E9","v":""},{"c":"F9","v":""},{"c":"G9","v":""},{"c":"H9","v":""},{"c":"I9","v":""},{"c":"J9","v":""},{"c":"K9","v":""},{"c":"L9","v":""},{"c":"M9","v":""},{"c":"N9","v":""},{"c":"O9","v":""},{"c":"P9","v":""},{"c":"Q9","v":""},{"c":"R9","v":""},{"c":"S9","v":""},{"c":"T9","v":""},{"c":"U9","v":""},{"c":"V9","v":""},{"c":"W9","v":""}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":"CORE-01","b":true,"al":"center"},{"c":"B10","v":4200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"C10","v":2400,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D10","v":300,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E10","v":35,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0;\\(#,##0.0\\);\"-\""},{"c":"F10","v":420,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G10","v":8500,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H10","v":26500,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I10","v":14800,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J10","v":3200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K10","v":2100,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"L10","v":2700000,"in":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"M10","v":2150000000000,"in":true,"al":"center","nf":"#,##0.00E+00"},{"c":"N10","v":1450000000000,"in":true,"al":"center","nf":"#,##0.00E+00"},{"c":"O10","v":3850,"in":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"P10","v":0.831,"f":"=ROUND(MAX(J10, K10)/O10, 3)","al":"center","nf":"0.0%"},{"c":"Q10","v":3.15,"f":"=ROUND((G10*1000)/L10, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R10","v":14.79,"f":"=ROUND((H10*1000000*(C10/2))/M10, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"S10","v":17.94,"f":"=ROUND(Q10+R10, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"T10","v":"1800 × 800 mm","al":"center"},{"c":"U10","v":650,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"V10","v":1842,"f":"=ROUND((U10*1000)/(2*F10*0.42), 0)","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"W10","v":"8Φ20 زوايا + كانات Φ10@100 مم","b":true,"al":"center"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"CORE-02","b":true,"al":"center"},{"c":"B11","v":5000,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"C11","v":3000,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D11","v":300,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"E11","v":35,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0;\\(#,##0.0\\);\"-\""},{"c":"F11","v":420,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G11","v":9800,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H11","v":32000,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"I11","v":18500,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J11","v":3800,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K11","v":2600,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"L11","v":3600000,"in":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"M11","v":3850000000000,"in":true,"al":"center","nf":"#,##0.00E+00"},{"c":"N11","v":2650000000000,"in":true,"al":"center","nf":"#,##0.00E+00"},{"c":"O11","v":4950,"in":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"P11","v":0.768,"f":"=ROUND(MAX(J11, K11)/O11, 3)","al":"center","nf":"0.0%"},{"c":"Q11","v":2.72,"f":"=ROUND((G11*1000)/L11, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"R11","v":12.47,"f":"=ROUND((H11*1000000*(C11/2))/M11, 2)","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"S11","v":15.19,"f":"=ROUND(Q11+R11, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"T11","v":"2000 × 900 mm","al":"center"},{"c":"U11","v":780,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"V11","v":2211,"f":"=ROUND((U11*1000)/(2*F11*0.42), 0)","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"W11","v":"12Φ20 زوايا + كانات Φ10@100 مم","b":true,"al":"center"}]}]},{"name":"تفريد حديد التسليح BBS","maxRow":27,"maxCol":13,"colWidths":[14.0,28.0,14.0,15.0,14.0,13.0,13.0,15.0,13.0,14.0,13.0,15.0,18.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول تفريد حديد التسليح (BBS) ومخطط التقطيع لحوائط القص وكور المصاعد والسلالم","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"حساب أطوال الأسياخ، أشكال التشكيل وفق BS 8666 / SBC 304، كانات العناصر الطرفية بزاويـة 135°، وأوزان الحديد بالأقطار والطن المتري","bg":"#F1F5F9","fg":"#475569","al":"center","cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":13.9,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"جدول تفريد وتقطيع أسياخ حوائط القص وكور المصاعد (Bar Schedule & Cutting Lengths)","bg":"#B45309","fg":"#FFFFFF","b":true,"cs":13},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":42.0,"cells":[{"c":"A5","v":"رقم السيخ (Mark)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"العنصر والموضع الإنشائي","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"القطر Φ (mm)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"كود الشكل (Shape)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"البعد A (mm)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"البعد B (mm)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"البعد C (mm)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"طول السيخ L (m)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I5","v":"عدد العناصر","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J5","v":"العدد بالعنصر","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K5","v":"إجمالي العدد","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L5","v":"وزن المتر (kg/m)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M5","v":"إجمالي الوزن (kg)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":1,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B6","v":"أشاير حائط SW-01 بالقواعد (Dowels)","bg":"#F8FAFC"},{"c":"C6","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D6","v":"11 (L-Bar)","bg":"#F8FAFC","al":"center"},{"c":"E6","v":600,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F6","v":1800,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G6","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H6","v":2.4,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I6","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J6","v":28,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K6","v":56,"f":"=I6*J6","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"L6","v":2.469,"f":"=ROUND((C6^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"M6","v":331.8,"f":"=ROUND(H6*K6*L6, 1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":2,"b":true,"al":"center"},{"c":"B7","v":"رأسي عناصر طرفية SW-01 (Boundary Verticals)"},{"c":"C7","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D7","v":"00 (Straight)","al":"center"},{"c":"E7","v":4200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F7","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G7","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H7","v":4.2,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I7","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J7","v":28,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K7","v":56,"f":"=I7*J7","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"L7","v":2.469,"f":"=ROUND((C7^2)/162, 3)","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"M7","v":580.7,"f":"=ROUND(H7*K7*L7, 1)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":3,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B8","v":"كانات تكثيف أطراف SW-01 بـ 135° (Ties)","bg":"#F8FAFC"},{"c":"C8","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D8","v":"51 (Rectangular)","bg":"#F8FAFC","al":"center"},{"c":"E8","v":450,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F8","v":250,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G8","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H8","v":1.55,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I8","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J8","v":64,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K8","v":128,"f":"=I8*J8","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"L8","v":0.617,"f":"=ROUND((C8^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"M8","v":122.4,"f":"=ROUND(H8*K8*L8, 1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":4,"b":true,"al":"center"},{"c":"B9","v":"كانات ربط داخلية ماسكة SW-01 (Cross-ties)"},{"c":"C9","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D9","v":"77 (J-Hook)","al":"center"},{"c":"E9","v":350,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F9","v":100,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G9","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H9","v":0.55,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I9","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J9","v":64,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K9","v":128,"f":"=I9*J9","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"L9","v":0.617,"f":"=ROUND((C9^2)/162, 3)","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"M9","v":43.4,"f":"=ROUND(H9*K9*L9, 1)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":5,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":"شبكة رأسية وسطية SW-01 (Web Verticals)","bg":"#F8FAFC"},{"c":"C10","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D10","v":"00 (Straight)","bg":"#F8FAFC","al":"center"},{"c":"E10","v":4200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F10","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G10","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H10","v":4.2,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I10","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J10","v":48,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K10","v":96,"f":"=I10*J10","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"L10","v":0.889,"f":"=ROUND((C10^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"M10","v":358.4,"f":"=ROUND(H10*K10*L10, 1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":6,"b":true,"al":"center"},{"c":"B11","v":"شبكة أفقية مزدوجة SW-01 (Web Horizontals)"},{"c":"C11","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D11","v":"21 (U-Bar)","al":"center"},{"c":"E11","v":6200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F11","v":250,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G11","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H11","v":6.7,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I11","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J11","v":38,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K11","v":76,"f":"=I11*J11","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"L11","v":0.889,"f":"=ROUND((C11^2)/162, 3)","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"M11","v":452.7,"f":"=ROUND(H11*K11*L11, 1)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":7,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B12","v":"أشاير حائط SW-02 بالقواعد (Dowels)","bg":"#F8FAFC"},{"c":"C12","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D12","v":"11 (L-Bar)","bg":"#F8FAFC","al":"center"},{"c":"E12","v":600,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F12","v":1800,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G12","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H12","v":2.4,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I12","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J12","v":24,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K12","v":48,"f":"=I12*J12","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"L12","v":2.469,"f":"=ROUND((C12^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"M12","v":284.4,"f":"=ROUND(H12*K12*L12, 1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":8,"b":true,"al":"center"},{"c":"B13","v":"رأسي عناصر طرفية SW-02 (Boundary Verticals)"},{"c":"C13","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D13","v":"00 (Straight)","al":"center"},{"c":"E13","v":4200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F13","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G13","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H13","v":4.2,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I13","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J13","v":24,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K13","v":48,"f":"=I13*J13","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"L13","v":2.469,"f":"=ROUND((C13^2)/162, 3)","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"M13","v":497.8,"f":"=ROUND(H13*K13*L13, 1)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":9,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":"كانات تكثيف أطراف SW-02 بـ 135° (Ties)","bg":"#F8FAFC"},{"c":"C14","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D14","v":"51 (Rectangular)","bg":"#F8FAFC","al":"center"},{"c":"E14","v":450,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F14","v":250,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G14","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H14","v":1.55,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I14","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J14","v":60,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K14","v":120,"f":"=I14*J14","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"L14","v":0.617,"f":"=ROUND((C14^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"M14","v":114.8,"f":"=ROUND(H14*K14*L14, 1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":10,"b":true,"al":"center"},{"c":"B15","v":"شبكة رأسية وسطية SW-02 (Web Verticals)"},{"c":"C15","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D15","v":"00 (Straight)","al":"center"},{"c":"E15","v":4200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F15","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G15","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H15","v":4.2,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I15","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J15","v":44,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K15","v":88,"f":"=I15*J15","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"L15","v":0.889,"f":"=ROUND((C15^2)/162, 3)","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"M15","v":328.6,"f":"=ROUND(H15*K15*L15, 1)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":11,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B16","v":"شبكة أفقية مزدوجة SW-02 (Web Horizontals)","bg":"#F8FAFC"},{"c":"C16","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D16","v":"21 (U-Bar)","bg":"#F8FAFC","al":"center"},{"c":"E16","v":5700,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F16","v":250,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G16","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H16","v":6.2,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I16","v":2,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J16","v":38,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K16","v":76,"f":"=I16*J16","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"L16","v":0.889,"f":"=ROUND((C16^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"M16","v":418.9,"f":"=ROUND(H16*K16*L16, 1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":12,"b":true,"al":"center"},{"c":"B17","v":"رأسي زوايا وأجنحة CORE-01 (Core Verticals)"},{"c":"C17","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D17","v":"00 (Straight)","al":"center"},{"c":"E17","v":4200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F17","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G17","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H17","v":4.2,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I17","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J17","v":48,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K17","v":48,"f":"=I17*J17","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"L17","v":2.469,"f":"=ROUND((C17^2)/162, 3)","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"M17","v":497.8,"f":"=ROUND(H17*K17*L17, 1)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":13,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B18","v":"كانات حبس زوايا CORE-01 (Corner Ties)","bg":"#F8FAFC"},{"c":"C18","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D18","v":"51 (Rectangular)","bg":"#F8FAFC","al":"center"},{"c":"E18","v":400,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F18","v":200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G18","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H18","v":1.35,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I18","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J18","v":96,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K18","v":96,"f":"=I18*J18","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"L18","v":0.617,"f":"=ROUND((C18^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"M18","v":80,"f":"=ROUND(H18*K18*L18, 1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":14,"b":true,"al":"center"},{"c":"B19","v":"شبكة أفقية ورأسية CORE-01 (Web Rebar)"},{"c":"C19","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D19","v":"21 (U-Bar)","al":"center"},{"c":"E19","v":4400,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F19","v":200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G19","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H19","v":4.8,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I19","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J19","v":84,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K19","v":84,"f":"=I19*J19","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"L19","v":0.889,"f":"=ROUND((C19^2)/162, 3)","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"M19","v":358.4,"f":"=ROUND(H19*K19*L19, 1)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":15,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B20","v":"أسياخ عتب الربط المائلة CORE-01 (Diagonals)","bg":"#F8FAFC"},{"c":"C20","v":25,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D20","v":"00 (Straight)","bg":"#F8FAFC","al":"center"},{"c":"E20","v":2800,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F20","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G20","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H20","v":2.8,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I20","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J20","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K20","v":16,"f":"=I20*J20","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"L20","v":3.858,"f":"=ROUND((C20^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"M20","v":172.8,"f":"=ROUND(H20*K20*L20, 1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":16,"b":true,"al":"center"},{"c":"B21","v":"كانات تطويق عتب الربط CORE-01 (Coupling Ties)"},{"c":"C21","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D21","v":"51 (Rectangular)","al":"center"},{"c":"E21","v":700,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F21","v":200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G21","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H21","v":1.95,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I21","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J21","v":32,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K21","v":32,"f":"=I21*J21","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"L21","v":0.617,"f":"=ROUND((C21^2)/162, 3)","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"M21","v":38.5,"f":"=ROUND(H21*K21*L21, 1)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":22,"h":52.0,"cells":[{"c":"A22","v":17,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B22","v":"رأسي زوايا CORE-02 السلالم (Box Verticals)","bg":"#F8FAFC"},{"c":"C22","v":20,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D22","v":"00 (Straight)","bg":"#F8FAFC","al":"center"},{"c":"E22","v":4200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F22","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G22","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H22","v":4.2,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I22","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J22","v":56,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K22","v":56,"f":"=I22*J22","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"L22","v":2.469,"f":"=ROUND((C22^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"M22","v":580.7,"f":"=ROUND(H22*K22*L22, 1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":23,"h":52.0,"cells":[{"c":"A23","v":18,"b":true,"al":"center"},{"c":"B23","v":"كانات حبس وتكثيف CORE-02 (Box Ties)"},{"c":"C23","v":10,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D23","v":"51 (Rectangular)","al":"center"},{"c":"E23","v":400,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F23","v":200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G23","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H23","v":1.35,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I23","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J23","v":112,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K23","v":112,"f":"=I23*J23","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"L23","v":0.617,"f":"=ROUND((C23^2)/162, 3)","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"M23","v":93.3,"f":"=ROUND(H23*K23*L23, 1)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":24,"h":52.0,"cells":[{"c":"A24","v":19,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B24","v":"شبكة أفقية ورأسية CORE-02 (Web Rebar)","bg":"#F8FAFC"},{"c":"C24","v":12,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D24","v":"21 (U-Bar)","bg":"#F8FAFC","al":"center"},{"c":"E24","v":5200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F24","v":200,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G24","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H24","v":5.6,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I24","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J24","v":92,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K24","v":92,"f":"=I24*J24","bg":"#F8FAFC","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"L24","v":0.889,"f":"=ROUND((C24^2)/162, 3)","bg":"#F8FAFC","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"M24","v":458,"f":"=ROUND(H24*K24*L24, 1)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":25,"h":52.0,"cells":[{"c":"A25","v":20,"b":true,"al":"center"},{"c":"B25","v":"أسياخ عتب الربط CORE-02 (Coupling Diagonals)"},{"c":"C25","v":25,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"D25","v":"00 (Straight)","al":"center"},{"c":"E25","v":3000,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"F25","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"G25","v":0,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"H25","v":3,"in":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"I25","v":1,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"J25","v":16,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"K25","v":16,"f":"=I25*J25","al":"center","nf":"#,##0;\\(#,##0\\);\"-\""},{"c":"L25","v":3.858,"f":"=ROUND((C25^2)/162, 3)","al":"center","nf":"#,##0.000;\\(#,##0.000\\);\"-\""},{"c":"M25","v":185.2,"f":"=ROUND(H25*K25*L25, 1)","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":26,"h":40.0,"cells":[{"c":"A26","v":"إجمالي وزن حديد التسليح لحوائط القص والكور (كجم):","bg":"#E2E8F0","b":true,"al":"center","cs":12},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"M26","v":5998.6,"f":"=SUM(M6:M25)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0;\\(#,##0\\);\"-\""}]},{"r":27,"h":44.0,"cells":[{"c":"A27","v":"إجمالي وزن حديد التسليح الكلي (طن متري Metric Ton):","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":12},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"M27","v":6,"f":"=ROUND(M26/1000, 2)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""}]}]},{"name":"حصر الكميات والتسعير وقائمة QC","maxRow":35,"maxCol":7,"colWidths":[14.0,58.0,14.0,15.0,16.0,18.0,36.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"مقايسة التكاليف وحصر الكميات وقائمة الفحص واستلام الجودة (QC Checklist)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"حصر الخرسانة والحديد والشدات، تسعير الأعمال الإنشائية مع ضريبة القيمة المضافة 15%، وقائمة تدقيق موقعية شاملة من 15 بنداً وفق SBC / ACI","bg":"#F1F5F9","fg":"#475569","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":13.9,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"1. جدول الكميات ومقايسة التكلفة التقديرية لأعمال حوائط القص وكور المصاعد والسلالم","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":42.0,"cells":[{"c":"A5","v":"بند","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"بيان الأعمال والمواصفات الفنية","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"الوحدة","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"الكمية","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"الفئة (ر.س)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"الإجمالي (ر.س)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"ملاحظات واشتراطات التنفيذ","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":72.0,"cells":[{"c":"A6","v":1,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B6","v":"توريد وصب خرسانة مسلحة سابقة الخلط C35 مقاومة للأملاح والكبريتات لحوائط القص وكور المصاعد والسلالم شاملة الضخ والدمك الميكانيكي والهزازات ومعالجة أسطح فواصل الصب","bg":"#F8FAFC"},{"c":"C6","v":"م³","bg":"#F8FAFC","al":"center"},{"c":"D6","v":248.5,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0;\\(#,##0.0\\);\"-\""},{"c":"E6","v":275,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F6","v":68337.5,"f":"=ROUND(D6*E6, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G6","v":"صب على مراحل بارتفاع لا يتجاوز 1.5 م للطبقة لمنع الانفصال الحبيبي","bg":"#F8FAFC","fg":"#475569"}]},{"r":7,"h":72.0,"cells":[{"c":"A7","v":2,"b":true,"al":"center"},{"c":"B7","v":"توريد وتشكيل وتركيب حديد تسليح عالي المقاومة Gr 420 مشوه للأقطار Φ16 - Φ25 للعناصر الطرفية وزوايا الكور وأوتار عتبات الربط شاملة السلك والكراسي والتكثيف"},{"c":"C7","v":"طن","al":"center"},{"c":"D7","v":18.6,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0;\\(#,##0.0\\);\"-\""},{"c":"E7","v":3050,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F7","v":56730,"f":"=ROUND(D7*E7, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G7","v":"مطابق لكود SBC 304 مع كانات مغلقة بزاوية 135° وتكثيف لا يتجاوز 100 مم","fg":"#475569"}]},{"r":8,"h":72.0,"cells":[{"c":"A8","v":3,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B8","v":"توريد وتشكيل وتركيب حديد تسليح عالي المقاومة Gr 420 مشوه للأقطار Φ10 - Φ14 للشبكات الأفقية والرأسية المزدوجة لحوائط القص وكانات الحبس والكانات الداخلية","bg":"#F8FAFC"},{"c":"C8","v":"طن","bg":"#F8FAFC","al":"center"},{"c":"D8","v":12.8,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0;\\(#,##0.0\\);\"-\""},{"c":"E8","v":3150,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F8","v":40320,"f":"=ROUND(D8*E8, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G8","v":"طبقتان تسليح مع مثبتات تباعد (U-Caps) ومباعدات خرسانية لتحقيق غطاء 40 مم","bg":"#F8FAFC","fg":"#475569"}]},{"r":9,"h":72.0,"cells":[{"c":"A9","v":4,"b":true,"al":"center"},{"c":"B9","v":"توريد وتركيب شدات معدنية وخشبية متطورة (Steel/Plywood Formwork) لحوائط القص والكور شاملة الزراجين الإنشائية المحمية (Tie Rods) والمحاذاة الشاقولية والتدعيم"},{"c":"C9","v":"م²","al":"center"},{"c":"D9","v":1450,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0;\\(#,##0.0\\);\"-\""},{"c":"E9","v":78,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F9","v":113100,"f":"=ROUND(D9*E9, 2)","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G9","v":"أقصى انحراف مسموح في الشاقولية 6 مم لكل دور و 12 مم لكامل المبنى","fg":"#475569"}]},{"r":10,"h":72.0,"cells":[{"c":"A10","v":5,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":"توريد وتركيب شرائح مانع تسرب المياه المنتفخة (Hydrophilic Waterstop) ومعالجة فواصل الصب الرأسية والأفقية لحوائط القبو الملامسة للتربة بدهان إيبوكسي رابط","bg":"#F8FAFC"},{"c":"C10","v":"م.ط","bg":"#F8FAFC","al":"center"},{"c":"D10","v":165,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.0;\\(#,##0.0\\);\"-\""},{"c":"E10","v":48,"in":true,"bg":"#FEF9C3","fg":"#0000FF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"F10","v":7920,"f":"=ROUND(D10*E10, 2)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G10","v":"تثبيت محكم بمسامير صلب قبل صب المرحلة التالية مع تنظيف الخرسانة بضغط الهواء","bg":"#F8FAFC","fg":"#475569"}]},{"r":11,"h":40.0,"cells":[{"c":"A11","v":"إجمالي التكلفة المباشرة للأعمال (Direct Cost):","bg":"#E2E8F0","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F11","v":286407.5,"f":"=SUM(F6:F10)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G11","v":"شامل المواد والعمالة والمعدات","al":"center"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":"المصاريف غير المباشرة وهامش الربح للمقاول (15% Overheads & Profit):","bg":"#F8FAFC","fg":"#334155","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F12","v":42961.12,"f":"=ROUND(F11*0.15, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G12","v":"إدارة المشروع والإشراف والتأمين","al":"center"}]},{"r":13,"h":38.0,"cells":[{"c":"A13","v":"المجموع الإجمالي الخاضع للضريبة (Subtotal before VAT):","bg":"#E2E8F0","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F13","v":329368.62,"f":"=ROUND(F11+F12, 2)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G13","v":"القيمة التعاقدية قبل الضريبة","al":"center"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":"ضريبة القيمة المضافة (15% VAT):","bg":"#F8FAFC","fg":"#334155","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F14","v":49405.29,"f":"=ROUND(F13*0.15, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G14","v":"وفق نظام هيئة الزكاة والضريبة والجمارك ZATCA","al":"center"}]},{"r":15,"h":46.0,"cells":[{"c":"A15","v":"الإجمالي العام النهائي شاملاً ضريبة القيمة المضافة (Grand Total with VAT):","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F15","v":378773.91,"f":"=ROUND(F13+F14, 2)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00;\\(#,##0.00\\);\"-\""},{"c":"G15","v":"ريال سعودي SAR شامل الضريبة","al":"center"}]},{"r":16,"h":13.9,"cells":[{"c":"A16","v":""},{"c":"B16","v":""},{"c":"C16","v":""},{"c":"D16","v":""},{"c":"E16","v":""},{"c":"F16","v":""},{"c":"G16","v":""}]},{"r":17,"h":128.0,"cells":[{"c":"A17","v":"إعداد مهندس الحسابات والمكتب الفني:\nالاسم: م. ............................\nالتوقيع: .............................\nالتاريخ:     /    / 2026 م","bg":"#F1F5F9","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"C17","v":"مراجعة المهندس الإنشائي المصمم:\nالاسم: م. ............................\nالتوقيع: .............................\nالتاريخ:     /    / 2026 م","bg":"#F1F5F9","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true},{"c":"E17","v":"اعتماد المهندس الاستشاري المشرف:\nالاسم: م. ............................\nالختم الرسمي: ......................\nالتاريخ:     /    / 2026 م","bg":"#F1F5F9","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":18,"h":13.9,"cells":[{"c":"A18","v":""},{"c":"B18","v":""},{"c":"C18","v":""},{"c":"D18","v":""},{"c":"E18","v":""},{"c":"F18","v":""},{"c":"G18","v":""}]},{"r":19,"h":38.0,"cells":[{"c":"A19","v":"2. قائمة الفحص الموقعي واستلام جودة أعمال حوائط القص وكور المصاعد (Site QC Checklist)","bg":"#0F766E","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":"م","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B20","v":"بند الفحص والاستلام الهندسي الموقعي","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C20","v":"المرجع بالكود الهندسي","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D20","v":"معيار القبول والتحقق الهندسي","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E20","v":"طريقة الفحص","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F20","v":"حالة المطابقة","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G20","v":"ملاحظات الاستشاري المشرف","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":21,"h":72.0,"cells":[{"c":"A21","v":1,"b":true,"al":"center"},{"c":"B21","v":"مطابقة محاور حائط القص وكور المصاعد مع الخنزيرة ونقاط الـ Total Station المساحية المعتمدة"},{"c":"C21","v":"SBC 304 §26.4","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D21","v":"انحراف لا يتجاوز ±5 مم عن الإحداثيات"},{"c":"E21","v":"مساحة بجهاز Total Station","al":"center"},{"c":"F21","v":"مطابق ✅","fg":"#16A34A","b":true,"al":"center"},{"c":"G21","v":"تم الفحص والاعتماد بدون ملاحظات","fg":"#64748B"}]},{"r":22,"h":72.0,"cells":[{"c":"A22","v":2,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B22","v":"التحقق من نظافة كعب الحائط وإزالة الخبث (Laitance) وخشونة سطح فاصل الصب الرأسي بمعدل 6 مم","bg":"#F8FAFC"},{"c":"C22","v":"ACI 318 §26.5.6","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D22","v":"خشونة واضحة مع إزالة الزبد الضعيف","bg":"#F8FAFC"},{"c":"E22","v":"معاينة بصرية ولمس","bg":"#F8FAFC","al":"center"},{"c":"F22","v":"مطابق ✅","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"},{"c":"G22","v":"تم الفحص والاعتماد بدون ملاحظات","bg":"#F8FAFC","fg":"#64748B"}]},{"r":23,"h":72.0,"cells":[{"c":"A23","v":3,"b":true,"al":"center"},{"c":"B23","v":"تثبيت شرائح ووترستوب (Waterstop) لحوائط البدرومات والخزانات المحيطية ومنع ثقبها بأسلاك الربط"},{"c":"C23","v":"SBC 304 / ACI 350","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D23","v":"استمرارية كاملة ولحام حراري معتمد"},{"c":"E23","v":"فحص مادي قبل التقفيل","al":"center"},{"c":"F23","v":"مطابق ✅","fg":"#16A34A","b":true,"al":"center"},{"c":"G23","v":"تم الفحص والاعتماد بدون ملاحظات","fg":"#64748B"}]},{"r":24,"h":72.0,"cells":[{"c":"A24","v":4,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B24","v":"مطابقة أقطار وأعداد أسياخ التسليح الرأسي للعناصر الطرفية (Boundary Elements) مع المخطط المعتمد","bg":"#F8FAFC"},{"c":"C24","v":"SBC 304 §18.10.6","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D24","v":"مطابقة تامة لعدد وأقطار الأسياخ (Φ20)","bg":"#F8FAFC"},{"c":"E24","v":"عد بالعين والقياس بالقدمة","bg":"#F8FAFC","al":"center"},{"c":"F24","v":"مطابق ✅","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"},{"c":"G24","v":"تم الفحص والاعتماد بدون ملاحظات","bg":"#F8FAFC","fg":"#64748B"}]},{"r":25,"h":72.0,"cells":[{"c":"A25","v":5,"b":true,"al":"center"},{"c":"B25","v":"التحقق من زاوية قفل كانات العناصر الطرفية (135°) مع امتداد لا يقل عن 6 أقطار السيخ (أو 75 مم)"},{"c":"C25","v":"ACI 318 §25.7.2","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D25","v":"خطاف زلزالي 135° متبادل في الأركان"},{"c":"E25","v":"قياس بالزاوية والقدمة","al":"center"},{"c":"F25","v":"مطابق ✅","fg":"#16A34A","b":true,"al":"center"},{"c":"G25","v":"تم الفحص والاعتماد بدون ملاحظات","fg":"#64748B"}]},{"r":26,"h":52.0,"cells":[{"c":"A26","v":6,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B26","v":"التحقق من الخطوة الرأسية لكانات الحبس في منطقة العناصر الطرفية وتكثيفها (لا تتجاوز 100 مم)","bg":"#F8FAFC"},{"c":"C26","v":"SBC 304 §18.10.6.4","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D26","v":"s ≤ min(b/3, 6db, 100 mm)","bg":"#F8FAFC"},{"c":"E26","v":"قياس بشريط القياس","bg":"#F8FAFC","al":"center"},{"c":"F26","v":"مطابق ✅","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"},{"c":"G26","v":"تم الفحص والاعتماد بدون ملاحظات","bg":"#F8FAFC","fg":"#64748B"}]},{"r":27,"h":52.0,"cells":[{"c":"A27","v":7,"b":true,"al":"center"},{"c":"B27","v":"فحص طول وصلات التراكب (Lap Splices) للأسياخ الرأسية مع تبادل الوصلات staggered بما لا يقل عن Class B"},{"c":"C27","v":"SBC 304 §25.5.2","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D27","v":"L_lap ≥ 1.3 L_d مع إزاحة 600 مم"},{"c":"E27","v":"قياس بشريط القياس","al":"center"},{"c":"F27","v":"مطابق ✅","fg":"#16A34A","b":true,"al":"center"},{"c":"G27","v":"تم الفحص والاعتماد بدون ملاحظات","fg":"#64748B"}]},{"r":28,"h":52.0,"cells":[{"c":"A28","v":8,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B28","v":"فحص كانات الربط المتبادلة الداخلية (Cross-Ties) وتثبيتها بالأسياخ الرأسية بزوايا 135° و 90° متناوبة","bg":"#F8FAFC"},{"c":"C28","v":"ACI 318 §18.10.6.4","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D28","v":"قفل محكم مع احتضان السيخ الرأسي","bg":"#F8FAFC"},{"c":"E28","v":"معاينة ميكانيكية باليد","bg":"#F8FAFC","al":"center"},{"c":"F28","v":"مطابق ✅","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"},{"c":"G28","v":"تم الفحص والاعتماد بدون ملاحظات","bg":"#F8FAFC","fg":"#64748B"}]},{"r":29,"h":52.0,"cells":[{"c":"A29","v":9,"b":true,"al":"center"},{"c":"B29","v":"التحقق من تسليح عتبات الربط المائلة (Coupling Beams) وتطويق مجموعات الأسياخ بكانات حابسة حلزونية"},{"c":"C29","v":"SBC 304 §18.10.7","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D29","v":"زاوية ميلان ومطابقة أقطار Φ25"},{"c":"E29","v":"فحص هندسي للقفص المائل","al":"center"},{"c":"F29","v":"مطابق ✅","fg":"#16A34A","b":true,"al":"center"},{"c":"G29","v":"تم الفحص والاعتماد بدون ملاحظات","fg":"#64748B"}]},{"r":30,"h":72.0,"cells":[{"c":"A30","v":10,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B30","v":"التحقق من الغطاء الخرساني الصافي (Concrete Cover) بواسطة بسكويت خرساني أو بلاستيكي ثقيل","bg":"#F8FAFC"},{"c":"C30","v":"SBC 304 §20.6.1","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D30","v":"40 مم للقواعد والبدروم و 25 مم للأدوار","bg":"#F8FAFC"},{"c":"E30","v":"قدمة ورنية ومقياس بسكويت","bg":"#F8FAFC","al":"center"},{"c":"F30","v":"مطابق ✅","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"},{"c":"G30","v":"تم الفحص والاعتماد بدون ملاحظات","bg":"#F8FAFC","fg":"#64748B"}]},{"r":31,"h":52.0,"cells":[{"c":"A31","v":11,"b":true,"al":"center"},{"c":"B31","v":"فحص استقامة وشاقولية الشدات المعدنية والخشبية لحوائط الكور والتأكد من عدم وجود ميول (Plumbness)"},{"c":"C31","v":"ACI 117 / SBC 304","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D31","v":"انحراف لا يتجاوز 6 مم لكل 3 أمتار ارتفاع"},{"c":"E31","v":"ميزان خيط أو ليزر مساحي","al":"center"},{"c":"F31","v":"مطابق ✅","fg":"#16A34A","b":true,"al":"center"},{"c":"G31","v":"تم الفحص والاعتماد بدون ملاحظات","fg":"#64748B"}]},{"r":32,"h":72.0,"cells":[{"c":"A32","v":12,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B32","v":"التحقق من جودة وقوة أقفال الزراجين الإنشائية (Tie Rods) واستخدام مواسير PVC مع سدادات مانعة للمياه","bg":"#F8FAFC"},{"c":"C32","v":"ACI 347R","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D32","v":"توزيع منتظم وتحمل ضغط الخرسانة السائلة","bg":"#F8FAFC"},{"c":"E32","v":"مراجعة ميكانيكية للزراجين","bg":"#F8FAFC","al":"center"},{"c":"F32","v":"مطابق ✅","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"},{"c":"G32","v":"تم الفحص والاعتماد بدون ملاحظات","bg":"#F8FAFC","fg":"#64748B"}]},{"r":33,"h":72.0,"cells":[{"c":"A33","v":13,"b":true,"al":"center"},{"c":"B33","v":"منع تمديد مواسير الكهرباء والصرف والسباكة داخل نطاق العناصر الطرفية المحصورة (Boundary Elements Zone)"},{"c":"C33","v":"SBC 304 §26.8","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D33","v":"خلو تام للعناصر الطرفية من أي تمديدات"},{"c":"E33","v":"معاينة بصرية قبل التسكير","al":"center"},{"c":"F33","v":"مطابق ✅","fg":"#16A34A","b":true,"al":"center"},{"c":"G33","v":"تم الفحص والاعتماد بدون ملاحظات","fg":"#64748B"}]},{"r":34,"h":72.0,"cells":[{"c":"A34","v":14,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B34","v":"فحص جاهزية معدات الصب وهزازات الخرسانة الميكانيكية (إبرة هزاز 25-35 مم لدخول كثافة الحديد)","bg":"#F8FAFC"},{"c":"C34","v":"SBC 304 §26.5","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D34","v":"توفر هزازين رئيسيين + هزاز احتياطي","bg":"#F8FAFC"},{"c":"E34","v":"اختبار تشغيل الهزازات","bg":"#F8FAFC","al":"center"},{"c":"F34","v":"مطابق ✅","bg":"#F8FAFC","fg":"#16A34A","b":true,"al":"center"},{"c":"G34","v":"تم الفحص والاعتماد بدون ملاحظات","bg":"#F8FAFC","fg":"#64748B"}]},{"r":35,"h":72.0,"cells":[{"c":"A35","v":15,"b":true,"al":"center"},{"c":"B35","v":"التحقق من اختبار هبوط الخرسانة (Slump Test) ودرجة الحرارة (أقل من 32°م) قبل الإذن بالتفريغ والصب"},{"c":"C35","v":"SBC 304 / ASTM C143","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D35","v":"هبوط 150-180 مم مع الملدنات الفائقة"},{"c":"E35","v":"اختبار مخروط الهبوط بالموقع","al":"center"},{"c":"F35","v":"مطابق ✅","fg":"#16A34A","b":true,"al":"center"},{"c":"G35","v":"تم الفحص والاعتماد بدون ملاحظات","fg":"#64748B"}]}]}]}