{"slug":"shear-walls-tanks-bbs","sheets":[{"name":"إعدادات_المشروع_والمعايير","maxRow":30,"maxCol":5,"colWidths":[28.0,52.0,26.0,24.0,46.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"بيانات المشروع والاشتراطات الهندسية لتفريد حديد حوائط القص والخزانات (Design Baseline & Rebar Standards)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":54.0,"cells":[{"c":"A2","v":"⚠️ تنبيه استرشادي: الأسعار والنسب والمدخلات في هذا الشيت هي قيم هندسية واسترشادية لمتوسطات السوق. يرجى تعديل رتب الخرسانة وأقطار الحديد والعملة أدناه بما يطابق المخططات الإنشائية لمشروعك.","bg":"#FEF3C7","fg":"#92400E","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"1. البيانات التعاقدية والهندسية للمشروع (Project Metadata)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"اسم المشروع (Project Name):","bg":"#F8FAFC","b":true},{"c":"B5","v":"مشروع برج الأندلس السكني والتجاري (قبو + أرضي + 12 دور)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C5","v":"كود المستند (Doc No):","bg":"#F8FAFC","b":true},{"c":"D5","v":"BBS-SW-TK-2026-01","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E5","v":""}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"المالك (Client):","b":true},{"c":"B6","v":"شركة الأفق للاستثمار العقاري والمقاولات","fg":"#1E293B"},{"c":"C6","v":"التاريخ (Date):","b":true},{"c":"D6","v":"2026-10-09","fg":"#1E293B","al":"center"},{"c":"E6","v":""}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"الاستشاري العام (Consultant):","bg":"#F8FAFC","b":true},{"c":"B7","v":"دار العمارة للاستشارات الهندسية وفحص التربة","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C7","v":"رقم النسخة (Revision):","bg":"#F8FAFC","b":true},{"c":"D7","v":"Rev 02 (جاهز للتنفيذ)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E7","v":""}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"المقاول العام (Main Contractor):","b":true},{"c":"B8","v":"شركة البنيان المتطورة للإنشاءات","fg":"#1E293B"},{"c":"C8","v":"العملة المعتمدة (Currency):","b":true},{"c":"D8","v":"ر.س SAR","fg":"#1E293B","al":"center"},{"c":"E8","v":""}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"كود التصميم الإنشائي المعتمد:","bg":"#F8FAFC","b":true},{"c":"B9","v":"كود البناء السعودي SBC 304 / الكود المصري ECP 203","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C9","v":"حالة العنصر الإنشائي:","bg":"#F8FAFC","b":true},{"c":"D9","v":"حوائط قص + جدران ساندة + خزان أرضي","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E9","v":""}]},{"r":10,"h":28.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""}]},{"r":11,"h":38.0,"cells":[{"c":"A11","v":"2. محددات المواد ومقاومة الخرسانة والحديد (Material & Structural Specifications)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":"إجهاد كسر الخرسانة لحوائط القص fcu / f'c:","b":true},{"c":"B12","v":35,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"C12","v":"نيوتن/مم² (MPa)","fg":"#1E293B"},{"c":"D12","v":"خرسانة جاهزة مقاومة للكبريتات SRC للقبو والخزان","fg":"#64748B"},{"c":"E12","v":""}]},{"r":13,"h":72.0,"cells":[{"c":"A13","v":"إجهاد خضوع حديد التسليح الرئيسي fy:","bg":"#F8FAFC","b":true},{"c":"B13","v":420,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"C13","v":"نيوتن/مم² (MPa)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D13","v":"حديد عالي المقاومة مشوه B420D-WR مطابق لـ SASO ASTM","bg":"#F8FAFC","fg":"#64748B"},{"c":"E13","v":""}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"الغطاء الخرساني لحوائط القص الداخلية (Cover):","b":true},{"c":"B14","v":25,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"C14","v":"ملم (mm)","fg":"#1E293B"},{"c":"D14","v":"طبقا لاشتراطات SBC 304 للحوائط الداخلية","fg":"#64748B"},{"c":"E14","v":""}]},{"r":15,"h":72.0,"cells":[{"c":"A15","v":"الغطاء الخرساني لجدران وأرضية خزان المياه:","bg":"#F8FAFC","b":true},{"c":"B15","v":50,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"C15","v":"ملم (mm)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D15","v":"طبقا لاشتراطات المنشآت المائية وحماية الحديد من الصدأ","bg":"#F8FAFC","fg":"#64748B"},{"c":"E15","v":""}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"معامل طول الوصلة بالتراكب للشد Class B Lap:","b":true},{"c":"B16","v":60,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"C16","v":"مضاعف القطر (60Φ)","fg":"#1E293B"},{"c":"D16","v":"للأسياخ الرأسية المعرضة لشد زلزالي وحوائط الخزانات","fg":"#64748B"},{"c":"E16","v":""}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"معامل طول الوصلة بالتراكب للضغط Compression Lap:","bg":"#F8FAFC","b":true},{"c":"B17","v":45,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"C17","v":"مضاعف القطر (45Φ)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D17","v":"للأشاير الرأسية المستمرة في الأدوار المتكررة","bg":"#F8FAFC","fg":"#64748B"},{"c":"E17","v":""}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"النسبة المئوية لهالك حديد التسليح المقدرة (Scrap %):","b":true},{"c":"B18","v":0.045,"in":true,"b":true,"al":"center","nf":"0.0%"},{"c":"C18","v":"نسبة مئوية (4.5%)","fg":"#1E293B"},{"c":"D18","v":"تفريد محسوب لتقليل فضلات الحديد والهالك","fg":"#64748B"},{"c":"E18","v":""}]},{"r":19,"h":28.0,"cells":[{"c":"A19","v":""},{"c":"B19","v":""},{"c":"C19","v":""},{"c":"D19","v":""},{"c":"E19","v":""}]},{"r":20,"h":38.0,"cells":[{"c":"A20","v":"3. جدول أوزان وأقطار حديد التسليح القياسي (Rebar Unit Weights D²/162)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":21,"h":38.0,"cells":[{"c":"A21","v":"قطر السيخ القياسي Φ (mm)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B21","v":"مساحة المقطع As (mm²)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C21","v":"الوزن النظري كجم/متر (D²/162)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D21","v":"طول السيخ التجاري (م)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E21","v":"الاستخدام النموذجي في الحوائط والخزانات","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":8,"b":true,"al":"center"},{"c":"B22","v":50.27,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C22","v":0.395,"f":"=ROUND((A22*A22)/162, 3)","b":true,"al":"center","nf":"#,##0.000"},{"c":"D22","v":12,"in":true,"fg":"#1E293B","al":"center"},{"c":"E22","v":"كانات داخلية وكلبسات شنابر وحفظ مسافات","fg":"#64748B"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":10,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B23","v":78.54,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C23","v":0.617,"f":"=ROUND((A23*A23)/162, 3)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"D23","v":12,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E23","v":"كانات الأركان المخفية وشبكة انكماش علوية","bg":"#F8FAFC","fg":"#64748B"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":12,"b":true,"al":"center"},{"c":"B24","v":113.1,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C24","v":0.889,"f":"=ROUND((A24*A24)/162, 3)","b":true,"al":"center","nf":"#,##0.000"},{"c":"D24","v":12,"in":true,"fg":"#1E293B","al":"center"},{"c":"E24","v":"تسليح أفقي ورقة انكماش وتوزيع حراري","fg":"#64748B"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":14,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B25","v":153.94,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C25","v":1.21,"f":"=ROUND((A25*A25)/162, 3)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"D25","v":12,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E25","v":"تسليح رأسي للحوائط المتوسطة وجدران الخزان","bg":"#F8FAFC","fg":"#64748B"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":16,"b":true,"al":"center"},{"c":"B26","v":201.06,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C26","v":1.58,"f":"=ROUND((A26*A26)/162, 3)","b":true,"al":"center","nf":"#,##0.000"},{"c":"D26","v":12,"in":true,"fg":"#1E293B","al":"center"},{"c":"E26","v":"تسليح رئيسي رأسي لحوائط القص والأعمدة الطرفية","fg":"#64748B"}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":18,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B27","v":254.47,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C27","v":2,"f":"=ROUND((A27*A27)/162, 3)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"D27","v":12,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E27","v":"تسليح رأسي لأعمدة الكور وعناصر التثبيت الطرفية","bg":"#F8FAFC","fg":"#64748B"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":20,"b":true,"al":"center"},{"c":"B28","v":314.16,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C28","v":2.469,"f":"=ROUND((A28*A28)/162, 3)","b":true,"al":"center","nf":"#,##0.000"},{"c":"D28","v":12,"in":true,"fg":"#1E293B","al":"center"},{"c":"E28","v":"تسليح رئيسي لحوائط القص العالية وأرضية الخزان","fg":"#64748B"}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":22,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B29","v":380.13,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C29","v":2.988,"f":"=ROUND((A29*A29)/162, 3)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"D29","v":12,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E29","v":"تسليح مكثف للأبراج العالية ونقاط ارتكاز الكور","bg":"#F8FAFC","fg":"#64748B"}]},{"r":30,"h":34.0,"cells":[{"c":"A30","v":25,"b":true,"al":"center"},{"c":"B30","v":490.87,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C30","v":3.858,"f":"=ROUND((A30*A30)/162, 3)","b":true,"al":"center","nf":"#,##0.000"},{"c":"D30","v":12,"in":true,"fg":"#1E293B","al":"center"},{"c":"E30","v":"أوتار الشد وعناصر حافة حوائط القص Boundary Elements","fg":"#64748B"}]}]},{"name":"لوحة_المؤشرات_والملخص_التنفيذي","maxRow":22,"maxCol":7,"colWidths":[28.0,24.0,20.0,22.0,24.0,24.0,26.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"لوحة المؤشرات التنفيذية والملخص التراكمي لحديد حوائط القص والخزانات (Executive BBS Dashboard)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"ملخص مؤشرات استهلاك حديد التسليح، إجمالي الأطنان حسب الأقطار، معدلات التسليح للمتر المكعب، وحالة اعتماد الاستشاري","bg":"#1E40AF","fg":"#F1F5F9","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"إجمالي وزن حديد التسليح (Total Rebar)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"إجمالي حجم الخرسانة المسلحة (Concrete Volume)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"معدل استهلاك الحديد (Steel Ratio)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center"},{"c":"F4","v":"إجمالي مسطحات الشدات الخشبية (Formwork Area)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":46.0,"cells":[{"c":"A5","v":32.743932,"f":"=SUM('تفريد_حديد_حوائط_القص'!N10:N50) + SUM('تفريد_حديد_خزانات_المياه'!N10:N50)","bg":"#F1F5F9","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00 \"طن\"","cs":2},{"skip":true},{"c":"C5","v":385.5,"in":true,"bg":"#F1F5F9","fg":"#047857","b":true,"al":"center","nf":"#,##0.0 \"م³\"","cs":2},{"skip":true},{"c":"E5","v":84.938864,"f":"=(A5*1000)/C5","bg":"#F1F5F9","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0 \"كجم/م³\""},{"c":"F5","v":1860,"in":true,"bg":"#F1F5F9","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0 \"م²\"","cs":2},{"skip":true}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"شاملاً حوائط القص وجدران وأرضية الخزان","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C6","v":"حوائط القص 240م³ + الخزان الأرضي 145.5م³","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E6","v":"المعدل الطبيعي: 115 - 145 كجم/م³","bg":"#F1F5F9","fg":"#64748B","al":"center"},{"c":"F6","v":"وجهين حوائط القص + وجهين جدران الخزان","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"جدول حصر وتوزيع حديد التسليح حسب القطر القياسي (Rebar Breakdown by Diameter)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":"قطر السيخ القياسي Φ (mm)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"إجمالي الأطوال (متر طولي)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"وزن المتر كجم/م","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"وزن حوائط القص (طن)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"وزن خزان المياه (طن)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"إجمالي الوزن (طن)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"النسبة المئوية من الإجمالي (%)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":8,"b":true,"al":"center"},{"c":"B10","v":210,"f":"=SUMIF('تفريد_حديد_حوائط_القص'!$D$10:$D$50, A10, 'تفريد_حديد_حوائط_القص'!$K$10:$K$50) + SUMIF('تفريد_حديد_خزانات_المياه'!$D$10:$D$50, A10, 'تفريد_حديد_خزانات_المياه'!$K$10:$K$50)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C10","v":0.395,"f":"=ROUND((A10*A10)/162, 3)","b":true,"al":"center","nf":"#,##0.000"},{"c":"D10","v":0.032864,"f":"=SUMIF('تفريد_حديد_حوائط_القص'!$D$10:$D$50, A10, 'تفريد_حديد_حوائط_القص'!$N$10:$N$50)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E10","v":0.028243,"f":"=SUMIF('تفريد_حديد_خزانات_المياه'!$D$10:$D$50, A10, 'تفريد_حديد_خزانات_المياه'!$N$10:$N$50)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F10","v":0.061107,"f":"=D10+E10","b":true,"al":"center","nf":"#,##0.00"},{"c":"G10","v":0,"f":"=IF($F$18>0, F10/$F$18, 0)","fg":"#1E293B","al":"center","nf":"0.0%"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":10,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":1216,"f":"=SUMIF('تفريد_حديد_حوائط_القص'!$D$10:$D$50, A11, 'تفريد_حديد_حوائط_القص'!$K$10:$K$50) + SUMIF('تفريد_حديد_خزانات_المياه'!$D$10:$D$50, A11, 'تفريد_حديد_خزانات_المياه'!$K$10:$K$50)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C11","v":0.617,"f":"=ROUND((A11*A11)/162, 3)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"D11","v":0.816896,"f":"=SUMIF('تفريد_حديد_حوائط_القص'!$D$10:$D$50, A11, 'تفريد_حديد_حوائط_القص'!$N$10:$N$50)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E11","v":0.687708,"f":"=SUMIF('تفريد_حديد_خزانات_المياه'!$D$10:$D$50, A11, 'تفريد_حديد_خزانات_المياه'!$N$10:$N$50)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F11","v":1.504604,"f":"=D11+E11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G11","v":0,"f":"=IF($F$18>0, F11/$F$18, 0)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0%"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":12,"b":true,"al":"center"},{"c":"B12","v":447,"f":"=SUMIF('تفريد_حديد_حوائط_القص'!$D$10:$D$50, A12, 'تفريد_حديد_حوائط_القص'!$K$10:$K$50) + SUMIF('تفريد_حديد_خزانات_المياه'!$D$10:$D$50, A12, 'تفريد_حديد_خزانات_المياه'!$K$10:$K$50)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C12","v":0.889,"f":"=ROUND((A12*A12)/162, 3)","b":true,"al":"center","nf":"#,##0.000"},{"c":"D12","v":1.20904,"f":"=SUMIF('تفريد_حديد_حوائط_القص'!$D$10:$D$50, A12, 'تفريد_حديد_حوائط_القص'!$N$10:$N$50)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E12","v":1.308919,"f":"=SUMIF('تفريد_حديد_خزانات_المياه'!$D$10:$D$50, A12, 'تفريد_حديد_خزانات_المياه'!$N$10:$N$50)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F12","v":2.517959,"f":"=D12+E12","b":true,"al":"center","nf":"#,##0.00"},{"c":"G12","v":0,"f":"=IF($F$18>0, F12/$F$18, 0)","fg":"#1E293B","al":"center","nf":"0.0%"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":14,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":557,"f":"=SUMIF('تفريد_حديد_حوائط_القص'!$D$10:$D$50, A13, 'تفريد_حديد_حوائط_القص'!$K$10:$K$50) + SUMIF('تفريد_حديد_خزانات_المياه'!$D$10:$D$50, A13, 'تفريد_حديد_خزانات_المياه'!$K$10:$K$50)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C13","v":1.21,"f":"=ROUND((A13*A13)/162, 3)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"D13","v":2.873508,"f":"=SUMIF('تفريد_حديد_حوائط_القص'!$D$10:$D$50, A13, 'تفريد_حديد_حوائط_القص'!$N$10:$N$50)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E13","v":0.96437,"f":"=SUMIF('تفريد_حديد_خزانات_المياه'!$D$10:$D$50, A13, 'تفريد_حديد_خزانات_المياه'!$N$10:$N$50)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F13","v":3.837878,"f":"=D13+E13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G13","v":0,"f":"=IF($F$18>0, F13/$F$18, 0)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0%"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":16,"b":true,"al":"center"},{"c":"B14","v":171,"f":"=SUMIF('تفريد_حديد_حوائط_القص'!$D$10:$D$50, A14, 'تفريد_حديد_حوائط_القص'!$K$10:$K$50) + SUMIF('تفريد_حديد_خزانات_المياه'!$D$10:$D$50, A14, 'تفريد_حديد_خزانات_المياه'!$K$10:$K$50)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C14","v":1.58,"f":"=ROUND((A14*A14)/162, 3)","b":true,"al":"center","nf":"#,##0.000"},{"c":"D14","v":0.091008,"f":"=SUMIF('تفريد_حديد_حوائط_القص'!$D$10:$D$50, A14, 'تفريد_حديد_حوائط_القص'!$N$10:$N$50)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E14","v":1.051964,"f":"=SUMIF('تفريد_حديد_خزانات_المياه'!$D$10:$D$50, A14, 'تفريد_حديد_خزانات_المياه'!$N$10:$N$50)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F14","v":1.142972,"f":"=D14+E14","b":true,"al":"center","nf":"#,##0.00"},{"c":"G14","v":0,"f":"=IF($F$18>0, F14/$F$18, 0)","fg":"#1E293B","al":"center","nf":"0.0%"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":18,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":390,"f":"=SUMIF('تفريد_حديد_حوائط_القص'!$D$10:$D$50, A15, 'تفريد_حديد_حوائط_القص'!$K$10:$K$50) + SUMIF('تفريد_حديد_خزانات_المياه'!$D$10:$D$50, A15, 'تفريد_حديد_خزانات_المياه'!$K$10:$K$50)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C15","v":2,"f":"=ROUND((A15*A15)/162, 3)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"D15","v":3.548,"f":"=SUMIF('تفريد_حديد_حوائط_القص'!$D$10:$D$50, A15, 'تفريد_حديد_حوائط_القص'!$N$10:$N$50)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E15","v":0,"f":"=SUMIF('تفريد_حديد_خزانات_المياه'!$D$10:$D$50, A15, 'تفريد_حديد_خزانات_المياه'!$N$10:$N$50)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F15","v":3.548,"f":"=D15+E15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G15","v":0,"f":"=IF($F$18>0, F15/$F$18, 0)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0%"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":20,"b":true,"al":"center"},{"c":"B16","v":110,"f":"=SUMIF('تفريد_حديد_حوائط_القص'!$D$10:$D$50, A16, 'تفريد_حديد_حوائط_القص'!$K$10:$K$50) + SUMIF('تفريد_حديد_خزانات_المياه'!$D$10:$D$50, A16, 'تفريد_حديد_خزانات_المياه'!$K$10:$K$50)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C16","v":2.469,"f":"=ROUND((A16*A16)/162, 3)","b":true,"al":"center","nf":"#,##0.000"},{"c":"D16","v":0.841929,"f":"=SUMIF('تفريد_حديد_حوائط_القص'!$D$10:$D$50, A16, 'تفريد_حديد_حوائط_القص'!$N$10:$N$50)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E16","v":0,"f":"=SUMIF('تفريد_حديد_خزانات_المياه'!$D$10:$D$50, A16, 'تفريد_حديد_خزانات_المياه'!$N$10:$N$50)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F16","v":0.841929,"f":"=D16+E16","b":true,"al":"center","nf":"#,##0.00"},{"c":"G16","v":0,"f":"=IF($F$18>0, F16/$F$18, 0)","fg":"#1E293B","al":"center","nf":"0.0%"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":25,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B17","v":0,"f":"=SUMIF('تفريد_حديد_حوائط_القص'!$D$10:$D$50, A17, 'تفريد_حديد_حوائط_القص'!$K$10:$K$50) + SUMIF('تفريد_حديد_خزانات_المياه'!$D$10:$D$50, A17, 'تفريد_حديد_خزانات_المياه'!$K$10:$K$50)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C17","v":3.858,"f":"=ROUND((A17*A17)/162, 3)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"D17","v":0,"f":"=SUMIF('تفريد_حديد_حوائط_القص'!$D$10:$D$50, A17, 'تفريد_حديد_حوائط_القص'!$N$10:$N$50)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E17","v":0,"f":"=SUMIF('تفريد_حديد_خزانات_المياه'!$D$10:$D$50, A17, 'تفريد_حديد_خزانات_المياه'!$N$10:$N$50)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F17","v":0,"f":"=D17+E17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G17","v":0,"f":"=IF($F$18>0, F17/$F$18, 0)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0%"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"الإجمالي الكلي لحديد التسليح (Grand Total)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B18","v":3101,"f":"=SUM(B10:B17)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"C18","v":"-","bg":"#E2E8F0","al":"center"},{"c":"D18","v":9.413245,"f":"=SUM(D10:D17)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"E18","v":4.041204,"f":"=SUM(E10:E17)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"F18","v":13.454449,"f":"=SUM(F10:F17)","bg":"#FEF3C7","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"G18","v":0,"f":"=SUM(G10:G17)","bg":"#FEF3C7","b":true,"al":"center","nf":"0.0%"}]},{"r":19,"h":28.0,"cells":[{"c":"A19","v":""},{"c":"B19","v":""},{"c":"C19","v":""},{"c":"D19","v":""},{"c":"E19","v":""},{"c":"F19","v":""},{"c":"G19","v":""}]},{"r":20,"h":36.0,"cells":[{"c":"A20","v":"اعتماد وتدقيق جدول تفريد حديد التسليح (BBS Quality Inspection & Sign-off)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":"إعداد مهندس المكتب الفني والتفريد:","bg":"#E2E8F0","b":true,"al":"center","cs":2},{"skip":true},{"c":"C21","v":"مراجعة وتدقيق مهندس الجودة QC / QA:","bg":"#E2E8F0","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F21","v":"اعتماد الاستشاري المشرف:","bg":"#E2E8F0","b":true,"al":"center","cs":2},{"skip":true}]},{"r":22,"h":76.0,"cells":[{"c":"A22","v":"الاسم: م. أحمد عبد العزيز\nالتوقيع: ........................\nالتاريخ: 2026-10-09","fg":"#1E293B","cs":2},{"skip":true},{"c":"C22","v":"الاسم: م. مصطفى الشناوي\nالتوقيع: ........................\nالختم: تم التدقيق والتحقق من أطوال التراكب","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"F22","v":"الاسم: د.م. سلطان القحطاني\nالتوقيع: ........................\nالقرار: معتمد للتصنيع والتقطيع","fg":"#1E293B","cs":2},{"skip":true}]}]},{"name":"تفريد_حديد_حوائط_القص","maxRow":27,"maxCol":15,"colWidths":[8.0,24.0,38.0,16.0,26.0,14.0,14.0,14.0,18.0,14.0,18.0,20.0,16.0,18.0,46.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول تفريد حديد التسليح لحوائط القص والكور والجدران الساندة (Shear Walls & Retaining Walls BBS)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"حساب أطوال القطعيات، أوزان الأسياخ الرأسية والأفقية، كانات الأعمدة الطرفية المخفية (Boundary Elements)، الكلبسات والشنابر","bg":"#1E40AF","fg":"#F1F5F9","al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""},{"c":"O3","v":""}]},{"r":4,"h":42.0,"cells":[{"c":"A4","v":"م","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"العنصر الإنشائي والموقع","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"توصيف السيخ ومكانه بالتفصيلة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"القطر Φ (مم)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"شكل السيخ (Shape)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"البعد A (م)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"البعد B (م)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"البعد C (م)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"طول القطعية L (م)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"عدد العناصر","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"عدد الأسياخ بالعنصر","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L4","v":"إجمالي الطول (متر)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M4","v":"وزن المتر كجم/م","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N4","v":"إجمالي الوزن (طن)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"O4","v":"ملاحظات واشتراطات الوصلات والتنفيذ","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":36.0,"cells":[{"c":"A5","v":1,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B5","v":"حائط قص SW1 (قبو)","bg":"#F8FAFC","b":true},{"c":"C5","v":"أشاير رأسية من اللبشة (Dowels)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D5","v":16,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E5","v":"شكل L مع رجل تثبيت","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F5","v":0.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G5","v":2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H5","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I5","v":2.5,"f":"=F5+G5+H5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J5","v":2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K5","v":50,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L5","v":250,"f":"=I5*J5*K5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M5","v":1.58,"f":"=ROUND((D5*D5)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N5","v":0.395,"f":"=(L5*M5)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O5","v":"رجل بطة 50 سم في اللبشة + وصلة 60Φ","bg":"#F8FAFC","fg":"#64748B"}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":2,"b":true,"al":"center"},{"c":"B6","v":"حائط قص SW1 (قبو)","b":true},{"c":"C6","v":"تسليح رأسي رقة خارجية (Vertical Outer)","fg":"#1E293B"},{"c":"D6","v":16,"in":true,"b":true,"al":"center"},{"c":"E6","v":"سيخ مستقيم","fg":"#64748B","al":"center"},{"c":"F6","v":3.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G6","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H6","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I6","v":3.8,"f":"=F6+G6+H6","b":true,"al":"center","nf":"#,##0.00"},{"c":"J6","v":2,"in":true,"fg":"#1E293B","al":"center"},{"c":"K6","v":50,"in":true,"fg":"#1E293B","al":"center"},{"c":"L6","v":380,"f":"=I6*J6*K6","b":true,"al":"center","nf":"#,##0.00"},{"c":"M6","v":1.58,"f":"=ROUND((D6*D6)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N6","v":0.6004,"f":"=(L6*M6)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O6","v":"مسافة تقسيط 15 سم تراكب 96 سم","fg":"#64748B"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":3,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"حائط قص SW1 (قبو)","bg":"#F8FAFC","b":true},{"c":"C7","v":"تسليح رأسي رقة داخلية (Vertical Inner)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D7","v":16,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E7","v":"سيخ مستقيم","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F7","v":3.8,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G7","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H7","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I7","v":3.8,"f":"=F7+G7+H7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J7","v":2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K7","v":50,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L7","v":380,"f":"=I7*J7*K7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M7","v":1.58,"f":"=ROUND((D7*D7)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N7","v":0.6004,"f":"=(L7*M7)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O7","v":"مسافة تقسيط 15 سم وصلات تبادلية","bg":"#F8FAFC","fg":"#64748B"}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":4,"b":true,"al":"center"},{"c":"B8","v":"حائط قص SW1 (قبو)","b":true},{"c":"C8","v":"تسليح أفقي خارجي وداخلي (Horizontal Web)","fg":"#1E293B"},{"c":"D8","v":12,"in":true,"b":true,"al":"center"},{"c":"E8","v":"سيخ مستقيم مع خطاف 90°","fg":"#64748B","al":"center"},{"c":"F8","v":5.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G8","v":0.3,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H8","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I8","v":5.5,"f":"=F8+G8+H8","b":true,"al":"center","nf":"#,##0.00"},{"c":"J8","v":2,"in":true,"fg":"#1E293B","al":"center"},{"c":"K8","v":48,"in":true,"fg":"#1E293B","al":"center"},{"c":"L8","v":528,"f":"=I8*J8*K8","b":true,"al":"center","nf":"#,##0.00"},{"c":"M8","v":0.889,"f":"=ROUND((D8*D8)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N8","v":0.469392,"f":"=(L8*M8)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O8","v":"كل 15 سم يلتف حول الأعمدة الطرفية","fg":"#64748B"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":5,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"حائط قص SW1 (قبو)","bg":"#F8FAFC","b":true},{"c":"C9","v":"أعمدة طرفية مخفية (Boundary Elements)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D9","v":20,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E9","v":"سيخ رأسي طرفي رئيسي","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F9","v":4.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G9","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H9","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I9","v":4.2,"f":"=F9+G9+H9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J9","v":2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K9","v":16,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L9","v":134.4,"f":"=I9*J9*K9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M9","v":2.469,"f":"=ROUND((D9*D9)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N9","v":0.331834,"f":"=(L9*M9)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O9","v":"تسليح مكثف 8 أسياخ في كل طرف للشد والضغط","bg":"#F8FAFC","fg":"#64748B"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":6,"b":true,"al":"center"},{"c":"B10","v":"حائط قص SW1 (قبو)","b":true},{"c":"C10","v":"كانات تكثيف للأعمدة الطرفية (Ties)","fg":"#1E293B"},{"c":"D10","v":10,"in":true,"b":true,"al":"center"},{"c":"E10","v":"كانة مغلقة مع قفل 135°","fg":"#64748B","al":"center"},{"c":"F10","v":0.85,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G10","v":0.25,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H10","v":0.15,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I10","v":1.25,"f":"=F10+G10+H10","b":true,"al":"center","nf":"#,##0.00"},{"c":"J10","v":2,"in":true,"fg":"#1E293B","al":"center"},{"c":"K10","v":60,"in":true,"fg":"#1E293B","al":"center"},{"c":"L10","v":150,"f":"=I10*J10*K10","b":true,"al":"center","nf":"#,##0.00"},{"c":"M10","v":0.617,"f":"=ROUND((D10*D10)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N10","v":0.09255,"f":"=(L10*M10)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O10","v":"كانات كل 10 سم في الثلث السفلي والعلوي","fg":"#64748B"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":7,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"حائط قص SW1 (قبو)","bg":"#F8FAFC","b":true},{"c":"C11","v":"كلبسات وغوالق نهايات الحائط (U-Caps)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D11","v":10,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E11","v":"شكل U قفل نهاية","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F11","v":0.3,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G11","v":0.6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H11","v":0.3,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I11","v":1.2,"f":"=F11+G11+H11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J11","v":2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K11","v":36,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L11","v":86.4,"f":"=I11*J11*K11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M11","v":0.617,"f":"=ROUND((D11*D11)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N11","v":0.053309,"f":"=(L11*M11)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O11","v":"إغلاق أطراف الرقتين عند فتحات الأبواب والنهايات","bg":"#F8FAFC","fg":"#64748B"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":8,"b":true,"al":"center"},{"c":"B12","v":"حائط قص SW1 (قبو)","b":true},{"c":"C12","v":"شنابر وحفظ مسافة (S-Ties Cross Spacers)","fg":"#1E293B"},{"c":"D12","v":8,"in":true,"b":true,"al":"center"},{"c":"E12","v":"شنبر حرف S مع خطافين","fg":"#64748B","al":"center"},{"c":"F12","v":0.32,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G12","v":0.1,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H12","v":0.1,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I12","v":0.52,"f":"=F12+G12+H12","b":true,"al":"center","nf":"#,##0.00"},{"c":"J12","v":2,"in":true,"fg":"#1E293B","al":"center"},{"c":"K12","v":80,"in":true,"fg":"#1E293B","al":"center"},{"c":"L12","v":83.2,"f":"=I12*J12*K12","b":true,"al":"center","nf":"#,##0.00"},{"c":"M12","v":0.395,"f":"=ROUND((D12*D12)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N12","v":0.032864,"f":"=(L12*M12)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O12","v":"4 شنابر لكل م² للربط بين الرقتين ومنع الانبعاج","fg":"#64748B"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":9,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"حائط قص SW2 (متكرر)","bg":"#F8FAFC","b":true},{"c":"C13","v":"تسليح رأسي رقة أولى (Vertical Face 1)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D13","v":14,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E13","v":"سيخ مستقيم مع وصلة","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F13","v":3.4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G13","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H13","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I13","v":3.4,"f":"=F13+G13+H13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J13","v":3,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K13","v":40,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L13","v":408,"f":"=I13*J13*K13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M13","v":1.21,"f":"=ROUND((D13*D13)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N13","v":0.49368,"f":"=(L13*M13)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O13","v":"تراكب 60Φ = 84 سم مع أشاير الدور السابق","bg":"#F8FAFC","fg":"#64748B"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":10,"b":true,"al":"center"},{"c":"B14","v":"حائط قص SW2 (متكرر)","b":true},{"c":"C14","v":"تسليح رأسي رقة ثانية (Vertical Face 2)","fg":"#1E293B"},{"c":"D14","v":14,"in":true,"b":true,"al":"center"},{"c":"E14","v":"سيخ مستقيم مع وصلة","fg":"#64748B","al":"center"},{"c":"F14","v":3.4,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G14","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H14","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I14","v":3.4,"f":"=F14+G14+H14","b":true,"al":"center","nf":"#,##0.00"},{"c":"J14","v":3,"in":true,"fg":"#1E293B","al":"center"},{"c":"K14","v":40,"in":true,"fg":"#1E293B","al":"center"},{"c":"L14","v":408,"f":"=I14*J14*K14","b":true,"al":"center","nf":"#,##0.00"},{"c":"M14","v":1.21,"f":"=ROUND((D14*D14)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N14","v":0.49368,"f":"=(L14*M14)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O14","v":"تبادلية الوصلات بنسبة 50%","fg":"#64748B"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":11,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"حائط قص SW2 (متكرر)","bg":"#F8FAFC","b":true},{"c":"C15","v":"تسليح أفقي للوجهين (Horizontal Mesh)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D15","v":10,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E15","v":"سيخ أفقي مستمر","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F15","v":4.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G15","v":0.25,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H15","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I15","v":4.45,"f":"=F15+G15+H15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J15","v":3,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K15","v":42,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L15","v":560.7,"f":"=I15*J15*K15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M15","v":0.617,"f":"=ROUND((D15*D15)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N15","v":0.345952,"f":"=(L15*M15)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O15","v":"تقسيط 15 سم على كامل ارتفاع الحائط","bg":"#F8FAFC","fg":"#64748B"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":12,"b":true,"al":"center"},{"c":"B16","v":"حائط قص SW2 (متكرر)","b":true},{"c":"C16","v":"تسليح أعمدة الحافة (Boundary Ties)","fg":"#1E293B"},{"c":"D16","v":10,"in":true,"b":true,"al":"center"},{"c":"E16","v":"كانة مربعة للأعمدة المخفية","fg":"#64748B","al":"center"},{"c":"F16","v":0.7,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G16","v":0.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H16","v":0.12,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I16","v":1.02,"f":"=F16+G16+H16","b":true,"al":"center","nf":"#,##0.00"},{"c":"J16","v":3,"in":true,"fg":"#1E293B","al":"center"},{"c":"K16","v":48,"in":true,"fg":"#1E293B","al":"center"},{"c":"L16","v":146.88,"f":"=I16*J16*K16","b":true,"al":"center","nf":"#,##0.00"},{"c":"M16","v":0.617,"f":"=ROUND((D16*D16)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N16","v":0.090625,"f":"=(L16*M16)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O16","v":"تكثيف الكانات كل 10 سم","fg":"#64748B"}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":13,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B17","v":"حائط ساند RW1 (قبو)","bg":"#F8FAFC","b":true},{"c":"C17","v":"تسليح رأسي خارجي جهة الردم (Earth Face)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D17","v":18,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E17","v":"شكل L من اللبشة للسطح","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F17","v":0.6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G17","v":4.4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H17","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I17","v":5,"f":"=F17+G17+H17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J17","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K17","v":170,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L17","v":850,"f":"=I17*J17*K17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M17","v":2,"f":"=ROUND((D17*D17)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N17","v":1.7,"f":"=(L17*M17)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O17","v":"مقاومة ضغط التربة والمياه الجوفية كل 15 سم","bg":"#F8FAFC","fg":"#64748B"}]},{"r":18,"h":36.0,"cells":[{"c":"A18","v":14,"b":true,"al":"center"},{"c":"B18","v":"حائط ساند RW1 (قبو)","b":true},{"c":"C18","v":"تسليح رأسي داخلي (Inside Face)","fg":"#1E293B"},{"c":"D18","v":14,"in":true,"b":true,"al":"center"},{"c":"E18","v":"سيخ مستقيم","fg":"#64748B","al":"center"},{"c":"F18","v":4.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G18","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H18","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I18","v":4.2,"f":"=F18+G18+H18","b":true,"al":"center","nf":"#,##0.00"},{"c":"J18","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"K18","v":170,"in":true,"fg":"#1E293B","al":"center"},{"c":"L18","v":714,"f":"=I18*J18*K18","b":true,"al":"center","nf":"#,##0.00"},{"c":"M18","v":1.21,"f":"=ROUND((D18*D18)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N18","v":0.86394,"f":"=(L18*M18)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O18","v":"تقسيط كل 15 سم للرقة الداخلية","fg":"#64748B"}]},{"r":19,"h":36.0,"cells":[{"c":"A19","v":15,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B19","v":"حائط ساند RW1 (قبو)","bg":"#F8FAFC","b":true},{"c":"C19","v":"تسليح أفقي خارجي (Earth Side Horiz)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D19","v":12,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E19","v":"أسياخ أفقية متراكبة","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F19","v":6.8,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G19","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H19","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I19","v":6.8,"f":"=F19+G19+H19","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J19","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K19","v":100,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L19","v":680,"f":"=I19*J19*K19","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M19","v":0.889,"f":"=ROUND((D19*D19)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N19","v":0.60452,"f":"=(L19*M19)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O19","v":"وصلات تراكب 72 سم مع وصلات موزعة","bg":"#F8FAFC","fg":"#64748B"}]},{"r":20,"h":36.0,"cells":[{"c":"A20","v":16,"b":true,"al":"center"},{"c":"B20","v":"حائط ساند RW1 (قبو)","b":true},{"c":"C20","v":"تسليح أفقي داخلي (Inside Horiz)","fg":"#1E293B"},{"c":"D20","v":12,"in":true,"b":true,"al":"center"},{"c":"E20","v":"أسياخ أفقية متراكبة","fg":"#64748B","al":"center"},{"c":"F20","v":6.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G20","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H20","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I20","v":6.8,"f":"=F20+G20+H20","b":true,"al":"center","nf":"#,##0.00"},{"c":"J20","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"K20","v":100,"in":true,"fg":"#1E293B","al":"center"},{"c":"L20","v":680,"f":"=I20*J20*K20","b":true,"al":"center","nf":"#,##0.00"},{"c":"M20","v":0.889,"f":"=ROUND((D20*D20)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N20","v":0.60452,"f":"=(L20*M20)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O20","v":"تقسيط كل 15 سم رقة داخلية","fg":"#64748B"}]},{"r":21,"h":36.0,"cells":[{"c":"A21","v":17,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B21","v":"حائط ساند RW1 (قبو)","bg":"#F8FAFC","b":true},{"c":"C21","v":"شنابر كروس تايز (Cross Spacers)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D21","v":10,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E21","v":"شنبر خطاف 135°","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F21","v":0.4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G21","v":0.12,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H21","v":0.12,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I21","v":0.64,"f":"=F21+G21+H21","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J21","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K21","v":350,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L21","v":224,"f":"=I21*J21*K21","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M21","v":0.617,"f":"=ROUND((D21*D21)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N21","v":0.138208,"f":"=(L21*M21)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O21","v":"حفظ مسافة وتأمين الرقتين أثناء الضخ والدمك","bg":"#F8FAFC","fg":"#64748B"}]},{"r":22,"h":36.0,"cells":[{"c":"A22","v":18,"b":true,"al":"center"},{"c":"B22","v":"كور المصاعد C1 (قبو)","b":true},{"c":"C22","v":"أشاير الكور الرأسية (Core Dowels)","fg":"#1E293B"},{"c":"D22","v":20,"in":true,"b":true,"al":"center"},{"c":"E22","v":"شكل L تثبيت باللبشة","fg":"#64748B","al":"center"},{"c":"F22","v":0.7,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G22","v":2.4,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H22","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I22","v":3.1,"f":"=F22+G22+H22","b":true,"al":"center","nf":"#,##0.00"},{"c":"J22","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"K22","v":110,"in":true,"fg":"#1E293B","al":"center"},{"c":"L22","v":341,"f":"=I22*J22*K22","b":true,"al":"center","nf":"#,##0.00"},{"c":"M22","v":2.469,"f":"=ROUND((D22*D22)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N22","v":0.841929,"f":"=(L22*M22)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O22","v":"تثبيت عميق باللبشة بعمق 70 سم","fg":"#64748B"}]},{"r":23,"h":36.0,"cells":[{"c":"A23","v":19,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B23","v":"كور المصاعد C1 (قبو)","bg":"#F8FAFC","b":true},{"c":"C23","v":"تسليح رأسي رقتين (Vertical Double)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D23","v":18,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E23","v":"سيخ مستقيم","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F23","v":4.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G23","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H23","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I23","v":4.2,"f":"=F23+G23+H23","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J23","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K23","v":220,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L23","v":924,"f":"=I23*J23*K23","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M23","v":2,"f":"=ROUND((D23*D23)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N23","v":1.848,"f":"=(L23*M23)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O23","v":"تسليح رأسي كثيف لمقاومة العزوم الزلزالية والرياح","bg":"#F8FAFC","fg":"#64748B"}]},{"r":24,"h":36.0,"cells":[{"c":"A24","v":20,"b":true,"al":"center"},{"c":"B24","v":"كور المصاعد C1 (قبو)","b":true},{"c":"C24","v":"تسليح أفقي محيطي (Perimeter Horiz)","fg":"#1E293B"},{"c":"D24","v":14,"in":true,"b":true,"al":"center"},{"c":"E24","v":"حلقات أفقية مقفلة","fg":"#64748B","al":"center"},{"c":"F24","v":8.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G24","v":0.3,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H24","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I24","v":8.8,"f":"=F24+G24+H24","b":true,"al":"center","nf":"#,##0.00"},{"c":"J24","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"K24","v":96,"in":true,"fg":"#1E293B","al":"center"},{"c":"L24","v":844.8,"f":"=I24*J24*K24","b":true,"al":"center","nf":"#,##0.00"},{"c":"M24","v":1.21,"f":"=ROUND((D24*D24)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N24","v":1.022208,"f":"=(L24*M24)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O24","v":"تراكب مغلق وموزع على محيط الكور","fg":"#64748B"}]},{"r":25,"h":36.0,"cells":[{"c":"A25","v":21,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B25","v":"كور المصاعد C1 (قبو)","bg":"#F8FAFC","b":true},{"c":"C25","v":"تسليح الزوايا والأركان (Corner Diagonals)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D25","v":16,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E25","v":"سيخ قطري مائل 45°","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F25","v":1.8,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G25","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H25","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I25","v":1.8,"f":"=F25+G25+H25","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J25","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K25","v":32,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L25","v":57.6,"f":"=I25*J25*K25","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M25","v":1.58,"f":"=ROUND((D25*D25)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N25","v":0.091008,"f":"=(L25*M25)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O25","v":"مقاومة تركيز الإجهادات عند زوايا الكور","bg":"#F8FAFC","fg":"#64748B"}]},{"r":26,"h":36.0,"cells":[{"c":"A26","v":22,"b":true,"al":"center"},{"c":"B26","v":"كور المصاعد C1 (قبو)","b":true},{"c":"C26","v":"كانات أعمدة أركان الكور (Core Corner Ties)","fg":"#1E293B"},{"c":"D26","v":10,"in":true,"b":true,"al":"center"},{"c":"E26","v":"كانة مستطيلة خاصة","fg":"#64748B","al":"center"},{"c":"F26","v":0.9,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G26","v":0.25,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H26","v":0.15,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I26","v":1.3,"f":"=F26+G26+H26","b":true,"al":"center","nf":"#,##0.00"},{"c":"J26","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"K26","v":120,"in":true,"fg":"#1E293B","al":"center"},{"c":"L26","v":156,"f":"=I26*J26*K26","b":true,"al":"center","nf":"#,##0.00"},{"c":"M26","v":0.617,"f":"=ROUND((D26*D26)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N26","v":0.096252,"f":"=(L26*M26)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O26","v":"كانات تكثيف كل 10 سم بأركان الكور","fg":"#64748B"}]},{"r":27,"h":42.0,"cells":[{"c":"A27","v":"إجمالي حديد حوائط القص والكور والجدران الساندة (Total Shear Walls Rebar)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"L27","v":8986.98,"f":"=SUM(L5:L26)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"M27","v":"-","bg":"#E2E8F0","al":"center"},{"c":"N27","v":11.810271,"f":"=SUM(N5:N26)","bg":"#FEF3C7","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"O27","v":"شامل الهالك بنسبة 4.5%","bg":"#E2E8F0","fg":"#64748B"}]}]},{"name":"تفريد_حديد_خزانات_المياه","maxRow":25,"maxCol":15,"colWidths":[8.0,26.0,38.0,16.0,26.0,14.0,14.0,14.0,18.0,14.0,18.0,20.0,16.0,18.0,46.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول تفريد حديد التسليح لخزان المياه الخرساني الأرضي (Underground Water Tank BBS)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"تفريد حديد أرضية الخزان، جدران الخزان الخارجية والفاصلة، زوايا التثبيت، تفصيلة واتر ستوب (Waterstop)، وسقف الخزان","bg":"#1E40AF","fg":"#F1F5F9","al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""},{"c":"O3","v":""}]},{"r":4,"h":42.0,"cells":[{"c":"A4","v":"م","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"العنصر الإنشائي والموقع","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"توصيف السيخ ومكانه بالتفصيلة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"القطر Φ (مم)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"شكل السيخ (Shape)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"البعد A (م)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"البعد B (م)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"البعد C (م)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"طول القطعية L (م)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"عدد العناصر","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"عدد الأسياخ بالعنصر","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L4","v":"إجمالي الطول (متر)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M4","v":"وزن المتر كجم/م","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N4","v":"إجمالي الوزن (طن)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"O4","v":"ملاحظات واشتراطات الوصلات والتنفيذ","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":36.0,"cells":[{"c":"A5","v":1,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B5","v":"أرضية الخزان (Base Raft)","bg":"#F8FAFC","b":true},{"c":"C5","v":"فرش سفلي رئيسي باتجاه القصير (Bottom Short)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D5","v":16,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E5","v":"شكل U مع رجل صاعدة 30 سم","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F5","v":0.3,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G5","v":6.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H5","v":0.3,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I5","v":6.8,"f":"=F5+G5+H5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J5","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K5","v":68,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L5","v":462.4,"f":"=I5*J5*K5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M5","v":1.58,"f":"=ROUND((D5*D5)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N5","v":0.730592,"f":"=(L5*M5)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O5","v":"حديد رئيسي سفلي كل 15 سم لمقاومة ضغط التربة","bg":"#F8FAFC","fg":"#64748B"}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":2,"b":true,"al":"center"},{"c":"B6","v":"أرضية الخزان (Base Raft)","b":true},{"c":"C6","v":"غطاء سفلي ثانوي باتجاه الطويل (Bottom Long)","fg":"#1E293B"},{"c":"D6","v":14,"in":true,"b":true,"al":"center"},{"c":"E6","v":"شكل U مع رجل صاعدة 30 سم","fg":"#64748B","al":"center"},{"c":"F6","v":0.3,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G6","v":10.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H6","v":0.3,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I6","v":10.8,"f":"=F6+G6+H6","b":true,"al":"center","nf":"#,##0.00"},{"c":"J6","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"K6","v":42,"in":true,"fg":"#1E293B","al":"center"},{"c":"L6","v":453.6,"f":"=I6*J6*K6","b":true,"al":"center","nf":"#,##0.00"},{"c":"M6","v":1.21,"f":"=ROUND((D6*D6)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N6","v":0.548856,"f":"=(L6*M6)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O6","v":"حديد سفلي باتجاه الطول كل 15 سم","fg":"#64748B"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":3,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"أرضية الخزان (Base Raft)","bg":"#F8FAFC","b":true},{"c":"C7","v":"فرش علوي لمقاومة عزم التثبيت (Top Short)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D7","v":16,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E7","v":"شكل U مقلوب","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F7","v":0.3,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G7","v":6.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H7","v":0.3,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I7","v":6.8,"f":"=F7+G7+H7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J7","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K7","v":68,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L7","v":462.4,"f":"=I7*J7*K7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M7","v":1.58,"f":"=ROUND((D7*D7)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N7","v":0.730592,"f":"=(L7*M7)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O7","v":"حديد علوي كل 15 سم لمقاومة عزوم اتصال الجدران","bg":"#F8FAFC","fg":"#64748B"}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":4,"b":true,"al":"center"},{"c":"B8","v":"أرضية الخزان (Base Raft)","b":true},{"c":"C8","v":"غطاء علوي باتجاه الطويل (Top Long)","fg":"#1E293B"},{"c":"D8","v":14,"in":true,"b":true,"al":"center"},{"c":"E8","v":"شكل U مقلوب","fg":"#64748B","al":"center"},{"c":"F8","v":0.3,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G8","v":10.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H8","v":0.3,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I8","v":10.8,"f":"=F8+G8+H8","b":true,"al":"center","nf":"#,##0.00"},{"c":"J8","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"K8","v":42,"in":true,"fg":"#1E293B","al":"center"},{"c":"L8","v":453.6,"f":"=I8*J8*K8","b":true,"al":"center","nf":"#,##0.00"},{"c":"M8","v":1.21,"f":"=ROUND((D8*D8)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N8","v":0.548856,"f":"=(L8*M8)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O8","v":"حديد علوي كل 15 سم","fg":"#64748B"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":5,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"أرضية الخزان (Base Raft)","bg":"#F8FAFC","b":true},{"c":"C9","v":"أشاير جدران الخزان من الأرضية (Wall Starter Dowels)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D9","v":16,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E9","v":"شكل L مع رجل تثبيت بالأرضية","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F9","v":0.8,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G9","v":1.8,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H9","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I9","v":2.6,"f":"=F9+G9+H9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J9","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K9","v":214,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L9","v":556.4,"f":"=I9*J9*K9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M9","v":1.58,"f":"=ROUND((D9*D9)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N9","v":0.879112,"f":"=(L9*M9)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O9","v":"أشاير رقتين جدران الخزان محيطية ووسطية تراكب 60Φ","bg":"#F8FAFC","fg":"#64748B"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":6,"b":true,"al":"center"},{"c":"B10","v":"أرضية الخزان (Base Raft)","b":true},{"c":"C10","v":"كراسي حديد لحمل الرقة العلوية (Chairs)","fg":"#1E293B"},{"c":"D10","v":12,"in":true,"b":true,"al":"center"},{"c":"E10","v":"كرسي حديد قياسي","fg":"#64748B","al":"center"},{"c":"F10","v":0.4,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G10","v":0.25,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H10","v":0.4,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I10","v":1.05,"f":"=F10+G10+H10","b":true,"al":"center","nf":"#,##0.00"},{"c":"J10","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"K10","v":35,"in":true,"fg":"#1E293B","al":"center"},{"c":"L10","v":36.75,"f":"=I10*J10*K10","b":true,"al":"center","nf":"#,##0.00"},{"c":"M10","v":0.889,"f":"=ROUND((D10*D10)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N10","v":0.032671,"f":"=(L10*M10)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O10","v":"كرسي بارتفاع 25 سم كل 1.5 م²","fg":"#64748B"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":7,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"جدران الخزان الخارجية (Walls)","bg":"#F8FAFC","b":true},{"c":"C11","v":"تسليح رأسي رقة داخلية ملامسة للماء (Water Face Vert)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D11","v":16,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E11","v":"سيخ رأسي مستقيم","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F11","v":3.8,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G11","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H11","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I11","v":3.8,"f":"=F11+G11+H11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J11","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K11","v":107,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L11","v":406.6,"f":"=I11*J11*K11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M11","v":1.58,"f":"=ROUND((D11*D11)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N11","v":0.642428,"f":"=(L11*M11)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O11","v":"مقاومة الضغط الهيدروستاتيكي كل 15 سم","bg":"#F8FAFC","fg":"#64748B"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":8,"b":true,"al":"center"},{"c":"B12","v":"جدران الخزان الخارجية (Walls)","b":true},{"c":"C12","v":"تسليح رأسي رقة خارجية ملامسة للتربة (Earth Face Vert)","fg":"#1E293B"},{"c":"D12","v":14,"in":true,"b":true,"al":"center"},{"c":"E12","v":"سيخ رأسي مستقيم","fg":"#64748B","al":"center"},{"c":"F12","v":3.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G12","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H12","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I12","v":3.8,"f":"=F12+G12+H12","b":true,"al":"center","nf":"#,##0.00"},{"c":"J12","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"K12","v":107,"in":true,"fg":"#1E293B","al":"center"},{"c":"L12","v":406.6,"f":"=I12*J12*K12","b":true,"al":"center","nf":"#,##0.00"},{"c":"M12","v":1.21,"f":"=ROUND((D12*D12)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N12","v":0.491986,"f":"=(L12*M12)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O12","v":"مقاومة ضغط الردم الجانبي كل 15 سم","fg":"#64748B"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":9,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"جدران الخزان الخارجية (Walls)","bg":"#F8FAFC","b":true},{"c":"C13","v":"تسليح أفقي رقة داخلية (Water Face Horiz)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D13","v":12,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E13","v":"سيخ أفقي مستمر مع خطاف 90°","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F13","v":6.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G13","v":0.25,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H13","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I13","v":6.75,"f":"=F13+G13+H13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J13","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K13","v":48,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L13","v":324,"f":"=I13*J13*K13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M13","v":0.889,"f":"=ROUND((D13*D13)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N13","v":0.288036,"f":"=(L13*M13)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O13","v":"حديد أفقي لمقاومة الشد الحلقي والانكماش الحراري","bg":"#F8FAFC","fg":"#64748B"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":10,"b":true,"al":"center"},{"c":"B14","v":"جدران الخزان الخارجية (Walls)","b":true},{"c":"C14","v":"تسليح أفقي رقة خارجية (Earth Face Horiz)","fg":"#1E293B"},{"c":"D14","v":12,"in":true,"b":true,"al":"center"},{"c":"E14","v":"سيخ أفقي مستمر مع خطاف 90°","fg":"#64748B","al":"center"},{"c":"F14","v":6.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G14","v":0.25,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H14","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I14","v":6.75,"f":"=F14+G14+H14","b":true,"al":"center","nf":"#,##0.00"},{"c":"J14","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"K14","v":48,"in":true,"fg":"#1E293B","al":"center"},{"c":"L14","v":324,"f":"=I14*J14*K14","b":true,"al":"center","nf":"#,##0.00"},{"c":"M14","v":0.889,"f":"=ROUND((D14*D14)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N14","v":0.288036,"f":"=(L14*M14)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O14","v":"حديد أفقي خارجي تراكب 60Φ = 72 سم","fg":"#64748B"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":11,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"جدران الخزان الخارجية (Walls)","bg":"#F8FAFC","b":true},{"c":"C15","v":"شنابر ربط الرقتين (Water Tank S-Ties)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D15","v":10,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E15","v":"شنبر حرف S بخطاف 135°","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F15","v":0.32,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G15","v":0.12,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H15","v":0.12,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I15","v":0.56,"f":"=F15+G15+H15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J15","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K15","v":450,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L15","v":252.0,"f":"=I15*J15*K15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M15","v":0.617,"f":"=ROUND((D15*D15)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N15","v":0.155484,"f":"=(L15*M15)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O15","v":"5 شنابر لكل م² لضمان سمك الجدار 30 سم","bg":"#F8FAFC","fg":"#64748B"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":12,"b":true,"al":"center"},{"c":"B16","v":"زوايا وأركان الخزان (Corners)","b":true},{"c":"C16","v":"حديد زوايا الأركان 90° (Corner Ties)","fg":"#1E293B"},{"c":"D16","v":16,"in":true,"b":true,"al":"center"},{"c":"E16","v":"شكل زاوية 90° متساوية الساقين","fg":"#64748B","al":"center"},{"c":"F16","v":1.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G16","v":1.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H16","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I16","v":2.4,"f":"=F16+G16+H16","b":true,"al":"center","nf":"#,##0.00"},{"c":"J16","v":4,"in":true,"fg":"#1E293B","al":"center"},{"c":"K16","v":24,"in":true,"fg":"#1E293B","al":"center"},{"c":"L16","v":230.4,"f":"=I16*J16*K16","b":true,"al":"center","nf":"#,##0.00"},{"c":"M16","v":1.58,"f":"=ROUND((D16*D16)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N16","v":0.364032,"f":"=(L16*M16)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O16","v":"مقاومة العزم السالب الزاوي عند التقاء الجدران","fg":"#64748B"}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":13,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B17","v":"زوايا وأركان الخزان (Corners)","bg":"#F8FAFC","b":true},{"c":"C17","v":"كسحات شطفة الأركان 45° (Corner Chamfer)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D17","v":14,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E17","v":"سيخ قطري مائل","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F17","v":0.9,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G17","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H17","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I17","v":0.9,"f":"=F17+G17+H17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J17","v":4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K17","v":24,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L17","v":86.4,"f":"=I17*J17*K17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M17","v":1.21,"f":"=ROUND((D17*D17)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N17","v":0.104544,"f":"=(L17*M17)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O17","v":"شطفة خرسانية 45° لمنع تسرب المياه بالأركان","bg":"#F8FAFC","fg":"#64748B"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":14,"b":true,"al":"center"},{"c":"B18","v":"فاصل الصب والواتر ستوب (Construction Joint)","b":true},{"c":"C18","v":"كانات تثبيت شريط الواتر ستوب (Waterstop Clips)","fg":"#1E293B"},{"c":"D18","v":8,"in":true,"b":true,"al":"center"},{"c":"E18","v":"كلبس تثبيت شريط PVC","fg":"#64748B","al":"center"},{"c":"F18","v":0.25,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G18","v":0.15,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H18","v":0.15,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I18","v":0.55,"f":"=F18+G18+H18","b":true,"al":"center","nf":"#,##0.00"},{"c":"J18","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"K18","v":130,"in":true,"fg":"#1E293B","al":"center"},{"c":"L18","v":71.5,"f":"=I18*J18*K18","b":true,"al":"center","nf":"#,##0.00"},{"c":"M18","v":0.395,"f":"=ROUND((D18*D18)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N18","v":0.028243,"f":"=(L18*M18)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O18","v":"كل 25 سم لتثبيت شريط منع التسرب 25 سم سنام","fg":"#64748B"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":15,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B19","v":"الجدار الفاصل بين الخزانين (Baffle Wall)","bg":"#F8FAFC","b":true},{"c":"C19","v":"تسليح رأسي للوجهين (Partition Vert)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D19","v":14,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E19","v":"سيخ رأسي مستقيم","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F19","v":3.8,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G19","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H19","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I19","v":3.8,"f":"=F19+G19+H19","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J19","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K19","v":80,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L19","v":304,"f":"=I19*J19*K19","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M19","v":1.21,"f":"=ROUND((D19*D19)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N19","v":0.36784,"f":"=(L19*M19)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O19","v":"تسليح رأسي رقتين لمقاومة تفريغ أحد الخزانين","bg":"#F8FAFC","fg":"#64748B"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":16,"b":true,"al":"center"},{"c":"B20","v":"الجدار الفاصل بين الخزانين (Baffle Wall)","b":true},{"c":"C20","v":"تسليح أفقي للوجهين (Partition Horiz)","fg":"#1E293B"},{"c":"D20","v":12,"in":true,"b":true,"al":"center"},{"c":"E20","v":"سيخ أفقي متداخل بالجدران الخارجية","fg":"#64748B","al":"center"},{"c":"F20","v":6.6,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G20","v":0.3,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H20","v":0.3,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I20","v":7.2,"f":"=F20+G20+H20","b":true,"al":"center","nf":"#,##0.00"},{"c":"J20","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"K20","v":48,"in":true,"fg":"#1E293B","al":"center"},{"c":"L20","v":345.6,"f":"=I20*J20*K20","b":true,"al":"center","nf":"#,##0.00"},{"c":"M20","v":0.889,"f":"=ROUND((D20*D20)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N20","v":0.307238,"f":"=(L20*M20)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O20","v":"تداخل عميق بالجدران الخارجية بعمق 30 سم","fg":"#64748B"}]},{"r":21,"h":36.0,"cells":[{"c":"A21","v":17,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B21","v":"سقف الخزان المسلح (Roof Slab)","bg":"#F8FAFC","b":true},{"c":"C21","v":"فرش سفلي باتجاه القصير (Roof Bottom Short)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D21","v":12,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E21","v":"سيخ مستقيم مع خطافين","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F21","v":6.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G21","v":0.15,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H21","v":0.15,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I21","v":6.5,"f":"=F21+G21+H21","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J21","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K21","v":68,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L21","v":442,"f":"=I21*J21*K21","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M21","v":0.889,"f":"=ROUND((D21*D21)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N21","v":0.392938,"f":"=(L21*M21)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O21","v":"تسليح سفلي للسقف كل 15 سم","bg":"#F8FAFC","fg":"#64748B"}]},{"r":22,"h":36.0,"cells":[{"c":"A22","v":18,"b":true,"al":"center"},{"c":"B22","v":"سقف الخزان المسلح (Roof Slab)","b":true},{"c":"C22","v":"غطاء سفلي باتجاه الطويل (Roof Bottom Long)","fg":"#1E293B"},{"c":"D22","v":10,"in":true,"b":true,"al":"center"},{"c":"E22","v":"سيخ مستقيم مع خطافين","fg":"#64748B","al":"center"},{"c":"F22","v":10.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G22","v":0.15,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H22","v":0.15,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I22","v":10.5,"f":"=F22+G22+H22","b":true,"al":"center","nf":"#,##0.00"},{"c":"J22","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"K22","v":42,"in":true,"fg":"#1E293B","al":"center"},{"c":"L22","v":441,"f":"=I22*J22*K22","b":true,"al":"center","nf":"#,##0.00"},{"c":"M22","v":0.617,"f":"=ROUND((D22*D22)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N22","v":0.272097,"f":"=(L22*M22)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O22","v":"تسليح سفلي كل 15 سم","fg":"#64748B"}]},{"r":23,"h":36.0,"cells":[{"c":"A23","v":19,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B23","v":"سقف الخزان المسلح (Roof Slab)","bg":"#F8FAFC","b":true},{"c":"C23","v":"شبكة علوية انكماش (Roof Top Mesh)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D23","v":10,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E23","v":"شبكة علوية متعامدة","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F23","v":6.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G23","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H23","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I23","v":6.2,"f":"=F23+G23+H23","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J23","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K23","v":68,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L23","v":421.6,"f":"=I23*J23*K23","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M23","v":0.617,"f":"=ROUND((D23*D23)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N23","v":0.260127,"f":"=(L23*M23)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O23","v":"مقاومة الانكماش الحراري والشمس فوق السطح","bg":"#F8FAFC","fg":"#64748B"}]},{"r":24,"h":36.0,"cells":[{"c":"A24","v":20,"b":true,"al":"center"},{"c":"B24","v":"سقف الخزان المسلح (Roof Slab)","b":true},{"c":"C24","v":"فواتير حديد حول فتحة النزول (Manhole Trimmers)","fg":"#1E293B"},{"c":"D24","v":16,"in":true,"b":true,"al":"center"},{"c":"E24","v":"فواتير أقطار إضافية","fg":"#64748B","al":"center"},{"c":"F24","v":1.8,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G24","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H24","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I24","v":1.8,"f":"=F24+G24+H24","b":true,"al":"center","nf":"#,##0.00"},{"c":"J24","v":2,"in":true,"fg":"#1E293B","al":"center"},{"c":"K24","v":8,"in":true,"fg":"#1E293B","al":"center"},{"c":"L24","v":28.8,"f":"=I24*J24*K24","b":true,"al":"center","nf":"#,##0.00"},{"c":"M24","v":1.58,"f":"=ROUND((D24*D24)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N24","v":0.045504,"f":"=(L24*M24)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O24","v":"فواتير قطرية ومحيطية حول فتحة الصيانة 60×60 سم","fg":"#64748B"}]},{"r":25,"h":42.0,"cells":[{"c":"A25","v":"إجمالي حديد خزان المياه الأرضي بالكامل (Total Water Tank Rebar)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"L25","v":6509.65,"f":"=SUM(L5:L24)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"M25","v":"-","bg":"#E2E8F0","al":"center"},{"c":"N25","v":7.479212,"f":"=SUM(N5:N24)","bg":"#FEF3C7","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"O25","v":"شامل الهالك وتفاصيل الواتر ستوب","bg":"#E2E8F0","fg":"#64748B"}]}]}]}