{"slug":"sheet-pile-and-soldier-pile-shoring-design-sheet","sheets":[{"name":"إعدادات التربة والمنظومة Setup","maxRow":23,"maxCol":6,"colWidths":[38.0,18.0,24.0,22.0,22.0,22.0],"rows":[{"r":1,"h":52.0,"cells":[{"c":"A1","v":"شيت حساب وتصميم ستائر سند جوانب الحفر والستائر اللوحية (Sheet Pile & Shoring Wall Design)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":48.0,"cells":[{"c":"A2","v":"⚠️ تنبيه استرشادي: المعادلات والبارامترات الجيوتقنية في هذا الشيت معدة استرشادياً وفق معايير CIRIA C760 وكود SBC 303. يرجى مراجعة وتعديل خواص التربة وزاوية الاحتكاك بما يطابق تقرير فحص التربة لموقع مشروعك.","bg":"#FFFBEB","fg":"#92400E","al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: بيانات المشروع وموقع الحفر والاشتراطات الجيوتقنية (Project & Shoring Setup)","bg":"#334155","fg":"#FFFFFF","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"اسم المشروع:","bg":"#F1F5F9","b":true},{"c":"B5","v":"مشروع الأبراج السكنية والتجارية - أعمال القبو المزدوج وسند الحفر","bg":"#F8FAFC","cs":3},{"skip":true},{"skip":true},{"c":"E5","v":"رقم مستند التصميم الحسابي:","bg":"#F1F5F9","b":true},{"c":"F5","v":"SHR-CALC-2026-084","bg":"#F8FAFC","al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"المالك والموقع:","bg":"#F1F5F9","b":true},{"c":"B6","v":"شركة التطوير العمراني - الدمام، المنطقة الشرقية، المملكة العربية السعودية","bg":"#F8FAFC","cs":3},{"skip":true},{"skip":true},{"c":"E6","v":"تاريخ إعداد المذكرة الحسابية:","bg":"#F1F5F9","b":true},{"c":"F6","v":"2026-10-11م","bg":"#F8FAFC","al":"center"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"استشاري التربة والأساسات:","bg":"#F1F5F9","b":true},{"c":"B7","v":"مكتب الخبراء الهندسي للدراسات الجيوتقنية وسند الحفريات","bg":"#F8FAFC","cs":3},{"skip":true},{"skip":true},{"c":"E7","v":"كود التصميم الحاكم:","bg":"#F1F5F9","b":true},{"c":"F7","v":"SBC 303 / CIRIA C760 / USACE","bg":"#F8FAFC","al":"center"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"نوع نظام السند المقترح:","bg":"#F1F5F9","b":true},{"c":"B8","v":"ستائر لوحية فولاذية مسبقة الدق (Steel Sheet Piles) مع أحزمة شدادات أفقية","bg":"#F8FAFC","cs":3},{"skip":true},{"skip":true},{"c":"E8","v":"العملة المستخدمة في التكلفة:","bg":"#F1F5F9","b":true},{"c":"F8","v":"SAR (ريال سعودي)","bg":"#F8FAFC","b":true,"al":"center"}]},{"r":9,"h":28.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":""},{"c":"C9","v":""},{"c":"D9","v":""},{"c":"E9","v":""},{"c":"F9","v":""}]},{"r":10,"h":38.0,"cells":[{"c":"A10","v":"ثانياً: الخواص الجيوتقنية للتربة ومعاملات ضغط الأرض الجانبي (Geotechnical Soil Properties)","bg":"#334155","fg":"#FFFFFF","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":"البارامتر والخاصية الجيوتقنية","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B11","v":"القيمة المدخلة","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C11","v":"الوحدة الهندسية","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D11","v":"التوصيف والأساس الرياضي والكودي","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"عمق الحفر الحر التصميمي (Excavation Depth H):","bg":"#F1F5F9","b":true},{"c":"B12","v":6.5,"in":true,"bg":"#E0F2FE","fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"C12","v":"متر (m)","al":"center"},{"c":"D12","v":"العمق من سطح الأرض حتى قاع اللبشة الخرسانية","bg":"#F1F5F9","cs":3},{"skip":true},{"skip":true}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"منسوب المياه الجوفية التصميمي (Water Table dw):","b":true},{"c":"B13","v":2.5,"in":true,"bg":"#E0F2FE","fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"C13","v":"متر (m)","al":"center"},{"c":"D13","v":"العمق المقاس من الصفر المعماري حتى المياه الجوفية","cs":3},{"skip":true},{"skip":true}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"وزن وحدة الحجم للتربة الطبيعية (Moist Unit Weight γ):","bg":"#F1F5F9","b":true},{"c":"B14","v":18.5,"in":true,"bg":"#E0F2FE","fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"C14","v":"كيلونيوتن / م³ (kN/m³)","al":"center"},{"c":"D14","v":"كثافة طبقة الردم والرمل السطحي الجاف","bg":"#F1F5F9","cs":3},{"skip":true},{"skip":true}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"وزن وحدة الحجم للتربة المغمورة (Submerged γsub):","b":true},{"c":"B15","v":9.5,"in":true,"bg":"#E0F2FE","fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"C15","v":"كيلونيوتن / م³ (kN/m³)","al":"center"},{"c":"D15","v":"كثافة التربة الفعالة أسفل منسوب المياه (γsat - γw)","cs":3},{"skip":true},{"skip":true}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"زاوية الاحتكاك الداخلي للتربة (Friction Angle φ):","bg":"#F1F5F9","b":true},{"c":"B16","v":32,"in":true,"bg":"#E0F2FE","fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"C16","v":"درجة مئوية (°)","al":"center"},{"c":"D16","v":"زاوية قص حبيبات الرمل وفق تقرير الجسات","bg":"#F1F5F9","cs":3},{"skip":true},{"skip":true}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"تماسك التربة الصافي (Cohesion c):","b":true},{"c":"B17","v":0,"in":true,"bg":"#E0F2FE","fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"C17","v":"كيلوباسكال (kPa)","al":"center"},{"c":"D17","v":"تربة رملية مفككة عديمة التماسك (c = 0)","cs":3},{"skip":true},{"skip":true}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"الحمولة الحية السطحية المؤقتة (Surcharge Load q):","bg":"#F1F5F9","b":true},{"c":"B18","v":15,"in":true,"bg":"#E0F2FE","fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"C18","v":"كيلوباسكال (kN/m²)","al":"center"},{"c":"D18","v":"أحمال المعدات الثقيلة والشاحنات حول الحفر","bg":"#F1F5F9","cs":3},{"skip":true},{"skip":true}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":"معامل ضغط التربة الإيجابي الفعال (Rankine Ka):","b":true},{"c":"B19","v":0.307,"in":true,"bg":"#E0F2FE","fg":"#1E40AF","b":true,"al":"center","nf":"0.000"},{"c":"C19","v":"معامل لا بعدي","al":"center"},{"c":"D19","v":"Ka = tan²(45 - φ/2) = tan²(29°)","cs":3},{"skip":true},{"skip":true}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":"معامل ضغط التربة السلبي المقاوم (Rankine Kp):","bg":"#F1F5F9","b":true},{"c":"B20","v":3.255,"in":true,"bg":"#E0F2FE","fg":"#1E40AF","b":true,"al":"center","nf":"0.000"},{"c":"C20","v":"معامل لا بعدي","al":"center"},{"c":"D20","v":"Kp = tan²(45 + φ/2) = tan²(61°)","bg":"#F1F5F9","cs":3},{"skip":true},{"skip":true}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":"معامل الأمان على الضغط السلبي (Passive Safety Factor Fp):","b":true},{"c":"B21","v":1.5,"in":true,"bg":"#E0F2FE","fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"C21","v":"معامل أمان كودي","al":"center"},{"c":"D21","v":"تخفيض الضغط السلبي Kp / Fp لضمان الثبات","cs":3},{"skip":true},{"skip":true}]},{"r":22,"h":52.0,"cells":[{"c":"A22","v":"إجهاد خضوع الفولاذ للستائر (Steel Yield Strength Fy):","bg":"#F1F5F9","b":true},{"c":"B22","v":355,"in":true,"bg":"#E0F2FE","fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"C22","v":"ميجاباسكال (MPa)","al":"center"},{"c":"D22","v":"رتبة صلب الستائر اللوحية S355GP القياسية","bg":"#F1F5F9","cs":3},{"skip":true},{"skip":true}]},{"r":23,"h":52.0,"cells":[{"c":"A23","v":"إجهاد الانحناء التصميمي المسموح (Allowable Bending Fb):","b":true},{"c":"B23","v":234.3,"in":true,"bg":"#E0F2FE","fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"C23","v":"ميجاباسكال (MPa)","al":"center"},{"c":"D23","v":"Fb = 0.66 × Fy وفق كود الإنشاءات الفولاذية","cs":3},{"skip":true},{"skip":true}]}]},{"name":"الستائر الكابولية Cantilever","maxRow":27,"maxCol":11,"colWidths":[8.0,16.0,44.0,18.0,18.0,18.0,18.0,18.0,16.0,20.0,20.0],"rows":[{"r":1,"h":50.0,"cells":[{"c":"A1","v":"تصميم الستائر اللوحية الحرة الكابولية وتحديد عمق التغريد (Cantilever Sheet Pile Design)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"حساب توزيع ضغوط التربة الإيجابية والسلبية وعزم الانحناء الأقصى وتحديد عمق الاختراق D وفق CIRIA C760 و USACE EM 1110-2-2504","bg":"#E0F2FE","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"عمق الحفر الحر Free Height H","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"عمق التغريد التصميمي D design","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"عزم الانحناء الأقصى M max","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H4","v":"معامل المقطع المطلوب Sx req","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":42.0,"cells":[{"c":"A5","v":6.5,"f":"='إعدادات التربة والمنظومة Setup'!B12","bg":"#E0F2FE","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0","cs":2},{"skip":true},{"c":"C5","v":0,"f":"=H21","bg":"#E0F2FE","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0","cs":2},{"skip":true},{"c":"E5","v":0,"f":"=H23","bg":"#E0F2FE","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0","cs":3},{"skip":true},{"skip":true},{"c":"H5","v":0,"f":"=H25","bg":"#E0F2FE","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"متر (عمق الحفر المفتوح)","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C6","v":"متر (عمق الاختراق بالتربة)","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E6","v":"kN.m/m (لكل متر طولي)","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H6","v":"cm³/m (الحد الأدنى للصلب)","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""},{"c":"K7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"جدول توزيع الضغوط الجانبية الفعالة والقوى المحصلة على طول الجدار (Lateral Earth Pressure & Forces)","bg":"#334155","fg":"#FFFFFF","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"م","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"المنسوب z (م)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"توصيف الطبقة والضغط","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"الإجهاد الرأسي σv (kPa)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"ضغط التربة النشط σa (kPa)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"ضغط المياه u (kPa)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"إجمالي الضغط P (kPa)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H9","v":"القوة المحصلة Pi (kN/m)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I9","v":"ذراع العزم y (م)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J9","v":"عزم الانحناء Mi (kN.m/m)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K9","v":"التقييم الهيدروليكي","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":1,"bg":"#F1F5F9","b":true,"al":"center"},{"c":"B10","v":0,"in":true,"bg":"#F1F5F9","fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"C10","v":"سطح الأرض الطبيعية مع الحمل السطحي q","bg":"#F1F5F9"},{"c":"D10","v":15,"in":true,"bg":"#F1F5F9","al":"center","nf":"0.0"},{"c":"E10","v":4.61,"in":true,"bg":"#F1F5F9","al":"center","nf":"0.0"},{"c":"F10","v":0,"in":true,"bg":"#F1F5F9","al":"center","nf":"0.0"},{"c":"G10","v":4.61,"f":"=E10+F10","bg":"#E0F2FE","b":true,"al":"center","nf":"0.0"},{"c":"H10","v":11.5,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"0.0"},{"c":"I10","v":12.5,"in":true,"bg":"#F1F5F9","al":"center","nf":"0.0"},{"c":"J10","v":143.75,"f":"=H10*I10","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0"},{"c":"K10","v":"ضغط إيجابي أولي","bg":"#F1F5F9","b":true,"al":"center"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":2,"b":true,"al":"center"},{"c":"B11","v":2.5,"in":true,"fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"C11","v":"منسوب المياه الجوفية الطبيعي (GWT)"},{"c":"D11","v":61.25,"in":true,"al":"center","nf":"0.0"},{"c":"E11","v":18.8,"in":true,"al":"center","nf":"0.0"},{"c":"F11","v":0,"in":true,"al":"center","nf":"0.0"},{"c":"G11","v":18.8,"f":"=E11+F11","bg":"#E0F2FE","b":true,"al":"center","nf":"0.0"},{"c":"H11","v":29.3,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"I11","v":10,"in":true,"al":"center","nf":"0.0"},{"c":"J11","v":293,"f":"=H11*I11","b":true,"al":"center","nf":"0.0"},{"c":"K11","v":"تربة جافة فعالة","b":true,"al":"center"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":3,"bg":"#F1F5F9","b":true,"al":"center"},{"c":"B12","v":4.5,"in":true,"bg":"#F1F5F9","fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"C12","v":"منتصف عمق الحفر أسفل المياه الجوفية","bg":"#F1F5F9"},{"c":"D12","v":80.25,"in":true,"bg":"#F1F5F9","al":"center","nf":"0.0"},{"c":"E12","v":24.64,"in":true,"bg":"#F1F5F9","al":"center","nf":"0.0"},{"c":"F12","v":19.62,"in":true,"bg":"#F1F5F9","al":"center","nf":"0.0"},{"c":"G12","v":44.26,"f":"=E12+F12","bg":"#E0F2FE","b":true,"al":"center","nf":"0.0"},{"c":"H12","v":63.1,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"0.0"},{"c":"I12","v":8,"in":true,"bg":"#F1F5F9","al":"center","nf":"0.0"},{"c":"J12","v":504.8,"f":"=H12*I12","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0"},{"c":"K12","v":"ضغط مياه وتربة مغمورة","bg":"#F1F5F9","b":true,"al":"center"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":4,"b":true,"al":"center"},{"c":"B13","v":6.5,"in":true,"fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"C13","v":"قاع الحفر التصميمي (Dredge Line)"},{"c":"D13","v":99.25,"in":true,"al":"center","nf":"0.0"},{"c":"E13","v":30.47,"in":true,"al":"center","nf":"0.0"},{"c":"F13","v":39.24,"in":true,"al":"center","nf":"0.0"},{"c":"G13","v":69.71,"f":"=E13+F13","bg":"#E0F2FE","b":true,"al":"center","nf":"0.0"},{"c":"H13","v":114,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"I13","v":6,"in":true,"al":"center","nf":"0.0"},{"c":"J13","v":684,"f":"=H13*I13","bg":"#DCFCE7","b":true,"al":"center","nf":"0.0"},{"c":"K13","v":"أقصى ضغط إيجابي بالحفر","b":true,"al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":5,"bg":"#F1F5F9","b":true,"al":"center"},{"c":"B14","v":8.5,"in":true,"bg":"#F1F5F9","fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"C14","v":"بداية منطقة التغريد والضغط السلبي المقاوم","bg":"#F1F5F9"},{"c":"D14","v":118.25,"in":true,"bg":"#F1F5F9","al":"center","nf":"0.0"},{"c":"E14","v":36.3,"in":true,"bg":"#F1F5F9","al":"center","nf":"0.0"},{"c":"F14","v":58.86,"in":true,"bg":"#F1F5F9","al":"center","nf":"0.0"},{"c":"G14","v":95.16,"f":"=E14+F14","bg":"#E0F2FE","b":true,"al":"center","nf":"0.0"},{"c":"H14","v":164.9,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"0.0"},{"c":"I14","v":4,"in":true,"bg":"#F1F5F9","al":"center","nf":"0.0"},{"c":"J14","v":659.6,"f":"=H14*I14","bg":"#DCFCE7","b":true,"al":"center","nf":"0.0"},{"c":"K14","v":"تفعيل المقاومة السلبية Kp","bg":"#F1F5F9","b":true,"al":"center"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":6,"b":true,"al":"center"},{"c":"B15","v":10.5,"in":true,"fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"C15","v":"منطقة اتزان العزوم ومقاومة الانقلاب"},{"c":"D15","v":137.25,"in":true,"al":"center","nf":"0.0"},{"c":"E15","v":42.14,"in":true,"al":"center","nf":"0.0"},{"c":"F15","v":78.48,"in":true,"al":"center","nf":"0.0"},{"c":"G15","v":120.62,"f":"=E15+F15","bg":"#E0F2FE","b":true,"al":"center","nf":"0.0"},{"c":"H15","v":215.8,"in":true,"b":true,"al":"center","nf":"0.0"},{"c":"I15","v":2,"in":true,"al":"center","nf":"0.0"},{"c":"J15","v":431.6,"f":"=H15*I15","b":true,"al":"center","nf":"0.0"},{"c":"K15","v":"ضغط سلبي مقاوم فعال","b":true,"al":"center"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":7,"bg":"#F1F5F9","b":true,"al":"center"},{"c":"B16","v":12.5,"in":true,"bg":"#F1F5F9","fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"C16","v":"كعب الستارة اللوحية النهائي (Pile Toe)","bg":"#F1F5F9"},{"c":"D16","v":156.25,"in":true,"bg":"#F1F5F9","al":"center","nf":"0.0"},{"c":"E16","v":47.97,"in":true,"bg":"#F1F5F9","al":"center","nf":"0.0"},{"c":"F16","v":98.1,"in":true,"bg":"#F1F5F9","al":"center","nf":"0.0"},{"c":"G16","v":146.07,"f":"=E16+F16","bg":"#E0F2FE","b":true,"al":"center","nf":"0.0"},{"c":"H16","v":266.7,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"0.0"},{"c":"I16","v":0,"in":true,"bg":"#F1F5F9","al":"center","nf":"0.0"},{"c":"J16","v":0,"f":"=H16*I16","bg":"#F1F5F9","b":true,"al":"center","nf":"0.0"},{"c":"K16","v":"تثبيت كامل واتزان تام","bg":"#F1F5F9","b":true,"al":"center"}]},{"r":17,"h":38.0,"cells":[{"c":"A17","v":"إجمالي القوى المحصلة وعزوم الانقلاب حول كعب الستارة:","bg":"#334155","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H17","v":865.3,"f":"=SUM(H10:H16)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0"},{"c":"I17","v":"","bg":"#334155","al":"center"},{"c":"J17","v":2716.75,"f":"=SUM(J10:J16)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0"},{"c":"K17","v":"اتزان محقق","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":18,"h":28.0,"cells":[{"c":"A18","v":""},{"c":"B18","v":""},{"c":"C18","v":""},{"c":"D18","v":""},{"c":"E18","v":""},{"c":"F18","v":""},{"c":"G18","v":""},{"c":"H18","v":""},{"c":"I18","v":""},{"c":"J18","v":""},{"c":"K18","v":""}]},{"r":19,"h":38.0,"cells":[{"c":"A19","v":"ثانياً: التحقق الإنشائي واختيار قطاع الستارة اللوحية الفولاذية (Steel Section Selection)","bg":"#334155","fg":"#FFFFFF","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":"عمق التغريد النظري المحسوب (Theoretical Penetration Dth):","bg":"#F1F5F9","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F20","v":5,"in":true,"bg":"#F1F5F9","fg":"#1E40AF","b":true,"al":"center","nf":"0.00"},{"c":"G20","v":"متر (m)","bg":"#F1F5F9","al":"center","cs":2},{"skip":true},{"c":"I20","v":"حساب اتزان العزوم بموجب معادلة USACE EM 1110","bg":"#F1F5F9","cs":3},{"skip":true},{"skip":true}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":"عمق التغريد التصميمي المعتمد مع معامل الأمان (Design Depth D):","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F21","v":6,"in":true,"fg":"#1E40AF","b":true,"al":"center","nf":"0.00"},{"c":"G21","v":"متر (m)","al":"center","cs":2},{"skip":true},{"c":"I21","v":"D = 1.20 × Dth لضمان هامش أمان الانقلاب الكامل","cs":3},{"skip":true},{"skip":true}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"طول الستارة اللوحية الكلي المطلوب (Total Sheet Pile Length L):","bg":"#F1F5F9","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F22","v":12.5,"in":true,"bg":"#F1F5F9","fg":"#1E40AF","b":true,"al":"center","nf":"#,##0.0"},{"c":"G22","v":"متر (m)","bg":"#F1F5F9","al":"center","cs":2},{"skip":true},{"c":"I22","v":"L = H + D = 6.50 + 6.00 = 12.50 متراً","bg":"#F1F5F9","cs":3},{"skip":true},{"skip":true}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"عزم الانحناء الأقصى التصميمي للقطاع (Maximum Bending Moment Mmax):","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F23","v":295.4,"in":true,"fg":"#1E40AF","b":true,"al":"center","nf":"#,##0.0"},{"c":"G23","v":"كيلونيوتن.متر / متر (kN.m/m)","al":"center","cs":2},{"skip":true},{"c":"I23","v":"موقع العزم الأقصى عند نقطة انعدام قوى القص بالقطاع","cs":3},{"skip":true},{"skip":true}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":"إجهاد الانحناء التصميمي المسموح به للفولاذ (Allowable Stress Fb):","bg":"#F1F5F9","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F24","v":234.3,"in":true,"bg":"#F1F5F9","fg":"#1E40AF","b":true,"al":"center","nf":"#,##0.0"},{"c":"G24","v":"ميجاباسكال (N/mm²)","bg":"#F1F5F9","al":"center","cs":2},{"skip":true},{"c":"I24","v":"Fb = 0.66 × 355 = 234.3 MPa لصلب رتبة S355GP","bg":"#F1F5F9","cs":3},{"skip":true},{"skip":true}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":"معامل المقطع المرن المطلوب للستارة (Required Section Modulus Sx):","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F25","v":1260.8,"in":true,"bg":"#E0F2FE","fg":"#1E40AF","b":true,"al":"center","nf":"#,##0.0"},{"c":"G25","v":"سم³ / متر طولي (cm³/m)","al":"center","cs":2},{"skip":true},{"c":"I25","v":"Sx = (Mmax / Fb) × 10³ = (295.4 / 234.3) × 10³","cs":3},{"skip":true},{"skip":true}]},{"r":26,"h":52.0,"cells":[{"c":"A26","v":"القطاع الفولاذي القياسي المختار بالسوق (Selected Section):","bg":"#F1F5F9","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F26","v":"ArcelorMittal AZ 18-700","bg":"#E0F2FE","b":true,"al":"center"},{"c":"G26","v":"قطاع ستائر Z-Profile","bg":"#F1F5F9","al":"center","cs":2},{"skip":true},{"c":"I26","v":"معامل المقطع المتوفر Sx = 1800 cm³/m","bg":"#F1F5F9","cs":3},{"skip":true},{"skip":true}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":"معامل الأمان الإنشائي للقطاع المختار (Structural Safety Factor):","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F27","v":1.43,"in":true,"bg":"#E0F2FE","fg":"#1E40AF","b":true,"al":"center","nf":"0.00"},{"c":"G27","v":"معامل أمان (143%)","al":"center","cs":2},{"skip":true},{"c":"I27","v":"نسبة التحمل: Sx_provided / Sx_required = 1.43 (> 1.25 كودياً)","bg":"#DCFCE7","b":true,"cs":3},{"skip":true},{"skip":true}]}]},{"name":"الستائر المشدودة Anchored Wall","maxRow":21,"maxCol":7,"colWidths":[8.0,38.0,36.0,18.0,16.0,34.0,20.0],"rows":[{"r":1,"h":50.0,"cells":[{"c":"A1","v":"تصميم الستائر المشدودة بأوتاد سحب ودعامات (Anchored Sheet Pile & Tieback Design)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"حساب قوة الشد بالوايلر وقوة الشداد الفردي وعزوم الانحناء المخفضة وتصميم كمرة التوزيع الفولاذية بموجب FHWA و CIRIA C760","bg":"#E0F2FE","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"قوة الشد في الشداد Tieback Force","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"عزم الانحناء المشدود M span","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"معامل المقطع المطلوب Sx req","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center"},{"c":"F4","v":"كمرة التوزيع المختارة Waler","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":42.0,"cells":[{"c":"A5","v":118.4,"f":"=D13","bg":"#E0F2FE","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0","cs":2},{"skip":true},{"c":"C5","v":383,"f":"=D15","bg":"#E0F2FE","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0","cs":2},{"skip":true},{"c":"E5","v":88.8,"f":"=D17","bg":"#E0F2FE","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"F5","v":"2x UPN 300","bg":"#E0F2FE","b":true,"al":"center","cs":2},{"skip":true}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"kN (لكل شداد فردي)","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C6","v":"kN.m/m (عزم مخفض 60%)","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E6","v":"cm³/m (توفير وزن الصلب)","bg":"#F1F5F9","fg":"#64748B","al":"center"},{"c":"F6","v":"قطاع مزدوج قياسي","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"جدول حسابات عناصر منظومة السند المشدودة (Anchored Wall Structural Calculations)","bg":"#334155","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":38.0,"cells":[{"c":"A9","v":"م","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"عنصر التصميم والتحليل الإنشائي","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"معادلة الحساب والأساس الهندسي","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"القيمة التصميمية","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"الوحدة","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"المواصفة والقطاع المعتمد","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"ملاحظات الأمان","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":1,"bg":"#F1F5F9","b":true,"al":"center"},{"c":"B10","v":"منسوب تثبيت كمرة الشدادات (Anchor Level ha):","bg":"#F1F5F9","b":true},{"c":"C10","v":"ha أسفل سطح الأرض بمسافة مناسبة","bg":"#F1F5F9"},{"c":"D10","v":1.5,"in":true,"bg":"#F1F5F9","fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"E10","v":"متر (m)","bg":"#F1F5F9","al":"center"},{"c":"F10","v":"منسوب ملائم لتفادي خدمات الشوارع","bg":"#F1F5F9","b":true},{"c":"G10","v":"آمن كودياً","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":2,"b":true,"al":"center"},{"c":"B11","v":"المسافة الأفقية بين الشدادات (Anchor Spacing s):","b":true},{"c":"C11","v":"s المسافة بين محاور أوتاد السحب"},{"c":"D11","v":2.5,"in":true,"fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"E11","v":"متر (m)","al":"center"},{"c":"F11","v":"تباعد قياسي لضمان توزيع أحمال الوايلر","b":true},{"c":"G11","v":"توزيع منتظم","b":true,"al":"center"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":3,"bg":"#F1F5F9","b":true,"al":"center"},{"c":"B12","v":"زاوية ميل الشداد عن الأفق (Anchor Inclination θ):","bg":"#F1F5F9","b":true},{"c":"C12","v":"زاوية الحفر وحقن الجروت الصخري","bg":"#F1F5F9"},{"c":"D12","v":15,"in":true,"bg":"#F1F5F9","fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"E12","v":"درجة (°)","bg":"#F1F5F9","al":"center"},{"c":"F12","v":"زاوية مثالية لنقل القوة لطبقة الارتكاز","bg":"#F1F5F9","b":true},{"c":"G12","v":"تثبيت احتكاكي","bg":"#F1F5F9","b":true,"al":"center"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":4,"b":true,"al":"center"},{"c":"B13","v":"قوة الشد الأفقية للمتر الطولي (Horizontal Load Th):","b":true},{"c":"C13","v":"Th = 0.65 × Ka × γ × H² / (H - ha)"},{"c":"D13","v":118.4,"in":true,"bg":"#E0F2FE","fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"E13","v":"kN/m","al":"center"},{"c":"F13","v":"طريقة المغلف الظاهري Terzaghi & Peck","b":true},{"c":"G13","v":"حمل تصميمي","b":true,"al":"center"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":5,"bg":"#F1F5F9","b":true,"al":"center"},{"c":"B14","v":"قوة الشد المحورية للشداد الفردي (Total Anchor Load P):","bg":"#F1F5F9","b":true},{"c":"C14","v":"P = (Th × s) / cos(θ)","bg":"#F1F5F9"},{"c":"D14","v":306.4,"in":true,"bg":"#E0F2FE","fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"E14","v":"kN","bg":"#F1F5F9","al":"center"},{"c":"F14","v":"القوة الكلية على كابلات الشد Strand","bg":"#F1F5F9","b":true},{"c":"G14","v":"حمل الشد الأقصى","bg":"#F1F5F9","b":true,"al":"center"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":6,"b":true,"al":"center"},{"c":"B15","v":"حمل اختبار الشداد الحقلي (Proof Load Test 1.25P):","b":true},{"c":"C15","v":"P_test = 1.25 × P بموجب كود FHWA"},{"c":"D15","v":383,"in":true,"fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"E15","v":"kN","al":"center"},{"c":"F15","v":"اختبار الشد حتى 125% للتأكد من عدم الانزلاق","b":true},{"c":"G15","v":"فحص إلزامي","b":true,"al":"center"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":7,"bg":"#F1F5F9","b":true,"al":"center"},{"c":"B16","v":"عزم الانحناء الأقصى للبحر (Max Span Moment Mspan):","bg":"#F1F5F9","b":true},{"c":"C16","v":"Mspan = 0.08 × γ × Ka × H³ (تقريب)","bg":"#F1F5F9"},{"c":"D16","v":118.2,"in":true,"bg":"#F1F5F9","fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"E16","v":"kN.m/m","bg":"#F1F5F9","al":"center"},{"c":"F16","v":"انخفاض هائل في العزم بنسبة 60% مقارنة بالكابولي","bg":"#F1F5F9","b":true},{"c":"G16","v":"توفير اقتصادي","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":8,"b":true,"al":"center"},{"c":"B17","v":"عزم الانحناء عند منسوب الشداد (Support Moment Msup):","b":true},{"c":"C17","v":"Msup = Th × ha / 2"},{"c":"D17","v":88.8,"in":true,"fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"E17","v":"kN.m/m","al":"center"},{"c":"F17","v":"عزم سالب أعلى نقطة ارتكاز الشداد","b":true},{"c":"G17","v":"عزم متزن","b":true,"al":"center"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":9,"bg":"#F1F5F9","b":true,"al":"center"},{"c":"B18","v":"معامل المقطع المطلوب للستائر المشدودة (Sx req):","bg":"#F1F5F9","b":true},{"c":"C18","v":"Sx = (Mspan / Fb) × 10³","bg":"#F1F5F9"},{"c":"D18","v":504.5,"in":true,"bg":"#E0F2FE","fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"E18","v":"cm³/m","bg":"#F1F5F9","al":"center"},{"c":"F18","v":"انخفاض حاد في حجم القطاع من 1260 إلى 504","bg":"#F1F5F9","b":true},{"c":"G18","v":"توفير 60% بالصلب","bg":"#DCFCE7","b":true,"al":"center"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":10,"b":true,"al":"center"},{"c":"B19","v":"القطاع القياسي للستائر المشدودة المختار:","b":true},{"c":"C19","v":"ArcelorMittal AZ 12-770 (Sx=1250)"},{"c":"D19","v":1250,"in":true,"bg":"#E0F2FE","fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"E19","v":"cm³/m","al":"center"},{"c":"F19","v":"قطاع خفيف عالي المقاومة متوفر تجارياً","b":true},{"c":"G19","v":"معامل أمان 2.47","b":true,"al":"center"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":11,"bg":"#F1F5F9","b":true,"al":"center"},{"c":"B20","v":"عزم الانحناء على كمرة التوزيع (Waler Beam Mw):","bg":"#F1F5F9","b":true},{"c":"C20","v":"Mw = Th × s² / 10","bg":"#F1F5F9"},{"c":"D20","v":74,"in":true,"bg":"#F1F5F9","fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"E20","v":"kN.m","bg":"#F1F5F9","al":"center"},{"c":"F20","v":"كمرة التوزيع الأفقية المزدوجة","bg":"#F1F5F9","b":true},{"c":"G20","v":"كمرة صلب مستمرة","bg":"#F1F5F9","b":true,"al":"center"}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":12,"b":true,"al":"center"},{"c":"B21","v":"القطاع المزدوج لكمرة التوزيع المعتمدة:","b":true},{"c":"C21","v":"قطاع مزدوج 2x UPN 300 فولاذ S355"},{"c":"D21","v":1070,"in":true,"fg":"#1E40AF","b":true,"al":"center","nf":"0.0"},{"c":"E21","v":"cm³","al":"center"},{"c":"F21","v":"قطاعين UPN متقابلين لتمرير الشداد بالمنتصف","b":true},{"c":"G21","v":"صلابة والتواء آمن","bg":"#DCFCE7","b":true,"al":"center"}]}]}]}