{"slug":"standby-diesel-generator-ats-synchronization-panel-and-fuel-system-boq-sheet","sheets":[{"name":"مقايسة المولدات والوقود","maxRow":26,"maxCol":9,"colWidths":[12.0,22.0,54.0,10.0,16.0,14.0,20.0,15.0,22.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"مقايسة مولدات الكهرباء الديزل الاحتياطية ولوحات التحويل الأوتوماتيكي (ATS) والتزامن وشبكة الوقود","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"جدول الكميات والأسعار التفصيلي (BOQ) لمحطة التوليد الاحتياطية وكواتم الصوت ونظام العادم والتبريد والوقود وفق ISO 8528 و NFPA 110 و SBC","bg":"#1B6B93","fg":"#E2E8F0","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"اسم المشروع:","bg":"#E2E8F0","b":true},{"c":"B4","v":"توريد وتركيب محطة توليد الكهرباء الاحتياطية للطوارئ","bg":"#FFFBEB","cs":2},{"skip":true},{"c":"D4","v":"الجهة المالكة:","bg":"#E2E8F0","b":true},{"c":"E4","v":"إدارة المشروعات الكهروميكانيكية والمرافق","bg":"#FFFBEB","cs":2},{"skip":true},{"c":"G4","v":"تاريخ المقايسة:","bg":"#E2E8F0","b":true},{"c":"H4","v":"2026-11-07","bg":"#FFFBEB","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"الاستشاري الهندسي:","bg":"#E2E8F0","b":true},{"c":"B5","v":"مكتب الاستشارات الهندسية للأعمال الكهروميكانيكية MEP","bg":"#FFFBEB","cs":2},{"skip":true},{"c":"D5","v":"الكود المرجعي:","bg":"#E2E8F0","b":true},{"c":"E5","v":"ISO 8528 / NFPA 110 /NFPA 30 / IEC 60947-6-1","bg":"#FFFBEB","cs":2},{"skip":true},{"c":"G5","v":"نسبة ضريبة القيمة المضافة:","bg":"#E2E8F0","b":true},{"c":"H5","v":0.15,"in":true,"bg":"#FFFBEB","b":true,"al":"center","nf":"0.0%","cs":2},{"skip":true}]},{"r":6,"h":28.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":""},{"c":"C6","v":""},{"c":"D6","v":""},{"c":"E6","v":""},{"c":"F6","v":""},{"c":"G6","v":""},{"c":"H6","v":""},{"c":"I6","v":""}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"كود البند","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B7","v":"قسم الأعمال","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C7","v":"بيان ومواصفات البند الفنية (شامل التوريد والتركيب والاختبار FAT/SAT)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D7","v":"الوحدة","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E7","v":"الكمية التقديرية","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F7","v":"معامل الاحتياط %","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G7","v":"الكمية النهائية [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H7","v":"سعر الوحدة","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I7","v":"الإجمالي الكلي [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":8,"h":104.0,"cells":[{"c":"A8","v":"GEN-01","b":true,"al":"center"},{"c":"B8","v":"وحدات التوليد الديزل","al":"center"},{"c":"C8","v":"توريد وتركيب واختبار مولد كهرباء ديزل احتياطي (Standby Rating 1000 kVA / 800 kW, 400V, 50Hz, 1500 RPM, PF 0.8) شامل المحرك ومولد التيار (Alternator IP23 Class H) ورادياتير 50°C"},{"c":"D8","v":"عدد","al":"center"},{"c":"E8","v":2,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F8","v":0,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G8","v":2,"f":"=ROUND(E8*(1+F8),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H8","v":385000,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I8","v":770000,"f":"=ROUND(G8*H8,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":9,"h":104.0,"cells":[{"c":"A9","v":"GEN-02","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B9","v":"وحدات التوليد الديزل","bg":"#F4F7FA","al":"center"},{"c":"C9","v":"توريد وتركيب حاوية كاتمة للصوت ومقاومة للعوامل الجوية (Weatherproof Sound Attenuated Canopy <= 75 dBA @ 7m) أو عزل صوتي لغرفة المولدات مع مخمدات الاهتزاز الزنبركية (Spring Isolators)","bg":"#F4F7FA"},{"c":"D9","v":"عدد","bg":"#F4F7FA","al":"center"},{"c":"E9","v":2,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F9","v":0,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G9","v":2,"f":"=ROUND(E9*(1+F9),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H9","v":48000,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I9","v":96000,"f":"=ROUND(G9*H9,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":10,"h":104.0,"cells":[{"c":"A10","v":"GEN-03","b":true,"al":"center"},{"c":"B10","v":"وحدات التوليد الديزل","al":"center"},{"c":"C10","v":"منظومة بدء التشغيل والبطاريات (24V DC Heavy Duty Lead-Acid Batteries) مع شاحن بطاريات أوتوماتيكي وسخان مياه المحرك (Jacket Water Heater) لضمان الإقلاع خلال 10 ثوانٍ (NFPA 110)"},{"c":"D10","v":"مجموعة","al":"center"},{"c":"E10","v":2,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F10","v":0,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G10","v":2,"f":"=ROUND(E10*(1+F10),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H10","v":14500,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I10","v":29000,"f":"=ROUND(G10*H10,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":11,"h":72.0,"cells":[{"c":"A11","v":"GEN-04","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B11","v":"لوحات التزامن و ATS","bg":"#F4F7FA","al":"center"},{"c":"C11","v":"توريد وتركيب لوحة تزامن وتقاسم أحمال أوتوماتيكية للمولدين (Generator Paralleling & Synchronization Panel 2x1600A ACB + Tie Breaker) شاملة وحدات تحكم DeepSea/ComAp","bg":"#F4F7FA"},{"c":"D11","v":"عدد","bg":"#F4F7FA","al":"center"},{"c":"E11","v":1,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F11","v":0,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G11","v":1,"f":"=ROUND(E11*(1+F11),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H11","v":145000,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I11","v":145000,"f":"=ROUND(G11*H11,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":12,"h":104.0,"cells":[{"c":"A12","v":"GEN-05","b":true,"al":"center"},{"c":"B12","v":"لوحات التزامن و ATS","al":"center"},{"c":"C12","v":"توريد وتركيب لوحة تحويل أوتوماتيكي رباعية الأقطاب (4-Pole Motorized Changeover ATS Panel 2500A, AC-33B, IEC 60947-6-1) مع التراشق الميكانيكي والكهربائي ووضع Bypass للصيانة"},{"c":"D12","v":"عدد","al":"center"},{"c":"E12","v":1,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F12","v":0,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G12","v":1,"f":"=ROUND(E12*(1+F12),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H12","v":92000,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I12","v":92000,"f":"=ROUND(G12*H12,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":13,"h":72.0,"cells":[{"c":"A13","v":"GEN-06","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B13","v":"لوحات التزامن و ATS","bg":"#F4F7FA","al":"center"},{"c":"C13","v":"توريد وتركيب لوحة تحويل أوتوماتيكي فرعية لأحمال السلامة ومضخات الحريق والمصاعد (Life Safety ATS Panel 630A) شاملة كابلات التحكم والربط بنظام BMS عبر Modbus TCP/IP","bg":"#F4F7FA"},{"c":"D13","v":"عدد","bg":"#F4F7FA","al":"center"},{"c":"E13","v":1,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F13","v":0,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G13","v":1,"f":"=ROUND(E13*(1+F13),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H13","v":34000,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I13","v":34000,"f":"=ROUND(G13*H13,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":14,"h":104.0,"cells":[{"c":"A14","v":"GEN-07","b":true,"al":"center"},{"c":"B14","v":"شبكة وخزانات الوقود","al":"center"},{"c":"C14","v":"توريد وتركيب خزان وقود ديزل يومي سعة 1500 لتر لكل مولد (Daily Service Fuel Tank 1500L) من الصاج الأسود 4 مم مع حوض احتواء التسرب (Bund Wall 110%) ومبين منسوب وعوامات كهربائية"},{"c":"D14","v":"عدد","al":"center"},{"c":"E14","v":2,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F14","v":0,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G14","v":2,"f":"=ROUND(E14*(1+F14),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H14","v":19500,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I14","v":39000,"f":"=ROUND(G14*H14,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":15,"h":104.0,"cells":[{"c":"A15","v":"GEN-08","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B15","v":"شبكة وخزانات الوقود","bg":"#F4F7FA","al":"center"},{"c":"C15","v":"توريد وتركيب خزان وقود ديزل رئيسي مزدوج الجدار سعة 10,000 لتر (Bulk Double-Wall Fuel Storage Tank 10,000L UL-142 / NFPA 30) شامل فتحة التفتيش وخطوط التهوية والملء السريع وحساس التسرب","bg":"#F4F7FA"},{"c":"D15","v":"عدد","bg":"#F4F7FA","al":"center"},{"c":"E15","v":1,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F15","v":0,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G15","v":1,"f":"=ROUND(E15*(1+F15),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H15","v":88000,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I15","v":88000,"f":"=ROUND(G15*H15,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":16,"h":104.0,"cells":[{"c":"A16","v":"GEN-09","b":true,"al":"center"},{"c":"B16","v":"شبكة وخزانات الوقود","al":"center"},{"c":"C16","v":"توريد وتركيب مجموعة مضخات نقل الوقود الأوتوماتيكية المزدوجة (Duplex Fuel Transfer Pump Skid - Duty/Standby 50 L/min) مع الفلاتر المزدوجة وفاصل المياه ولوحة التحكم PLC"},{"c":"D16","v":"مجموعة","al":"center"},{"c":"E16","v":1,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F16","v":0,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G16","v":1,"f":"=ROUND(E16*(1+F16),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H16","v":36000,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I16","v":36000,"f":"=ROUND(G16*H16,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":17,"h":104.0,"cells":[{"c":"A17","v":"GEN-10","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B17","v":"شبكة وخزانات الوقود","bg":"#F4F7FA","al":"center"},{"c":"C17","v":"توريد وتركيب مواسير صلب أسود بدون لحام لشبكة التغذية والراجع للوقود (Seamless Black Steel Pipes ASTM A53 Sch 40) شاملة المحابس الكروية وصمام الإغلاق السريع بالحريق (Fusible Link Valve)","bg":"#F4F7FA"},{"c":"D17","v":"م.ط","bg":"#F4F7FA","al":"center"},{"c":"E17","v":85,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F17","v":0.05,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G17","v":89.25,"f":"=ROUND(E17*(1+F17),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H17","v":320,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I17","v":28560,"f":"=ROUND(G17*H17,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":18,"h":72.0,"cells":[{"c":"A18","v":"GEN-11","b":true,"al":"center"},{"c":"B18","v":"العادم وتهوية الغرفة","al":"center"},{"c":"C18","v":"توريد وتركيب كاتم صوت عادم صناعي سكني عالي الكفاءة (Residential Grade Exhaust Silencer -29 dB) مع الوصلة المرنة الإستانلس (Stainless Steel Bellows) لكل مولد"},{"c":"D18","v":"عدد","al":"center"},{"c":"E18","v":2,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F18","v":0,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G18","v":2,"f":"=ROUND(E18*(1+F18),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H18","v":16500,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I18","v":33000,"f":"=ROUND(G18*H18,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":19,"h":104.0,"cells":[{"c":"A19","v":"GEN-12","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B19","v":"العادم وتهوية الغرفة","bg":"#F4F7FA","al":"center"},{"c":"C19","v":"توريد وتركيب مواسير العادم الفولاذية (Black Steel Exhaust Piping DN250) مع العزل الحراري بالصوف الصخري كثافة 100 كجم/م3 سمك 50 مم والتغليف بالألومنيوم (Aluminum Cladding) حتى السطح","bg":"#F4F7FA"},{"c":"D19","v":"م.ط","bg":"#F4F7FA","al":"center"},{"c":"E19","v":42,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F19","v":0.05,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G19","v":44.1,"f":"=ROUND(E19*(1+F19),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H19","v":890,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I19","v":39249,"f":"=ROUND(G19*H19,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":20,"h":72.0,"cells":[{"c":"A20","v":"GEN-13","b":true,"al":"center"},{"c":"B20","v":"العادم وتهوية الغرفة","al":"center"},{"c":"C20","v":"توريد وتركيب جريلات ومخمدات صوتية لدخول وطرد هواء التبريد لغرفة المولدات (Acoustic Intake & Discharge Attenuator Louvers) مع وصلة الكانفاس المرنة أمام الرادياتير"},{"c":"D20","v":"مجموعة","al":"center"},{"c":"E20","v":2,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F20","v":0,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G20","v":2,"f":"=ROUND(E20*(1+F20),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H20","v":29000,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I20","v":58000,"f":"=ROUND(G20*H20,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":21,"h":104.0,"cells":[{"c":"A21","v":"GEN-14","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B21","v":"الكابلات والتأريض والاختبار","bg":"#F4F7FA","al":"center"},{"c":"C21","v":"توريد وتمديد كابلات القوى النحاسية المسلحة أو المرنة (XLPE/PVC Cu Cables 4x(3x1x300mm2)+2x150mm2) بين المولدات ولوحة التزامن والـ ATS شاملة حوامل الكابلات والترامل","bg":"#F4F7FA"},{"c":"D21","v":"م.ط","bg":"#F4F7FA","al":"center"},{"c":"E21","v":65,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F21","v":0.05,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G21","v":68.25,"f":"=ROUND(E21*(1+F21),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H21","v":1650,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I21","v":112612.5,"f":"=ROUND(G21*H21,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":22,"h":72.0,"cells":[{"c":"A22","v":"GEN-15","b":true,"al":"center"},{"c":"B22","v":"الكابلات والتأريض والاختبار","al":"center"},{"c":"C22","v":"توريد وتنفيذ شبكة تأريض مستقلة لنقطة التعادل وجسم المولدات وخزانات الوقود (Neutral & Body Earthing Pits R <= 2 Ohm) شاملة قضبان النحاس وشرائط النحاس 30×3 مم"},{"c":"D22","v":"مجموعة","al":"center"},{"c":"E22","v":2,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F22","v":0,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G22","v":2,"f":"=ROUND(E22*(1+F22),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H22","v":11500,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I22","v":23000,"f":"=ROUND(G22*H22,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":23,"h":104.0,"cells":[{"c":"A23","v":"GEN-16","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B23","v":"الكابلات والتأريض والاختبار","bg":"#F4F7FA","al":"center"},{"c":"C23","v":"إجراء اختبارات التحميل القياسية بالموقع باستخدام بنك أحمال مستأجر (Site Load Bank Testing at 25%, 50%, 75%, 100% & 110% Load) لمدة 8 ساعات شاملة وقود الاختبار والتدريب","bg":"#F4F7FA"},{"c":"D23","v":"مقطوعية","bg":"#F4F7FA","al":"center"},{"c":"E23","v":1,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"F23","v":0,"in":true,"bg":"#FFFBEB","al":"center","nf":"0.0%"},{"c":"G23","v":1,"f":"=ROUND(E23*(1+F23),2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H23","v":24000,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I23","v":24000,"f":"=ROUND(G23*H23,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":"إجمالي قيمة أعمال محطة المولدات ولوحات ATS وشبكة الوقود (غير شامل الضريبة)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I24","v":1647421.5,"f":"=SUM(I8:I23)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":"ضريبة القيمة المضافة المقررة (VAT 15%)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I25","v":247113.23,"f":"=ROUND(I24*H5,2)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":"الإجمالي الكلي للمقايسة شامل ضريبة القيمة المضافة (Grand Total)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"I26","v":1894534.73,"f":"=I24+I25","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"}]}]},{"name":"حساب القدرة واستهلاك الوقود","maxRow":17,"maxCol":9,"colWidths":[14.0,38.0,16.0,13.0,20.0,18.0,22.0,18.0,24.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"حساب أحمال الطوارئ وتحديد قدرة المولدات (kVA) واستهلاك الديزل وسعة الخزانات","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"نموذج حسابي للأحمال الحرجة ومعامل التباين وتيار بدء المحركات واستهلاك الوقود بالساعة (ISO 8528 / NFPA 110)","bg":"#1B6B93","fg":"#E2E8F0","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"كود الحمل","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"مجموعة أحمال الطوارئ (Emergency Load Group)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"الحمل المتصل (kW)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"معامل الطلب (DF)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"الحمل الفعلي (kW) [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"معامل القدرة (cos φ)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"القدرة الظاهرية (kVA) [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"معامل تيار البدء","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"قدرة الإقلاع اللحظية (kVA) [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"LD-01","b":true,"al":"center"},{"c":"B5","v":"مضخات الحريق الكهربائية وتهوية سحب الدخان وإنذار الحريق (Life Safety)"},{"c":"C5","v":220,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"D5","v":1,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"E5","v":220,"f":"=ROUND(C5*D5,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F5","v":0.8,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"G5","v":275,"f":"=ROUND(E5/F5,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H5","v":2.2,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I5","v":605,"f":"=ROUND(G5*H5,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"LD-02","b":true,"al":"center"},{"c":"B6","v":"المصاعد الكهربائية للركاب والخدمة ومصعد رجال الإطفاء"},{"c":"C6","v":180,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"D6","v":0.75,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"E6","v":135,"f":"=ROUND(C6*D6,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F6","v":0.8,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"G6","v":168.75,"f":"=ROUND(E6/F6,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H6","v":1.8,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I6","v":303.75,"f":"=ROUND(G6*H6,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"LD-03","b":true,"al":"center"},{"c":"B7","v":"أحمال غرف الخوادم والبيانات وأنظمة UPS والاتصالات (IT & Data Center)"},{"c":"C7","v":240,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"D7","v":0.95,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"E7","v":228,"f":"=ROUND(C7*D7,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F7","v":0.9,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"G7","v":253.33,"f":"=ROUND(E7/F7,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H7","v":1.2,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I7","v":304,"f":"=ROUND(G7*H7,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"LD-04","b":true,"al":"center"},{"c":"B8","v":"مضخات مياه الشرب والصرف والتهوية الميكانيكية الأساسية"},{"c":"C8","v":190,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"D8","v":0.8,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"E8","v":152,"f":"=ROUND(C8*D8,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F8","v":0.8,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"G8","v":190,"f":"=ROUND(E8/F8,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H8","v":1.6,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I8","v":304,"f":"=ROUND(G8*H8,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"LD-05","b":true,"al":"center"},{"c":"B9","v":"إنارة الطوارئ والممرات والمداخل ومنظومة التحكم الأمني"},{"c":"C9","v":160,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"D9","v":0.9,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"E9","v":144,"f":"=ROUND(C9*D9,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F9","v":0.9,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"G9","v":160,"f":"=ROUND(E9/F9,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H9","v":1.1,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I9","v":176,"f":"=ROUND(G9*H9,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":"LD-06","b":true,"al":"center"},{"c":"B10","v":"أحمال التكييف الحرجة للمناطق التشغيلية وغرف التحكم"},{"c":"C10","v":520,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"D10","v":0.85,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"E10","v":442,"f":"=ROUND(C10*D10,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"F10","v":0.82,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"G10","v":539.02,"f":"=ROUND(E10/F10,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H10","v":1.7,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I10","v":916.33,"f":"=ROUND(G10*H10,2)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"إجمالي أحمال الطوارئ للمشروع","bg":"#E2E8F0","fg":"#0F2C59","b":true,"cs":2},{"skip":true},{"c":"C11","v":1510,"f":"=SUM(C5:C10)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"},{"c":"D11","v":0.875,"f":"=AVERAGE(D5:D10)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"},{"c":"E11","v":1321,"f":"=SUM(E5:E10)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"},{"c":"F11","v":0.836667,"f":"=AVERAGE(F5:F10)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"},{"c":"G11","v":1586.1,"f":"=SUM(G5:G10)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"},{"c":"H11","v":1.6,"f":"=AVERAGE(H5:H10)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"},{"c":"I11","v":1867.99,"f":"=MAX(I5:I10)+G11*0.6","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"}]},{"r":12,"h":28.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":""},{"c":"C12","v":""},{"c":"D12","v":""},{"c":"E12","v":""},{"c":"F12","v":""},{"c":"G12","v":""},{"c":"H12","v":""},{"c":"I12","v":""}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"حساب معدل استهلاك الوقود الديزل وتصميم سعة الخزان اليومي والخزان الرئيسي (0.26 لتر/ك.و.س عند التحميل)","bg":"#1B6B93","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"البيان","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B14","v":"وصف وحدة التوليد","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C14","v":"القدرة المقننة (kW)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D14","v":"نسبة التحميل التشغيلية","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E14","v":"القدرة الفعلية (kW) [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F14","v":"معدل الاستهلاك (لتر/ك.و.س)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G14","v":"الاستهلاك بالساعة (لتر/ساعة) [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H14","v":"ساعات التشغيل المطلوبة","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I14","v":"سعة الخزان المطلوبة (لتر) [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"TNK-01","b":true,"al":"center"},{"c":"B15","v":"الخزان اليومي للمولد الأول (1000 kVA / 800 kW) لمدة 8 ساعات"},{"c":"C15","v":800,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"D15","v":0.8,"in":true,"bg":"#FFFBEB","al":"center","nf":"0%"},{"c":"E15","v":640,"f":"=ROUND(C15*D15,1)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"F15","v":0.26,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"G15","v":166.4,"f":"=ROUND(E15*F15,1)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H15","v":8,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I15","v":1464,"f":"=ROUND(G15*H15*1.1,0)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"TNK-02","b":true,"al":"center"},{"c":"B16","v":"الخزان اليومي للمولد الثاني (1000 kVA / 800 kW) لمدة 8 ساعات"},{"c":"C16","v":800,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"D16","v":0.8,"in":true,"bg":"#FFFBEB","al":"center","nf":"0%"},{"c":"E16","v":640,"f":"=ROUND(C16*D16,1)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"F16","v":0.26,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"G16","v":166.4,"f":"=ROUND(E16*F16,1)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H16","v":8,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I16","v":1464,"f":"=ROUND(G16*H16*1.1,0)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"TNK-03","b":true,"al":"center"},{"c":"B17","v":"الخزان الرئيسي الأرضي/السطحي للمحطة (تشغيل مستمر 24 ساعة للمولدين)"},{"c":"C17","v":1600,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"D17","v":0.8,"in":true,"bg":"#FFFBEB","al":"center","nf":"0%"},{"c":"E17","v":1280,"f":"=ROUND(C17*D17,1)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"F17","v":0.26,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"G17","v":332.8,"f":"=ROUND(E17*F17,1)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H17","v":24,"in":true,"bg":"#FFFBEB","al":"center","nf":"#,##0.00"},{"c":"I17","v":9185,"f":"=ROUND(G17*H17*1.15,0)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]}]},{"name":"الملخص واختبارات القبول","maxRow":18,"maxCol":7,"colWidths":[14.0,26.0,36.0,24.0,34.0,28.0,24.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"الملخص المالي لأقسام محطة التوليد وقائمة فحوصات القبول والتشغيل التجريبي (FAT & SAT)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"تحليل التكلفة حسب النظام الفرعي وجدول اختبارات استلام المولدات ولوحات ATS وبنك الأحمال (NFPA 110 / ISO 8528)","bg":"#1B6B93","fg":"#E2E8F0","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"رقم القسم","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"النظام الفرعي لمحطة المولدات","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"عدد البنود","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"إجمالي التكلفة قبل الضريبة [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"نسبة القسم من الإجمالي % [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"قيمة ضريبة القيمة المضافة 15% [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"الإجمالي شامل الضريبة [Auto]","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"01","b":true,"al":"center"},{"c":"B5","v":"وحدات التوليد الديزل"},{"c":"C5","v":3,"in":true,"al":"center"},{"c":"D5","v":895000,"f":"=SUMIF('مقايسة المولدات والوقود'!$B$8:$B$23, B5, 'مقايسة المولدات والوقود'!$I$8:$I$23)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E5","v":0,"f":"=IF($D$10>0, D5/$D$10, 0)","bg":"#EFF6FF","al":"center","nf":"0.0%"},{"c":"F5","v":134250,"f":"=ROUND(D5*0.15, 2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"G5","v":1029250,"f":"=D5+F5","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"02","b":true,"al":"center"},{"c":"B6","v":"لوحات التزامن و ATS"},{"c":"C6","v":3,"in":true,"al":"center"},{"c":"D6","v":271000,"f":"=SUMIF('مقايسة المولدات والوقود'!$B$8:$B$23, B6, 'مقايسة المولدات والوقود'!$I$8:$I$23)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E6","v":0,"f":"=IF($D$10>0, D6/$D$10, 0)","bg":"#EFF6FF","al":"center","nf":"0.0%"},{"c":"F6","v":40650,"f":"=ROUND(D6*0.15, 2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"G6","v":311650,"f":"=D6+F6","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"03","b":true,"al":"center"},{"c":"B7","v":"شبكة وخزانات الوقود"},{"c":"C7","v":4,"in":true,"al":"center"},{"c":"D7","v":191560,"f":"=SUMIF('مقايسة المولدات والوقود'!$B$8:$B$23, B7, 'مقايسة المولدات والوقود'!$I$8:$I$23)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E7","v":0,"f":"=IF($D$10>0, D7/$D$10, 0)","bg":"#EFF6FF","al":"center","nf":"0.0%"},{"c":"F7","v":28734,"f":"=ROUND(D7*0.15, 2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"G7","v":220294,"f":"=D7+F7","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"04","b":true,"al":"center"},{"c":"B8","v":"العادم وتهوية الغرفة"},{"c":"C8","v":3,"in":true,"al":"center"},{"c":"D8","v":130249,"f":"=SUMIF('مقايسة المولدات والوقود'!$B$8:$B$23, B8, 'مقايسة المولدات والوقود'!$I$8:$I$23)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E8","v":0,"f":"=IF($D$10>0, D8/$D$10, 0)","bg":"#EFF6FF","al":"center","nf":"0.0%"},{"c":"F8","v":19537.35,"f":"=ROUND(D8*0.15, 2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"G8","v":149786.35,"f":"=D8+F8","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"05","b":true,"al":"center"},{"c":"B9","v":"الكابلات والتأريض والاختبار"},{"c":"C9","v":3,"in":true,"al":"center"},{"c":"D9","v":159612.5,"f":"=SUMIF('مقايسة المولدات والوقود'!$B$8:$B$23, B9, 'مقايسة المولدات والوقود'!$I$8:$I$23)","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"},{"c":"E9","v":0,"f":"=IF($D$10>0, D9/$D$10, 0)","bg":"#EFF6FF","al":"center","nf":"0.0%"},{"c":"F9","v":23941.88,"f":"=ROUND(D9*0.15, 2)","bg":"#EFF6FF","al":"center","nf":"#,##0.00"},{"c":"G9","v":183554.38,"f":"=D9+F9","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"الإجمالي الكلي لمقايسة محطة المولدات والـ ATS","bg":"#E2E8F0","fg":"#0F2C59","b":true,"cs":2},{"skip":true},{"c":"C10","v":16,"f":"=SUM(C5:C9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center"},{"c":"D10","v":1647421.5,"f":"=SUM(D5:D9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"},{"c":"E10","v":0,"f":"=SUM(E5:E9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"0.0%"},{"c":"F10","v":247113.23,"f":"=SUM(F5:F9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"},{"c":"G10","v":1894534.73,"f":"=SUM(G5:G9)","bg":"#E2E8F0","fg":"#0F2C59","b":true,"al":"center","nf":"#,##0.00"}]},{"r":11,"h":28.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":""},{"c":"C11","v":""},{"c":"D11","v":""},{"c":"E11","v":""},{"c":"F11","v":""},{"c":"G11","v":""}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"ضوابط اختبارات القبول بالمصنع والموقع لمولدات الطوارئ ولوحات ATS (Testing & Commissioning Checklist)","bg":"#1B6B93","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"كود الفحص","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B13","v":"النظام المختبر","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C13","v":"بيان الاختبار الهندسي (SAT / Commissioning)","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D13","v":"الكود المرجعي","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E13","v":"معيار القبول القياسي","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F13","v":"مدة / شروط الفحص","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G13","v":"حالة الفحص","bg":"#0F2C59","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":14,"h":72.0,"cells":[{"c":"A14","v":"SAT-01","b":true,"al":"center"},{"c":"B14","v":"سرعة الإقلاع والتحويل","al":"center"},{"c":"C14","v":"اختبار محاكاة انقطاع مصدر الشبكة العمومية وحساب زمن إقلاع المولد وتحويل مفتاح ATS"},{"c":"D14","v":"NFPA 110 Level 1","al":"center"},{"c":"E14","v":"وصول الجهد والتردد للاستقرار وتحويل الحمل خلال <= 10 ثوانٍ"},{"c":"F14","v":"3 محاولات متتالية على البارد","al":"center"},{"c":"G14","v":"إلزامي قبل التسليم","al":"center"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"SAT-02","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B15","v":"اختبار بنك الأحمال المتدرج","bg":"#F4F7FA","al":"center"},{"c":"C15","v":"اختبار التحميل المتدرج (Step Load Test 25% -> 50% -> 75% -> 100% -> 110%) ومراقبة الحرارة والضغط","bg":"#F4F7FA"},{"c":"D15","v":"ISO 8528-5 / G3","bg":"#F4F7FA","al":"center"},{"c":"E15","v":"ثبات التردد (±1%) والجهد (±2.5%) وحرارة المياه <= 95°C","bg":"#F4F7FA"},{"c":"F15","v":"4 ساعات متواصلة عند 100% + ساعة 110%","bg":"#F4F7FA","al":"center"},{"c":"G15","v":"إلزامي بحضور الاستشاري","bg":"#F4F7FA","al":"center"}]},{"r":16,"h":72.0,"cells":[{"c":"A16","v":"SAT-03","b":true,"al":"center"},{"c":"B16","v":"اختبار التزامن وتقاسم الأحمال","al":"center"},{"c":"C16","v":"اختبار دخول المولدين على التوازي (Auto-Synchronization) وتقاسم الحمل الفعال والغير فعال (kW / kVAr Sharing)"},{"c":"D16","v":"IEC 60947 / ISO 8528","al":"center"},{"c":"E16","v":"تفاوت تقاسم الحمل بين المولدين لا يتجاوز ±5% دون تيارات عكسية"},{"c":"F16","v":"عند تحميل 50% و80% وفصل أحد المولدين","al":"center"},{"c":"G16","v":"إلزامي لمحطات التزامن","al":"center"}]},{"r":17,"h":72.0,"cells":[{"c":"A17","v":"SAT-04","bg":"#F4F7FA","b":true,"al":"center"},{"c":"B17","v":"قياس مستوى الضوضاء","bg":"#F4F7FA","al":"center"},{"c":"C17","v":"قياس مستوى شدة الصوت المحيط بالحاوية الكاتمة أو خارج غرفة المولدات أثناء التحميل الكامل","bg":"#F4F7FA"},{"c":"D17","v":"ISO 3744 / स्थानीय البيئة","bg":"#F4F7FA","al":"center"},{"c":"E17","v":"مستوى الصوت <= 75 dBA على مسافة 7 أمتار (أو حسب المواصفة)","bg":"#F4F7FA"},{"c":"F17","v":"قراءات في 8 اتجاهات بجهاز معاير","bg":"#F4F7FA","al":"center"},{"c":"G17","v":"إلزامي قبل الاستلام","bg":"#F4F7FA","al":"center"}]},{"r":18,"h":72.0,"cells":[{"c":"A18","v":"SAT-05","b":true,"al":"center"},{"c":"B18","v":"منظومة نقل الوقود والحريق","al":"center"},{"c":"C18","v":"اختبار تشغيل مضخات نقل الديزل أوتوماتيكياً من الخزان الرئيسي وعمل صمام الإغلاق السريع بالحريق"},{"c":"D18","v":"NFPA 30 / NFPA 37","al":"center"},{"c":"E18","v":"إغلاق فوري لصمام الوقود عند تفعيل إنذار الحريق وعدم وجود أي تسريب"},{"c":"F18","v":"ضغط هيدروستاتيكي للمواسير عند 1.5 مرة","al":"center"},{"c":"G18","v":"إلزامي للأمن والسلامة","al":"center"}]}]}]}