{"slug":"steel-column-base-plate-and-anchor-bolt-design-sheet","sheets":[{"name":"إعدادات وبيانات القاعدة والعمود","maxRow":48,"maxCol":6,"colWidths":[8.0,42.0,26.0,18.0,24.0,38.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"نموذج وحسابات تصميم لوح قاعدة العمود الفولاذي ومسامير التثبيت وفق AISC 360-16 و ACI 318-19 و SBC 306","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"⚠️ تنبيه استرشادي: قيم الأحمال والقطاعات المدخلة هي قيم استرشادية، يرجى إدخال الأحمال التصميمية القصوى (Pu, Mu, Vu) من التحليل الإنشائي للمبنى ومراجعة تقرير التربة لمقاومة خرسانة القاعدة.","bg":"#FEF3C7","fg":"#92400E","al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":20.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: بيانات المشروع والتوصيف التعاقدي العام","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":1,"fg":"#334155","b":true,"al":"center"},{"c":"B5","v":"اسم المشروع الإنشائي","bg":"#F8FAFC","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"D5","v":"مشروع المستودعات اللوجستية والمباني الصناعية الفولاذية","cs":3},{"skip":true},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":2,"fg":"#334155","b":true,"al":"center"},{"c":"B6","v":"كود وموقع المشروع","bg":"#F8FAFC","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"D6","v":"المدينة الصناعية الثانية - الرياض (المملكة العربية السعودية)","cs":3},{"skip":true},{"skip":true}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":3,"fg":"#334155","b":true,"al":"center"},{"c":"B7","v":"المالك / جهة العمل","bg":"#F8FAFC","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"D7","v":"شركة التطوير اللوجستي والاستثماري","cs":3},{"skip":true},{"skip":true}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":4,"fg":"#334155","b":true,"al":"center"},{"c":"B8","v":"المكتب الهندسي الاستشاري","bg":"#F8FAFC","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"D8","v":"دار الاستشارات الهندسية للمنشآت المعدنية والخرسانية","cs":3},{"skip":true},{"skip":true}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":5,"fg":"#334155","b":true,"al":"center"},{"c":"B9","v":"المقاول العام المنفذ","bg":"#F8FAFC","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"D9","v":"الشركة المتقدمة للمقاولات العامة والإنشاءات الفولاذية","cs":3},{"skip":true},{"skip":true}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":6,"fg":"#334155","b":true,"al":"center"},{"c":"B10","v":"المرجع والكود الحاكم","bg":"#F8FAFC","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"D10","v":"كود AISC 360-16 / دليل AISC DG-1 / كود ACI 318-19 / كود SBC 306 & 304","cs":3},{"skip":true},{"skip":true}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":7,"fg":"#334155","b":true,"al":"center"},{"c":"B11","v":"تاريخ إعداد النموذج","bg":"#F8FAFC","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"D11","v":"أكتوبر 2026","cs":3},{"skip":true},{"skip":true}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":8,"fg":"#334155","b":true,"al":"center"},{"c":"B12","v":"وحدة القياس المعتمدة","bg":"#F8FAFC","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"D12","v":"النظام الدولي القياسي (kN - mm - MPa)","cs":3},{"skip":true},{"skip":true}]},{"r":13,"h":28.0,"cells":[{"c":"A13","v":""},{"c":"B13","v":""},{"c":"C13","v":""},{"c":"D13","v":""},{"c":"E13","v":""},{"c":"F13","v":""}]},{"r":14,"h":20.0,"cells":[{"c":"A14","v":""},{"c":"B14","v":""},{"c":"C14","v":""},{"c":"D14","v":""},{"c":"E14","v":""},{"c":"F14","v":""}]},{"r":15,"h":38.0,"cells":[{"c":"A15","v":"ثانياً: الأحمال التصميمية القصوى المؤثرة على قاعدة العمود (LRFD Factored Design Loads)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":1,"fg":"#334155","b":true,"al":"center"},{"c":"B16","v":"الحمل المحوري الرأسي التصميمي (Axial Load)","fg":"#1E293B","b":true},{"c":"C16","v":1250,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D16","v":"Pu","fg":"#2563EB","b":true,"al":"center"},{"c":"E16","v":"kN","fg":"#475569","al":"center"},{"c":"F16","v":"حمل ضغط رأسي أقصى (Compression)","fg":"#64748B"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":2,"fg":"#334155","b":true,"al":"center"},{"c":"B17","v":"عزم الانحناء حول المحور القوي (Major Moment)","fg":"#1E293B","b":true},{"c":"C17","v":185,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D17","v":"Mux","fg":"#2563EB","b":true,"al":"center"},{"c":"E17","v":"kN.m","fg":"#475569","al":"center"},{"c":"F17","v":"عزم الانحناء التصميمي في اتجاه طول اللوح N","fg":"#64748B"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":3,"fg":"#334155","b":true,"al":"center"},{"c":"B18","v":"عزم الانحناء حول المحور الضعيف (Minor Moment)","fg":"#1E293B","b":true},{"c":"C18","v":25,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D18","v":"Muy","fg":"#2563EB","b":true,"al":"center"},{"c":"E18","v":"kN.m","fg":"#475569","al":"center"},{"c":"F18","v":"عزم انحناء ثانوي في اتجاه عرض اللوح B","fg":"#64748B"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":4,"fg":"#334155","b":true,"al":"center"},{"c":"B19","v":"قوة القص الأفقية في اتجاه طول اللوح (Shear X)","fg":"#1E293B","b":true},{"c":"C19","v":110,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D19","v":"Vux","fg":"#2563EB","b":true,"al":"center"},{"c":"E19","v":"kN","fg":"#475569","al":"center"},{"c":"F19","v":"قوة القص التصميمية الموازية للاتجاه X","fg":"#64748B"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":5,"fg":"#334155","b":true,"al":"center"},{"c":"B20","v":"قوة القص الأفقية في اتجاه عرض اللوح (Shear Y)","fg":"#1E293B","b":true},{"c":"C20","v":45,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D20","v":"Vuy","fg":"#2563EB","b":true,"al":"center"},{"c":"E20","v":"kN","fg":"#475569","al":"center"},{"c":"F20","v":"قوة القص التصميمية الموازية للاتجاه Y","fg":"#64748B"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":6,"fg":"#334155","b":true,"al":"center"},{"c":"B21","v":"معامل تصعيد الأحمال المعتمد (Design Philosophy)","fg":"#1E293B","b":true},{"c":"C21","v":"LRFD / SBC","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D21","v":"Code","fg":"#2563EB","b":true,"al":"center"},{"c":"E21","v":"-","fg":"#475569","al":"center"},{"c":"F21","v":"طريقة معاملات الحمل ومقاومة المقاطع","fg":"#64748B"}]},{"r":22,"h":20.0,"cells":[{"c":"A22","v":""},{"c":"B22","v":""},{"c":"C22","v":""},{"c":"D22","v":""},{"c":"E22","v":""},{"c":"F22","v":""}]},{"r":23,"h":38.0,"cells":[{"c":"A23","v":"ثالثاً: الخصائص الهندسية لقطاع العمود الفولاذي (Steel Column Properties)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":1,"fg":"#334155","b":true,"al":"center"},{"c":"B24","v":"كود وتسمية قطاع العمود الفولاذي","fg":"#1E293B","b":true},{"c":"C24","v":"W12x96 (HEB 300 Equiv)","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D24","v":"Section","fg":"#2563EB","b":true,"al":"center"},{"c":"E24","v":"-","fg":"#475569","al":"center"},{"c":"F24","v":"قطاع قياسي مدرفل على الساخن عريض الفلانجة","fg":"#64748B"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":2,"fg":"#334155","b":true,"al":"center"},{"c":"B25","v":"الارتفاع الكلي لقطاع العمود (Depth)","fg":"#1E293B","b":true},{"c":"C25","v":323,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D25","v":"d","fg":"#2563EB","b":true,"al":"center"},{"c":"E25","v":"mm","fg":"#475569","al":"center"},{"c":"F25","v":"العمق الكلي للقطاع شامل الفلانجات","fg":"#64748B"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":3,"fg":"#334155","b":true,"al":"center"},{"c":"B26","v":"عرض فلانجة العمود الفولاذي (Flange Width)","fg":"#1E293B","b":true},{"c":"C26","v":309,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D26","v":"bf","fg":"#2563EB","b":true,"al":"center"},{"c":"E26","v":"mm","fg":"#475569","al":"center"},{"c":"F26","v":"عرض الفلانجة المقاومة للعزوم","fg":"#64748B"}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":4,"fg":"#334155","b":true,"al":"center"},{"c":"B27","v":"سماكة فلانجة العمود (Flange Thickness)","fg":"#1E293B","b":true},{"c":"C27","v":23,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D27","v":"tf","fg":"#2563EB","b":true,"al":"center"},{"c":"E27","v":"mm","fg":"#475569","al":"center"},{"c":"F27","v":"سماكة الفلانجة العلوية والسفلية","fg":"#64748B"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":5,"fg":"#334155","b":true,"al":"center"},{"c":"B28","v":"سماكة جسد العمود (Web Thickness)","fg":"#1E293B","b":true},{"c":"C28","v":14,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D28","v":"tw","fg":"#2563EB","b":true,"al":"center"},{"c":"E28","v":"mm","fg":"#475569","al":"center"},{"c":"F28","v":"سماكة الجسد المقاوم لقوى القص","fg":"#64748B"}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":6,"fg":"#334155","b":true,"al":"center"},{"c":"B29","v":"رتبة فولاذ قطاع العمود (Steel Grade)","fg":"#1E293B","b":true},{"c":"C29","v":"ASTM A992 / S355","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D29","v":"Grade","fg":"#2563EB","b":true,"al":"center"},{"c":"E29","v":"-","fg":"#475569","al":"center"},{"c":"F29","v":"فولاذ إنشائي عالي المقاومة","fg":"#64748B"}]},{"r":30,"h":34.0,"cells":[{"c":"A30","v":7,"fg":"#334155","b":true,"al":"center"},{"c":"B30","v":"إجهاد خضوع فولاذ العمود (Yield Strength)","fg":"#1E293B","b":true},{"c":"C30","v":345,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D30","v":"Fyc","fg":"#2563EB","b":true,"al":"center"},{"c":"E30","v":"MPa","fg":"#475569","al":"center"},{"c":"F30","v":"إجهاد الخضوع الاسمي لمعدن العمود","fg":"#64748B"}]},{"r":31,"h":20.0,"cells":[{"c":"A31","v":""},{"c":"B31","v":""},{"c":"C31","v":""},{"c":"D31","v":""},{"c":"E31","v":""},{"c":"F31","v":""}]},{"r":32,"h":38.0,"cells":[{"c":"A32","v":"رابعاً: الخصائص الهندسية لرقبة القاعدة الخرسانية والمونة غير القابلة للانكماش (Pedestal & Grout)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":33,"h":52.0,"cells":[{"c":"A33","v":1,"fg":"#334155","b":true,"al":"center"},{"c":"B33","v":"مقاومة الضغط المميزة للخرسانة (Compressive Strength)","fg":"#1E293B","b":true},{"c":"C33","v":30,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D33","v":"f'c","fg":"#2563EB","b":true,"al":"center"},{"c":"E33","v":"MPa","fg":"#475569","al":"center"},{"c":"F33","v":"مقاومة المكعب/الأسطوانة الخرسانية عند 28 يوماً","fg":"#64748B"}]},{"r":34,"h":34.0,"cells":[{"c":"A34","v":2,"fg":"#334155","b":true,"al":"center"},{"c":"B34","v":"عرض رقبة القاعدة الخرسانية (Pedestal Width)","fg":"#1E293B","b":true},{"c":"C34","v":800,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D34","v":"Bped","fg":"#2563EB","b":true,"al":"center"},{"c":"E34","v":"mm","fg":"#475569","al":"center"},{"c":"F34","v":"عرض الرقبة الخرسانية في اتجاه عرض اللوح","fg":"#64748B"}]},{"r":35,"h":34.0,"cells":[{"c":"A35","v":3,"fg":"#334155","b":true,"al":"center"},{"c":"B35","v":"طول رقبة القاعدة الخرسانية (Pedestal Length)","fg":"#1E293B","b":true},{"c":"C35","v":900,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D35","v":"Lped","fg":"#2563EB","b":true,"al":"center"},{"c":"E35","v":"mm","fg":"#475569","al":"center"},{"c":"F35","v":"طول الرقبة الخرسانية في اتجاه طول اللوح","fg":"#64748B"}]},{"r":36,"h":52.0,"cells":[{"c":"A36","v":4,"fg":"#334155","b":true,"al":"center"},{"c":"B36","v":"مساحة رقبة القاعدة الخرسانية الحاصرة (Pedestal Area)","fg":"#1E293B","b":true},{"c":"C36","v":720000,"f":"=C34*C35","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"D36","v":"A2","fg":"#2563EB","b":true,"al":"center"},{"c":"E36","v":"mm²","fg":"#475569","al":"center"},{"c":"F36","v":"مساحة الحصر الخرساني لحساب معامل الزيادة","fg":"#64748B"}]},{"r":37,"h":52.0,"cells":[{"c":"A37","v":5,"fg":"#334155","b":true,"al":"center"},{"c":"B37","v":"سماكة طبقة الجراوت غير القابل للانكماش (Grout Thickness)","fg":"#1E293B","b":true},{"c":"C37","v":40,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D37","v":"tg","fg":"#2563EB","b":true,"al":"center"},{"c":"E37","v":"mm","fg":"#475569","al":"center"},{"c":"F37","v":"مونة أسمنتية إيبوكسية لتسوية وتثبيت اللوح","fg":"#64748B"}]},{"r":38,"h":34.0,"cells":[{"c":"A38","v":6,"fg":"#334155","b":true,"al":"center"},{"c":"B38","v":"مقاومة الضغط التصميمية للجراوت (Grout Strength)","fg":"#1E293B","b":true},{"c":"C38","v":55,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D38","v":"f'g","fg":"#2563EB","b":true,"al":"center"},{"c":"E38","v":"MPa","fg":"#475569","al":"center"},{"c":"F38","v":"مقاومة الجراوت الإنشائي عالي المقاومة","fg":"#64748B"}]},{"r":39,"h":20.0,"cells":[{"c":"A39","v":""},{"c":"B39","v":""},{"c":"C39","v":""},{"c":"D39","v":""},{"c":"E39","v":""},{"c":"F39","v":""}]},{"r":40,"h":38.0,"cells":[{"c":"A40","v":"خامساً: الأبعاد المقترحة وخصائص معدن لوح القاعدة الفولاذي (Proposed Base Plate Geometry)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":41,"h":52.0,"cells":[{"c":"A41","v":1,"fg":"#334155","b":true,"al":"center"},{"c":"B41","v":"طول لوح القاعدة في اتجاه العزم الأكبر (Plate Length)","fg":"#1E293B","b":true},{"c":"C41","v":650,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D41","v":"N","fg":"#2563EB","b":true,"al":"center"},{"c":"E41","v":"mm","fg":"#475569","al":"center"},{"c":"F41","v":"طول اللوح الموازي للمحور القوي ومقاومة العزم Mux","fg":"#64748B"}]},{"r":42,"h":34.0,"cells":[{"c":"A42","v":2,"fg":"#334155","b":true,"al":"center"},{"c":"B42","v":"عرض لوح القاعدة الفولاذي (Plate Width)","fg":"#1E293B","b":true},{"c":"C42","v":550,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D42","v":"B","fg":"#2563EB","b":true,"al":"center"},{"c":"E42","v":"mm","fg":"#475569","al":"center"},{"c":"F42","v":"عرض اللوح الموازي لاتجاه فلانجة العمود","fg":"#64748B"}]},{"r":43,"h":34.0,"cells":[{"c":"A43","v":3,"fg":"#334155","b":true,"al":"center"},{"c":"B43","v":"السماكة المبدئية المقترحة للوح (Proposed Thickness)","fg":"#1E293B","b":true},{"c":"C43","v":36,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D43","v":"tp","fg":"#2563EB","b":true,"al":"center"},{"c":"E43","v":"mm","fg":"#475569","al":"center"},{"c":"F43","v":"سماكة اللوح الفولاذي المقترحة للتحقق الإنشائي","fg":"#64748B"}]},{"r":44,"h":34.0,"cells":[{"c":"A44","v":4,"fg":"#334155","b":true,"al":"center"},{"c":"B44","v":"مساحة سطح لوح القاعدة الفولاذي (Base Plate Area)","fg":"#1E293B","b":true},{"c":"C44","v":357500,"f":"=C41*C42","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"D44","v":"A1","fg":"#2563EB","b":true,"al":"center"},{"c":"E44","v":"mm²","fg":"#475569","al":"center"},{"c":"F44","v":"مساحة الارتكاز المباشرة على المونة والخرسانة","fg":"#64748B"}]},{"r":45,"h":34.0,"cells":[{"c":"A45","v":5,"fg":"#334155","b":true,"al":"center"},{"c":"B45","v":"رتبة فولاذ لوح القاعدة (Base Plate Steel Grade)","fg":"#1E293B","b":true},{"c":"C45","v":"ASTM A36 / S275","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D45","v":"Grade","fg":"#2563EB","b":true,"al":"center"},{"c":"E45","v":"-","fg":"#475569","al":"center"},{"c":"F45","v":"فولاذ كربوني إنشائي قياسي للألواح","fg":"#64748B"}]},{"r":46,"h":34.0,"cells":[{"c":"A46","v":6,"fg":"#334155","b":true,"al":"center"},{"c":"B46","v":"إجهاد خضوع فولاذ لوح القاعدة (Yield Strength)","fg":"#1E293B","b":true},{"c":"C46","v":250,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D46","v":"Fy","fg":"#2563EB","b":true,"al":"center"},{"c":"E46","v":"MPa","fg":"#475569","al":"center"},{"c":"F46","v":"إجهاد الخضوع المعتمد لحساب عزم الانحناء للوح","fg":"#64748B"}]},{"r":47,"h":75.0,"cells":[{"c":"A47","v":""},{"c":"B47","v":""},{"c":"C47","v":""},{"c":"D47","v":""},{"c":"E47","v":""},{"c":"F47","v":""}]},{"r":48,"h":52.0,"cells":[{"c":"A48","v":"مهندس التصميم الإنشائي / المكتب الفني:\nالتوقيع: .......................................","bg":"#F8FAFC","fg":"#334155","b":true,"al":"center","cs":2},{"skip":true},{"c":"C48","v":"مدير المشروعات / مهندس الموقع:\nالتوقيع: .......................................","bg":"#F8FAFC","fg":"#334155","b":true,"al":"center","cs":2},{"skip":true},{"c":"E48","v":"المهندس الاستشاري المشرف على التنفيذ:\nالتوقيع والختم: .......................................","bg":"#F8FAFC","fg":"#334155","b":true,"al":"center","cs":2},{"skip":true}]}]},{"name":"تصميم لوح القاعدة والإجهادات","maxRow":45,"maxCol":6,"colWidths":[8.0,44.0,26.0,18.0,24.0,38.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"حساب إجهادات الارتكاز وعزوم الكابولي وسماكة لوح القاعدة الفولاذي وفق دليل AISC Design Guide 1","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"تحليل وتدقيق مقاومة الارتكاز الخرساني (Concrete Bearing Capacity) وتحديد منطقة اللامركزية وتعيين السماكة المطلوبة لمقاومة خضوع اللوح.","bg":"#F8FAFC","fg":"#475569","al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":20.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: التحقق من إجهادات ومقاومة ارتكاز الخرسانة (Concrete Bearing Capacity Check)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":1,"fg":"#334155","b":true,"al":"center"},{"c":"B5","v":"مساحة سطح لوح القاعدة الفولاذي (Base Plate Area)","fg":"#1E293B","b":true},{"c":"C5","v":357500,"f":"='إعدادات وبيانات القاعدة والعمود'!C44","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"D5","v":"A1","fg":"#2563EB","b":true,"al":"center"},{"c":"E5","v":"mm²","fg":"#475569","al":"center"},{"c":"F5","v":"مساحة الارتكاز المباشرة للوح","fg":"#64748B"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":2,"fg":"#334155","b":true,"al":"center"},{"c":"B6","v":"مساحة رقبة القاعدة الخرسانية الحاصرة (Pedestal Area)","fg":"#1E293B","b":true},{"c":"C6","v":720000,"f":"='إعدادات وبيانات القاعدة والعمود'!C36","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0"},{"c":"D6","v":"A2","fg":"#2563EB","b":true,"al":"center"},{"c":"E6","v":"mm²","fg":"#475569","al":"center"},{"c":"F6","v":"مساحة الحصر الخرساني","fg":"#64748B"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":3,"fg":"#334155","b":true,"al":"center"},{"c":"B7","v":"معامل زيادة الارتكاز بتأثير الحصر الخرساني","fg":"#1E293B","b":true},{"c":"C7","v":1.41915,"f":"=MIN(2.0, SQRT(C6/C5))","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00"},{"c":"D7","v":"√(A2/A1)","fg":"#2563EB","b":true,"al":"center"},{"c":"E7","v":"-","fg":"#475569","al":"center"},{"c":"F7","v":"معامل الحصر محدد بحد أقصى 2.0 وفق AISC J8","fg":"#64748B"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":4,"fg":"#334155","b":true,"al":"center"},{"c":"B8","v":"مقاومة الارتكاز الاسمية المحسوبة للخرسانة (Nominal Bearing)","fg":"#1E293B","b":true},{"c":"C8","v":12937.326188,"f":"=0.85*'إعدادات وبيانات القاعدة والعمود'!C33*C5*C7/1000","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D8","v":"Pp_calc","fg":"#2563EB","b":true,"al":"center"},{"c":"E8","v":"kN","fg":"#475569","al":"center"},{"c":"F8","v":"Pp = 0.85 * f'c * A1 * √(A2/A1)","fg":"#64748B"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":5,"fg":"#334155","b":true,"al":"center"},{"c":"B9","v":"الحد الأقصى المطلق لمقاومة الارتكاز الاسمية","fg":"#1E293B","b":true},{"c":"C9","v":18232.5,"f":"=1.7*'إعدادات وبيانات القاعدة والعمود'!C33*C5/1000","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D9","v":"Pp_max","fg":"#2563EB","b":true,"al":"center"},{"c":"E9","v":"kN","fg":"#475569","al":"center"},{"c":"F9","v":"Pp_max = 1.7 * f'c * A1","fg":"#64748B"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":6,"fg":"#334155","b":true,"al":"center"},{"c":"B10","v":"المقاومة الاسمية المعتمدة للارتكاز (Nominal Capacity)","fg":"#1E293B","b":true},{"c":"C10","v":12937.326188,"f":"=MIN(C8, C9)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D10","v":"Pp","fg":"#2563EB","b":true,"al":"center"},{"c":"E10","v":"kN","fg":"#475569","al":"center"},{"c":"F10","v":"القيمة الأقل الحاكمة لمقاومة الارتكاز الاسمية","fg":"#64748B"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":7,"fg":"#334155","b":true,"al":"center"},{"c":"B11","v":"معامل تخفيض المقاومة للارتكاز الخرساني (LRFD Phi)","fg":"#1E293B","b":true},{"c":"C11","v":0.65,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"0.00"},{"c":"D11","v":"φc","fg":"#2563EB","b":true,"al":"center"},{"c":"E11","v":"-","fg":"#475569","al":"center"},{"c":"F11","v":"معامل الأمان الجزئي للارتكاز على الخرسانة","fg":"#64748B"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":8,"fg":"#334155","b":true,"al":"center"},{"c":"B12","v":"مقاومة الارتكاز التصميمية للخرسانة (Design Bearing Strength)","fg":"#1E293B","b":true},{"c":"C12","v":8409.262022,"f":"=C11*C10","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D12","v":"φc.Pp","fg":"#2563EB","b":true,"al":"center"},{"c":"E12","v":"kN","fg":"#475569","al":"center"},{"c":"F12","v":"المقاومة التصميمية القصوى المتاحة للارتكاز","fg":"#64748B"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":9,"fg":"#334155","b":true,"al":"center"},{"c":"B13","v":"أقصى إجهاد ارتكاز تصميمي مسموح به على الخرسانة","fg":"#1E293B","b":true},{"c":"C13","v":23.522411,"f":"=(C12*1000)/C5","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00"},{"c":"D13","v":"fp_max","fg":"#2563EB","b":true,"al":"center"},{"c":"E13","v":"MPa","fg":"#475569","al":"center"},{"c":"F13","v":"أقصى ضغط ارتكاز بوحدات الميجاباسكال N/mm²","fg":"#64748B"}]},{"r":14,"h":20.0,"cells":[{"c":"A14","v":""},{"c":"B14","v":""},{"c":"C14","v":""},{"c":"D14","v":""},{"c":"E14","v":""},{"c":"F14","v":""}]},{"r":15,"h":38.0,"cells":[{"c":"A15","v":"ثانياً: تحليل اللامركزية وتوزيع إجهادات الارتكاز (Eccentricity Analysis & Stress Regime)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":1,"fg":"#334155","b":true,"al":"center"},{"c":"B16","v":"اللامركزية الفعلية للأحمال (Eccentricity)","fg":"#1E293B","b":true},{"c":"C16","v":148,"f":"=('إعدادات وبيانات القاعدة والعمود'!C17*1000)/'إعدادات وبيانات القاعدة والعمود'!C16","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D16","v":"e","fg":"#2563EB","b":true,"al":"center"},{"c":"E16","v":"mm","fg":"#475569","al":"center"},{"c":"F16","v":"e = (Mux * 1000) / Pu","fg":"#64748B"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":2,"fg":"#334155","b":true,"al":"center"},{"c":"B17","v":"أقصى حمل ارتكاز لكل مليمتر طولي من عرض اللوح","fg":"#1E293B","b":true},{"c":"C17","v":12937.32605,"f":"=C13*'إعدادات وبيانات القاعدة والعمود'!C42","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D17","v":"q_max","fg":"#2563EB","b":true,"al":"center"},{"c":"E17","v":"N/mm","fg":"#475569","al":"center"},{"c":"F17","v":"q_max = fp_max * B","fg":"#64748B"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":3,"fg":"#334155","b":true,"al":"center"},{"c":"B18","v":"اللامركزية الحرجة الفاصلة (Critical Eccentricity)","fg":"#1E293B","b":true},{"c":"C18","v":276.690172,"f":"=('إعدادات وبيانات القاعدة والعمود'!C41/2) - ('إعدادات وبيانات القاعدة والعمود'!C16*1000/(2*C17))","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D18","v":"e_crit","fg":"#2563EB","b":true,"al":"center"},{"c":"E18","v":"mm","fg":"#475569","al":"center"},{"c":"F18","v":"e_crit = N/2 - Pu / (2 * q_max)","fg":"#64748B"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":4,"fg":"#334155","b":true,"al":"center"},{"c":"B19","v":"حالة ونظام اللامركزية الحاكم (Eccentricity Regime)","fg":"#1E293B","b":true},{"c":"C19","v":"لا مركزية صغيرة (Small e) - ضغط كامل بدون شد مسامير","f":"=IF(C16<=C18, \"لا مركزية صغيرة (Small e) - ضغط كامل بدون شد مسامير\", \"لا مركزية كبيرة (Large e) - يتولد شد في المسامير\")","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D19","v":"Regime","fg":"#2563EB","b":true,"al":"center"},{"c":"E19","v":"-","fg":"#475569","al":"center"},{"c":"F19","v":"تحديد الحاجة لتشغيل مسامير التثبيت في الشد","fg":"#64748B"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":5,"fg":"#334155","b":true,"al":"center"},{"c":"B20","v":"طول مسافة ضغط الارتكاز الفعالة (Bearing Length)","fg":"#1E293B","b":true},{"c":"C20","v":531,"f":"=IF(C16<=C18, 3*('إعدادات وبيانات القاعدة والعمود'!C41/2 - C16), ('إعدادات وبيانات القاعدة والعمود'!C41/2 + 250) - SQRT(('إعدادات وبيانات القاعدة والعمود'!C41/2 + 250)^2 - (2*'إعدادات وبيانات القاعدة والعمود'!C16*1000*(C16 + 250))/C17))","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D20","v":"Y","fg":"#2563EB","b":true,"al":"center"},{"c":"E20","v":"mm","fg":"#475569","al":"center"},{"c":"F20","v":"طول مساحة التماس المضغوطة تحت اللوح","fg":"#64748B"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":6,"fg":"#334155","b":true,"al":"center"},{"c":"B21","v":"إجمالي قوة الشد المتولدة على مسامير التثبيت","fg":"#1E293B","b":true},{"c":"C21","v":0,"f":"=IF(C16<=C18, 0, ROUND((C20*C17/1000) - 'إعدادات وبيانات القاعدة والعمود'!C16, 1))","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D21","v":"Tu","fg":"#2563EB","b":true,"al":"center"},{"c":"E21","v":"kN","fg":"#475569","al":"center"},{"c":"F21","v":"قوة الشد الكلية التصميمية المقاومة للعزم","fg":"#64748B"}]},{"r":22,"h":52.0,"cells":[{"c":"A22","v":7,"fg":"#334155","b":true,"al":"center"},{"c":"B22","v":"إجهاد الارتكاز الفعلي الواقع على الخرسانة (Bearing Stress)","fg":"#1E293B","b":true},{"c":"C22","v":4.280089,"f":"=('إعدادات وبيانات القاعدة والعمود'!C16*1000)/('إعدادات وبيانات القاعدة والعمود'!C42*C20)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D22","v":"fp_act","fg":"#2563EB","b":true,"al":"center"},{"c":"E22","v":"MPa","fg":"#475569","al":"center"},{"c":"F22","v":"fp_act = Pu / (B * Y)","fg":"#64748B"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":8,"fg":"#334155","b":true,"al":"center"},{"c":"B23","v":"نسبة إجهاد الارتكاز الفعلي للمسموح به (Bearing Ratio)","fg":"#1E293B","b":true},{"c":"C23","v":0.182,"f":"=ROUND(C22/C13, 3)","fg":"#1E3A8A","b":true,"al":"center","nf":"0.000"},{"c":"D23","v":"D/C Ratio","fg":"#2563EB","b":true,"al":"center"},{"c":"E23","v":"-","fg":"#475569","al":"center"},{"c":"F23","v":"نسبة الاستخدام ويشترط أن تكون <= 1.00","fg":"#64748B"}]},{"r":24,"h":20.0,"cells":[{"c":"A24","v":""},{"c":"B24","v":""},{"c":"C24","v":""},{"c":"D24","v":""},{"c":"E24","v":""},{"c":"F24","v":""}]},{"r":25,"h":38.0,"cells":[{"c":"A25","v":"ثالثاً: حساب أبعاد الكابولي وخطوط الخضوع للوح (Base Plate Cantilever Distances)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":26,"h":52.0,"cells":[{"c":"A26","v":1,"fg":"#334155","b":true,"al":"center"},{"c":"B26","v":"طول كابولي اللوح في اتجاه طول العمود (Length Cantilever)","fg":"#1E293B","b":true},{"c":"C26","v":171.575,"f":"=('إعدادات وبيانات القاعدة والعمود'!C41 - 0.95*'إعدادات وبيانات القاعدة والعمود'!C25)/2","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D26","v":"m","fg":"#2563EB","b":true,"al":"center"},{"c":"E26","v":"mm","fg":"#475569","al":"center"},{"c":"F26","v":"m = (N - 0.95 * d) / 2","fg":"#64748B"}]},{"r":27,"h":52.0,"cells":[{"c":"A27","v":2,"fg":"#334155","b":true,"al":"center"},{"c":"B27","v":"عرض كابولي اللوح في اتجاه فلانجة العمود (Width Cantilever)","fg":"#1E293B","b":true},{"c":"C27","v":151.4,"f":"=('إعدادات وبيانات القاعدة والعمود'!C42 - 0.80*'إعدادات وبيانات القاعدة والعمود'!C26)/2","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D27","v":"n","fg":"#2563EB","b":true,"al":"center"},{"c":"E27","v":"mm","fg":"#475569","al":"center"},{"c":"F27","v":"n = (B - 0.80 * bf) / 2","fg":"#64748B"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":3,"fg":"#334155","b":true,"al":"center"},{"c":"B28","v":"معامل هندسة قطاع العمود الحرج (Yield Line Geometry)","fg":"#1E293B","b":true},{"c":"C28","v":0.148573,"f":"=(4*'إعدادات وبيانات القاعدة والعمود'!C25*'إعدادات وبيانات القاعدة والعمود'!C26/('إعدادات وبيانات القاعدة والعمود'!C25+'إعدادات وبيانات القاعدة والعمود'!C26)^2)*('إعدادات وبيانات القاعدة والعمود'!C16/C12)","fg":"#1E3A8A","b":true,"al":"center","nf":"0.000"},{"c":"D28","v":"X","fg":"#2563EB","b":true,"al":"center"},{"c":"E28","v":"-","fg":"#475569","al":"center"},{"c":"F28","v":"X = [4*d*bf/(d+bf)²] * [Pu / (φc*Pp)]","fg":"#64748B"}]},{"r":29,"h":52.0,"cells":[{"c":"A29","v":4,"fg":"#334155","b":true,"al":"center"},{"c":"B29","v":"معامل خطوط الخضوع للوح بين الفلانجات (Yield Line Factor)","fg":"#1E293B","b":true},{"c":"C29","v":0.400942,"f":"=MIN(1.0, (2*SQRT(C28))/(1+SQRT(MAX(0.001, 1-C28))))","fg":"#1E3A8A","b":true,"al":"center","nf":"0.000"},{"c":"D29","v":"λ","fg":"#2563EB","b":true,"al":"center"},{"c":"E29","v":"-","fg":"#475569","al":"center"},{"c":"F29","v":"معامل الانحناء المركزي للوح وفق AISC","fg":"#64748B"}]},{"r":30,"h":52.0,"cells":[{"c":"A30","v":5,"fg":"#334155","b":true,"al":"center"},{"c":"B30","v":"المسافة المكافئة لخطوط الخضوع الداخلية (Equivalent Span)","fg":"#1E293B","b":true},{"c":"C30","v":78.980615,"f":"=SQRT('إعدادات وبيانات القاعدة والعمود'!C25*'إعدادات وبيانات القاعدة والعمود'!C26)/4","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D30","v":"n'","fg":"#2563EB","b":true,"al":"center"},{"c":"E30","v":"mm","fg":"#475569","al":"center"},{"c":"F30","v":"n' = √(d * bf) / 4","fg":"#64748B"}]},{"r":31,"h":34.0,"cells":[{"c":"A31","v":6,"fg":"#334155","b":true,"al":"center"},{"c":"B31","v":"طول كابولي خطوط الخضوع الداخلية المعدل","fg":"#1E293B","b":true},{"c":"C31","v":31.666646,"f":"=C29*C30","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D31","v":"λ.n'","fg":"#2563EB","b":true,"al":"center"},{"c":"E31","v":"mm","fg":"#475569","al":"center"},{"c":"F31","v":"كابولي الانحناء الداخلي بين فلانجات العمود","fg":"#64748B"}]},{"r":32,"h":52.0,"cells":[{"c":"A32","v":7,"fg":"#334155","b":true,"al":"center"},{"c":"B32","v":"طول الكابولي الحاكم لتصميم سماكة اللوح (Governing Cantilever)","fg":"#1E293B","b":true},{"c":"C32","v":171.575,"f":"=MAX(C26, C27, C31)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D32","v":"l_gov","fg":"#2563EB","b":true,"al":"center"},{"c":"E32","v":"mm","fg":"#475569","al":"center"},{"c":"F32","v":"l_gov = MAX(m, n, λ.n')","fg":"#64748B"}]},{"r":33,"h":20.0,"cells":[{"c":"A33","v":""},{"c":"B33","v":""},{"c":"C33","v":""},{"c":"D33","v":""},{"c":"E33","v":""},{"c":"F33","v":""}]},{"r":34,"h":38.0,"cells":[{"c":"A34","v":"رابعاً: حساب السماكة التصميمية المطلوبة والتحقق الإنشائي (Required Thickness & Safety Check)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":35,"h":34.0,"cells":[{"c":"A35","v":1,"fg":"#334155","b":true,"al":"center"},{"c":"B35","v":"السماكة المطلوبة لمقاومة إجهاد ضغط الارتكاز (Bearing)","fg":"#1E293B","b":true},{"c":"C35","v":33.465923,"f":"=C32*SQRT((2*C22)/(0.90*'إعدادات وبيانات القاعدة والعمود'!C46))","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D35","v":"treq_bearing","fg":"#2563EB","b":true,"al":"center"},{"c":"E35","v":"mm","fg":"#475569","al":"center"},{"c":"F35","v":"treq1 = l * √[ (2 * fp) / (0.90 * Fy) ]","fg":"#64748B"}]},{"r":36,"h":52.0,"cells":[{"c":"A36","v":2,"fg":"#334155","b":true,"al":"center"},{"c":"B36","v":"السماكة المطلوبة لمقاومة عزم شد المسامير (Tension Cantilever)","fg":"#1E293B","b":true},{"c":"C36","v":0,"f":"=IF(C21>0, 2.11*SQRT((C21*1000*125)/('إعدادات وبيانات القاعدة والعمود'!C42*'إعدادات وبيانات القاعدة والعمود'!C46)), 0)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D36","v":"treq_tension","fg":"#2563EB","b":true,"al":"center"},{"c":"E36","v":"mm","fg":"#475569","al":"center"},{"c":"F36","v":"treq2 = 2.11 * √[ (Tu * x) / (B * Fy) ]","fg":"#64748B"}]},{"r":37,"h":52.0,"cells":[{"c":"A37","v":3,"fg":"#334155","b":true,"al":"center"},{"c":"B37","v":"السماكة التصميمية الحاكمة المطلوبة للوح (Required Thickness)","fg":"#1E293B","b":true},{"c":"C37","v":33.5,"f":"=ROUNDUP(MAX(C35, C36), 1)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D37","v":"treq_gov","fg":"#2563EB","b":true,"al":"center"},{"c":"E37","v":"mm","fg":"#475569","al":"center"},{"c":"F37","v":"السماكة الدنيا الواجب توفيرها بالمليمتر","fg":"#64748B"}]},{"r":38,"h":52.0,"cells":[{"c":"A38","v":4,"fg":"#334155","b":true,"al":"center"},{"c":"B38","v":"السماكة الفعلية المنفذة للوح الفولاذي (Provided Thickness)","fg":"#1E293B","b":true},{"c":"C38","v":36,"f":"='إعدادات وبيانات القاعدة والعمود'!C43","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D38","v":"tp_prov","fg":"#2563EB","b":true,"al":"center"},{"c":"E38","v":"mm","fg":"#475569","al":"center"},{"c":"F38","v":"سماكة اللوح المحددة في المخططات الإنشائية","fg":"#64748B"}]},{"r":39,"h":52.0,"cells":[{"c":"A39","v":5,"fg":"#334155","b":true,"al":"center"},{"c":"B39","v":"نسبة كفاءة سماكة اللوح الفولاذي (Thickness Demand/Capacity)","fg":"#1E293B","b":true},{"c":"C39","v":0.931,"f":"=ROUND(C37/C38, 3)","fg":"#2563EB","b":true,"al":"center","nf":"0.000"},{"c":"D39","v":"D/C Ratio","fg":"#2563EB","b":true,"al":"center"},{"c":"E39","v":"-","fg":"#475569","al":"center"},{"c":"F39","v":"نسبة السماكة المطلوبة للسماكة المنفذة","fg":"#64748B"}]},{"r":40,"h":52.0,"cells":[{"c":"A40","v":6,"fg":"#334155","b":true,"al":"center"},{"c":"B40","v":"حالة التحقق والأمان الإنشائي لسماكة اللوح (Safety Verdict)","fg":"#1E293B","b":true},{"c":"C40","v":"محقق وآمن إنشائياً (PASS)","f":"=IF(C39<=1.0, \"محقق وآمن إنشائياً (PASS)\", \"غير محقق - يلزم زيادة سماكة اللوح (FAIL)\")","fg":"#166534","b":true,"al":"center"},{"c":"D40","v":"Status","fg":"#2563EB","b":true,"al":"center"},{"c":"E40","v":"-","fg":"#475569","al":"center"},{"c":"F40","v":"التحقق من كفاية سماكة اللوح ضد الانحناء","fg":"#64748B"}]},{"r":41,"h":52.0,"cells":[{"c":"A41","v":7,"fg":"#334155","b":true,"al":"center"},{"c":"B41","v":"وزن لوح القاعدة الفولاذي التقريبي (Estimated Plate Weight)","fg":"#1E293B","b":true},{"c":"C41","v":101,"f":"=ROUND(('إعدادات وبيانات القاعدة والعمود'!C41*'إعدادات وبيانات القاعدة والعمود'!C42*C38*7850)/1000000000, 1)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D41","v":"Weight","fg":"#2563EB","b":true,"al":"center"},{"c":"E41","v":"kg","fg":"#475569","al":"center"},{"c":"F41","v":"وزن اللوح الفولاذي بافتراض كثافة 7850 كجم/م³","fg":"#64748B"}]},{"r":42,"h":52.0,"cells":[{"c":"A42","v":8,"fg":"#334155","b":true,"al":"center"},{"c":"B42","v":"التوصية الهندسية للمكتب الفني (Technical Recommendation)","fg":"#1E293B","b":true},{"c":"C42","v":"سماكة اللوح آمنة ومثالية للمشروع","f":"=IF(C39<=0.85, \"سماكة اللوح آمنة واقتصادية تماماً\", IF(C39<=1.0, \"سماكة اللوح آمنة ومثالية للمشروع\", \"يجب زيادة سماكة اللوح إلى \" & TEXT(ROUNDUP(C37+2,0),\"0\") & \" مم\"))","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D42","v":"Notes","fg":"#2563EB","b":true,"al":"center"},{"c":"E42","v":"-","fg":"#475569","al":"center"},{"c":"F42","v":"توجيهات اعتماد لوح القاعدة بالموقع","fg":"#64748B"}]},{"r":43,"h":20.0,"cells":[{"c":"A43","v":""},{"c":"B43","v":""},{"c":"C43","v":""},{"c":"D43","v":""},{"c":"E43","v":""},{"c":"F43","v":""}]},{"r":44,"h":75.0,"cells":[{"c":"A44","v":""},{"c":"B44","v":""},{"c":"C44","v":""},{"c":"D44","v":""},{"c":"E44","v":""},{"c":"F44","v":""}]},{"r":45,"h":52.0,"cells":[{"c":"A45","v":"مهندس التصميم الإنشائي / المكتب الفني:\nالتوقيع: .......................................","bg":"#F8FAFC","fg":"#334155","b":true,"al":"center","cs":2},{"skip":true},{"c":"C45","v":"مدير المشروعات / مهندس الموقع:\nالتوقيع: .......................................","bg":"#F8FAFC","fg":"#334155","b":true,"al":"center","cs":2},{"skip":true},{"c":"E45","v":"المهندس الاستشاري المشرف على التنفيذ:\nالتوقيع والختم: .......................................","bg":"#F8FAFC","fg":"#334155","b":true,"al":"center","cs":2},{"skip":true}]}]},{"name":"تصميم مسامير التثبيت والقص","maxRow":44,"maxCol":6,"colWidths":[8.0,44.0,26.0,18.0,24.0,38.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"تصميم مسامير التثبيت وقوى الشد والقص وتماسك الخرسانة وفق ACI 318-19 Chapter 17 و SBC 304","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"فحوصات تفصيلية لمقاومة شد وقص الفولاذ (Steel Strength)، واقتلاع الخرسانة (Concrete Breakout & Pullout)، والتفاعل المشترك بين الشد والقص.","bg":"#F8FAFC","fg":"#475569","al":"center","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":20.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: مواصفات وأبعاد مسامير التثبيت (Anchor Rod Specifications & Layout)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":1,"fg":"#334155","b":true,"al":"center"},{"c":"B5","v":"إجمالي عدد مسامير التثبيت في القاعدة (Total Anchor Rods)","fg":"#1E293B","b":true},{"c":"C5","v":4,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"0"},{"c":"D5","v":"ntotal","fg":"#2563EB","b":true,"al":"center"},{"c":"E5","v":"-","fg":"#475569","al":"center"},{"c":"F5","v":"أربعة مسامير تثبيت موزعة على جانبي الفلانجات","fg":"#64748B"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":2,"fg":"#334155","b":true,"al":"center"},{"c":"B6","v":"عدد مسامير التثبيت المقاومة للشد في الجانب المشدود","fg":"#1E293B","b":true},{"c":"C6","v":2,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"0"},{"c":"D6","v":"nt","fg":"#2563EB","b":true,"al":"center"},{"c":"E6","v":"-","fg":"#475569","al":"center"},{"c":"F6","v":"مسماران في جهة الشد لمقاومة عزم الانحناء","fg":"#64748B"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":3,"fg":"#334155","b":true,"al":"center"},{"c":"B7","v":"القطر الاسمي لمسمار التثبيت (Nominal Diameter)","fg":"#1E293B","b":true},{"c":"C7","v":30,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D7","v":"db","fg":"#2563EB","b":true,"al":"center"},{"c":"E7","v":"mm","fg":"#475569","al":"center"},{"c":"F7","v":"مسامير قطر M30 عالية القوة","fg":"#64748B"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":4,"fg":"#334155","b":true,"al":"center"},{"c":"B8","v":"المواصفة القياسية ورتبة فولاذ المسامير","fg":"#1E293B","b":true},{"c":"C8","v":"ASTM F1554 Gr. 55","fg":"#1E3A8A","b":true,"al":"center"},{"c":"D8","v":"Grade","fg":"#2563EB","b":true,"al":"center"},{"c":"E8","v":"-","fg":"#475569","al":"center"},{"c":"F8","v":"فولاذ إنشائي عالي الشد لمسامير التثبيت","fg":"#64748B"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":5,"fg":"#334155","b":true,"al":"center"},{"c":"B9","v":"إجهاد خضوع مسمار التثبيت (Yield Strength)","fg":"#1E293B","b":true},{"c":"C9","v":380,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D9","v":"Fya","fg":"#2563EB","b":true,"al":"center"},{"c":"E9","v":"MPa","fg":"#475569","al":"center"},{"c":"F9","v":"إجهاد الخضوع الاسمي لرتبة Grade 55","fg":"#64748B"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":6,"fg":"#334155","b":true,"al":"center"},{"c":"B10","v":"إجهاد الشد الأقصى لمسمار التثبيت (Tensile Strength)","fg":"#1E293B","b":true},{"c":"C10","v":515,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D10","v":"Futa","fg":"#2563EB","b":true,"al":"center"},{"c":"E10","v":"MPa","fg":"#475569","al":"center"},{"c":"F10","v":"مقاومة الشد القصوى للمسمار","fg":"#64748B"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":7,"fg":"#334155","b":true,"al":"center"},{"c":"B11","v":"المساحة الإجمالية للمقطع العرضي للمسمار (Gross Area)","fg":"#1E293B","b":true},{"c":"C11","v":706.858347,"f":"=PI()*(C7^2)/4","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D11","v":"Ag","fg":"#2563EB","b":true,"al":"center"},{"c":"E11","v":"mm²","fg":"#475569","al":"center"},{"c":"F11","v":"مساحة مقطع ساق المسمار الدائري","fg":"#64748B"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":8,"fg":"#334155","b":true,"al":"center"},{"c":"B12","v":"المساحة الفعالة المقاومة لإجهاد الشد (Tensile Stress Area)","fg":"#1E293B","b":true},{"c":"C12","v":663.339587,"f":"=0.7854*(C7 - 0.9382)^2","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D12","v":"Ase","fg":"#2563EB","b":true,"al":"center"},{"c":"E12","v":"mm²","fg":"#475569","al":"center"},{"c":"F12","v":"مساحة المقاومة الصافية عند منطقة السن واللولب","fg":"#64748B"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":9,"fg":"#334155","b":true,"al":"center"},{"c":"B13","v":"عمق التثبيت الفعال للمسمار داخل الخرسانة (Embedment Depth)","fg":"#1E293B","b":true},{"c":"C13","v":450,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D13","v":"hef","fg":"#2563EB","b":true,"al":"center"},{"c":"E13","v":"mm","fg":"#475569","al":"center"},{"c":"F13","v":"عمق الغرس داخل رقبة القاعدة الخرسانية","fg":"#64748B"}]},{"r":14,"h":20.0,"cells":[{"c":"A14","v":""},{"c":"B14","v":""},{"c":"C14","v":""},{"c":"D14","v":""},{"c":"E14","v":""},{"c":"F14","v":""}]},{"r":15,"h":38.0,"cells":[{"c":"A15","v":"ثانياً: فحوصات مقاومة الشد لمسامير التثبيت وتماسك الخرسانة (Tension Checks - ACI 318)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":1,"fg":"#334155","b":true,"al":"center"},{"c":"B16","v":"قوة الشد التصميمية المطبقة على المسمار الواحد (Tension Demand)","fg":"#1E293B","b":true},{"c":"C16","v":0,"f":"='تصميم لوح القاعدة والإجهادات'!C21/C6","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D16","v":"Nua","fg":"#2563EB","b":true,"al":"center"},{"c":"E16","v":"kN","fg":"#475569","al":"center"},{"c":"F16","v":"Nua = Tu / nt","fg":"#64748B"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":2,"fg":"#334155","b":true,"al":"center"},{"c":"B17","v":"مقاومة شد الفولاذ الاسمية للمسمار (Steel Nominal Strength)","fg":"#1E293B","b":true},{"c":"C17","v":341.619887,"f":"=(C12*C10)/1000","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D17","v":"Nsa","fg":"#2563EB","b":true,"al":"center"},{"c":"E17","v":"kN","fg":"#475569","al":"center"},{"c":"F17","v":"Nsa = Ase * Futa","fg":"#64748B"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":3,"fg":"#334155","b":true,"al":"center"},{"c":"B18","v":"معامل تخفيض مقاومة شد الفولاذ للمسامير (Strength Factor)","fg":"#1E293B","b":true},{"c":"C18","v":0.75,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"0.00"},{"c":"D18","v":"φ_steel","fg":"#2563EB","b":true,"al":"center"},{"c":"E18","v":"-","fg":"#475569","al":"center"},{"c":"F18","v":"معامل خفض المقاومة للشد وفق ACI 17.5.3","fg":"#64748B"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":4,"fg":"#334155","b":true,"al":"center"},{"c":"B19","v":"مقاومة شد الفولاذ التصميمية للمسمار (Design Steel Strength)","fg":"#1E293B","b":true},{"c":"C19","v":256.214915,"f":"=C17*C18","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D19","v":"φNsa","fg":"#2563EB","b":true,"al":"center"},{"c":"E19","v":"kN","fg":"#475569","al":"center"},{"c":"F19","v":"φNsa = 0.75 * Nsa","fg":"#64748B"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":5,"fg":"#334155","b":true,"al":"center"},{"c":"B20","v":"نسبة التحقق من شد فولاذ المسمار (Steel Tension D/C)","fg":"#1E293B","b":true},{"c":"C20","v":0,"f":"=ROUND(C16/C19, 3)","fg":"#2563EB","b":true,"al":"center","nf":"0.000"},{"c":"D20","v":"D/C Steel","fg":"#2563EB","b":true,"al":"center"},{"c":"E20","v":"-","fg":"#475569","al":"center"},{"c":"F20","v":"نسبة الشد الفعلي للمقاومة التصميمية","fg":"#64748B"}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":6,"fg":"#334155","b":true,"al":"center"},{"c":"B21","v":"مقاومة اقتلاع الخرسانة الأساسية في الشد (Concrete Breakout)","fg":"#1E293B","b":true},{"c":"C21","v":1254.846604,"f":"=(24*1.0*SQRT('إعدادات وبيانات القاعدة والعمود'!C33)*(C13^1.5))/1000","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D21","v":"Nb","fg":"#2563EB","b":true,"al":"center"},{"c":"E21","v":"kN","fg":"#475569","al":"center"},{"c":"F21","v":"Nb = kc * λa * √f'c * hef^1.5","fg":"#64748B"}]},{"r":22,"h":52.0,"cells":[{"c":"A22","v":7,"fg":"#334155","b":true,"al":"center"},{"c":"B22","v":"مقاومة اقتلاع الخرسانة التصميمية لمجموعة المسامير","fg":"#1E293B","b":true},{"c":"C22","v":1273.669303,"f":"=0.70*C21*1.45","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D22","v":"φNcbg","fg":"#2563EB","b":true,"al":"center"},{"c":"E22","v":"kN","fg":"#475569","al":"center"},{"c":"F22","v":"تشمل تأثير مساحة مخروط الاقتلاع والتباعد والحافة","fg":"#64748B"}]},{"r":23,"h":52.0,"cells":[{"c":"A23","v":8,"fg":"#334155","b":true,"al":"center"},{"c":"B23","v":"نسبة التحقق من اقتلاع الخرسانة في الشد (Concrete Breakout D/C)","fg":"#1E293B","b":true},{"c":"C23","v":0,"f":"='تصميم لوح القاعدة والإجهادات'!C21/C22","fg":"#2563EB","b":true,"al":"center","nf":"0.000"},{"c":"D23","v":"D/C Breakout","fg":"#2563EB","b":true,"al":"center"},{"c":"E23","v":" -","fg":"#475569","al":"center"},{"c":"F23","v":"نسبة إجمالي قوة الشد Tu لمقاومة الاقتلاع","fg":"#64748B"}]},{"r":24,"h":52.0,"cells":[{"c":"A24","v":9,"fg":"#334155","b":true,"al":"center"},{"c":"B24","v":"حالة أمان مسامير التثبيت في الشد (Tension Safety Verdict)","fg":"#1E293B","b":true},{"c":"C24","v":"آمن ومحقق في الشد (PASS)","f":"=IF(MAX(C20, C23)<=1.0, \"آمن ومحقق في الشد (PASS)\", \"غير آمن - يلزم زيادة القطر أو عمق التثبيت (FAIL)\")","fg":"#166534","b":true,"al":"center"},{"c":"D24","v":"Status","fg":"#2563EB","b":true,"al":"center"},{"c":"E24","v":"-","fg":"#475569","al":"center"},{"c":"F24","v":"التحقق من كفاية المسامير ضد قوى الشد","fg":"#64748B"}]},{"r":25,"h":38.0,"cells":[{"c":"A25","v":"ثالثاً: التحقق من قوى القص ونقل الأحمال الأفقية (Shear Transfer & Bolt Shear Checks)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":26,"h":52.0,"cells":[{"c":"A26","v":1,"fg":"#334155","b":true,"al":"center"},{"c":"B26","v":"قوة القص التصميمية الأفقية الإجمالية (Factored Shear Load)","fg":"#1E293B","b":true},{"c":"C26","v":110,"f":"='إعدادات وبيانات القاعدة والعمود'!C19","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D26","v":"Vu","fg":"#2563EB","b":true,"al":"center"},{"c":"E26","v":"kN","fg":"#475569","al":"center"},{"c":"F26","v":"إجمالي قوة القص الأفقية المؤثرة","fg":"#64748B"}]},{"r":27,"h":52.0,"cells":[{"c":"A27","v":2,"fg":"#334155","b":true,"al":"center"},{"c":"B27","v":"معامل الاحتكاك بين لوح القاعدة والمونة (Friction Coefficient)","fg":"#1E293B","b":true},{"c":"C27","v":0.45,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"0.00"},{"c":"D27","v":"μ","fg":"#2563EB","b":true,"al":"center"},{"c":"E27","v":"-","fg":"#475569","al":"center"},{"c":"F27","v":"معامل الاحتكاك المعتمد بين اللوح والجراوت","fg":"#64748B"}]},{"r":28,"h":52.0,"cells":[{"c":"A28","v":3,"fg":"#334155","b":true,"al":"center"},{"c":"B28","v":"مقاومة القص التصميمية بالاحتكاك (Design Friction Capacity)","fg":"#1E293B","b":true},{"c":"C28","v":421.875,"f":"=0.75*C27*'إعدادات وبيانات القاعدة والعمود'!C16","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D28","v":"φVf","fg":"#2563EB","b":true,"al":"center"},{"c":"E28","v":"kN","fg":"#475569","al":"center"},{"c":"F28","v":"φVf = 0.75 * μ * Pu (المقاومة بالاحتكاك المباشر)","fg":"#64748B"}]},{"r":29,"h":52.0,"cells":[{"c":"A29","v":4,"fg":"#334155","b":true,"al":"center"},{"c":"B29","v":"صافي قوة القص المنقولة لمسامير التثبيت بعد خصم الاحتكاك","fg":"#1E293B","b":true},{"c":"C29","v":0,"f":"=MAX(0, C26 - C28)","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D29","v":"V_bolts","fg":"#2563EB","b":true,"al":"center"},{"c":"E29","v":"kN","fg":"#475569","al":"center"},{"c":"F29","v":"قوة القص المتبقية التي تتحملها المسامير","fg":"#64748B"}]},{"r":30,"h":52.0,"cells":[{"c":"A30","v":5,"fg":"#334155","b":true,"al":"center"},{"c":"B30","v":"قوة القص المؤثرة على المسمار الواحد (Shear Demand per Rod)","fg":"#1E293B","b":true},{"c":"C30","v":0,"f":"=C29/C5","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D30","v":"Vua","fg":"#2563EB","b":true,"al":"center"},{"c":"E30","v":"kN","fg":"#475569","al":"center"},{"c":"F30","v":"Vua = V_bolts / ntotal","fg":"#64748B"}]},{"r":31,"h":34.0,"cells":[{"c":"A31","v":6,"fg":"#334155","b":true,"al":"center"},{"c":"B31","v":"مقاومة قص الفولاذ الاسمية للمسمار (Nominal Bolt Shear)","fg":"#1E293B","b":true},{"c":"C31","v":204.971932,"f":"=(0.60*C12*C10)/1000","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D31","v":"Vsa","fg":"#2563EB","b":true,"al":"center"},{"c":"E31","v":"kN","fg":"#475569","al":"center"},{"c":"F31","v":"Vsa = 0.60 * Ase * Futa","fg":"#64748B"}]},{"r":32,"h":52.0,"cells":[{"c":"A32","v":7,"fg":"#334155","b":true,"al":"center"},{"c":"B32","v":"مقاومة قص الفولاذ التصميمية للمسمار (Design Steel Shear)","fg":"#1E293B","b":true},{"c":"C32","v":133.231756,"f":"=0.65*C31","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D32","v":"φVsa","fg":"#2563EB","b":true,"al":"center"},{"c":"E32","v":"kN","fg":"#475569","al":"center"},{"c":"F32","v":"φVsa = 0.65 * Vsa","fg":"#64748B"}]},{"r":33,"h":52.0,"cells":[{"c":"A33","v":8,"fg":"#334155","b":true,"al":"center"},{"c":"B33","v":"نسبة التحقق من قص فولاذ المسمار (Steel Shear D/C Ratio)","fg":"#1E293B","b":true},{"c":"C33","v":0,"f":"=ROUND(C30/C32, 3)","fg":"#2563EB","b":true,"al":"center","nf":"0.000"},{"c":"D33","v":"D/C Shear","fg":"#2563EB","b":true,"al":"center"},{"c":"E33","v":"-","fg":"#475569","al":"center"},{"c":"F33","v":"نسبة القص الفعلي للمقاومة التصميمية","fg":"#64748B"}]},{"r":34,"h":52.0,"cells":[{"c":"A34","v":9,"fg":"#334155","b":true,"al":"center"},{"c":"B34","v":"حالة أمان مسامير التثبيت في القص (Shear Safety Verdict)","fg":"#1E293B","b":true},{"c":"C34","v":"آمن ومحقق في القص (PASS)","f":"=IF(C33<=1.0, \"آمن ومحقق في القص (PASS)\", \"غير آمن - يلزم خافض قص Shear Lug (FAIL)\")","fg":"#166534","b":true,"al":"center"},{"c":"D34","v":"Status","fg":"#2563EB","b":true,"al":"center"},{"c":"E34","v":"-","fg":"#475569","al":"center"},{"c":"F34","v":"التحقق من كفاية المسامير ضد قوى القص","fg":"#64748B"}]},{"r":35,"h":38.0,"cells":[{"c":"A35","v":"رابعاً: التحقق من التفاعل المشترك بين قوى الشد والقص (Tension & Shear Interaction Check)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":36,"h":52.0,"cells":[{"c":"A36","v":1,"fg":"#334155","b":true,"al":"center"},{"c":"B36","v":"نسبة استخدام الشد الحاكمة للمسمار (Governing Tension Ratio)","fg":"#1E293B","b":true},{"c":"C36","v":0,"f":"=C20","fg":"#1E3A8A","b":true,"al":"center","nf":"0.000"},{"c":"D36","v":"(Nua/φNn)","fg":"#2563EB","b":true,"al":"center"},{"c":"E36","v":"-","fg":"#475569","al":"center"},{"c":"F36","v":"نسبة التحقق الأكبر في قوى الشد","fg":"#64748B"}]},{"r":37,"h":52.0,"cells":[{"c":"A37","v":2,"fg":"#334155","b":true,"al":"center"},{"c":"B37","v":"نسبة استخدام القص الحاكمة للمسمار (Governing Shear Ratio)","fg":"#1E293B","b":true},{"c":"C37","v":0,"f":"=C33","fg":"#1E3A8A","b":true,"al":"center","nf":"0.000"},{"c":"D37","v":"(Vua/φVn)","fg":"#2563EB","b":true,"al":"center"},{"c":"E37","v":"-","fg":"#475569","al":"center"},{"c":"F37","v":"نسبة التحقق الأكبر في قوى القص","fg":"#64748B"}]},{"r":38,"h":52.0,"cells":[{"c":"A38","v":3,"fg":"#334155","b":true,"al":"center"},{"c":"B38","v":"معادلة التفاعل المشترك التكعيبية (Elliptical Interaction)","fg":"#1E293B","b":true},{"c":"C38","v":0,"f":"=ROUND((C36^1.667) + (C37^1.667), 3)","fg":"#2563EB","b":true,"al":"center","nf":"0.000"},{"c":"D38","v":"Interaction","fg":"#2563EB","b":true,"al":"center"},{"c":"E38","v":"-","fg":"#475569","al":"center"},{"c":"F38","v":"(Nua/φNn)^5/3 + (Vua/φVn)^5/3 <= 1.00","fg":"#64748B"}]},{"r":39,"h":52.0,"cells":[{"c":"A39","v":4,"fg":"#334155","b":true,"al":"center"},{"c":"B39","v":"معادلة التفاعل المشترك الخطية المبسطة (Linear Interaction)","fg":"#1E293B","b":true},{"c":"C39","v":0,"f":"=ROUND(C36 + C37, 3)","fg":"#1E3A8A","b":true,"al":"center","nf":"0.000"},{"c":"D39","v":"Linear","fg":"#2563EB","b":true,"al":"center"},{"c":"E39","v":"-","fg":"#475569","al":"center"},{"c":"F39","v":"Nua/φNn + Vua/φVn <= 1.20 وفق ACI 17.8","fg":"#64748B"}]},{"r":40,"h":52.0,"cells":[{"c":"A40","v":5,"fg":"#334155","b":true,"al":"center"},{"c":"B40","v":"النتيجة النهائية لصلاحية وأمان مسامير التثبيت (Final Verdict)","fg":"#1E293B","b":true},{"c":"C40","v":"محقق ومقبول إنشائياً بالكامل (PASS)","f":"=IF(C38<=1.0, \"محقق ومقبول إنشائياً بالكامل (PASS)\", \"غير محقق - تفاعل الشد والقص يتجاوز الحدود (FAIL)\")","fg":"#166534","b":true,"al":"center"},{"c":"D40","v":"Verdict","fg":"#2563EB","b":true,"al":"center"},{"c":"E40","v":"-","fg":"#475569","al":"center"},{"c":"F40","v":"الاعتماد النهائي لمسامير تثبيت لوح القاعدة","fg":"#64748B"}]},{"r":41,"h":52.0,"cells":[{"c":"A41","v":6,"fg":"#334155","b":true,"al":"center"},{"c":"B41","v":"مقاس خط اللحام الزاوي المقترح لربط العمود باللوح (Weld Size)","fg":"#1E293B","b":true},{"c":"C41","v":10,"in":true,"fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0"},{"c":"D41","v":"aw","fg":"#2563EB","b":true,"al":"center"},{"c":"E41","v":"mm","fg":"#475569","al":"center"},{"c":"F41","v":"لحام زاوي مستمر حول فلانجات وجسد العمود بسلك E70XX","fg":"#64748B"}]},{"r":42,"h":20.0,"cells":[{"c":"A42","v":""},{"c":"B42","v":""},{"c":"C42","v":""},{"c":"D42","v":""},{"c":"E42","v":""},{"c":"F42","v":""}]},{"r":43,"h":75.0,"cells":[{"c":"A43","v":""},{"c":"B43","v":""},{"c":"C43","v":""},{"c":"D43","v":""},{"c":"E43","v":""},{"c":"F43","v":""}]},{"r":44,"h":52.0,"cells":[{"c":"A44","v":"مهندس التصميم الإنشائي / المكتب الفني:\nالتوقيع: .......................................","bg":"#F8FAFC","fg":"#334155","b":true,"al":"center","cs":2},{"skip":true},{"c":"C44","v":"مدير المشروعات / مهندس الموقع:\nالتوقيع: .......................................","bg":"#F8FAFC","fg":"#334155","b":true,"al":"center","cs":2},{"skip":true},{"c":"E44","v":"المهندس الاستشاري المشرف على التنفيذ:\nالتوقيع والختم: .......................................","bg":"#F8FAFC","fg":"#334155","b":true,"al":"center","cs":2},{"skip":true}]}]}]}