{"slug":"stormwater-drainage-and-attenuation-tank-sizing-sheet","sheets":[{"name":"تدفق السيول Rational Method","maxRow":34,"maxCol":9,"colWidths":[8.0,44.0,16.0,18.0,18.0,18.0,18.0,18.0,38.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت حساب وتصميم شبكات تصريف مياه الأمطار وخزانات التهدئة وفق SBC 702 ودليل وزارة البلديات","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"حساب تدفق الذروة عبر الطريقة النسبية Rational Method، معاملات الجريان C، زمن التركيز Tc، وشدة المطر لمنحنيات IDF","bg":"#0F172A","fg":"#E2E8F0","al":"center","cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"إجمالي مساحة حوض التصريف (A)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"معامل الجريان المرجح (Weighted C)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"تدفق الذروة التصميمي للسيول (Q_Peak)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H4","v":"فترة التكرار التصميمية المعتمدة","bg":"#CCFBF1","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":44.0,"cells":[{"c":"A5","v":32000,"f":"=E24","bg":"#F8FAFC","fg":"#0F766E","b":true,"al":"center","nf":"#,##0\" م²\"","cs":2},{"skip":true},{"c":"C5","v":0.763281,"f":"=G24","bg":"#F8FAFC","fg":"#0F766E","b":true,"al":"center","nf":"0.00","cs":2},{"skip":true},{"c":"E5","v":11847.068809,"f":"=D31","bg":"#F8FAFC","fg":"#0F766E","b":true,"al":"center","nf":"#,##0.0\" لتر/ثانية (\"#,##0.0\" م³/ساعة)\"","cs":3},{"skip":true},{"skip":true},{"c":"H5","v":"10 سنوات (IDF Return)","f":"=TEXT(D10,\"0\")&\" سنوات (IDF Return)\"","bg":"#CCFBF1","fg":"#0F766E","b":true,"al":"center","cs":2},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"Total Catchment Basin Area","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"C6","v":"Composite Runoff Coefficient","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"E6","v":"Peak Runoff Discharge Rate","bg":"#F8FAFC","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H6","v":"Design Return Period (Years)","bg":"#CCFBF1","fg":"#475569","al":"center","cs":2},{"skip":true}]},{"r":7,"h":14.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"أولاً: محددات الموقع والبيانات الهيدرولوجية والمناخية (Hydrological & Climate Inputs)","bg":"#0F766E","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":"م","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"بيان المتغير الهيدروليكي / المناخي","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"الرمز","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"القيمة المدخلة","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"الوحدة","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"المرجعية النظامية","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"التوصيف الهندسي والملاحظات","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":1,"bg":"#F0FDFA","al":"center"},{"c":"B10","v":"فترة التكرار التصميمية لشبكة تصريف الأمطار","bg":"#F0FDFA","b":true},{"c":"C10","v":"Return_Period","bg":"#F0FDFA","al":"center"},{"c":"D10","v":10,"in":true,"bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0.0"},{"c":"E10","v":"سنوات","bg":"#F0FDFA","al":"center"},{"c":"F10","v":"MOMRAH Drainage Manual","bg":"#F0FDFA","al":"center"},{"c":"G10","v":"10 سنوات للمجمعات التجارية والسكنية الداخلية","bg":"#F0FDFA","cs":3},{"skip":true},{"skip":true}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":2,"al":"center"},{"c":"B11","v":"المدينة والمحطة المناخية المعتمدة لبيانات IDF","b":true},{"c":"C11","v":"City_Station","al":"center"},{"c":"D11","v":"مدينة الرياض - المحطة المركزية","b":true,"al":"center"},{"c":"E11","v":"محطة","al":"center"},{"c":"F11","v":"أطلس الأمطار السعودي","al":"center"},{"c":"G11","v":"منحنيات الشدة والمدة والتكرار IDF","cs":3},{"skip":true},{"skip":true}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":3,"bg":"#F0FDFA","al":"center"},{"c":"B12","v":"زمن التركيز الهيدرولوجي الأولي (Inlet Time)","bg":"#F0FDFA","b":true},{"c":"C12","v":"Time_Inlet","bg":"#F0FDFA","al":"center"},{"c":"D12","v":10,"in":true,"bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0.0"},{"c":"E12","v":"دقيقة","bg":"#F0FDFA","al":"center"},{"c":"F12","v":"Kirpich / FAA Formula","bg":"#F0FDFA","al":"center"},{"c":"G12","v":"زمن وصول قطرة الماء من أبعد نقطة للمصيدة","bg":"#F0FDFA","cs":3},{"skip":true},{"skip":true}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":4,"al":"center"},{"c":"B13","v":"زمن السريان في خطوط وشبكات الأنابيب","b":true},{"c":"C13","v":"Time_Travel","al":"center"},{"c":"D13","v":5,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E13","v":"دقيقة","al":"center"},{"c":"F13","v":"Hydraulic Travel Time","al":"center"},{"c":"G13","v":"زمن الجريان في الأنابيب حتى المخرج النهائي","cs":3},{"skip":true},{"skip":true}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":5,"bg":"#F0FDFA","al":"center"},{"c":"B14","v":"إجمالي زمن التركيز التصميمي (Time of Conc.)","bg":"#F0FDFA","b":true},{"c":"C14","v":"Time_Tc","bg":"#F0FDFA","al":"center"},{"c":"D14","v":15,"f":"=D12+D13","bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0.0"},{"c":"E14","v":"دقيقة","bg":"#F0FDFA","al":"center"},{"c":"F14","v":"Tc = Ti + Tt","bg":"#F0FDFA","al":"center"},{"c":"G14","v":"الحد الأدنى الكودي لزمن التركيز = 15 دقيقة","bg":"#F0FDFA","cs":3},{"skip":true},{"skip":true}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":6,"al":"center"},{"c":"B15","v":"شدة هطول الأمطار التصميمية عند زمن التركيز","b":true},{"c":"C15","v":"Rainfall_I","al":"center"},{"c":"D15","v":48.5,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E15","v":"مم/ساعة","al":"center"},{"c":"F15","v":"معادلة IDF لمنطقة الرياض","al":"center"},{"c":"G15","v":"شدة العاصفة المطرية التصميمية (I)","cs":3},{"skip":true},{"skip":true}]},{"r":16,"h":38.0,"cells":[{"c":"A16","v":"ثانياً: حصر أسطح حوض التصريف وحساب معامل الجريان السطحي المرجح (Weighted Runoff Coefficient)","bg":"#0F766E","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"م","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B17","v":"نوع وطبيعة السطح المعماري (Catchment Surface)","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C17","v":"تصنيف النفاذية","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D17","v":"معامل الجريان (C)","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E17","v":"المساحة الفعلية (م²)","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F17","v":"المساحة بالهكتار (ha)","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G17","v":"حاصل ضرب المساحة والمعامل (C × A)","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H17","v":"النسبة من الإجمالي %","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I17","v":"المرجعية الهندسية والاشتراطات","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":1,"bg":"#F0FDFA","al":"center"},{"c":"B18","v":"أسطح المباني الخرسانية المعزولة (Roofs)","bg":"#F0FDFA"},{"c":"C18","v":"غير منفذ","bg":"#F0FDFA","al":"center"},{"c":"D18","v":0.9,"in":true,"bg":"#F0FDFA","b":true,"al":"center","nf":"0.00"},{"c":"E18","v":8500,"in":true,"bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0.0"},{"c":"F18","v":0.85,"f":"=E18/10000","bg":"#F0FDFA","al":"center","nf":"#,##0.00"},{"c":"G18","v":7650,"f":"=D18*E18","bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0.0"},{"c":"H18","v":0,"f":"=E18/$E$24","bg":"#F0FDFA","al":"center","nf":"0.0%"},{"c":"I18","v":"SBC 702 Table 1106.2","bg":"#F0FDFA"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":2,"al":"center"},{"c":"B19","v":"مواقف السيارات والطرق الإسفلتية (Asphalt Pavement)"},{"c":"C19","v":"غير منفذ","al":"center"},{"c":"D19","v":0.85,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E19","v":12000,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"F19","v":1.2,"f":"=E19/10000","al":"center","nf":"#,##0.00"},{"c":"G19","v":10200,"f":"=D19*E19","b":true,"al":"center","nf":"#,##0.0"},{"c":"H19","v":0,"f":"=E19/$E$24","al":"center","nf":"0.0%"},{"c":"I19","v":"MOMRAH Drainage Manual"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":3,"bg":"#F0FDFA","al":"center"},{"c":"B20","v":"ممرات المشاة وبلاط الإنترلوك (Concrete Pavers)","bg":"#F0FDFA"},{"c":"C20","v":"شبه منفذ","bg":"#F0FDFA","al":"center"},{"c":"D20","v":0.7,"in":true,"bg":"#F0FDFA","b":true,"al":"center","nf":"0.00"},{"c":"E20","v":4500,"in":true,"bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0.0"},{"c":"F20","v":0.45,"f":"=E20/10000","bg":"#F0FDFA","al":"center","nf":"#,##0.00"},{"c":"G20","v":3150,"f":"=D20*E20","bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0.0"},{"c":"H20","v":0,"f":"=E20/$E$24","bg":"#F0FDFA","al":"center","nf":"0.0%"},{"c":"I20","v":"فواصل ممتلئة بالرمل","bg":"#F0FDFA"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":4,"al":"center"},{"c":"B21","v":"المناطق الخضراء والحدائق المنسقة (Landscape)"},{"c":"C21","v":"منفذ للتربة","al":"center"},{"c":"D21","v":0.2,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E21","v":3500,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"F21","v":0.35,"f":"=E21/10000","al":"center","nf":"#,##0.00"},{"c":"G21","v":700,"f":"=D21*E21","b":true,"al":"center","nf":"#,##0.0"},{"c":"H21","v":0,"f":"=E21/$E$24","al":"center","nf":"0.0%"},{"c":"I21","v":"تربة زراعية مسامية تمتص الماء"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":5,"bg":"#F0FDFA","al":"center"},{"c":"B22","v":"أرضيات حجرية ومكشوفة مرصوفة (Stone Paving)","bg":"#F0FDFA"},{"c":"C22","v":"منخفض النفاذية","bg":"#F0FDFA","al":"center"},{"c":"D22","v":0.75,"in":true,"bg":"#F0FDFA","b":true,"al":"center","nf":"0.00"},{"c":"E22","v":1500,"in":true,"bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0.0"},{"c":"F22","v":0.15,"f":"=E22/10000","bg":"#F0FDFA","al":"center","nf":"#,##0.00"},{"c":"G22","v":1125,"f":"=D22*E22","bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0.0"},{"c":"H22","v":0,"f":"=E22/$E$24","bg":"#F0FDFA","al":"center","nf":"0.0%"},{"c":"I22","v":"ساحات التجمع واللوبي الخارجي","bg":"#F0FDFA"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":6,"al":"center"},{"c":"B23","v":"أفنية الخدمات المكشوفة ومناطق التحميل"},{"c":"C23","v":"شبه مصمت","al":"center"},{"c":"D23","v":0.8,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E23","v":2000,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"F23","v":0.2,"f":"=E23/10000","al":"center","nf":"#,##0.00"},{"c":"G23","v":1600,"f":"=D23*E23","b":true,"al":"center","nf":"#,##0.0"},{"c":"H23","v":0,"f":"=E23/$E$24","al":"center","nf":"0.0%"},{"c":"I23","v":"منحدرات الشحن والتفريغ"}]},{"r":24,"h":42.0,"cells":[{"c":"A24","v":"إجمالي حوض التصريف ومعامل الجريان المرجح الكلي","bg":"#E2E8F0","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D24","v":"-","bg":"#E2E8F0","b":true,"al":"center"},{"c":"E24","v":32000,"f":"=SUM(E18:E23)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.0"},{"c":"F24","v":3.2,"f":"=E24/10000","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00\" ha\""},{"c":"G24","v":0.763281,"f":"=SUM(G18:G23)/E24","bg":"#E2E8F0","b":true,"al":"center","nf":"0.00"},{"c":"H24","v":0,"f":"=SUM(H18:H23)","bg":"#E2E8F0","b":true,"al":"center","nf":"100.0%"},{"c":"I24","v":"C_weighted = Σ(Ci·Ai) / ΣAi","bg":"#E2E8F0","b":true,"al":"center"}]},{"r":25,"h":38.0,"cells":[{"c":"A25","v":"ثالثاً: حساب تدفق الذروة التصميمي عبر معادلة الطريقة النسبية Rational Formula (Q = C · I · A)","bg":"#0F766E","fg":"#FFFFFF","b":true,"cs":9},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":1,"bg":"#F0FDFA","al":"center"},{"c":"B26","v":"معامل الجريان السطحي المرجح للمشروع","bg":"#F0FDFA","b":true},{"c":"C26","v":"C_Composite","bg":"#F0FDFA","al":"center"},{"c":"D26","v":0.763281,"f":"=G24","bg":"#F0FDFA","b":true,"al":"center","nf":"0.00"},{"c":"E26","v":"معامل","bg":"#F0FDFA","al":"center"},{"c":"F26","v":"Σ(C·A) / Total_Area","bg":"#F0FDFA","al":"center"},{"c":"G26","v":"معامل الجريان المكافئ للموقع ككل","bg":"#F0FDFA","cs":3},{"skip":true},{"skip":true}]},{"r":27,"h":52.0,"cells":[{"c":"A27","v":2,"al":"center"},{"c":"B27","v":"شدة هطول الأمطار التصميمية المعتمدة (I)","b":true},{"c":"C27","v":"Rainfall_Int","al":"center"},{"c":"D27","v":48.5,"f":"=D15","b":true,"al":"center","nf":"#,##0.0"},{"c":"E27","v":"مم/ساعة","al":"center"},{"c":"F27","v":"IDF Curve (10 Yrs, 15 Min)","al":"center"},{"c":"G27","v":"شدة العاصفة المطرية القصوى","cs":3},{"skip":true},{"skip":true}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":3,"bg":"#F0FDFA","al":"center"},{"c":"B28","v":"مساحة حوض التصريف الإجمالية بالهكتار","bg":"#F0FDFA","b":true},{"c":"C28","v":"Area_Hectares","bg":"#F0FDFA","al":"center"},{"c":"D28","v":3.2,"f":"=F24","bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0.0"},{"c":"E28","v":"هكتار (ha)","bg":"#F0FDFA","al":"center"},{"c":"F28","v":"Total_Area / 10,000","bg":"#F0FDFA","al":"center"},{"c":"G28","v":"المساحة المجمعة لمياه الأمطار","bg":"#F0FDFA","cs":3},{"skip":true},{"skip":true}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":4,"al":"center"},{"c":"B29","v":"مساحة حوض التصريف الإجمالية بالمتر المربع","b":true},{"c":"C29","v":"Area_SqMeters","al":"center"},{"c":"D29","v":32000,"f":"=E24","b":true,"al":"center","nf":"#,##0"},{"c":"E29","v":"م²","al":"center"},{"c":"F29","v":"المخطط المساحي العام","al":"center"},{"c":"G29","v":"مساحة مسقط المشروع","cs":3},{"skip":true},{"skip":true}]},{"r":30,"h":52.0,"cells":[{"c":"A30","v":5,"bg":"#F0FDFA","al":"center"},{"c":"B30","v":"تدفق الذروة التصميمي لمياه الأمطار (Q_Peak)","bg":"#F0FDFA","b":true},{"c":"C30","v":"Q_Peak_LPS","bg":"#F0FDFA","al":"center"},{"c":"D30","v":3290.852447,"f":"=(0.002778*D26*D27*D29)","bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0.0"},{"c":"E30","v":"لتر/ثانية (L/s)","bg":"#F0FDFA","al":"center"},{"c":"F30","v":"Q = 0.002778 × C × I × A(m²)","bg":"#F0FDFA","al":"center"},{"c":"G30","v":"معدل تدفق السيول باللتر في الثانية","bg":"#F0FDFA","cs":3},{"skip":true},{"skip":true}]},{"r":31,"h":34.0,"cells":[{"c":"A31","v":6,"al":"center"},{"c":"B31","v":"تدفق الذروة التصميمي بالمتر المكعب/ساعة","b":true},{"c":"C31","v":"Q_Peak_m3h","al":"center"},{"c":"D31","v":11847.068809,"f":"=D30*3.6","b":true,"al":"center","nf":"#,##0.0"},{"c":"E31","v":"م³/ساعة","al":"center"},{"c":"F31","v":"Q (L/s) × 3.6","al":"center"},{"c":"G31","v":"التدفق الحجمي الساعي لتصميم الشبكة","cs":3},{"skip":true},{"skip":true}]},{"r":32,"h":34.0,"cells":[{"c":"A32","v":7,"bg":"#F0FDFA","al":"center"},{"c":"B32","v":"تدفق الذروة بالمتر المكعب في الثانية (m³/s)","bg":"#F0FDFA","b":true},{"c":"C32","v":"Q_Peak_m3s","bg":"#F0FDFA","al":"center"},{"c":"D32","v":3.290852,"f":"=D30/1000","bg":"#F0FDFA","b":true,"al":"center","nf":"0.000"},{"c":"E32","v":"م³/ثانية","bg":"#F0FDFA","al":"center"},{"c":"F32","v":"Q (L/s) / 1000","bg":"#F0FDFA","al":"center"},{"c":"G32","v":"التدفق بالوحدات الهيدروليكية الدولية","bg":"#F0FDFA","cs":3},{"skip":true},{"skip":true}]},{"r":33,"h":34.0,"cells":[{"c":"A33","v":8,"al":"center"},{"c":"B33","v":"معامل الأمان الهيدروليكي الإضافي (10%)","b":true},{"c":"C33","v":"Safety_Margin","al":"center"},{"c":"D33","v":1.1,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E33","v":"معامل","al":"center"},{"c":"F33","v":"MOMRAH Code Practice","al":"center"},{"c":"G33","v":"10% لمواجهة الانسدادات الجزئية والترسبات","cs":3},{"skip":true},{"skip":true}]},{"r":34,"h":34.0,"cells":[{"c":"A34","v":9,"bg":"#F0FDFA","al":"center"},{"c":"B34","v":"تدفق الذروة النهائي المعتمد للتصميم الهيدروليكي","bg":"#F0FDFA","b":true},{"c":"C34","v":"Q_Design_Final","bg":"#F0FDFA","al":"center"},{"c":"D34","v":3619.937692,"f":"=D30*D33","bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0.0"},{"c":"E34","v":"لتر/ثانية","bg":"#F0FDFA","al":"center"},{"c":"F34","v":"Q_Peak × Safety_Margin","bg":"#F0FDFA","al":"center"},{"c":"G34","v":"التدفق النهائي المعتمد لاختيار الأنابيب","bg":"#F0FDFA","cs":3},{"skip":true},{"skip":true}]}]},{"name":"تصميم خطوط الانحدار Manning","maxRow":23,"maxCol":10,"colWidths":[8.0,44.0,18.0,16.0,16.0,16.0,18.0,16.0,16.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"تصميم خطوط وأنابيب انحدار مياه الأمطار وفق معادلة مانينغ (Manning's Equation) وكود SBC 702","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"حساب الأقطار الهيدروليكية، الميول الطولية، سرعات الجريان الذاتي (0.75 - 3.0 م/ث)، ونسبة الامتلاء d/D للأنابيب","bg":"#0F172A","fg":"#E2E8F0","al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"قطر خط الطرد الرئيسي المعتمد","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"السعة الهيدروليكية القصوى (Q_Full)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"سرعة جريان المياه داخل الأنبوب (Velocity)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H4","v":"حالة التحقق الهيدروليكي والكودي","bg":"#CCFBF1","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":5,"h":44.0,"cells":[{"c":"A5","v":500,"f":"=E10","bg":"#F8FAFC","fg":"#0F766E","b":true,"al":"center","nf":"#,##0\" مم (DN)\"","cs":2},{"skip":true},{"c":"C5","v":347.1,"f":"=G10","bg":"#F8FAFC","fg":"#0F766E","b":true,"al":"center","nf":"#,##0.0\" لتر/ثانية\"","cs":2},{"skip":true},{"c":"E5","v":1.77,"f":"=H10","bg":"#F8FAFC","fg":"#0F766E","b":true,"al":"center","nf":"0.00\" م/ثانية\"","cs":3},{"skip":true},{"skip":true},{"c":"H5","v":"يلزم تعديل القطر/الميل","f":"=IF(J10=\"مطابق وآمن كودياً\",\"محقق لمعايير SBC 702\",\"يلزم تعديل القطر/الميل\")","bg":"#CCFBF1","fg":"#166534","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"Main Outfall Pipe Diameter","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"C6","v":"Full-Bore Pipe Capacity","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"E6","v":"Flow Velocity (0.75 ≤ V ≤ 3.0 m/s)","bg":"#F8FAFC","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H6","v":"Self-Cleansing & Capacity Check","bg":"#CCFBF1","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":7,"h":14.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"أولاً: جدول التصميم الهيدروليكي لخطوط الانحدار عبر معادلة مانينغ (Gravity Storm Sewer Schedule)","bg":"#0F766E","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"م","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"رمز الخط ومسار المناهيل (Line ID)","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"التدفق التصميمي (L/s)","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"معامل خشونة مانينغ (n)","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"القطر الاسمي (DN mm)","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"الميل الطولي S (%)","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"سعة الأنبوب الممتلئ (L/s)","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H9","v":"سرعة الجريان (م/ث)","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I9","v":"نسبة الامتلاء (d/D)","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J9","v":"حالة التحقق الكودية","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":1,"bg":"#F0FDFA","al":"center"},{"c":"B10","v":"الخط الرئيسي للمصب (Main Outfall MH-01 to Outfall)","bg":"#F0FDFA","b":true},{"c":"C10","v":3619.937692,"f":"='تدفق السيول Rational Method'!D34","bg":"#F0FDFA","al":"center","nf":"#,##0.0"},{"c":"D10","v":0.01,"in":true,"bg":"#F0FDFA","al":"center","nf":"0.000"},{"c":"E10","v":500,"in":true,"bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0"},{"c":"F10","v":0.5,"in":true,"bg":"#F0FDFA","al":"center","nf":"0.00\"%\""},{"c":"G10","v":347.1,"f":"=ROUND((1/D10)*PI()*((E10/2000)^2)*((E10/4000)^(2/3))*SQRT(F10/100)*1000,1)","bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0.0"},{"c":"H10","v":1.77,"f":"=ROUND(G10/(PI()*((E10/2000)^2)*1000),2)","bg":"#F0FDFA","b":true,"al":"center","nf":"0.00"},{"c":"I10","v":10.43,"f":"=ROUND((C10/G10),2)","bg":"#F0FDFA","al":"center","nf":"0.0%"},{"c":"J10","v":"تحذير: غير مطابق","f":"=IF(AND(H10>=0.75,H10<=3.0,I10<=0.85),\"مطابق وآمن كودياً\",\"تحذير: غير مطابق\")","bg":"#F0FDFA","fg":"#166534","b":true,"al":"center"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":2,"al":"center"},{"c":"B11","v":"الخط المجمع للمواقف (Branch 1: MH-02 to MH-01)","b":true},{"c":"C11","v":125,"in":true,"al":"center","nf":"#,##0.0"},{"c":"D11","v":0.01,"in":true,"al":"center","nf":"0.000"},{"c":"E11","v":400,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"F11","v":0.6,"in":true,"al":"center","nf":"0.00\"%\""},{"c":"G11","v":209.7,"f":"=ROUND((1/D11)*PI()*((E11/2000)^2)*((E11/4000)^(2/3))*SQRT(F11/100)*1000,1)","b":true,"al":"center","nf":"#,##0.0"},{"c":"H11","v":1.67,"f":"=ROUND(G11/(PI()*((E11/2000)^2)*1000),2)","b":true,"al":"center","nf":"0.00"},{"c":"I11","v":0.6,"f":"=ROUND((C11/G11),2)","al":"center","nf":"0.0%"},{"c":"J11","v":"مطابق وآمن كودياً","f":"=IF(AND(H11>=0.75,H11<=3.0,I11<=0.85),\"مطابق وآمن كودياً\",\"تحذير: غير مطابق\")","fg":"#166534","b":true,"al":"center"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":3,"bg":"#F0FDFA","al":"center"},{"c":"B12","v":"الخط المجمع لأسطح المبنى (Branch 2: MH-03 to MH-01)","bg":"#F0FDFA","b":true},{"c":"C12","v":95,"in":true,"bg":"#F0FDFA","al":"center","nf":"#,##0.0"},{"c":"D12","v":0.01,"in":true,"bg":"#F0FDFA","al":"center","nf":"0.000"},{"c":"E12","v":315,"in":true,"bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0"},{"c":"F12","v":0.8,"in":true,"bg":"#F0FDFA","al":"center","nf":"0.00\"%\""},{"c":"G12","v":128.1,"f":"=ROUND((1/D12)*PI()*((E12/2000)^2)*((E12/4000)^(2/3))*SQRT(F12/100)*1000,1)","bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0.0"},{"c":"H12","v":1.64,"f":"=ROUND(G12/(PI()*((E12/2000)^2)*1000),2)","bg":"#F0FDFA","b":true,"al":"center","nf":"0.00"},{"c":"I12","v":0.74,"f":"=ROUND((C12/G12),2)","bg":"#F0FDFA","al":"center","nf":"0.0%"},{"c":"J12","v":"مطابق وآمن كودياً","f":"=IF(AND(H12>=0.75,H12<=3.0,I12<=0.85),\"مطابق وآمن كودياً\",\"تحذير: غير مطابق\")","bg":"#F0FDFA","fg":"#166534","b":true,"al":"center"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":4,"al":"center"},{"c":"B13","v":"خط ممرات المشاة والساحات (Branch 3: MH-04 to MH-02)","b":true},{"c":"C13","v":55,"in":true,"al":"center","nf":"#,##0.0"},{"c":"D13","v":0.01,"in":true,"al":"center","nf":"0.000"},{"c":"E13","v":250,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"F13","v":1,"in":true,"al":"center","nf":"0.00\"%\""},{"c":"G13","v":77.3,"f":"=ROUND((1/D13)*PI()*((E13/2000)^2)*((E13/4000)^(2/3))*SQRT(F13/100)*1000,1)","b":true,"al":"center","nf":"#,##0.0"},{"c":"H13","v":1.57,"f":"=ROUND(G13/(PI()*((E13/2000)^2)*1000),2)","b":true,"al":"center","nf":"0.00"},{"c":"I13","v":0.71,"f":"=ROUND((C13/G13),2)","al":"center","nf":"0.0%"},{"c":"J13","v":"مطابق وآمن كودياً","f":"=IF(AND(H13>=0.75,H13<=3.0,I13<=0.85),\"مطابق وآمن كودياً\",\"تحذير: غير مطابق\")","fg":"#166534","b":true,"al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":5,"bg":"#F0FDFA","al":"center"},{"c":"B14","v":"خط ساحات التحميل والخدمة (Branch 4: MH-05 to MH-02)","bg":"#F0FDFA","b":true},{"c":"C14","v":42,"in":true,"bg":"#F0FDFA","al":"center","nf":"#,##0.0"},{"c":"D14","v":0.01,"in":true,"bg":"#F0FDFA","al":"center","nf":"0.000"},{"c":"E14","v":250,"in":true,"bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0"},{"c":"F14","v":0.8,"in":true,"bg":"#F0FDFA","al":"center","nf":"0.00\"%\""},{"c":"G14","v":69.1,"f":"=ROUND((1/D14)*PI()*((E14/2000)^2)*((E14/4000)^(2/3))*SQRT(F14/100)*1000,1)","bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0.0"},{"c":"H14","v":1.41,"f":"=ROUND(G14/(PI()*((E14/2000)^2)*1000),2)","bg":"#F0FDFA","b":true,"al":"center","nf":"0.00"},{"c":"I14","v":0.61,"f":"=ROUND((C14/G14),2)","bg":"#F0FDFA","al":"center","nf":"0.0%"},{"c":"J14","v":"مطابق وآمن كودياً","f":"=IF(AND(H14>=0.75,H14<=3.0,I14<=0.85),\"مطابق وآمن كودياً\",\"تحذير: غير مطابق\")","bg":"#F0FDFA","fg":"#166534","b":true,"al":"center"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":6,"al":"center"},{"c":"B15","v":"خط تصريف الحدائق والمسطحات (Branch 5: MH-06 to MH-03)","b":true},{"c":"C15","v":28,"in":true,"al":"center","nf":"#,##0.0"},{"c":"D15","v":0.01,"in":true,"al":"center","nf":"0.000"},{"c":"E15","v":200,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"F15","v":1,"in":true,"al":"center","nf":"0.00\"%\""},{"c":"G15","v":42.6,"f":"=ROUND((1/D15)*PI()*((E15/2000)^2)*((E15/4000)^(2/3))*SQRT(F15/100)*1000,1)","b":true,"al":"center","nf":"#,##0.0"},{"c":"H15","v":1.36,"f":"=ROUND(G15/(PI()*((E15/2000)^2)*1000),2)","b":true,"al":"center","nf":"0.00"},{"c":"I15","v":0.66,"f":"=ROUND((C15/G15),2)","al":"center","nf":"0.0%"},{"c":"J15","v":"مطابق وآمن كودياً","f":"=IF(AND(H15>=0.75,H15<=3.0,I15<=0.85),\"مطابق وآمن كودياً\",\"تحذير: غير مطابق\")","fg":"#166534","b":true,"al":"center"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":7,"bg":"#F0FDFA","al":"center"},{"c":"B16","v":"وصلة المصائد والبالوعات الجانبية (Gully Inlets to MH)","bg":"#F0FDFA","b":true},{"c":"C16","v":18,"in":true,"bg":"#F0FDFA","al":"center","nf":"#,##0.0"},{"c":"D16","v":0.01,"in":true,"bg":"#F0FDFA","al":"center","nf":"0.000"},{"c":"E16","v":160,"in":true,"bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0"},{"c":"F16","v":1.5,"in":true,"bg":"#F0FDFA","al":"center","nf":"0.00\"%\""},{"c":"G16","v":28.8,"f":"=ROUND((1/D16)*PI()*((E16/2000)^2)*((E16/4000)^(2/3))*SQRT(F16/100)*1000,1)","bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0.0"},{"c":"H16","v":1.43,"f":"=ROUND(G16/(PI()*((E16/2000)^2)*1000),2)","bg":"#F0FDFA","b":true,"al":"center","nf":"0.00"},{"c":"I16","v":0.62,"f":"=ROUND((C16/G16),2)","bg":"#F0FDFA","al":"center","nf":"0.0%"},{"c":"J16","v":"مطابق وآمن كودياً","f":"=IF(AND(H16>=0.75,H16<=3.0,I16<=0.85),\"مطابق وآمن كودياً\",\"تحذير: غير مطابق\")","bg":"#F0FDFA","fg":"#166534","b":true,"al":"center"}]},{"r":17,"h":28.0,"cells":[{"c":"A17","v":""},{"c":"B17","v":""},{"c":"C17","v":""},{"c":"D17","v":""},{"c":"E17","v":""},{"c":"F17","v":""},{"c":"G17","v":""},{"c":"H17","v":""},{"c":"I17","v":""},{"c":"J17","v":""}]},{"r":18,"h":38.0,"cells":[{"c":"A18","v":"ثانياً: معايير توزيع المناهيل وغرف التفتيش ومصائد السيول (Manholes & Catch Basins Spacing)","bg":"#0F766E","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":"م","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B19","v":"عنصر التجميع / التفتيش","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C19","v":"النوع والمادة","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D19","v":"أقصى مسافة تباعد مسموحة","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E19","v":"العمق التشغيلي الموصى به","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F19","v":"أبعاد الغرفة الداخلية","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G19","v":"اشتراطات أمانة الرياض / MOMRAH","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":1,"bg":"#F0FDFA","al":"center"},{"c":"B20","v":"مناهيل الخطوط الرئيسية (Main Line Manholes)","bg":"#F0FDFA","b":true},{"c":"C20","v":"خرسانة مسلحة سابقة الصب C40","bg":"#F0FDFA"},{"c":"D20","v":"50 - 60 متر للأقطار حتى 500 مم","bg":"#F0FDFA","b":true,"al":"center"},{"c":"E20","v":"1.5 - 3.5 متر","bg":"#F0FDFA","al":"center"},{"c":"F20","v":"قطر دائري 1200 مم أو 1500 مم","bg":"#F0FDFA","al":"center"},{"c":"G20","v":"سلالم ألومنيوم وأغطية دكتايل D400","bg":"#F0FDFA","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":2,"al":"center"},{"c":"B21","v":"مناهيل الخطوط الفرعية (Branch Manholes)","b":true},{"c":"C21","v":"خرسانة مسلحة مقاومة للأملاح"},{"c":"D21","v":"30 - 40 متر للأقطار حتى 300 مم","b":true,"al":"center"},{"c":"E21","v":"1.2 - 2.0 متر","al":"center"},{"c":"F21","v":"قطر دائري 1000 مم أو مربع 1×1 م","al":"center"},{"c":"G21","v":"قنوات هيدروليكية (Benching) ملساء","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":22,"h":52.0,"cells":[{"c":"A22","v":3,"bg":"#F0FDFA","al":"center"},{"c":"B22","v":"مصائد صرف الأمطار الجانبية (Curb Inlets)","bg":"#F0FDFA","b":true},{"c":"C22","v":"مصيدة خرسانية مع جريلية دكتايل","bg":"#F0FDFA"},{"c":"D22","v":"20 - 30 متر على حواف الأرصفة","bg":"#F0FDFA","b":true,"al":"center"},{"c":"E22","v":"0.8 - 1.2 متر","bg":"#F0FDFA","al":"center"},{"c":"F22","v":"غرفة تجميع 600 × 600 مم","bg":"#F0FDFA","al":"center"},{"c":"G22","v":"حاجز حجز الرمال والرواسب (Sump)","bg":"#F0FDFA","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":23,"h":52.0,"cells":[{"c":"A23","v":4,"al":"center"},{"c":"B23","v":"بالوعات صرف الساحات المكشوفة (Grate Inlets)","b":true},{"c":"C23","v":"غرف تصريف حديد دكتايل مشبك"},{"c":"D23","v":"25 - 35 متر في النقاط المنخفضة","b":true,"al":"center"},{"c":"E23","v":"0.8 - 1.5 متر","al":"center"},{"c":"F23","v":"غرفة تجميع 800 × 800 مم","al":"center"},{"c":"G23","v":"سلة حجز النفايات والأوراق القابلة للرفع","cs":4},{"skip":true},{"skip":true},{"skip":true}]}]},{"name":"خزان التهدئة Attenuation Tank","maxRow":31,"maxCol":8,"colWidths":[8.0,44.0,16.0,18.0,16.0,18.0,16.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"حساب وتصميم خزان التجميع والتهدئة (Stormwater Attenuation & Detention Tank) وفق ASCE و SBC 702","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"تحديد السعة الحجمية المطلوبة لاحتجاز مياه السيول، معدل التفريغ المقيد إلى الشبكة العمومية، ومضخات الرفع الغاطسة","bg":"#0F172A","fg":"#E2E8F0","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"السعة التخزينية لخزان التهدئة","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"التدفق المقيد المسموح للمصب","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"أبعاد الخزان المقترحة (L × W × H)","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H4","v":"قدرة مضخات الأمطار الغاطسة","bg":"#CCFBF1","fg":"#1E293B","b":true,"al":"center"}]},{"r":5,"h":44.0,"cells":[{"c":"A5","v":14800.242078,"f":"=D18","bg":"#F8FAFC","fg":"#0F766E","b":true,"al":"center","nf":"#,##0.0\" م³\"","cs":2},{"skip":true},{"c":"C5","v":45,"f":"=D12","bg":"#F8FAFC","fg":"#0F766E","b":true,"al":"center","nf":"#,##0.0\" لتر/ثانية\"","cs":2},{"skip":true},{"c":"E5","v":"16.0 م × 10.0 م × 92.5 م","f":"=TEXT(D20,\"0.0\")&\" م × \"&TEXT(D21,\"0.0\")&\" م × \"&TEXT(D22,\"0.0\")&\" م\"","bg":"#F8FAFC","fg":"#0F766E","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H5","v":"11.5 0","f":"=TEXT(D30,\"0.0\")&\" kW (\"&TEXT(D31,\"0.0\")&\" HP)\"","bg":"#CCFBF1","fg":"#0F766E","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"Required Attenuation Volume","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"C6","v":"Allowable Outflow Discharge Rate","bg":"#F8FAFC","fg":"#475569","al":"center","cs":2},{"skip":true},{"c":"E6","v":"Length × Width × Effective Height","bg":"#F8FAFC","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"H6","v":"Stormwater Submersible Pumps","bg":"#CCFBF1","fg":"#475569","al":"center"}]},{"r":7,"h":14.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"أولاً: محددات ومعادلات حساب سعة خزان التهدئة واحتجاز السيول (Attenuation Volume Calculation)","bg":"#0F766E","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":"م","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"بيان المتغير الهيدروليكي / المناخي","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"الرمز","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"القيمة المدخلة","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"الوحدة","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"المرجعية النظامية","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"التوصيف الهندسي والملاحظات","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":1,"bg":"#F0FDFA","al":"center"},{"c":"B10","v":"أقصى تدفق وارد إلى الخزان وقت الذروة (Q_Inflow)","bg":"#F0FDFA","b":true},{"c":"C10","v":"Q_Inflow","bg":"#F0FDFA","al":"center"},{"c":"D10","v":3619.937692,"f":"='تدفق السيول Rational Method'!D34","bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0.0"},{"c":"E10","v":"لتر/ثانية","bg":"#F0FDFA","al":"center"},{"c":"F10","v":"تدفق الذروة التصميمي للشبكة","bg":"#F0FDFA","al":"center"},{"c":"G10","v":"أعلى معدل تدفق مياه سيول وارد للخزان","bg":"#F0FDFA","cs":2},{"skip":true}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":2,"al":"center"},{"c":"B11","v":"التدفق الوارد المكافئ بالمتر المكعب في الدقيقة","b":true},{"c":"C11","v":"Q_Inflow_m3min","al":"center"},{"c":"D11","v":217.196262,"f":"=(D10*60)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"E11","v":"م³/دقيقة","al":"center"},{"c":"F11","v":"Q_In (L/s) × 60 / 1000","al":"center"},{"c":"G11","v":"التدفق الحجمي الدقيق بالدقيقة","cs":2},{"skip":true}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":3,"bg":"#F0FDFA","al":"center"},{"c":"B12","v":"أقصى تدفق منصرف مسموح به للمصب (Q_Outflow)","bg":"#F0FDFA","b":true},{"c":"C12","v":"Q_Outflow","bg":"#F0FDFA","al":"center"},{"c":"D12","v":45,"in":true,"bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0.0"},{"c":"E12","v":"لتر/ثانية","bg":"#F0FDFA","al":"center"},{"c":"F12","v":"اشتراطات البلدية وشبكة المدينة","bg":"#F0FDFA","al":"center"},{"c":"G12","v":"المعدل المقيد لمنع إغراق الشبكة العمومية","bg":"#F0FDFA","cs":2},{"skip":true}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":4,"al":"center"},{"c":"B13","v":"التدفق المنصرف بالمتر المكعب في الدقيقة","b":true},{"c":"C13","v":"Q_Outflow_m3min","al":"center"},{"c":"D13","v":2.7,"f":"=(D12*60)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"E13","v":"م³/دقيقة","al":"center"},{"c":"F13","v":"Q_Out (L/s) × 60 / 1000","al":"center"},{"c":"G13","v":"التفريغ المنضبط بالدقيقة","cs":2},{"skip":true}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":5,"bg":"#F0FDFA","al":"center"},{"c":"B14","v":"مدة العاصفة المطرية الحرجة للتخزين (Storm Duration)","bg":"#F0FDFA","b":true},{"c":"C14","v":"Storm_Duration","bg":"#F0FDFA","al":"center"},{"c":"D14","v":60,"in":true,"bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0.0"},{"c":"E14","v":"دقيقة (1 ساعة)","bg":"#F0FDFA","al":"center"},{"c":"F14","v":"ASCE Envelope Method","bg":"#F0FDFA","al":"center"},{"c":"G14","v":"مدة استمرار الهطول القصوى المحتملة","bg":"#F0FDFA","cs":2},{"skip":true}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":6,"al":"center"},{"c":"B15","v":"إجمالي حجم المياه الواردة خلال العاصفة","b":true},{"c":"C15","v":"Total_Inflow_Vol","al":"center"},{"c":"D15","v":13031.77572,"f":"=D11*D14","b":true,"al":"center","nf":"#,##0.0"},{"c":"E15","v":"م³","al":"center"},{"c":"F15","v":"Q_In (m³/min) × Duration","al":"center"},{"c":"G15","v":"الكتلة المائية الإجمالية للعاصفة","cs":2},{"skip":true}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":7,"bg":"#F0FDFA","al":"center"},{"c":"B16","v":"إجمالي حجم المياه المصرفة خلال العاصفة","bg":"#F0FDFA","b":true},{"c":"C16","v":"Total_Outflow_Vol","bg":"#F0FDFA","al":"center"},{"c":"D16","v":162,"f":"=D13*D14","bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0.0"},{"c":"E16","v":"م³","bg":"#F0FDFA","al":"center"},{"c":"F16","v":"Q_Out (m³/min) × Duration","bg":"#F0FDFA","al":"center"},{"c":"G16","v":"المياه المصرفة بالتزامن مع الهطول","bg":"#F0FDFA","cs":2},{"skip":true}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":8,"al":"center"},{"c":"B17","v":"السعة الصافية المطلوبة لاحتجاز مياه السيول","b":true},{"c":"C17","v":"Net_Storage_m3","al":"center"},{"c":"D17","v":12869.77572,"f":"=D15-D16","b":true,"al":"center","nf":"#,##0.0"},{"c":"E17","v":"م³","al":"center"},{"c":"F17","v":"Total_Inflow - Total_Outflow","al":"center"},{"c":"G17","v":"الحجم الفعال الفعلي الواجب احتجازه بالخزان","cs":2},{"skip":true}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":9,"bg":"#F0FDFA","al":"center"},{"c":"B18","v":"سعة التهدئة الإجمالية مع هامش أمان (15% Freeboard)","bg":"#F0FDFA","b":true},{"c":"C18","v":"Total_Tank_Vol","bg":"#F0FDFA","al":"center"},{"c":"D18","v":14800.242078,"f":"=D17*1.15","bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0.0"},{"c":"E18","v":"م³","bg":"#F0FDFA","al":"center"},{"c":"F18","v":"Net_Storage × 1.15","bg":"#F0FDFA","al":"center"},{"c":"G18","v":"السعة الخرسانية المعتمدة للتنفيذ","bg":"#F0FDFA","cs":2},{"skip":true}]},{"r":19,"h":38.0,"cells":[{"c":"A19","v":"ثانياً: أبعاد الخزان الإنشائي ومواصفات مضخات رفع السيول (Tank Geometry & Pump Sizing)","bg":"#0F766E","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":1,"bg":"#F0FDFA","al":"center"},{"c":"B20","v":"طول الخزان الخرساني الداخلي المقترح","bg":"#F0FDFA","b":true},{"c":"C20","v":"Tank_Length","bg":"#F0FDFA","al":"center"},{"c":"D20","v":16,"in":true,"bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0.0"},{"c":"E20","v":"متر","bg":"#F0FDFA","al":"center"},{"c":"F20","v":"المخطط الإنشائي","bg":"#F0FDFA","al":"center"},{"c":"G20","v":"طول الخزان الصافي من الداخل","bg":"#F0FDFA","cs":2},{"skip":true}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":2,"al":"center"},{"c":"B21","v":"عرض الخزان الخرساني الداخلي المقترح","b":true},{"c":"C21","v":"Tank_Width","al":"center"},{"c":"D21","v":10,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E21","v":"متر","al":"center"},{"c":"F21","v":"المخطط الإنشائي","al":"center"},{"c":"G21","v":"عرض الخزان الصافي من الداخل","cs":2},{"skip":true}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":3,"bg":"#F0FDFA","al":"center"},{"c":"B22","v":"عمق المياه الفعال داخل الخزان","bg":"#F0FDFA","b":true},{"c":"C22","v":"Water_Depth","bg":"#F0FDFA","al":"center"},{"c":"D22","v":92.5,"f":"=ROUND(D18/(D20*D21),2)","bg":"#F0FDFA","b":true,"al":"center","nf":"0.00"},{"c":"E22","v":"متر","bg":"#F0FDFA","al":"center"},{"c":"F22","v":"Total_Vol / (L × W)","bg":"#F0FDFA","al":"center"},{"c":"G22","v":"ارتفاع منسوب المياه عند الامتلاء الكامل","bg":"#F0FDFA","cs":2},{"skip":true}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":4,"al":"center"},{"c":"B23","v":"ارتفاع الفراغ الهوائي الإضافي (Freeboard)","b":true},{"c":"C23","v":"Freeboard_Height","al":"center"},{"c":"D23","v":0.5,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"E23","v":"متر","al":"center"},{"c":"F23","v":"SBC 702 Standard","al":"center"},{"c":"G23","v":"مسافة أمان هوائية أعلى منسوب الطفح","cs":2},{"skip":true}]},{"r":24,"h":52.0,"cells":[{"c":"A24","v":5,"bg":"#F0FDFA","al":"center"},{"c":"B24","v":"إجمالي الارتفاع الإنشائي الداخلي للخزان","bg":"#F0FDFA","b":true},{"c":"C24","v":"Total_Height","bg":"#F0FDFA","al":"center"},{"c":"D24","v":93,"f":"=D22+D23","bg":"#F0FDFA","b":true,"al":"center","nf":"0.00"},{"c":"E24","v":"متر","bg":"#F0FDFA","al":"center"},{"c":"F24","v":"Water_Depth + Freeboard","bg":"#F0FDFA","al":"center"},{"c":"G24","v":"العمق الإنشائي الصافي للصب الخرساني","bg":"#F0FDFA","cs":2},{"skip":true}]},{"r":25,"h":52.0,"cells":[{"c":"A25","v":6,"al":"center"},{"c":"B25","v":"الحجم الفعلي المنفذ للخزان الخرساني","b":true},{"c":"C25","v":"Provided_Volume","al":"center"},{"c":"D25","v":14800,"f":"=(D20*D21*D22)","b":true,"al":"center","nf":"#,##0.0"},{"c":"E25","v":"م³","al":"center"},{"c":"F25","v":"Length × Width × Water_Depth","al":"center"},{"c":"G25","v":"السعة المائية المحققة فعلياً","cs":2},{"skip":true}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":7,"bg":"#F0FDFA","al":"center"},{"c":"B26","v":"غرفة حجز الرواسب والرمال الأولية (Silt Trap)","bg":"#F0FDFA","b":true},{"c":"C26","v":"Silt_Trap_Vol","bg":"#F0FDFA","al":"center"},{"c":"D26","v":1184.019366,"f":"=D18*0.08","bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0.0"},{"c":"E26","v":"م³","bg":"#F0FDFA","al":"center"},{"c":"F26","v":"8% من سعة الخزان","bg":"#F0FDFA","al":"center"},{"c":"G26","v":"حفرة تجميع الرمال قبل مروحة المضخات","bg":"#F0FDFA","cs":2},{"skip":true}]},{"r":27,"h":52.0,"cells":[{"c":"A27","v":8,"al":"center"},{"c":"B27","v":"فاصل الزيوت والشحوم الميكانيكي (Oil-Grit)","b":true},{"c":"C27","v":"Separator_Type","al":"center"},{"c":"D27","v":"فاصل جاذبية بألواح مائلة Coalescing","b":true,"al":"center"},{"c":"E27","v":"نوع","al":"center"},{"c":"F27","v":"اشتراطات حماية البيئة MEWA","al":"center"},{"c":"G27","v":"منع وصول الزيوت النفطية للشبكة العامة","cs":2},{"skip":true}]},{"r":28,"h":52.0,"cells":[{"c":"A28","v":9,"bg":"#F0FDFA","al":"center"},{"c":"B28","v":"تدفق مضخة السيول الغاطسة الواحدة (1D + 1S)","bg":"#F0FDFA","b":true},{"c":"C28","v":"Q_Storm_Pump","bg":"#F0FDFA","al":"center"},{"c":"D28","v":45,"f":"=D12","bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0.0"},{"c":"E28","v":"لتر/ثانية","bg":"#F0FDFA","al":"center"},{"c":"F28","v":"مضخة عاملة + مضخة احتياط 100%","bg":"#F0FDFA","al":"center"},{"c":"G28","v":"سعة المضخة الواحدة مساوية لتدفق المصب","bg":"#F0FDFA","cs":2},{"skip":true}]},{"r":29,"h":52.0,"cells":[{"c":"A29","v":10,"al":"center"},{"c":"B29","v":"ضغط الرفع الكلي لمضخة السيول (TDH)","b":true},{"c":"C29","v":"Pump_TDH","al":"center"},{"c":"D29","v":12,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"E29","v":"متر عمود ماء","al":"center"},{"c":"F29","v":"فارق المناسيب + فواقد خط الطرد","al":"center"},{"c":"G29","v":"الرفع من قاع الخزان حتى منهل الصرف العام","cs":2},{"skip":true}]},{"r":30,"h":52.0,"cells":[{"c":"A30","v":11,"bg":"#F0FDFA","al":"center"},{"c":"B30","v":"القدرة المقننة لمحرك مضخة السيول بالكيلوواط","bg":"#F0FDFA","b":true},{"c":"C30","v":"Pump_Motor_kW","bg":"#F0FDFA","al":"center"},{"c":"D30","v":11.505665,"f":"=(9.81*D28*D29)/(1000*0.65*0.85)*1.20","bg":"#F0FDFA","b":true,"al":"center","nf":"#,##0.0"},{"c":"E30","v":"kW","bg":"#F0FDFA","al":"center"},{"c":"F30","v":"Hydraulic / (η_p × η_m) × 1.20","bg":"#F0FDFA","al":"center"},{"c":"G30","v":"القدرة الاسمية للمحرك الكهربائي الغاطس","bg":"#F0FDFA","cs":2},{"skip":true}]},{"r":31,"h":34.0,"cells":[{"c":"A31","v":12,"al":"center"},{"c":"B31","v":"القدرة المقابلة بالحصان الميكانيكي (HP)","b":true},{"c":"C31","v":"Pump_Motor_HP","al":"center"},{"c":"D31","v":15.429097,"f":"=D30*1.341","b":true,"al":"center","nf":"#,##0.0"},{"c":"E31","v":"HP","al":"center"},{"c":"F31","v":"kW × 1.341","al":"center"},{"c":"G31","v":"القدرة الحصانية لمضخة الطوارئ الغاطسة","cs":2},{"skip":true}]}]},{"name":"دليل المعاملات ومنحنيات IDF","maxRow":20,"maxCol":7,"colWidths":[8.0,38.0,20.0,28.0,22.0,22.0,28.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"دليل المعايير الهيدرولوجية ومعاملات الجريان السطحي C ومنحنيات IDF وفق SBC 702 ودليل MOMRAH","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"جداول معاملات الجريان C لمختلف الأسطح، فترات التكرار التصميمية الموصى بها، والحدود الهيدروليكية لشبكات الصرف","bg":"#0F172A","fg":"#E2E8F0","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: جدول معاملات الجريان السطحي C المعتمدة كودياً (SBC 702 & MOMRAH Table 3.2)","bg":"#0F766E","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"م","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"طبيعة ونوع السطح (Catchment Surface)","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"نطاق معامل C الأدنى","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"نطاق معامل C الأعلى","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"القيمة التصميمية الموصى بها","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"درجة النفاذية","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"اشتراطات التطبيق الكودي","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":1,"bg":"#F0FDFA","al":"center"},{"c":"B6","v":"أسطح المباني الخرسانية والمعادن (Roofs)","bg":"#F0FDFA","b":true},{"c":"C6","v":0.85,"in":true,"bg":"#F0FDFA","al":"center","nf":"0.00"},{"c":"D6","v":0.95,"in":true,"bg":"#F0FDFA","al":"center","nf":"0.00"},{"c":"E6","v":0.9,"in":true,"bg":"#F0FDFA","b":true,"al":"center","nf":"0.00"},{"c":"F6","v":"غير منفذ كلياً","bg":"#F0FDFA","al":"center"},{"c":"G6","v":"SBC 702 Section 1106","bg":"#F0FDFA"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":2,"al":"center"},{"c":"B7","v":"الطرق الإسفلتية ومواقف السيارات (Asphalt)","b":true},{"c":"C7","v":0.8,"in":true,"al":"center","nf":"0.00"},{"c":"D7","v":0.9,"in":true,"al":"center","nf":"0.00"},{"c":"E7","v":0.85,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"F7","v":"غير منفذ","al":"center"},{"c":"G7","v":"أمانة الرياض - دليل تصريف الأمطار"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":3,"bg":"#F0FDFA","al":"center"},{"c":"B8","v":"الأرضيات الخرسانية المصبوبة (Paved Concrete)","bg":"#F0FDFA","b":true},{"c":"C8","v":0.8,"in":true,"bg":"#F0FDFA","al":"center","nf":"0.00"},{"c":"D8","v":0.9,"in":true,"bg":"#F0FDFA","al":"center","nf":"0.00"},{"c":"E8","v":0.85,"in":true,"bg":"#F0FDFA","b":true,"al":"center","nf":"0.00"},{"c":"F8","v":"غير منفذ","bg":"#F0FDFA","al":"center"},{"c":"G8","v":"ساحات الشحن والخدمة","bg":"#F0FDFA"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":4,"al":"center"},{"c":"B9","v":"بلاط وممرات الإنترلوك الخرساني (Pavers)","b":true},{"c":"C9","v":0.6,"in":true,"al":"center","nf":"0.00"},{"c":"D9","v":0.75,"in":true,"al":"center","nf":"0.00"},{"c":"E9","v":0.7,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"F9","v":"شبه منفذ","al":"center"},{"c":"G9","v":"فواصل مفرغة بالرمل النظيف"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":5,"bg":"#F0FDFA","al":"center"},{"c":"B10","v":"المناطق الحصوية والمثبتة (Gravel Areas)","bg":"#F0FDFA","b":true},{"c":"C10","v":0.4,"in":true,"bg":"#F0FDFA","al":"center","nf":"0.00"},{"c":"D10","v":0.6,"in":true,"bg":"#F0FDFA","al":"center","nf":"0.00"},{"c":"E10","v":0.5,"in":true,"bg":"#F0FDFA","b":true,"al":"center","nf":"0.00"},{"c":"F10","v":"منفذ جزئياً","bg":"#F0FDFA","al":"center"},{"c":"G10","v":"أكتاف الطرق والمواقف الترابية","bg":"#F0FDFA"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":6,"al":"center"},{"c":"B11","v":"الحدائق والمسطحات الخضراء (Lawn / Clay Soil)","b":true},{"c":"C11","v":0.15,"in":true,"al":"center","nf":"0.00"},{"c":"D11","v":0.25,"in":true,"al":"center","nf":"0.00"},{"c":"E11","v":0.2,"in":true,"b":true,"al":"center","nf":"0.00"},{"c":"F11","v":"منفذ للتربة","al":"center"},{"c":"G11","v":"تربة ثقيلة بطيئة النفاذ"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":7,"bg":"#F0FDFA","al":"center"},{"c":"B12","v":"الحدائق ذات التربة الرملية (Sandy Soil)","bg":"#F0FDFA","b":true},{"c":"C12","v":0.05,"in":true,"bg":"#F0FDFA","al":"center","nf":"0.00"},{"c":"D12","v":0.15,"in":true,"bg":"#F0FDFA","al":"center","nf":"0.00"},{"c":"E12","v":0.1,"in":true,"bg":"#F0FDFA","b":true,"al":"center","nf":"0.00"},{"c":"F12","v":"عالي النفاذية","bg":"#F0FDFA","al":"center"},{"c":"G12","v":"تربة رملية طبيعية سريعة الامتصاص","bg":"#F0FDFA"}]},{"r":13,"h":28.0,"cells":[{"c":"A13","v":""},{"c":"B13","v":""},{"c":"C13","v":""},{"c":"D13","v":""},{"c":"E13","v":""},{"c":"F13","v":""},{"c":"G13","v":""}]},{"r":14,"h":38.0,"cells":[{"c":"A14","v":"ثانياً: فترات التكرار التصميمية المعتمدة لعناصر مشاريع تصريف السيول (Return Periods)","bg":"#0F766E","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":15,"h":40.0,"cells":[{"c":"A15","v":"م","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B15","v":"العنصر الإنشائي / نطاق المشروع","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C15","v":"فترة التكرار الموصى بها","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D15","v":"الهدف الهيدروليكي والأمني","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E15","v":"الحد الأدنى لقطر الأنبوب","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F15","v":"الحد الأدنى لسرعة السريان","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G15","v":"المرجعية النظامية","bg":"#0D9488","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":1,"bg":"#F0FDFA","al":"center"},{"c":"B16","v":"شبكات تصريف مياه الأمطار داخل المباني والأسطح","bg":"#F0FDFA","b":true},{"c":"C16","v":"5 - 10 سنوات","bg":"#F0FDFA","b":true,"al":"center"},{"c":"D16","v":"حماية الأسطح وتفادي انسداد المزاريب","bg":"#F0FDFA"},{"c":"E16","v":"110 مم (4 بوصة)","bg":"#F0FDFA","al":"center"},{"c":"F16","v":"0.90 م/ث","bg":"#F0FDFA","al":"center"},{"c":"G16","v":"SBC 702 Chapter 11","bg":"#F0FDFA"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":2,"al":"center"},{"c":"B17","v":"شبكات المواقف والطرق الداخلية بالمجمعات","b":true},{"c":"C17","v":"10 سنوات","b":true,"al":"center"},{"c":"D17","v":"منع تجمع البرك المائية وعرقلة الحركة"},{"c":"E17","v":"200 مم (8 بوصة)","al":"center"},{"c":"F17","v":"0.75 م/ث (تنظيف ذاتي)","al":"center"},{"c":"G17","v":"دليل تصريف الأمطار MOMRAH"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":3,"bg":"#F0FDFA","al":"center"},{"c":"B18","v":"الخطوط الناقلة والمجمعات الرئيسية بالمدينة","bg":"#F0FDFA","b":true},{"c":"C18","v":"25 سنة","bg":"#F0FDFA","b":true,"al":"center"},{"c":"D18","v":"حماية الشوارع الرئيسية والشريانية","bg":"#F0FDFA"},{"c":"E18","v":"300 مم (12 بوصة)","bg":"#F0FDFA","al":"center"},{"c":"F18","v":"0.75 م/ث إلى 3.0 م/ث","bg":"#F0FDFA","al":"center"},{"c":"G18","v":"مواصفات أمانة منطقة الرياض","bg":"#F0FDFA"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":4,"al":"center"},{"c":"B19","v":"خزانات التهدئة والتجميع ومحطات الرفع الغاطسة","b":true},{"c":"C19","v":"25 - 50 سنة","b":true,"al":"center"},{"c":"D19","v":"استيعاب فيضانات الذروة ومنع غرق المنشآت"},{"c":"E19","v":"مضخات مزدوجة (1D+1S)","al":"center"},{"c":"F19","v":"سرعة طرد 1.5 - 2.4 م/ث","al":"center"},{"c":"G19","v":"ASCE Manual of Practice 77"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":5,"bg":"#F0FDFA","al":"center"},{"c":"B20","v":"القنوات المفتوحة ومسارات السيول الكبرى (Wadi)","bg":"#F0FDFA","b":true},{"c":"C20","v":"50 - 100 سنة","bg":"#F0FDFA","b":true,"al":"center"},{"c":"D20","v":"تأمين وادي السيل الإقليمي وحماية الأرواح","bg":"#F0FDFA"},{"c":"E20","v":"عبارات صندوقية Box Culverts","bg":"#F0FDFA","al":"center"},{"c":"F20","v":"وفق دراسة المخاطر الهيدرولوجية","bg":"#F0FDFA","al":"center"},{"c":"G20","v":"الهيئة الملكية لمدينة الرياض","bg":"#F0FDFA"}]}]}]}