{"slug":"strip-footing-bbs","sheets":[{"name":"إعدادات_القواعد_الشريطية","maxRow":28,"maxCol":5,"colWidths":[28.0,52.0,26.0,24.0,46.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"بيانات المشروع والاشتراطات الهندسية لتفريد القواعد الشريطية والسملات (Strip Footings Standards)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":54.0,"cells":[{"c":"A2","v":"⚠️ تنبيه استرشادي: الأسعار والنسب والمدخلات في هذا الشيت هي قيم هندسية واسترشادية لمتوسطات السوق. يرجى تعديل أبعاد القواعد وإجهاد التربة والعملة أدناه بما يطابق المخططات الإنشائية لمشروعك.","bg":"#FEF3C7","fg":"#92400E","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"1. البيانات التعاقدية والهندسية للمشروع (Project Metadata)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"اسم المشروع (Project Name):","bg":"#F8FAFC","b":true},{"c":"B5","v":"مشروع مجمع الفلل السكنية والأسوار الاستنادية (24 فيلا مستقلة)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C5","v":"كود المستند (Doc No):","bg":"#F8FAFC","b":true},{"c":"D5","v":"BBS-STRIP-FTG-2026-01","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E5","v":""}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"المالك (Client):","b":true},{"c":"B6","v":"شركة الديار للتطوير العقاري والإسكان","fg":"#1E293B"},{"c":"C6","v":"التاريخ (Date):","b":true},{"c":"D6","v":"2026-10-09","fg":"#1E293B","al":"center"},{"c":"E6","v":""}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"الاستشاري الهندسي العام:","bg":"#F8FAFC","b":true},{"c":"B7","v":"مكتب الرؤية للاستشارات والتصميم الإنشائي","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C7","v":"رقم النسخة (Revision):","bg":"#F8FAFC","b":true},{"c":"D7","v":"Rev 02 (جاهز للتشغيل والتقطيع)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E7","v":""}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"المقاول العام للمشروع:","b":true},{"c":"B8","v":"شركة الأوتاد المتحدة للإنشاء والتعمير","fg":"#1E293B"},{"c":"C8","v":"العملة المعتمدة (Currency):","b":true},{"c":"D8","v":"ر.س SAR","fg":"#1E293B","al":"center"},{"c":"E8","v":""}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"نظام الأساسات المعتمد بالمشروع:","bg":"#F8FAFC","b":true},{"c":"B9","v":"قواعد شريطية مستمرة Strip Footings + سملات رابطة Ground Beams","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C9","v":"منسوب التأسيس التصميمي:","bg":"#F8FAFC","b":true},{"c":"D9","v":"-1.80 م من الصفر المعماري","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E9","v":""}]},{"r":10,"h":28.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""}]},{"r":11,"h":38.0,"cells":[{"c":"A11","v":"2. محددات التربة والخرسانة وحديد الأساسات (Geotechnical & Structural Specs)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":"جهد التربة الصافي المسموح به (Net Bearing Capacity qall):","b":true},{"c":"B12","v":180,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"C12","v":"كيلونيوتن/م² (kN/m²)","fg":"#1E293B"},{"c":"D12","v":"تربة رملية متوسطة الكثافة إلى متماسكة","fg":"#64748B"},{"c":"E12","v":""}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"إجهاد كسر الخرسانة المسلحة للقواعد fcu / f'c:","bg":"#F8FAFC","b":true},{"c":"B13","v":30,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"C13","v":"نيوتن/مم² (MPa)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D13","v":"خرسانة جاهزة عادية أو مقاومة للكبريتات SRC","bg":"#F8FAFC","fg":"#64748B"},{"c":"E13","v":""}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"إجهاد خضوع حديد التسليح الرئيسي fy:","b":true},{"c":"B14","v":420,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"C14","v":"نيوتن/مم² (MPa)","fg":"#1E293B"},{"c":"D14","v":"حديد عالي المقاومة مشوه B420D مطابق لـ SASO","fg":"#64748B"},{"c":"E14","v":""}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"الغطاء الخرساني السفلي والجانبي (Clear Cover):","bg":"#F8FAFC","b":true},{"c":"B15","v":50,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"C15","v":"ملم (mm)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D15","v":"مع وجود طبقة خرسانة عادية نظافة 10 سم","bg":"#F8FAFC","fg":"#64748B"},{"c":"E15","v":""}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"طول وصلة التراكب للشد (Tension Lap 50Φ):","b":true},{"c":"B16","v":50,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"C16","v":"مضاعف القطر (50Φ)","fg":"#1E293B"},{"c":"D16","v":"للحديد الطولي المستمر بالسملات والقواعد الشريطية","fg":"#64748B"},{"c":"E16","v":""}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"أبعاد رجل حرف L أو U لتثبيت الأسياخ العرضية:","bg":"#F8FAFC","b":true},{"c":"B17","v":0.35,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.0%"},{"c":"C17","v":"متر (35 سم)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D17","v":"رجل قائمة لضمان طول التماسك التام Ld بالكابولي","bg":"#F8FAFC","fg":"#64748B"},{"c":"E17","v":""}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"النسبة المئوية التقديرية لهالك الحديد (Scrap %):","b":true},{"c":"B18","v":0.04,"in":true,"b":true,"al":"center","nf":"0.0%"},{"c":"C18","v":"نسبة مئوية (4.0%)","fg":"#1E293B"},{"c":"D18","v":"تفريد مدروس وفق أطوال الأسياخ القياسية 12 متراً","fg":"#64748B"},{"c":"E18","v":""}]},{"r":19,"h":28.0,"cells":[{"c":"A19","v":""},{"c":"B19","v":""},{"c":"C19","v":""},{"c":"D19","v":""},{"c":"E19","v":""}]},{"r":20,"h":38.0,"cells":[{"c":"A20","v":"3. جدول أوزان وأقطار حديد التسليح القياسي (Standard Rebar Unit Weights D²/162)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":21,"h":38.0,"cells":[{"c":"A21","v":"قطر السيخ القياسي Φ (mm)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B21","v":"مساحة المقطع As (mm²)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C21","v":"الوزن النظري كجم/متر (D²/162)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D21","v":"طول السيخ التجاري (م)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E21","v":"الاستخدام النموذجي في القواعد والسملات","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":8,"b":true,"al":"center"},{"c":"B22","v":50.27,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C22","v":0.395,"f":"=ROUND((A22*A22)/162, 3)","b":true,"al":"center","nf":"#,##0.000"},{"c":"D22","v":12,"in":true,"fg":"#1E293B","al":"center"},{"c":"E22","v":"كانات خفيفة وشنابر ربط وتثبيت","fg":"#64748B"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":10,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B23","v":78.54,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C23","v":0.617,"f":"=ROUND((A23*A23)/162, 3)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"D23","v":12,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E23","v":"كانات السملات والميدات وتوزيع حراري","bg":"#F8FAFC","fg":"#64748B"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":12,"b":true,"al":"center"},{"c":"B24","v":113.1,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C24","v":0.889,"f":"=ROUND((A24*A24)/162, 3)","b":true,"al":"center","nf":"#,##0.000"},{"c":"D24","v":12,"in":true,"fg":"#1E293B","al":"center"},{"c":"E24","v":"تسليح طولي ثانوي وتوزيع للقواعد الشريطية","fg":"#64748B"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":14,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B25","v":153.94,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C25","v":1.21,"f":"=ROUND((A25*A25)/162, 3)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"D25","v":12,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E25","v":"تسليح رئيسي للقواعد الشريطية الخفيفة والسملات","bg":"#F8FAFC","fg":"#64748B"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":16,"b":true,"al":"center"},{"c":"B26","v":201.06,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C26","v":1.58,"f":"=ROUND((A26*A26)/162, 3)","b":true,"al":"center","nf":"#,##0.000"},{"c":"D26","v":12,"in":true,"fg":"#1E293B","al":"center"},{"c":"E26","v":"تسليح عرضي رئيسي للقواعد وسفلي رئيسي للسملات","fg":"#64748B"}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":18,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B27","v":254.47,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C27","v":2,"f":"=ROUND((A27*A27)/162, 3)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"D27","v":12,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E27","v":"تسليح رئيسي للقواعد الشريطية العريضة والحوائط الساندة","bg":"#F8FAFC","fg":"#64748B"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":20,"b":true,"al":"center"},{"c":"B28","v":314.16,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C28","v":2.469,"f":"=ROUND((A28*A28)/162, 3)","b":true,"al":"center","nf":"#,##0.000"},{"c":"D28","v":12,"in":true,"fg":"#1E293B","al":"center"},{"c":"E28","v":"تسليح مكثف للسملات العميقة والقواعد الحاملة للأبراج","fg":"#64748B"}]}]},{"name":"لوحة_المؤشرات_والملخص_التنفيذي","maxRow":21,"maxCol":7,"colWidths":[28.0,24.0,20.0,22.0,24.0,24.0,26.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"لوحة المؤشرات التنفيذية وحصر حديد القواعد الشريطية والسملات (Executive BBS Dashboard)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"ملخص مؤشرات أوزان حديد التسليح، إجمالي أطوال القواعد، حجوم الخرسانة المسلحة، ومعدل استهلاك الحديد للمتر المكعب","bg":"#1E40AF","fg":"#F1F5F9","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"إجمالي وزن حديد التسليح (Total Rebar)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"إجمالي حجم الخرسانة المسلحة (Concrete Volume)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"معدل استهلاك الحديد (Steel Ratio)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center"},{"c":"F4","v":"إجمالي أطوال القواعد والسملات (Total Length)","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":46.0,"cells":[{"c":"A5","v":36.913552,"f":"=SUM('تفريد_حديد_القواعد_الشريطية'!N10:N50) + SUM('تفريد_حديد_السملات_والميدات'!N10:N50)","bg":"#F1F5F9","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00 \"طن\"","cs":2},{"skip":true},{"c":"C5","v":285.6,"in":true,"bg":"#F1F5F9","fg":"#047857","b":true,"al":"center","nf":"#,##0.0 \"م³\"","cs":2},{"skip":true},{"c":"E5","v":129.249132,"f":"=(A5*1000)/C5","bg":"#F1F5F9","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.0 \"كجم/م³\""},{"c":"F5","v":620,"in":true,"bg":"#F1F5F9","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0 \"م طولي\"","cs":2},{"skip":true}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"شاملاً القواعد الشريطية والسملات الرابطة","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C6","v":"قواعد شريطية 195م³ + سملات وميدات 90.6م³","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E6","v":"المعدل القياسي: 80 - 105 كجم/م³","bg":"#F1F5F9","fg":"#64748B","al":"center"},{"c":"F6","v":"قواعد شريطية 340 م + سملات ربط 280 م","bg":"#F1F5F9","fg":"#64748B","al":"center","cs":2},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"جدول حصر وتوزيع حديد التسليح حسب القطر القياسي (Rebar Breakdown by Diameter)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":"قطر السيخ القياسي Φ (mm)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"إجمالي الأطوال (متر طولي)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"وزن المتر كجم/م","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"وزن القواعد الشريطية (طن)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"وزن السملات والميدات (طن)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"إجمالي الوزن (طن)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"النسبة المئوية من الإجمالي (%)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":8,"b":true,"al":"center"},{"c":"B10","v":680,"f":"=SUMIF('تفريد_حديد_القواعد_الشريطية'!$D$10:$D$50, A10, 'تفريد_حديد_القواعد_الشريطية'!$K$10:$K$50) + SUMIF('تفريد_حديد_السملات_والميدات'!$D$10:$D$50, A10, 'تفريد_حديد_السملات_والميدات'!$K$10:$K$50)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C10","v":0.395,"f":"=ROUND((A10*A10)/162, 3)","b":true,"al":"center","nf":"#,##0.000"},{"c":"D10","v":0.04345,"f":"=SUMIF('تفريد_حديد_القواعد_الشريطية'!$D$10:$D$50, A10, 'تفريد_حديد_القواعد_الشريطية'!$N$10:$N$50)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E10","v":0.11376,"f":"=SUMIF('تفريد_حديد_السملات_والميدات'!$D$10:$D$50, A10, 'تفريد_حديد_السملات_والميدات'!$N$10:$N$50)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F10","v":0.15721,"f":"=D10+E10","b":true,"al":"center","nf":"#,##0.00"},{"c":"G10","v":0,"f":"=IF($F$17>0, F10/$F$17, 0)","fg":"#1E293B","al":"center","nf":"0.0%"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":10,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":695,"f":"=SUMIF('تفريد_حديد_القواعد_الشريطية'!$D$10:$D$50, A11, 'تفريد_حديد_القواعد_الشريطية'!$K$10:$K$50) + SUMIF('تفريد_حديد_السملات_والميدات'!$D$10:$D$50, A11, 'تفريد_حديد_السملات_والميدات'!$K$10:$K$50)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C11","v":0.617,"f":"=ROUND((A11*A11)/162, 3)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"D11","v":0.25914,"f":"=SUMIF('تفريد_حديد_القواعد_الشريطية'!$D$10:$D$50, A11, 'تفريد_حديد_القواعد_الشريطية'!$N$10:$N$50)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E11","v":0.590346,"f":"=SUMIF('تفريد_حديد_السملات_والميدات'!$D$10:$D$50, A11, 'تفريد_حديد_السملات_والميدات'!$N$10:$N$50)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F11","v":0.849486,"f":"=D11+E11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G11","v":0,"f":"=IF($F$17>0, F11/$F$17, 0)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0%"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":12,"b":true,"al":"center"},{"c":"B12","v":192,"f":"=SUMIF('تفريد_حديد_القواعد_الشريطية'!$D$10:$D$50, A12, 'تفريد_حديد_القواعد_الشريطية'!$K$10:$K$50) + SUMIF('تفريد_حديد_السملات_والميدات'!$D$10:$D$50, A12, 'تفريد_حديد_السملات_والميدات'!$K$10:$K$50)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C12","v":0.889,"f":"=ROUND((A12*A12)/162, 3)","b":true,"al":"center","nf":"#,##0.000"},{"c":"D12","v":1.49352,"f":"=SUMIF('تفريد_حديد_القواعد_الشريطية'!$D$10:$D$50, A12, 'تفريد_حديد_القواعد_الشريطية'!$N$10:$N$50)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E12","v":0.569671,"f":"=SUMIF('تفريد_حديد_السملات_والميدات'!$D$10:$D$50, A12, 'تفريد_حديد_السملات_والميدات'!$N$10:$N$50)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F12","v":2.063191,"f":"=D12+E12","b":true,"al":"center","nf":"#,##0.00"},{"c":"G12","v":0,"f":"=IF($F$17>0, F12/$F$17, 0)","fg":"#1E293B","al":"center","nf":"0.0%"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":14,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":679,"f":"=SUMIF('تفريد_حديد_القواعد_الشريطية'!$D$10:$D$50, A13, 'تفريد_حديد_القواعد_الشريطية'!$K$10:$K$50) + SUMIF('تفريد_حديد_السملات_والميدات'!$D$10:$D$50, A13, 'تفريد_حديد_السملات_والميدات'!$K$10:$K$50)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C13","v":1.21,"f":"=ROUND((A13*A13)/162, 3)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"D13","v":3.03105,"f":"=SUMIF('تفريد_حديد_القواعد_الشريطية'!$D$10:$D$50, A13, 'تفريد_حديد_القواعد_الشريطية'!$N$10:$N$50)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E13","v":0.368808,"f":"=SUMIF('تفريد_حديد_السملات_والميدات'!$D$10:$D$50, A13, 'تفريد_حديد_السملات_والميدات'!$N$10:$N$50)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F13","v":3.399858,"f":"=D13+E13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G13","v":0,"f":"=IF($F$17>0, F13/$F$17, 0)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0%"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":16,"b":true,"al":"center"},{"c":"B14","v":467,"f":"=SUMIF('تفريد_حديد_القواعد_الشريطية'!$D$10:$D$50, A14, 'تفريد_حديد_القواعد_الشريطية'!$K$10:$K$50) + SUMIF('تفريد_حديد_السملات_والميدات'!$D$10:$D$50, A14, 'تفريد_حديد_السملات_والميدات'!$K$10:$K$50)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C14","v":1.58,"f":"=ROUND((A14*A14)/162, 3)","b":true,"al":"center","nf":"#,##0.000"},{"c":"D14","v":1.623292,"f":"=SUMIF('تفريد_حديد_القواعد_الشريطية'!$D$10:$D$50, A14, 'تفريد_حديد_القواعد_الشريطية'!$N$10:$N$50)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E14","v":0,"f":"=SUMIF('تفريد_حديد_السملات_والميدات'!$D$10:$D$50, A14, 'تفريد_حديد_السملات_والميدات'!$N$10:$N$50)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F14","v":1.623292,"f":"=D14+E14","b":true,"al":"center","nf":"#,##0.00"},{"c":"G14","v":0,"f":"=IF($F$17>0, F14/$F$17, 0)","fg":"#1E293B","al":"center","nf":"0.0%"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":18,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":632,"f":"=SUMIF('تفريد_حديد_القواعد_الشريطية'!$D$10:$D$50, A15, 'تفريد_حديد_القواعد_الشريطية'!$K$10:$K$50) + SUMIF('تفريد_حديد_السملات_والميدات'!$D$10:$D$50, A15, 'تفريد_حديد_السملات_والميدات'!$K$10:$K$50)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C15","v":2,"f":"=ROUND((A15*A15)/162, 3)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"D15","v":2.64,"f":"=SUMIF('تفريد_حديد_القواعد_الشريطية'!$D$10:$D$50, A15, 'تفريد_حديد_القواعد_الشريطية'!$N$10:$N$50)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E15","v":0.8512,"f":"=SUMIF('تفريد_حديد_السملات_والميدات'!$D$10:$D$50, A15, 'تفريد_حديد_السملات_والميدات'!$N$10:$N$50)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F15","v":3.4912,"f":"=D15+E15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"G15","v":0,"f":"=IF($F$17>0, F15/$F$17, 0)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.0%"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":20,"b":true,"al":"center"},{"c":"B16","v":48,"f":"=SUMIF('تفريد_حديد_القواعد_الشريطية'!$D$10:$D$50, A16, 'تفريد_حديد_القواعد_الشريطية'!$K$10:$K$50) + SUMIF('تفريد_حديد_السملات_والميدات'!$D$10:$D$50, A16, 'تفريد_حديد_السملات_والميدات'!$K$10:$K$50)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"C16","v":2.469,"f":"=ROUND((A16*A16)/162, 3)","b":true,"al":"center","nf":"#,##0.000"},{"c":"D16","v":0,"f":"=SUMIF('تفريد_حديد_القواعد_الشريطية'!$D$10:$D$50, A16, 'تفريد_حديد_القواعد_الشريطية'!$N$10:$N$50)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"E16","v":1.57621,"f":"=SUMIF('تفريد_حديد_السملات_والميدات'!$D$10:$D$50, A16, 'تفريد_حديد_السملات_والميدات'!$N$10:$N$50)","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"F16","v":1.57621,"f":"=D16+E16","b":true,"al":"center","nf":"#,##0.00"},{"c":"G16","v":0,"f":"=IF($F$17>0, F16/$F$17, 0)","fg":"#1E293B","al":"center","nf":"0.0%"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"الإجمالي الكلي لحديد التسليح (Grand Total)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B17","v":3393,"f":"=SUM(B10:B16)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"C17","v":"-","bg":"#E2E8F0","al":"center"},{"c":"D17","v":9.090452,"f":"=SUM(D10:D16)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"E17","v":4.069995,"f":"=SUM(E10:E16)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"F17","v":13.160447,"f":"=SUM(F10:F16)","bg":"#FEF3C7","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"G17","v":0,"f":"=SUM(G10:G16)","bg":"#FEF3C7","b":true,"al":"center","nf":"0.0%"}]},{"r":18,"h":28.0,"cells":[{"c":"A18","v":""},{"c":"B18","v":""},{"c":"C18","v":""},{"c":"D18","v":""},{"c":"E18","v":""},{"c":"F18","v":""},{"c":"G18","v":""}]},{"r":19,"h":36.0,"cells":[{"c":"A19","v":"اعتماد ومراجعة جداول تفريد الأساسات والسملات (BBS Sign-off)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":"مهندس المكتب الفني والتفريد:","bg":"#E2E8F0","b":true,"al":"center","cs":2},{"skip":true},{"c":"C20","v":"مهندس ضبط الجودة والموقع:","bg":"#E2E8F0","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F20","v":"اعتماد مهندس الاستشاري المشرف:","bg":"#E2E8F0","b":true,"al":"center","cs":2},{"skip":true}]},{"r":21,"h":76.0,"cells":[{"c":"A21","v":"الاسم: م. تامر عبد الحليم\nالتوقيع: ........................\nالتاريخ: 2026-10-09","fg":"#1E293B","cs":2},{"skip":true},{"c":"C21","v":"الاسم: م. ياسر الدوسري\nالتوقيع: ........................\nالختم: تم التدقيق والتحقق من أبعاد الكوابيل والركوب","fg":"#1E293B","cs":3},{"skip":true},{"skip":true},{"c":"F21","v":"الاسم: د.م. عمر السويدي\nالتوقيع: ........................\nالقرار: معتمد للتصنيع والصب","fg":"#1E293B","cs":2},{"skip":true}]}]},{"name":"تفريد_حديد_القواعد_الشريطية","maxRow":19,"maxCol":15,"colWidths":[8.0,26.0,38.0,16.0,26.0,14.0,14.0,14.0,18.0,14.0,18.0,20.0,16.0,18.0,46.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول تفريد حديد القواعد الشريطية المستمرة تحت الجدران والأسوار (Strip Footings BBS)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"تفريد الحديد العرضي الرئيسي (الفرش)، الحديد الطولي الثانوي (الغطاء)، أشاير الحوائط الخرسانية والشنابر","bg":"#1E40AF","fg":"#F1F5F9","al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""},{"c":"O3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"م","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"العنصر ونموذج القاعدة والموقع","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"توصيف السيخ ومكانه بالتفصيلة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"القطر Φ (مم)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"شكل السيخ (Shape)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"البعد A (م)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"البعد B (م)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"البعد C (م)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"طول القطعية L (م)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"عدد القواعد المتشابهة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"عدد الأسياخ بالقاعدة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L4","v":"إجمالي الطول (متر)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M4","v":"وزن المتر كجم/م","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N4","v":"إجمالي الوزن (طن)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"O4","v":"ملاحظات واشتراطات التنفيذ","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":36.0,"cells":[{"c":"A5","v":1,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B5","v":"قاعدة شريطية SF1 (سور)","bg":"#F8FAFC","b":true},{"c":"C5","v":"فرش عرضي رئيسي سفلي (Transverse Bottom)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D5","v":14,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E5","v":"شكل U مع رجلين 35 سم","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F5","v":0.35,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G5","v":1.1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H5","v":0.35,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I5","v":1.8,"f":"=F5+G5+H5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J5","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K5","v":1200,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L5","v":2160,"f":"=I5*J5*K5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M5","v":1.21,"f":"=ROUND((D5*D5)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N5","v":2.6136,"f":"=(L5*M5)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O5","v":"كل 15 سم لمقاومة عزم الانحناء الكابولي العرضي","bg":"#F8FAFC","fg":"#64748B"}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":2,"b":true,"al":"center"},{"c":"B6","v":"قاعدة شريطية SF1 (سور)","b":true},{"c":"C6","v":"غطاء طولي سفلي (Longitudinal Bottom)","fg":"#1E293B"},{"c":"D6","v":12,"in":true,"b":true,"al":"center"},{"c":"E6","v":"أسياخ مستقيمة متراكبة 50Φ","fg":"#64748B","al":"center"},{"c":"F6","v":12,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G6","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H6","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I6","v":12,"f":"=F6+G6+H6","b":true,"al":"center","nf":"#,##0.00"},{"c":"J6","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"K6","v":105,"in":true,"fg":"#1E293B","al":"center"},{"c":"L6","v":1260,"f":"=I6*J6*K6","b":true,"al":"center","nf":"#,##0.00"},{"c":"M6","v":0.889,"f":"=ROUND((D6*D6)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N6","v":1.12014,"f":"=(L6*M6)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O6","v":"7 أسياخ طولية موزعة بانتظام على عرض 1.20 م","fg":"#64748B"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":3,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"قاعدة شريطية SF1 (سور)","bg":"#F8FAFC","b":true},{"c":"C7","v":"شبكة علوية انكماش (Top Longitudinal)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D7","v":10,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E7","v":"أسياخ مستقيمة متراكبة","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F7","v":12,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G7","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H7","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I7","v":12,"f":"=F7+G7+H7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J7","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K7","v":60,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L7","v":720,"f":"=I7*J7*K7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M7","v":0.617,"f":"=ROUND((D7*D7)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N7","v":0.44424,"f":"=(L7*M7)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O7","v":"4 أسياخ طولية علوية لمقاومة الإجهادات الحرارية","bg":"#F8FAFC","fg":"#64748B"}]},{"r":8,"h":36.0,"cells":[{"c":"A8","v":4,"b":true,"al":"center"},{"c":"B8","v":"قاعدة شريطية SF1 (سور)","b":true},{"c":"C8","v":"أشاير أعمدة السور الخرسانية (Wall Dowels)","fg":"#1E293B"},{"c":"D8","v":14,"in":true,"b":true,"al":"center"},{"c":"E8","v":"شكل L مع رجل تثبيت 40 سم","fg":"#64748B","al":"center"},{"c":"F8","v":0.4,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G8","v":1.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H8","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I8","v":1.6,"f":"=F8+G8+H8","b":true,"al":"center","nf":"#,##0.00"},{"c":"J8","v":60,"in":true,"fg":"#1E293B","al":"center"},{"c":"K8","v":6,"in":true,"fg":"#1E293B","al":"center"},{"c":"L8","v":576,"f":"=I8*J8*K8","b":true,"al":"center","nf":"#,##0.00"},{"c":"M8","v":1.21,"f":"=ROUND((D8*D8)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N8","v":0.69696,"f":"=(L8*M8)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O8","v":"أشاير أعمدة السور كل 3.0 متر متراكبة مع حديد العمود","fg":"#64748B"}]},{"r":9,"h":36.0,"cells":[{"c":"A9","v":5,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"قاعدة شريطية SF2 (حائط ساند)","bg":"#F8FAFC","b":true},{"c":"C9","v":"فرش عرضي سفلي ثقيل (Heavy Transverse)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D9","v":18,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E9","v":"شكل U مع رجلين 50 سم","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F9","v":0.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G9","v":1.9,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H9","v":0.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I9","v":2.9,"f":"=F9+G9+H9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J9","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K9","v":600,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L9","v":1740,"f":"=I9*J9*K9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M9","v":2,"f":"=ROUND((D9*D9)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N9","v":3.48,"f":"=(L9*M9)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O9","v":"كل 15 سم لمقاومة عزم الانقلاب وضغط التربة الجانبي","bg":"#F8FAFC","fg":"#64748B"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":6,"b":true,"al":"center"},{"c":"B10","v":"قاعدة شريطية SF2 (حائط ساند)","b":true},{"c":"C10","v":"غطاء طولي سفلي (Longitudinal Bottom)","fg":"#1E293B"},{"c":"D10","v":14,"in":true,"b":true,"al":"center"},{"c":"E10","v":"أسياخ مستقيمة متراكبة 50Φ","fg":"#64748B","al":"center"},{"c":"F10","v":12,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G10","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H10","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I10","v":12,"f":"=F10+G10+H10","b":true,"al":"center","nf":"#,##0.00"},{"c":"J10","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"K10","v":85,"in":true,"fg":"#1E293B","al":"center"},{"c":"L10","v":1020,"f":"=I10*J10*K10","b":true,"al":"center","nf":"#,##0.00"},{"c":"M10","v":1.21,"f":"=ROUND((D10*D10)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N10","v":1.2342,"f":"=(L10*M10)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O10","v":"11 سيخاً طولي موزع بانتظام على عرض 2.0 م","fg":"#64748B"}]},{"r":11,"h":36.0,"cells":[{"c":"A11","v":7,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"قاعدة شريطية SF2 (حائط ساند)","bg":"#F8FAFC","b":true},{"c":"C11","v":"حديد علوي عرضي (Top Transverse Mesh)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D11","v":14,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E11","v":"شكل U مقلوب","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F11","v":0.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G11","v":1.9,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H11","v":0.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I11","v":2.9,"f":"=F11+G11+H11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J11","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K11","v":450,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L11","v":1305,"f":"=I11*J11*K11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M11","v":1.21,"f":"=ROUND((D11*D11)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N11","v":1.57905,"f":"=(L11*M11)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O11","v":"حديد علوي كل 20 سم لمقاومة عزوم الرفع Uplift","bg":"#F8FAFC","fg":"#64748B"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":8,"b":true,"al":"center"},{"c":"B12","v":"قاعدة شريطية SF2 (حائط ساند)","b":true},{"c":"C12","v":"حديد علوي طولي (Top Longitudinal)","fg":"#1E293B"},{"c":"D12","v":12,"in":true,"b":true,"al":"center"},{"c":"E12","v":"أسياخ مستقيمة متراكبة","fg":"#64748B","al":"center"},{"c":"F12","v":12,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G12","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H12","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I12","v":12,"f":"=F12+G12+H12","b":true,"al":"center","nf":"#,##0.00"},{"c":"J12","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"K12","v":85,"in":true,"fg":"#1E293B","al":"center"},{"c":"L12","v":1020,"f":"=I12*J12*K12","b":true,"al":"center","nf":"#,##0.00"},{"c":"M12","v":0.889,"f":"=ROUND((D12*D12)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N12","v":0.90678,"f":"=(L12*M12)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O12","v":"حديد طولي علوي لمنع الهبوط المتفاوت","fg":"#64748B"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":9,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"قاعدة شريطية SF2 (حائط ساند)","bg":"#F8FAFC","b":true},{"c":"C13","v":"أشاير الحائط الساند الرأسية (Retaining Dowels)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D13","v":18,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E13","v":"شكل L مع رجل تثبيت 60 سم","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F13","v":0.6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G13","v":1.6,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H13","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I13","v":2.2,"f":"=F13+G13+H13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J13","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K13","v":600,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L13","v":1320,"f":"=I13*J13*K13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M13","v":2,"f":"=ROUND((D13*D13)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N13","v":2.64,"f":"=(L13*M13)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O13","v":"أشاير رقتين للحائط الساند كل 15 سم ممتدة بالقاعدة","bg":"#F8FAFC","fg":"#64748B"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":10,"b":true,"al":"center"},{"c":"B14","v":"قاعدة شريطية SF2 (حائط ساند)","b":true},{"c":"C14","v":"كراسي حديدية للرقة العلوية (Chairs)","fg":"#1E293B"},{"c":"D14","v":14,"in":true,"b":true,"al":"center"},{"c":"E14","v":"كرسي حديد قياسي بارتفاع 50 سم","fg":"#64748B","al":"center"},{"c":"F14","v":0.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G14","v":0.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H14","v":0.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I14","v":1.5,"f":"=F14+G14+H14","b":true,"al":"center","nf":"#,##0.00"},{"c":"J14","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"K14","v":120,"in":true,"fg":"#1E293B","al":"center"},{"c":"L14","v":180,"f":"=I14*J14*K14","b":true,"al":"center","nf":"#,##0.00"},{"c":"M14","v":1.21,"f":"=ROUND((D14*D14)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N14","v":0.2178,"f":"=(L14*M14)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O14","v":"كرسي كل 1.5 م² لضمان ثبات الرقة العلوية أثناء الصب","fg":"#64748B"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":11,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"قاعدة شريطية SF3 (مباني)","bg":"#F8FAFC","b":true},{"c":"C15","v":"فرش عرضي رئيسي سفلي (Transverse Bottom)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D15","v":16,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E15","v":"شكل U مع رجلين 40 سم","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F15","v":0.4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G15","v":1.4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H15","v":0.4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I15","v":2.2,"f":"=F15+G15+H15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J15","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K15","v":467,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L15","v":1027.4,"f":"=I15*J15*K15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M15","v":1.58,"f":"=ROUND((D15*D15)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N15","v":1.623292,"f":"=(L15*M15)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O15","v":"كل 15 سم لتوزيع أحمال الجدران الحاملة","bg":"#F8FAFC","fg":"#64748B"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":12,"b":true,"al":"center"},{"c":"B16","v":"قاعدة شريطية SF3 (مباني)","b":true},{"c":"C16","v":"غطاء طولي سفلي (Longitudinal Bottom)","fg":"#1E293B"},{"c":"D16","v":12,"in":true,"b":true,"al":"center"},{"c":"E16","v":"أسياخ مستقيمة متراكبة","fg":"#64748B","al":"center"},{"c":"F16","v":12,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G16","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H16","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I16","v":12,"f":"=F16+G16+H16","b":true,"al":"center","nf":"#,##0.00"},{"c":"J16","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"K16","v":55,"in":true,"fg":"#1E293B","al":"center"},{"c":"L16","v":660,"f":"=I16*J16*K16","b":true,"al":"center","nf":"#,##0.00"},{"c":"M16","v":0.889,"f":"=ROUND((D16*D16)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N16","v":0.58674,"f":"=(L16*M16)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O16","v":"8 أسياخ طولية موزعة بانتظام","fg":"#64748B"}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":13,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B17","v":"قاعدة شريطية SF3 (مباني)","bg":"#F8FAFC","b":true},{"c":"C17","v":"شبكة علوية انكماش (Top Mesh)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D17","v":10,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E17","v":"أسياخ مستقيمة متراكبة","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F17","v":12,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G17","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H17","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I17","v":12,"f":"=F17+G17+H17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J17","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K17","v":35,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L17","v":420,"f":"=I17*J17*K17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M17","v":0.617,"f":"=ROUND((D17*D17)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N17","v":0.25914,"f":"=(L17*M17)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O17","v":"5 أسياخ طولية علوية لمنع شروخ التصلد","bg":"#F8FAFC","fg":"#64748B"}]},{"r":18,"h":36.0,"cells":[{"c":"A18","v":14,"b":true,"al":"center"},{"c":"B18","v":"قاعدة شريطية SF3 (مباني)","b":true},{"c":"C18","v":"شنابر ربط وتثبيت (S-Ties)","fg":"#1E293B"},{"c":"D18","v":8,"in":true,"b":true,"al":"center"},{"c":"E18","v":"شنبر حرف S بخطاف 135°","fg":"#64748B","al":"center"},{"c":"F18","v":0.35,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G18","v":0.1,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H18","v":0.1,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I18","v":0.55,"f":"=F18+G18+H18","b":true,"al":"center","nf":"#,##0.00"},{"c":"J18","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"K18","v":200,"in":true,"fg":"#1E293B","al":"center"},{"c":"L18","v":110.0,"f":"=I18*J18*K18","b":true,"al":"center","nf":"#,##0.00"},{"c":"M18","v":0.395,"f":"=ROUND((D18*D18)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N18","v":0.04345,"f":"=(L18*M18)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O18","v":"حفظ مسافة وتأمين الرقتين أثناء الصب","fg":"#64748B"}]},{"r":19,"h":42.0,"cells":[{"c":"A19","v":"إجمالي حديد القواعد الشريطية المستمرة (Total Strip Footings Rebar)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"L19","v":13518.4,"f":"=SUM(L5:L18)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"M19","v":"-","bg":"#E2E8F0","al":"center"},{"c":"N19","v":17.445392,"f":"=SUM(N5:N18)","bg":"#FEF3C7","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"O19","v":"شامل الهالك بنسبة 4.0%","bg":"#E2E8F0","fg":"#64748B"}]}]},{"name":"تفريد_حديد_السملات_والميدات","maxRow":18,"maxCol":15,"colWidths":[8.0,26.0,38.0,16.0,26.0,14.0,14.0,14.0,18.0,14.0,18.0,20.0,16.0,18.0,46.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول تفريد حديد السملات والميدات الرابطة والشناجات (Ground Beams & Straps BBS)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":36.0,"cells":[{"c":"A2","v":"تفريد الحديد السفلي والعلوي، كانات القص المغلقة، براندات الانكماش الجانبية، والوصلات فوق الركائز","bg":"#1E40AF","fg":"#F1F5F9","al":"center","cs":15},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""},{"c":"O3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"م","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"العنصر ونموذج القاعدة والموقع","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"توصيف السيخ ومكانه بالتفصيلة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"القطر Φ (مم)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"شكل السيخ (Shape)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"البعد A (م)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"البعد B (م)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"البعد C (م)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"طول القطعية L (م)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"عدد القواعد المتشابهة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"عدد الأسياخ بالقاعدة","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L4","v":"إجمالي الطول (متر)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M4","v":"وزن المتر كجم/م","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N4","v":"إجمالي الوزن (طن)","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"},{"c":"O4","v":"ملاحظات واشتراطات التنفيذ","bg":"#2563EB","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":36.0,"cells":[{"c":"A5","v":1,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B5","v":"سمل رابط GB1 (25×60 سم)","bg":"#F8FAFC","b":true},{"c":"C5","v":"تسليح سفلي رئيسي مستمر (Bottom Main)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D5","v":16,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E5","v":"أسياخ مستقيمة مع رجلين 45 سم","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F5","v":0.45,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G5","v":12,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H5","v":0.45,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I5","v":12.9,"f":"=F5+G5+H5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J5","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K5","v":40,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L5","v":516,"f":"=I5*J5*K5","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M5","v":1.58,"f":"=ROUND((D5*D5)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N5","v":0.81528,"f":"=(L5*M5)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O5","v":"4 أسياخ سفلية T16 مستمرة تراكب 50Φ عند الثلث الطرفي","bg":"#F8FAFC","fg":"#64748B"}]},{"r":6,"h":36.0,"cells":[{"c":"A6","v":2,"b":true,"al":"center"},{"c":"B6","v":"سمل رابط GB1 (25×60 سم)","b":true},{"c":"C6","v":"تسليح سفلي إضافي بمنتصف البحر (Bottom Extra)","fg":"#1E293B"},{"c":"D6","v":16,"in":true,"b":true,"al":"center"},{"c":"E6","v":"سيخ مستقيم بمنتصف البحر","fg":"#64748B","al":"center"},{"c":"F6","v":4.5,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G6","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H6","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I6","v":4.5,"f":"=F6+G6+H6","b":true,"al":"center","nf":"#,##0.00"},{"c":"J6","v":24,"in":true,"fg":"#1E293B","al":"center"},{"c":"K6","v":2,"in":true,"fg":"#1E293B","al":"center"},{"c":"L6","v":216,"f":"=I6*J6*K6","b":true,"al":"center","nf":"#,##0.00"},{"c":"M6","v":1.58,"f":"=ROUND((D6*D6)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N6","v":0.34128,"f":"=(L6*M6)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O6","v":"سيخان إضافيان T16 بمنتصف البحر لمقاومة العزم الموجب","fg":"#64748B"}]},{"r":7,"h":36.0,"cells":[{"c":"A7","v":3,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"سمل رابط GB1 (25×60 سم)","bg":"#F8FAFC","b":true},{"c":"C7","v":"تسليح علوي رئيسي مستمر (Top Main)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D7","v":14,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E7","v":"أسياخ مستقيمة مع رجلين 45 سم","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F7","v":0.45,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G7","v":12,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H7","v":0.45,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I7","v":12.9,"f":"=F7+G7+H7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J7","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K7","v":30,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L7","v":387,"f":"=I7*J7*K7","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M7","v":1.21,"f":"=ROUND((D7*D7)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N7","v":0.46827,"f":"=(L7*M7)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O7","v":"3 أسياخ علوية T14 مستمرة تراكب بمنتصف البحر","bg":"#F8FAFC","fg":"#64748B"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":4,"b":true,"al":"center"},{"c":"B8","v":"سمل رابط GB1 (25×60 سم)","b":true},{"c":"C8","v":"تسليح علوي إضافي فوق الركائز (Top Extra at Supports)","fg":"#1E293B"},{"c":"D8","v":16,"in":true,"b":true,"al":"center"},{"c":"E8","v":"شوكة علوية فوق القواعد","fg":"#64748B","al":"center"},{"c":"F8","v":3.2,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G8","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H8","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I8","v":3.2,"f":"=F8+G8+H8","b":true,"al":"center","nf":"#,##0.00"},{"c":"J8","v":24,"in":true,"fg":"#1E293B","al":"center"},{"c":"K8","v":2,"in":true,"fg":"#1E293B","al":"center"},{"c":"L8","v":153.6,"f":"=I8*J8*K8","b":true,"al":"center","nf":"#,##0.00"},{"c":"M8","v":1.58,"f":"=ROUND((D8*D8)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N8","v":0.242688,"f":"=(L8*M8)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O8","v":"مقاومة العزم السالب الناتج عن الهبوط المتفاوت بين القواعد","fg":"#64748B"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":5,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"سمل رابط GB1 (25×60 سم)","bg":"#F8FAFC","b":true},{"c":"C9","v":"كانات قص مغلقة بقفل زلزالي 135° (Stirrups)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D9","v":10,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E9","v":"كانة مستطيلة مغلقة","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F9","v":0.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G9","v":0.15,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H9","v":0.1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I9","v":0.75,"f":"=F9+G9+H9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J9","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K9","v":800,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L9","v":600,"f":"=I9*J9*K9","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M9","v":0.617,"f":"=ROUND((D9*D9)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N9","v":0.3702,"f":"=(L9*M9)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O9","v":"تكثيف الكانات 8T10/م في أول متر عند الركائز و 5T10/م بالوسط","bg":"#F8FAFC","fg":"#64748B"}]},{"r":10,"h":36.0,"cells":[{"c":"A10","v":6,"b":true,"al":"center"},{"c":"B10","v":"سمل رابط GB1 (25×60 سم)","b":true},{"c":"C10","v":"براندات انكماش جانبية (Side Skin Bars)","fg":"#1E293B"},{"c":"D10","v":10,"in":true,"b":true,"al":"center"},{"c":"E10","v":"أسياخ طولية مستقيمة","fg":"#64748B","al":"center"},{"c":"F10","v":12,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G10","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H10","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I10","v":12,"f":"=F10+G10+H10","b":true,"al":"center","nf":"#,##0.00"},{"c":"J10","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"K10","v":20,"in":true,"fg":"#1E293B","al":"center"},{"c":"L10","v":240,"f":"=I10*J10*K10","b":true,"al":"center","nf":"#,##0.00"},{"c":"M10","v":0.617,"f":"=ROUND((D10*D10)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N10","v":0.14808,"f":"=(L10*M10)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O10","v":"سيخان بالمنتصف لعمق أكبر من 60 سم وفق كود SBC 304","fg":"#64748B"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":7,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"شداد خرساني GB2 (40×80 سم)","bg":"#F8FAFC","b":true},{"c":"C11","v":"تسليح علوي رئيسي ثقيل للشداد (Top Heavy Tension)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D11","v":20,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E11","v":"أسياخ مستمرة مع رجلين 65 سم","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F11","v":0.65,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G11","v":12,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H11","v":0.65,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I11","v":13.3,"f":"=F11+G11+H11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J11","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K11","v":48,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L11","v":638.4,"f":"=I11*J11*K11","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M11","v":2.469,"f":"=ROUND((D11*D11)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N11","v":1.57621,"f":"=(L11*M11)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O11","v":"6 أسياخ علوية T20 لمقاومة عزم الانقلاب لقواعد الجار","bg":"#F8FAFC","fg":"#64748B"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":8,"b":true,"al":"center"},{"c":"B12","v":"شداد خرساني GB2 (40×80 سم)","b":true},{"c":"C12","v":"تسليح سفلي رئيسي للشداد (Bottom Main)","fg":"#1E293B"},{"c":"D12","v":18,"in":true,"b":true,"al":"center"},{"c":"E12","v":"أسياخ مستمرة مع رجلين 65 سم","fg":"#64748B","al":"center"},{"c":"F12","v":0.65,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G12","v":12,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H12","v":0.65,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I12","v":13.3,"f":"=F12+G12+H12","b":true,"al":"center","nf":"#,##0.00"},{"c":"J12","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"K12","v":32,"in":true,"fg":"#1E293B","al":"center"},{"c":"L12","v":425.6,"f":"=I12*J12*K12","b":true,"al":"center","nf":"#,##0.00"},{"c":"M12","v":2,"f":"=ROUND((D12*D12)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N12","v":0.8512,"f":"=(L12*M12)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O12","v":"4 أسياخ سفلية T18","fg":"#64748B"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":9,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"شداد خرساني GB2 (40×80 سم)","bg":"#F8FAFC","b":true},{"c":"C13","v":"كانات قص مزدوجة ذات 4 فروع (4-Legged Stirrups)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D13","v":10,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E13","v":"كانة خارجية + كانة داخلية","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F13","v":0.7,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G13","v":0.3,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H13","v":0.12,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I13","v":1.12,"f":"=F13+G13+H13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J13","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K13","v":640,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L13","v":716.8,"f":"=I13*J13*K13","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M13","v":0.617,"f":"=ROUND((D13*D13)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N13","v":0.442266,"f":"=(L13*M13)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O13","v":"كانات تكثيف 8T10/م بكامل طول الشداد لمقاومة قوى القص العالية","bg":"#F8FAFC","fg":"#64748B"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":10,"b":true,"al":"center"},{"c":"B14","v":"شداد خرساني GB2 (40×80 سم)","b":true},{"c":"C14","v":"براندات انكماش جانبية (Side Skin Bars)","fg":"#1E293B"},{"c":"D14","v":12,"in":true,"b":true,"al":"center"},{"c":"E14","v":"أسياخ طولية مستقيمة","fg":"#64748B","al":"center"},{"c":"F14","v":12,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G14","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H14","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I14","v":12,"f":"=F14+G14+H14","b":true,"al":"center","nf":"#,##0.00"},{"c":"J14","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"K14","v":28,"in":true,"fg":"#1E293B","al":"center"},{"c":"L14","v":336,"f":"=I14*J14*K14","b":true,"al":"center","nf":"#,##0.00"},{"c":"M14","v":0.889,"f":"=ROUND((D14*D14)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N14","v":0.298704,"f":"=(L14*M14)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O14","v":"4 أسياخ T12 على جانبي الشداد لمقاومة الشروخ","fg":"#64748B"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":11,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"ميدة مباني GB3 (20×50 سم)","bg":"#F8FAFC","b":true},{"c":"C15","v":"تسليح سفلي مستمر (Bottom Main)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D15","v":14,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E15","v":"أسياخ مستقيمة مع رجلين 35 سم","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F15","v":0.35,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G15","v":12,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H15","v":0.35,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I15","v":12.7,"f":"=F15+G15+H15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J15","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K15","v":24,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L15","v":304.8,"f":"=I15*J15*K15","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M15","v":1.21,"f":"=ROUND((D15*D15)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N15","v":0.368808,"f":"=(L15*M15)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O15","v":"3 أسياخ T14 سفلية لحمل جدران البلوك","bg":"#F8FAFC","fg":"#64748B"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":12,"b":true,"al":"center"},{"c":"B16","v":"ميدة مباني GB3 (20×50 سم)","b":true},{"c":"C16","v":"تسليح علوي مستمر (Top Main)","fg":"#1E293B"},{"c":"D16","v":12,"in":true,"b":true,"al":"center"},{"c":"E16","v":"أسياخ مستقيمة مع رجلين 35 سم","fg":"#64748B","al":"center"},{"c":"F16","v":0.35,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G16","v":12,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H16","v":0.35,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I16","v":12.7,"f":"=F16+G16+H16","b":true,"al":"center","nf":"#,##0.00"},{"c":"J16","v":1,"in":true,"fg":"#1E293B","al":"center"},{"c":"K16","v":24,"in":true,"fg":"#1E293B","al":"center"},{"c":"L16","v":304.8,"f":"=I16*J16*K16","b":true,"al":"center","nf":"#,##0.00"},{"c":"M16","v":0.889,"f":"=ROUND((D16*D16)/162, 3)","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N16","v":0.270967,"f":"=(L16*M16)/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"O16","v":"3 أسياخ T12 علوية","fg":"#64748B"}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":13,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B17","v":"ميدة مباني GB3 (20×50 سم)","bg":"#F8FAFC","b":true},{"c":"C17","v":"كانات مغلقة (Stirrups)","bg":"#F8FAFC","fg":"#1E293B"},{"c":"D17","v":8,"in":true,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"E17","v":"كانة مستطيلة مغلقة","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"F17","v":0.4,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"G17","v":0.12,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"H17","v":0.08,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.00"},{"c":"I17","v":0.6,"f":"=F17+G17+H17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"J17","v":1,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"K17","v":480,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"L17","v":288,"f":"=I17*J17*K17","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"M17","v":0.395,"f":"=ROUND((D17*D17)/162, 3)","bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.000"},{"c":"N17","v":0.11376,"f":"=(L17*M17)/1000","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"O17","v":"تقسيط 6T8/م على كامل الطول","bg":"#F8FAFC","fg":"#64748B"}]},{"r":18,"h":42.0,"cells":[{"c":"A18","v":"إجمالي حديد السملات والميدات الرابطة (Total Ground Beams Rebar)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"L18","v":5127,"f":"=SUM(L5:L17)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00"},{"c":"M18","v":"-","bg":"#E2E8F0","al":"center"},{"c":"N18","v":6.307713,"f":"=SUM(N5:N17)","bg":"#FEF3C7","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"O18","v":"شامل الهالك ونقاط الوصلات والتراكب","bg":"#E2E8F0","fg":"#64748B"}]}]}]}