{"slug":"structural-steel-welding-inspection-and-welder-repair-rate-sheet","sheets":[{"name":"سجل فحص اللحام واختبارات NDT","maxRow":24,"maxCol":12,"colWidths":[18.0,36.0,18.0,16.0,20.0,16.0,18.0,20.0,18.0,26.0,20.0,26.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"سجل فحص واختبارات لحام المنشآت الفولاذية (Structural Steel Welding & NDT Log)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":12},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"متابعة الفحص البصري VT والاختبارات اللاإتلافية (UT, RT, MT, PT) وفق كود AWS D1.1 و ASME IX و SBC 306","bg":"#0F172A","fg":"#FFFFFF","al":"center","cs":12},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"إجمالي أطوال اللحام المفحوصة","bg":"#E0F2FE","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D4","v":"أطوال اللحامات المعيبة المرفوضة","bg":"#FFEDD5","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G4","v":"النسبة العامة لعيوب اللحام بالمشروع","bg":"#DCFCE7","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J4","v":"حالة مؤشر جودة اللحام العام","bg":"#DCFCE7","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":5,"h":28.0,"cells":[{"c":"A5","v":"1,250.0 متر طولي","f":"=TEXT(H24,\"#,##0.0\") & \" متر طولي\"","bg":"#E0F2FE","fg":"#0369A1","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D5","v":"19.5 متر طولي","f":"=TEXT(K24,\"#,##0.0\") & \" متر طولي\"","bg":"#FFEDD5","fg":"#C2410C","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G5","v":"1.6%","f":"=TEXT((K24/H24),\"0.00%\")","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J5","v":"ممتثل ومقبول كودياً PASS","f":"=\"ممتثل ومقبول كودياً PASS\"","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":6,"h":28.0,"cells":[{"c":"A6","v":"شاملة الفحص البصري واختبارات NDT","f":"=\"شاملة الفحص البصري واختبارات NDT\"","bg":"#E0F2FE","fg":"#0369A1","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D6","v":"تتطلب إزالة الشق وإعادة اللحام الفوري","f":"=\"تتطلب إزالة الشق وإعادة اللحام الفوري\"","bg":"#FFEDD5","fg":"#C2410C","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G6","v":"ضمن حد الأمان الكودي <= 3.0%","f":"=\"ضمن حد الأمان الكودي <= 3.0%\"","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J6","v":"مطابق لمتطلبات AWS D1.1 Clause 6","f":"=\"مطابق لمتطلبات AWS D1.1 Clause 6\"","bg":"#DCFCE7","fg":"#15803D","al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""},{"c":"K7","v":""},{"c":"L7","v":""}]},{"r":8,"h":28.0,"cells":[{"c":"A8","v":""},{"c":"B8","v":""},{"c":"C8","v":""},{"c":"D8","v":""},{"c":"E8","v":""},{"c":"F8","v":""},{"c":"G8","v":""},{"c":"H8","v":""},{"c":"I8","v":""},{"c":"J8","v":""},{"c":"K8","v":""},{"c":"L8","v":""}]},{"r":9,"h":28.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":""},{"c":"C9","v":""},{"c":"D9","v":""},{"c":"E9","v":""},{"c":"F9","v":""},{"c":"G9","v":""},{"c":"H9","v":""},{"c":"I9","v":""},{"c":"J9","v":""},{"c":"K9","v":""},{"c":"L9","v":""}]},{"r":10,"h":28.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""},{"c":"F10","v":""},{"c":"G10","v":""},{"c":"H10","v":""},{"c":"I10","v":""},{"c":"J10","v":""},{"c":"K10","v":""},{"c":"L10","v":""}]},{"r":11,"h":28.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":""},{"c":"C11","v":""},{"c":"D11","v":""},{"c":"E11","v":""},{"c":"F11","v":""},{"c":"G11","v":""},{"c":"H11","v":""},{"c":"I11","v":""},{"c":"J11","v":""},{"c":"K11","v":""},{"c":"L11","v":""}]},{"r":12,"h":28.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":""},{"c":"C12","v":""},{"c":"D12","v":""},{"c":"E12","v":""},{"c":"F12","v":""},{"c":"G12","v":""},{"c":"H12","v":""},{"c":"I12","v":""},{"c":"J12","v":""},{"c":"K12","v":""},{"c":"L12","v":""}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"رقم الوصلة / العنصر","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B13","v":"موقع الوصلة والجمالون","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C13","v":"رمز إجراء اللحام WPS","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D13","v":"طريقة اللحام المتبعة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E13","v":"نوع الوصلة والسمك","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F13","v":"رمز ختم اللحام ID","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G13","v":"طريقة الفحص NDT","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H13","v":"طول اللحام المفحوص (م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I13","v":"نتيجة الفحص الأولي","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J13","v":"نوع العيب المرصود","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K13","v":"طول العيب المرفوض (م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L13","v":"قرار الجودة والإصلاح","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":"W-BM-COL-01","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"B14","v":"وصلة عزم عمود كمرة الإطار الرئيسي GL-1","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C14","v":"WPS-SMAW-01","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D14","v":"SMAW (111)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E14","v":"CJP Groove 25mm","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F14","v":"WLD-01","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"G14","v":"Visual + UT","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"H14","v":125,"in":true,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"I14","v":"مقبول كودياً","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"J14","v":"لا يوجد عيوب","bg":"#F8FAFC","fg":"#1E293B"},{"c":"K14","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"L14","v":"مجاز بدون إصلاح","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":"W-BM-COL-02","fg":"#1E293B","b":true,"al":"center"},{"c":"B15","v":"وصلة عزم عمود كمرة الإطار الرئيسي GL-2","fg":"#1E293B"},{"c":"C15","v":"WPS-FCAW-02","fg":"#1E293B","al":"center"},{"c":"D15","v":"FCAW (136)","fg":"#1E293B","al":"center"},{"c":"E15","v":"CJP Groove 25mm","fg":"#1E293B","al":"center"},{"c":"F15","v":"WLD-02","fg":"#1E293B","b":true,"al":"center"},{"c":"G15","v":"Visual + UT","fg":"#1E293B","al":"center"},{"c":"H15","v":130,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"I15","v":"مرفوض - عيب","bg":"#FEE2E2","fg":"#B91C1C","b":true,"al":"center"},{"c":"J15","v":"نقص انصهار Lack of Fusion","fg":"#1E293B"},{"c":"K15","v":4.2,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"L15","v":"تم التخويخ وإعادة اللحام","fg":"#1E293B"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":"W-BASE-PL-01","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"B16","v":"لحام صفيحة القاعدة للعمود C1 Base Plate","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C16","v":"WPS-SAW-03","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D16","v":"SAW (121)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E16","v":"Fillet Weld 16mm","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F16","v":"WLD-03","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"G16","v":"Visual + MT","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"H16","v":110,"in":true,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"I16","v":"مقبول كودياً","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"J16","v":"لا يوجد عيوب","bg":"#F8FAFC","fg":"#1E293B"},{"c":"K16","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"L16","v":"مجاز بدون إصلاح","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"W-TRUSS-01","fg":"#1E293B","b":true,"al":"center"},{"c":"B17","v":"عقدة الجمالون الفولاذي العلوي Node-T1","fg":"#1E293B"},{"c":"C17","v":"WPS-GMAW-04","fg":"#1E293B","al":"center"},{"c":"D17","v":"GMAW (135)","fg":"#1E293B","al":"center"},{"c":"E17","v":"Fillet Weld 12mm","fg":"#1E293B","al":"center"},{"c":"F17","v":"WLD-04","fg":"#1E293B","b":true,"al":"center"},{"c":"G17","v":"Visual + PT","fg":"#1E293B","al":"center"},{"c":"H17","v":145,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"I17","v":"مرفوض - عيب","bg":"#FEE2E2","fg":"#B91C1C","b":true,"al":"center"},{"c":"J17","v":"مسامية غازية Porosity","fg":"#1E293B"},{"c":"K17","v":3.8,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"L17","v":"تم التجليخ وإعادة التمرير","fg":"#1E293B"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"W-BRACE-01","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"B18","v":"وصلة شكال الرياح المائل Bracing Gusset","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C18","v":"WPS-SMAW-01","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D18","v":"SMAW (111)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E18","v":"PJP Groove 16mm","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F18","v":"WLD-01","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"G18","v":"Visual + MT","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"H18","v":95,"in":true,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"I18","v":"مقبول كودياً","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"J18","v":"لا يوجد عيوب","bg":"#F8FAFC","fg":"#1E293B"},{"c":"K18","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"L18","v":"مجاز بدون إصلاح","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":"W-SPLICE-01","fg":"#1E293B","b":true,"al":"center"},{"c":"B19","v":"وصلة وصل الكمرة الرئيسية Girders Splice","fg":"#1E293B"},{"c":"C19","v":"WPS-FCAW-02","fg":"#1E293B","al":"center"},{"c":"D19","v":"FCAW (136)","fg":"#1E293B","al":"center"},{"c":"E19","v":"CJP Groove 30mm","fg":"#1E293B","al":"center"},{"c":"F19","v":"WLD-05","fg":"#1E293B","b":true,"al":"center"},{"c":"G19","v":"Visual + RT","fg":"#1E293B","al":"center"},{"c":"H19","v":150,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"I19","v":"مرفوض - عيب","bg":"#FEE2E2","fg":"#B91C1C","b":true,"al":"center"},{"c":"J19","v":"خبث محبوس Slag Inclusion","fg":"#1E293B"},{"c":"K19","v":5.5,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"L19","v":"تم الإصلاح والفحص بـ RT","fg":"#1E293B"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":"W-PURLIN-01","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"B20","v":"لحام مدادات السقف بالكمرات Purlin Cleat","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C20","v":"WPS-SMAW-01","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D20","v":"SMAW (111)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E20","v":"Fillet Weld 8mm","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F20","v":"WLD-06","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"G20","v":"Visual VT","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"H20","v":160,"in":true,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"I20","v":"مقبول كودياً","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"J20","v":"لا يوجد عيوب","bg":"#F8FAFC","fg":"#1E293B"},{"c":"K20","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"L20","v":"مجاز بدون إصلاح","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":"W-CRANE-01","fg":"#1E293B","b":true,"al":"center"},{"c":"B21","v":"لحام كمرة مسار ونش المصنع Crane Girder","fg":"#1E293B"},{"c":"C21","v":"WPS-SAW-03","fg":"#1E293B","al":"center"},{"c":"D21","v":"SAW (121)","fg":"#1E293B","al":"center"},{"c":"E21","v":"CJP Groove 35mm","fg":"#1E293B","al":"center"},{"c":"F21","v":"WLD-07","fg":"#1E293B","b":true,"al":"center"},{"c":"G21","v":"Visual + UT","fg":"#1E293B","al":"center"},{"c":"H21","v":120,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"I21","v":"مرفوض - عيب","bg":"#FEE2E2","fg":"#B91C1C","b":true,"al":"center"},{"c":"J21","v":"حز سفلي Undercut 1.5mm","fg":"#1E293B"},{"c":"K21","v":3.2,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"L21","v":"تم التجليخ وإضافة باص لحام","fg":"#1E293B"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"W-TRUSS-02","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"B22","v":"عقدة الجمالون الفولاذي السفلي Node-B2","bg":"#F8FAFC","fg":"#1E293B"},{"c":"C22","v":"WPS-FCAW-02","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D22","v":"FCAW (136)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E22","v":"Fillet Weld 14mm","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"F22","v":"WLD-02","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"G22","v":"Visual + PT","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"H22","v":115,"in":true,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"I22","v":"مقبول كودياً","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"J22","v":"لا يوجد عيوب","bg":"#F8FAFC","fg":"#1E293B"},{"c":"K22","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"L22","v":"مجاز بدون إصلاح","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":"W-BM-COL-03","fg":"#1E293B","b":true,"al":"center"},{"c":"B23","v":"وصلة عزم عمود كمرة الإطار الرئيسي GL-3","fg":"#1E293B"},{"c":"C23","v":"WPS-GMAW-04","fg":"#1E293B","al":"center"},{"c":"D23","v":"GMAW (135)","fg":"#1E293B","al":"center"},{"c":"E23","v":"CJP Groove 25mm","fg":"#1E293B","al":"center"},{"c":"F23","v":"WLD-08","fg":"#1E293B","b":true,"al":"center"},{"c":"G23","v":"Visual + UT","fg":"#1E293B","al":"center"},{"c":"H23","v":100,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"I23","v":"مرفوض - عيب","bg":"#FEE2E2","fg":"#B91C1C","b":true,"al":"center"},{"c":"J23","v":"شرخ طولي باللحام Crack","fg":"#1E293B"},{"c":"K23","v":2.8,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"L23","v":"تم الحفر بالكامل وإعادة اللحام","fg":"#1E293B"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":"إجمالي أطوال اللحام المفحوصة والمعيبة","bg":"#F1F5F9","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H24","v":1250,"f":"=SUM(H14:H23)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"I24","v":"معدل العيوب","bg":"#F1F5F9","b":true,"al":"center"},{"c":"J24","v":"1.6%","f":"=TEXT((K24/H24),\"0.00%\")","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"K24","v":19.5,"f":"=SUM(K14:K23)","bg":"#FEE2E2","fg":"#B91C1C","b":true,"al":"center","nf":"#,##0.0"},{"c":"L24","v":"تم إصلاح كافة العيوب","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"}]}]},{"name":"معدل إصلاح اللحامين Repair Rate","maxRow":22,"maxCol":11,"colWidths":[16.0,28.0,20.0,24.0,20.0,20.0,20.0,20.0,18.0,22.0,30.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"لوحة تقييم ومعدل إصلاح اللحامين (Welder Performance & Repair Rate Matrix)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"احتساب نسبة العيوب والإصلاح لكل لحام ومقارنتها بحد الإنذار (3.0%) وسحب التأهيل (5.0%)","bg":"#0F172A","fg":"#FFFFFF","al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"إجمالي اللحامين المسجلين","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D4","v":"المعدل العام لإصلاح اللحامين","bg":"#DCFCE7","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G4","v":"اللحامون تحت الملاحظة (3% - 5%)","bg":"#FEF9C3","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J4","v":"اللحامون المسحوب تأهيلهم (> 5%)","bg":"#DCFCE7","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"8 لحامين مؤهلين","bg":"#F1F5F9","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D5","v":"1.6%","f":"=TEXT(H22,\"0.00%\")","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G5","v":"1 لحام فقط (WLD-05)","bg":"#FEF9C3","fg":"#854D0E","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J5","v":"0 لحام (التزام تام)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","cs":2},{"skip":true}]},{"r":6,"h":28.0,"cells":[{"c":"A6","v":"حاملي شهادات تأهيل WPQ سارية","f":"=\"حاملي شهادات تأهيل WPQ سارية\"","bg":"#F1F5F9","fg":"#475569","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D6","v":"أقل من حد الإنذار 3.0%","f":"=\"أقل من حد الإنذار 3.0%\"","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G6","v":"يتطلب تدريباً إضافياً وفحصاً مكثفاً","f":"=\"يتطلب تدريباً إضافياً وفحصاً مكثفاً\"","bg":"#FEF9C3","fg":"#854D0E","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J6","v":"كافة اللحامين ضمن النطاق الآمن","f":"=\"كافة اللحامين ضمن النطاق الآمن\"","bg":"#DCFCE7","fg":"#15803D","al":"center","cs":2},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""},{"c":"K7","v":""}]},{"r":8,"h":28.0,"cells":[{"c":"A8","v":""},{"c":"B8","v":""},{"c":"C8","v":""},{"c":"D8","v":""},{"c":"E8","v":""},{"c":"F8","v":""},{"c":"G8","v":""},{"c":"H8","v":""},{"c":"I8","v":""},{"c":"J8","v":""},{"c":"K8","v":""}]},{"r":9,"h":28.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":""},{"c":"C9","v":""},{"c":"D9","v":""},{"c":"E9","v":""},{"c":"F9","v":""},{"c":"G9","v":""},{"c":"H9","v":""},{"c":"I9","v":""},{"c":"J9","v":""},{"c":"K9","v":""}]},{"r":10,"h":28.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""},{"c":"F10","v":""},{"c":"G10","v":""},{"c":"H10","v":""},{"c":"I10","v":""},{"c":"J10","v":""},{"c":"K10","v":""}]},{"r":11,"h":28.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":""},{"c":"C11","v":""},{"c":"D11","v":""},{"c":"E11","v":""},{"c":"F11","v":""},{"c":"G11","v":""},{"c":"H11","v":""},{"c":"I11","v":""},{"c":"J11","v":""},{"c":"K11","v":""}]},{"r":12,"h":28.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":""},{"c":"C12","v":""},{"c":"D12","v":""},{"c":"E12","v":""},{"c":"F12","v":""},{"c":"G12","v":""},{"c":"H12","v":""},{"c":"I12","v":""},{"c":"J12","v":""},{"c":"K12","v":""}]},{"r":13,"h":40.0,"cells":[{"c":"A13","v":"رمز ختم اللحام ID","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B13","v":"اسم اللحام الفني","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C13","v":"رقم شهادة التأهيل WPQ","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D13","v":"عمليات اللحام المرخصة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E13","v":"إجمالي الطول المنفذ (م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F13","v":"طول اللحام المفحوص (م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G13","v":"طول اللحام المعيب (م)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H13","v":"معدل الإصلاح الفعلي %","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I13","v":"حد الإنذار الكودي %","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J13","v":"حالة الكفاءة الفنية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K13","v":"الإجراء التصحيحي للجودة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":"WLD-01","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"B14","v":"أحمد محمود سالم","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"C14","v":"WPQ-2025-01","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D14","v":"SMAW / GTAW (6G)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E14","v":320,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"F14","v":220,"in":true,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"G14","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"H14","v":0,"f":"=ROUND((G14/F14),4)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","nf":"0.00%"},{"c":"I14","v":0.03,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00%"},{"c":"J14","v":"كفاءة ممتازة آمنة","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"K14","v":"استمرار العمل بانتظام","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":"WLD-02","fg":"#1E293B","b":true,"al":"center"},{"c":"B15","v":"محمد عبد العزيز قاسم","fg":"#1E293B","b":true},{"c":"C15","v":"WPQ-2025-02","fg":"#1E293B","al":"center"},{"c":"D15","v":"FCAW / GMAW (4G)","fg":"#1E293B","al":"center"},{"c":"E15","v":360,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"F15","v":245,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"G15","v":4.2,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"H15","v":0.0171,"f":"=ROUND((G15/F15),4)","fg":"#1E293B","b":true,"al":"center","nf":"0.00%"},{"c":"I15","v":0.03,"in":true,"fg":"#1E293B","al":"center","nf":"0.00%"},{"c":"J15","v":"كفاءة مقبولة آمنة","fg":"#1E293B","al":"center"},{"c":"K15","v":"فحص دوري عادي","fg":"#1E293B"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":"WLD-03","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"B16","v":"إبراهيم حسن النجار","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"C16","v":"WPQ-2025-03","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D16","v":"SAW / SMAW (1G-2G)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E16","v":290,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"F16","v":110,"in":true,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"G16","v":0,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"H16","v":0,"f":"=ROUND((G16/F16),4)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","nf":"0.00%"},{"c":"I16","v":0.03,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00%"},{"c":"J16","v":"كفاءة ممتازة آمنة","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"K16","v":"استمرار العمل بانتظام","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"WLD-04","fg":"#1E293B","b":true,"al":"center"},{"c":"B17","v":"طارق عبد الرحمن الزهراني","fg":"#1E293B","b":true},{"c":"C17","v":"WPQ-2025-04","fg":"#1E293B","al":"center"},{"c":"D17","v":"GMAW / GTAW (6G)","fg":"#1E293B","al":"center"},{"c":"E17","v":310,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"F17","v":145,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"G17","v":3.8,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"H17","v":0.0262,"f":"=ROUND((G17/F17),4)","fg":"#1E293B","b":true,"al":"center","nf":"0.00%"},{"c":"I17","v":0.03,"in":true,"fg":"#1E293B","al":"center","nf":"0.00%"},{"c":"J17","v":"كفاءة مقبولة آمنة","fg":"#1E293B","al":"center"},{"c":"K17","v":"فحص دوري عادي","fg":"#1E293B"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":"WLD-05","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"B18","v":"خالد يوسف الشمري","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"C18","v":"WPQ-2025-05","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D18","v":"FCAW / SMAW (3G-4G)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E18","v":240,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"F18","v":150,"in":true,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"G18","v":5.5,"in":true,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"H18","v":0.0367,"f":"=ROUND((G18/F18),4)","bg":"#FEF9C3","fg":"#854D0E","b":true,"al":"center","nf":"0.00%"},{"c":"I18","v":0.03,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00%"},{"c":"J18","v":"تحت الملاحظة والرقابة","bg":"#FEF9C3","fg":"#854D0E","b":true,"al":"center"},{"c":"K18","v":"زيادة نسبة فحص NDT إلى 100%","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":"WLD-06","fg":"#1E293B","b":true,"al":"center"},{"c":"B19","v":"سامح فتحي رضوان","fg":"#1E293B","b":true},{"c":"C19","v":"WPQ-2025-06","fg":"#1E293B","al":"center"},{"c":"D19","v":"SMAW (All Positions)","fg":"#1E293B","al":"center"},{"c":"E19","v":380,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"F19","v":160,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"G19","v":0,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"H19","v":0,"f":"=ROUND((G19/F19),4)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","nf":"0.00%"},{"c":"I19","v":0.03,"in":true,"fg":"#1E293B","al":"center","nf":"0.00%"},{"c":"J19","v":"كفاءة ممتازة آمنة","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"K19","v":"استمرار العمل بانتظام","fg":"#1E293B"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":"WLD-07","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"B20","v":"كريم عثمان البدري","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"C20","v":"WPQ-2025-07","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"D20","v":"SAW Automatic","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E20","v":270,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"F20","v":120,"in":true,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"G20","v":3.2,"in":true,"bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"H20","v":0.0267,"f":"=ROUND((G20/F20),4)","fg":"#1E293B","b":true,"al":"center","nf":"0.00%"},{"c":"I20","v":0.03,"in":true,"bg":"#F8FAFC","fg":"#1E293B","al":"center","nf":"0.00%"},{"c":"J20","v":"كفاءة مقبولة آمنة","fg":"#1E293B","al":"center"},{"c":"K20","v":"معايرة ماكينة اللحام الآلي","bg":"#F8FAFC","fg":"#1E293B"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":"WLD-08","fg":"#1E293B","b":true,"al":"center"},{"c":"B21","v":"عصام توفيق الدوسري","fg":"#1E293B","b":true},{"c":"C21","v":"WPQ-2025-08","fg":"#1E293B","al":"center"},{"c":"D21","v":"GMAW / SMAW (6G)","fg":"#1E293B","al":"center"},{"c":"E21","v":250,"in":true,"fg":"#1E293B","al":"center","nf":"#,##0.0"},{"c":"F21","v":100,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"G21","v":2.8,"in":true,"fg":"#1E293B","b":true,"al":"center","nf":"#,##0.0"},{"c":"H21","v":0.028,"f":"=ROUND((G21/F21),4)","fg":"#1E293B","b":true,"al":"center","nf":"0.00%"},{"c":"I21","v":0.03,"in":true,"fg":"#1E293B","al":"center","nf":"0.00%"},{"c":"J21","v":"كفاءة مقبولة آمنة","fg":"#1E293B","al":"center"},{"c":"K21","v":"فحص دوري عادي","fg":"#1E293B"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"الإجمالي العام ومعدل إصلاح اللحام الكلي للمشروع","bg":"#F1F5F9","b":true,"cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E22","v":2420,"f":"=SUM(E14:E21)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F22","v":1250,"f":"=SUM(F14:F21)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"G22","v":19.5,"f":"=SUM(G14:G21)","bg":"#FEE2E2","fg":"#B91C1C","b":true,"al":"center","nf":"#,##0.0"},{"c":"H22","v":0.0156,"f":"=ROUND((G22/F22),4)","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","nf":"0.00%"},{"c":"I22","v":0.03,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"0.00%"},{"c":"J22","v":"معدل آمن ومقبول","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"K22","v":"التزام تام بمتطلبات AWS D1.1","bg":"#F1F5F9","b":true,"al":"center"}]}]},{"name":"سجل تأهيل اللحامين وإجراءات WPS","maxRow":21,"maxCol":11,"colWidths":[18.0,18.0,28.0,24.0,26.0,18.0,22.0,18.0,22.0,32.0,22.0],"rows":[{"r":1,"h":34.0,"cells":[{"c":"A1","v":"سجل إجراءات اللحام الموثقة وتأهيل العمالة (WPS, PQR & Welder WPQ Register)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":34.0,"cells":[{"c":"A2","v":"مصفوفة صلاحية مواصفات إجراءات اللحام WPS وسجلات التأهيل PQR وتجديد رخص اللحامين","bg":"#0F172A","fg":"#FFFFFF","al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"عدد إجراءات اللحام WPS الموثقة","bg":"#DCFCE7","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D4","v":"سجلات التأهيل المعملية PQR","bg":"#E0F2FE","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G4","v":"حالة تجديد رخص اللحامين (قاعدة 6 أشهر)","bg":"#DCFCE7","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J4","v":"المرجعية والمواصفات القياسية","bg":"#F1F5F9","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"4 إجراءات معملية موثقة","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D5","v":"4 اختبارات PQR ناجحة","bg":"#E0F2FE","fg":"#0369A1","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G5","v":"سارية ومجددة بالكامل","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J5","v":"AWS D1.1 / ASME IX","bg":"#F1F5F9","b":true,"al":"center","cs":2},{"skip":true}]},{"r":6,"h":28.0,"cells":[{"c":"A6","v":"تغطي كافة عمليات SMAW, FCAW, SAW, GMAW","f":"=\"تغطي كافة عمليات SMAW, FCAW, SAW, GMAW\"","bg":"#DCFCE7","fg":"#15803D","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D6","v":"اختبارات شد وثني وصدم Charpy موثقة كودياً","f":"=\"اختبارات شد وثني وصدم Charpy موثقة كودياً\"","bg":"#E0F2FE","fg":"#0369A1","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G6","v":"ممارسة دورية موثقة دون انقطاع > 6 أشهر","f":"=\"ممارسة دورية موثقة دون انقطاع > 6 أشهر\"","bg":"#DCFCE7","fg":"#15803D","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"J6","v":"SBC 306 Structural Steel Code","f":"=\"SBC 306 Structural Steel Code\"","bg":"#F1F5F9","fg":"#475569","al":"center","cs":2},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""},{"c":"I7","v":""},{"c":"J7","v":""},{"c":"K7","v":""}]},{"r":8,"h":28.0,"cells":[{"c":"A8","v":""},{"c":"B8","v":""},{"c":"C8","v":""},{"c":"D8","v":""},{"c":"E8","v":""},{"c":"F8","v":""},{"c":"G8","v":""},{"c":"H8","v":""},{"c":"I8","v":""},{"c":"J8","v":""},{"c":"K8","v":""}]},{"r":9,"h":28.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":""},{"c":"C9","v":""},{"c":"D9","v":""},{"c":"E9","v":""},{"c":"F9","v":""},{"c":"G9","v":""},{"c":"H9","v":""},{"c":"I9","v":""},{"c":"J9","v":""},{"c":"K9","v":""}]},{"r":10,"h":28.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""},{"c":"F10","v":""},{"c":"G10","v":""},{"c":"H10","v":""},{"c":"I10","v":""},{"c":"J10","v":""},{"c":"K10","v":""}]},{"r":11,"h":28.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":""},{"c":"C11","v":""},{"c":"D11","v":""},{"c":"E11","v":""},{"c":"F11","v":""},{"c":"G11","v":""},{"c":"H11","v":""},{"c":"I11","v":""},{"c":"J11","v":""},{"c":"K11","v":""}]},{"r":12,"h":28.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":""},{"c":"C12","v":""},{"c":"D12","v":""},{"c":"E12","v":""},{"c":"F12","v":""},{"c":"G12","v":""},{"c":"H12","v":""},{"c":"I12","v":""},{"c":"J12","v":""},{"c":"K12","v":""}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"رقم إجراء اللحام WPS","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B13","v":"رقم سجل التأهيل PQR","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C13","v":"طريقة اللحام Process","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D13","v":"المعدن الأساسي Base Metal","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E13","v":"معدن الحشو / السلك Filler Metal","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F13","v":"أقصى سمك مؤهل (مم)","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G13","v":"أوضاع اللحام المؤهلة","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H13","v":"درجة التسخين المسبق °C","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I13","v":"نوع الغاز الحامي Shielding Gas","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J13","v":"نتائج الاختبارات الميكانيكية","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K13","v":"حالة صلاحية الإجراء","bg":"#1E293B","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":"WPS-SMAW-01","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"B14","v":"PQR-SMAW-001","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"C14","v":"SMAW (Shielded Metal Arc)","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"D14","v":"ASTM A36 / A572 Gr 50","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E14","v":"AWS A5.1 E7018-1 H4R","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"F14","v":"3.0 - 40.0 mm","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"G14","v":"All Positions (1G to 4G)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"H14","v":"65 °C Min","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"I14","v":"N/A (Flux Coating)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"J14","v":"Tensile: 535 MPa / Bend: Pass","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"K14","v":"ساري وموثق كودياً","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":"WPS-FCAW-02","fg":"#1E293B","b":true,"al":"center"},{"c":"B15","v":"PQR-FCAW-002","fg":"#1E293B","al":"center"},{"c":"C15","v":"FCAW (Flux Cored Arc)","fg":"#1E293B","b":true},{"c":"D15","v":"ASTM A572 Gr 50 / A992","fg":"#1E293B","al":"center"},{"c":"E15","v":"AWS A5.20 E71T-1M / E71T-12M","fg":"#1E293B","b":true,"al":"center"},{"c":"F15","v":"6.0 - 50.0 mm","fg":"#1E293B","al":"center"},{"c":"G15","v":"All Positions (1G to 4G)","fg":"#1E293B","al":"center"},{"c":"H15","v":"100 °C Min","fg":"#1E293B","al":"center"},{"c":"I15","v":"75% Ar + 25% CO2","fg":"#1E293B","al":"center"},{"c":"J15","v":"Tensile: 560 MPa / Impact: 45J @ -20C","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"K15","v":"ساري وموثق كودياً","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"WPS-SAW-03","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"B16","v":"PQR-SAW-003","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"C16","v":"SAW (Submerged Arc)","bg":"#F8FAFC","fg":"#1E293B","b":true},{"c":"D16","v":"ASTM A572 Gr 50 / A36","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"E16","v":"AWS A5.17 F7A2-EM12K","bg":"#F8FAFC","fg":"#1E293B","b":true,"al":"center"},{"c":"F16","v":"10.0 - 60.0 mm","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"G16","v":"Flat & Horizontal (1F, 1G, 2F)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"H16","v":"100 °C Min","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"I16","v":"Granular Flux (Fused)","bg":"#F8FAFC","fg":"#1E293B","al":"center"},{"c":"J16","v":"Tensile: 550 MPa / Bend: Pass","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"K16","v":"ساري وموثق كودياً","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":"WPS-GMAW-04","fg":"#1E293B","b":true,"al":"center"},{"c":"B17","v":"PQR-GMAW-004","fg":"#1E293B","al":"center"},{"c":"C17","v":"GMAW (Gas Metal Arc / MIG)","fg":"#1E293B","b":true},{"c":"D17","v":"ASTM A36 / Grade 50","fg":"#1E293B","al":"center"},{"c":"E17","v":"AWS A5.18 ER70S-6","fg":"#1E293B","b":true,"al":"center"},{"c":"F17","v":"3.0 - 25.0 mm","fg":"#1E293B","al":"center"},{"c":"G17","v":"All Positions (1G to 4G)","fg":"#1E293B","al":"center"},{"c":"H17","v":"50 °C Min","fg":"#1E293B","al":"center"},{"c":"I17","v":"100% CO2 or Ar+CO2","fg":"#1E293B","al":"center"},{"c":"J17","v":"Tensile: 515 MPa / Bend: Pass","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"},{"c":"K17","v":"ساري وموثق كودياً","bg":"#DCFCE7","fg":"#15803D","b":true,"al":"center"}]},{"r":18,"h":28.0,"cells":[{"c":"A18","v":""},{"c":"B18","v":""},{"c":"C18","v":""},{"c":"D18","v":""},{"c":"E18","v":""},{"c":"F18","v":""},{"c":"G18","v":""},{"c":"H18","v":""},{"c":"I18","v":""},{"c":"J18","v":""},{"c":"K18","v":""}]},{"r":19,"h":28.0,"cells":[{"c":"A19","v":""},{"c":"B19","v":""},{"c":"C19","v":""},{"c":"D19","v":""},{"c":"E19","v":""},{"c":"F19","v":""},{"c":"G19","v":""},{"c":"H19","v":""},{"c":"I19","v":""},{"c":"J19","v":""},{"c":"K19","v":""}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":"مهندس ضبط الجودة QC Engineer","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D20","v":"مفتش جودة اللحام الدولي CWI","fg":"#1E293B","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"H20","v":"مدير المشروع واستشاري الإشراف الإنشائي","fg":"#1E293B","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":"التوقيع والاعتماد: ______________","fg":"#1E293B","al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D21","v":"التوقيع والاعتماد: ______________","fg":"#1E293B","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"H21","v":"التوقيع والاعتماد: ______________","fg":"#1E293B","al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]}]}]}