{"slug":"surveying-total-station-traverse-adjustment-and-leveling-reduction-sheet","sheets":[{"name":"إعدادات المشروع والشبكة","maxRow":24,"maxCol":7,"colWidths":[22.0,38.0,26.0,26.0,22.0,28.0,28.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"إعدادات المشروع وثوابت الشبكة المساحية ومعايير ضبط الأخطاء المسموحة","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"⚠️ تنبيه فني استرشادي: الإحداثيات والمناسيب وحدود التسامح المسجلة في هذا الشيت هي نماذج تطبيقية لشبكات ثوابت المشاريع الهندسية. يرجى تعديل إحداثيات نقاط الربط المرجعية ومناسيب الروبيرات بما يطابق شبكة إحداثيات مشروعك المعتمدة وهيئة المساحة.","bg":"#F1F5F9","fg":"#475569","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: بيانات المشروع الإنشائي وأجهزة الرصد المساحي وشبكة الإحداثيات","bg":"#0284C7","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"اسم المشروع الإنشائي:","bg":"#E0F2FE","fg":"#1E293B","b":true},{"c":"B5","v":"مشروع المجمع التجاري والسكني - برج الأعمال","cs":2},{"skip":true},{"c":"D5","v":"المقاول العام المنفذ:","bg":"#E0F2FE","fg":"#1E293B","b":true},{"c":"E5","v":"شركة الإنشاءات والمقاولات العامة","cs":3},{"skip":true},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"الجهة المالكة للمشروع:","bg":"#E0F2FE","fg":"#1E293B","b":true},{"c":"B6","v":"هيئة تطوير وتنمية المشاريع العقارية","bg":"#F8FAFC","cs":2},{"skip":true},{"c":"D6","v":"استشاري الإشراف الهندسي:","bg":"#E0F2FE","fg":"#1E293B","b":true},{"c":"E6","v":"مكتب الاستشارات الهندسية والإشراف المساحي","bg":"#F8FAFC","cs":3},{"skip":true},{"skip":true}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"نظام الإحداثيات المعتمد:","bg":"#E0F2FE","fg":"#1E293B","b":true},{"c":"B7","v":"UTM Zone 38N - WGS84 (المرجع الجيوديسي)","cs":2},{"skip":true},{"c":"D7","v":"رقم كود الشبكة المساحية:","bg":"#E0F2FE","fg":"#1E293B","b":true},{"c":"E7","v":"SURV-NET-2026-TR01","cs":3},{"skip":true},{"skip":true}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"جهاز التوتال ستيشن المستخدم:","bg":"#E0F2FE","fg":"#1E293B","b":true},{"c":"B8","v":"Total Station Leica TS16 (دقة 1 ثانية)","bg":"#F8FAFC","cs":2},{"skip":true},{"c":"D8","v":"جهاز الميزان الرقمي المستخدم:","bg":"#E0F2FE","fg":"#1E293B","b":true},{"c":"E8","v":"Digital Level Leica DNA03 / ميزان بصري دقيق","bg":"#F8FAFC","cs":3},{"skip":true},{"skip":true}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"تاريخ الرصد والربط المساحي:","bg":"#E0F2FE","fg":"#1E293B","b":true},{"c":"B9","v":"2026-10-18","cs":2},{"skip":true},{"c":"D9","v":"الرطوبة ودرجة الحرارة أثناء الرصد:","bg":"#E0F2FE","fg":"#1E293B","b":true},{"c":"E9","v":"26°C / ضغط جوي 1013 hPa","cs":3},{"skip":true},{"skip":true}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"حالة الطقس ورياح الموقع:","bg":"#E0F2FE","fg":"#1E293B","b":true},{"c":"B10","v":"طقس مستقر / رؤية بصرية ممتازة","bg":"#F8FAFC","cs":2},{"skip":true},{"c":"D10","v":"اسم مهندس المساحة بالموقع:","bg":"#E0F2FE","fg":"#1E293B","b":true},{"c":"E10","v":"م. أحمد عبد الرحمن - رئيس طاقم المساحة","bg":"#F8FAFC","cs":3},{"skip":true},{"skip":true}]},{"r":11,"h":28.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":""},{"c":"C11","v":""},{"c":"D11","v":""},{"c":"E11","v":""},{"c":"F11","v":""},{"c":"G11","v":""}]},{"r":12,"h":38.0,"cells":[{"c":"A12","v":"ثانياً: نقاط الثوابت المساحية المرجعية الأولية للمشروع (Primary Control Benchmarks)","bg":"#0F766E","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":13,"h":40.0,"cells":[{"c":"A13","v":"كود النقطة","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B13","v":"وصف موقع النقطة وتثبيتها","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C13","v":"الإحداثي الشرقي Easting (X)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D13","v":"الإحداثي الشمالي Northing (Y)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E13","v":"المنسوب المرجعي RL (Z)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F13","v":"نوع العلامة والتثبيت","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G13","v":"جهة الاعتماد والمصدر","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"CP-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":"نقطة ثوابت رئيسية - الركن الشمالي الشرقي لسور الموقع","bg":"#F8FAFC"},{"c":"C14","v":654210.582,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.000"},{"c":"D14","v":2741850.324,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.000"},{"c":"E14","v":612.45,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.000"},{"c":"F14","v":"مسمار مساحي في قاعدة خرسانية","bg":"#F8FAFC"},{"c":"G14","v":"هيئة المساحة الجيوديسية","bg":"#F8FAFC"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"CP-02","b":true,"al":"center"},{"c":"B15","v":"نقطة التوجيه الخلفي Backsight - تقاطع المحاور الرئيسية"},{"c":"C15","v":654485.914,"in":true,"al":"center","nf":"#,##0.000"},{"c":"D15","v":2742015.68,"in":true,"al":"center","nf":"#,##0.000"},{"c":"E15","v":614.18,"in":true,"al":"center","nf":"#,##0.000"},{"c":"F15","v":"لوح نحاسي مثبت برصيف طريق رئيسي"},{"c":"G15","v":"شبكة ثوابت المخطط المعتمد"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":"TBM-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B16","v":"روبير مساعد مؤقت - مدخل البوابة الغربية للمشروع","bg":"#F8FAFC"},{"c":"C16","v":653980.125,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.000"},{"c":"D16","v":2741720.45,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.000"},{"c":"E16","v":610.825,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.000"},{"c":"F16","v":"علامة حديدية في قاعدة عمود إنارة","bg":"#F8FAFC"},{"c":"G16","v":"استشاري المساحة المشرف","bg":"#F8FAFC"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"TBM-02","b":true,"al":"center"},{"c":"B17","v":"روبير مرجعي لربط مناسيب الميزانية - صخرة طبيعية ثابتة"},{"c":"C17","v":654620.3,"in":true,"al":"center","nf":"#,##0.000"},{"c":"D17","v":2742180.95,"in":true,"al":"center","nf":"#,##0.000"},{"c":"E17","v":616.29,"in":true,"al":"center","nf":"#,##0.000"},{"c":"F17","v":"مسمار فولاذي محمي بقمع خرساني"},{"c":"G17","v":"المكتب الفني للاستشاري"}]},{"r":18,"h":28.0,"cells":[{"c":"A18","v":""},{"c":"B18","v":""},{"c":"C18","v":""},{"c":"D18","v":""},{"c":"E18","v":""},{"c":"F18","v":""},{"c":"G18","v":""}]},{"r":19,"h":38.0,"cells":[{"c":"A19","v":"ثالثاً: حدود التسامح والخطأ القفلي المسموح هندسياً وفق المواصفات القياسية (Permissible Tolerances)","bg":"#0284C7","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":20,"h":40.0,"cells":[{"c":"A20","v":"عنصر الرصد المساحي","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B20","v":"معادلة حد الخطأ المسموح","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C20","v":"القيمة التصميمية بالمشروع","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D20","v":"الوحدة الفنية","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E20","v":"رتبة الدقة المستهدفة","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F20","v":"الكود المرجعي الحاكم","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G20","v":"الإجراء عند تجاوز الحد","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":21,"h":72.0,"cells":[{"c":"A21","v":"الخطأ القفلي الزاوي للترافرس (Angular Misclosure)","b":true},{"c":"B21","v":"C_ang = c * SQRT(n)  [c = 15 sec]","al":"center"},{"c":"C21","v":15,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"D21","v":"ثانية قوسية / محطة","al":"center"},{"c":"E21","v":"الدرجة الثانية (Second Order)","al":"center"},{"c":"F21","v":"FGCS / USACE EM 1110"},{"c":"G21","v":"إعادة رصد الزوايا المتجاوزة"}]},{"r":22,"h":72.0,"cells":[{"c":"A22","v":"نسبة الدقة النسبية الضلعية (Linear Precision Ratio)","bg":"#F8FAFC","b":true},{"c":"B22","v":"1 : (Total_Perimeter / Linear_Error)","bg":"#F8FAFC","al":"center"},{"c":"C22","v":10000,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"\"1 : \"#,##0"},{"c":"D22","v":"1 : N (الحد الأدنى 1:5,000)","bg":"#F8FAFC","al":"center"},{"c":"E22","v":"مساحة إنشائية دقيقة (Engineering Class)","bg":"#F8FAFC","al":"center"},{"c":"F22","v":"RICS / SBC Manual","bg":"#F8FAFC"},{"c":"G22","v":"إعادة قياس الأضلاع بالشريط/EDM","bg":"#F8FAFC"}]},{"r":23,"h":72.0,"cells":[{"c":"A23","v":"الخطأ القفلي لمناسيب الميزانية (Leveling Misclosure)","b":true},{"c":"B23","v":"C_elev = m * SQRT(K)  [m = 10 mm]","al":"center"},{"c":"C23","v":10,"in":true,"b":true,"al":"center","nf":"#,##0.0"},{"c":"D23","v":"مم / جذر الكيلومتر","al":"center"},{"c":"E23","v":"ميزانية هندسية دقيقة (Third Order)","al":"center"},{"c":"F23","v":"MOMRA / FGDC Standards"},{"c":"G23","v":"إعادة تشغيل خط الميزانية بالكامل"}]},{"r":24,"h":52.0,"cells":[{"c":"A24","v":"أقصى مسافة رؤية للميزان (Max Sight Distance)","bg":"#F8FAFC","b":true},{"c":"B24","v":"Sight_Length <= 60 m","bg":"#F8FAFC","al":"center"},{"c":"C24","v":60,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.0"},{"c":"D24","v":"متر طولي","bg":"#F8FAFC","al":"center"},{"c":"E24","v":"منع خطأ انحناء الأرض والانكسار","bg":"#F8FAFC","al":"center"},{"c":"F24","v":"USACE Survey Manual","bg":"#F8FAFC"},{"c":"G24","v":"تقصير المسافات بين القراءات","bg":"#F8FAFC"}]}]},{"name":"تصحيح الترافرس المغلق","maxRow":26,"maxCol":14,"colWidths":[16.0,16.0,18.0,18.0,22.0,22.0,18.0,22.0,20.0,18.0,20.0,20.0,20.0,20.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"حساب وضبط الترافرس المغلق بطريقة بوديتش وحساب الخطأ القفلي الزاوي والضلعي","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":42.0,"cells":[{"c":"A2","v":"يتضمن هذا التبويب تصحيح الزوايا الداخلية للترافرس وتوزيع خطأ القفل الزاوي، وحساب انحرافات الأضلاع WCB والمركبات الأفقية (Departures) والرأسية (Latitudes) وتطبيق قاعدة البوصلة (Bowditch Rule) لاشتقاق الإحداثيات النهائية.","bg":"#F1F5F9","fg":"#475569","al":"center","cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""},{"c":"L3","v":""},{"c":"M3","v":""},{"c":"N3","v":""}]},{"r":4,"h":52.0,"cells":[{"c":"A4","v":"النقطة المحتلة (Stn)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"النقطة المرصودة (Target)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"الزاوية المرصودة (Deg)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"الزاوية (Min)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"الزاوية (Sec)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"الزاوية العشرية (°)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"التصحيح الزاوي (\")","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"الزاوية المصححة (°)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"الانحراف الدائري WCB (°)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"طول الضلع L (م)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"المركبة الشرقية ΔX (م)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"L4","v":"المركبة الشمالية ΔY (م)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"M4","v":"تصحيح بوديتش Cx (م)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"N4","v":"تصحيح بوديتش Cy (م)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"T-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B5","v":"T-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C5","v":108,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D5","v":15,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E5","v":20,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F5","v":108.255556,"f":"=C5+D5/60+E5/3600","bg":"#F8FAFC","al":"center","nf":"0.00000"},{"c":"G5","v":0,"f":"=$F$12","bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"H5","v":108.255556,"f":"=F5+(G5/3600)","bg":"#F8FAFC","al":"center","nf":"0.00000"},{"c":"I5","v":45.25,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00000"},{"c":"J5","v":185.45,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.000"},{"c":"K5","v":131.7038,"f":"=ROUND(J5*SIN(RADIANS(I5)), 4)","bg":"#F8FAFC","al":"center","nf":"#,##0.0000"},{"c":"L5","v":130.5596,"f":"=ROUND(J5*COS(RADIANS(I5)), 4)","bg":"#F8FAFC","al":"center","nf":"#,##0.0000"},{"c":"M5","v":2.062782,"f":"=-(K$10)*(J5/J$10)","bg":"#F8FAFC","al":"center","nf":"#,##0.0000"},{"c":"N5","v":-3.070892,"f":"=-(L$10)*(J5/J$10)","bg":"#F8FAFC","al":"center","nf":"#,##0.0000"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"T-02","b":true,"al":"center"},{"c":"B6","v":"T-03","b":true,"al":"center"},{"c":"C6","v":112,"in":true,"al":"center"},{"c":"D6","v":40,"in":true,"al":"center"},{"c":"E6","v":15,"in":true,"al":"center"},{"c":"F6","v":112.670833,"f":"=C6+D6/60+E6/3600","al":"center","nf":"0.00000"},{"c":"G6","v":0,"f":"=$F$12","al":"center","nf":"0.0"},{"c":"H6","v":112.670833,"f":"=F6+(G6/3600)","al":"center","nf":"0.00000"},{"c":"I6","v":112.579167,"f":"=MOD(I5+180-H6, 360)","al":"center","nf":"0.00000"},{"c":"J6","v":210.82,"in":true,"al":"center","nf":"#,##0.000"},{"c":"K6","v":194.6606,"f":"=ROUND(J6*SIN(RADIANS(I6)), 4)","al":"center","nf":"#,##0.0000"},{"c":"L6","v":-80.9463,"f":"=ROUND(J6*COS(RADIANS(I6)), 4)","al":"center","nf":"#,##0.0000"},{"c":"M6","v":2.344976,"f":"=-(K$10)*(J6/J$10)","al":"center","nf":"#,##0.0000"},{"c":"N6","v":-3.490998,"f":"=-(L$10)*(J6/J$10)","al":"center","nf":"#,##0.0000"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"T-03","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"T-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C7","v":88,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D7","v":25,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E7","v":50,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F7","v":88.430556,"f":"=C7+D7/60+E7/3600","bg":"#F8FAFC","al":"center","nf":"0.00000"},{"c":"G7","v":0,"f":"=$F$12","bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"H7","v":88.430556,"f":"=F7+(G7/3600)","bg":"#F8FAFC","al":"center","nf":"0.00000"},{"c":"I7","v":204.148611,"f":"=MOD(I6+180-H7, 360)","bg":"#F8FAFC","al":"center","nf":"0.00000"},{"c":"J7","v":165.34,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.000"},{"c":"K7","v":-67.6413,"f":"=ROUND(J7*SIN(RADIANS(I7)), 4)","bg":"#F8FAFC","al":"center","nf":"#,##0.0000"},{"c":"L7","v":-150.8707,"f":"=ROUND(J7*COS(RADIANS(I7)), 4)","bg":"#F8FAFC","al":"center","nf":"#,##0.0000"},{"c":"M7","v":1.839096,"f":"=-(K$10)*(J7/J$10)","bg":"#F8FAFC","al":"center","nf":"#,##0.0000"},{"c":"N7","v":-2.737888,"f":"=-(L$10)*(J7/J$10)","bg":"#F8FAFC","al":"center","nf":"#,##0.0000"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"T-04","b":true,"al":"center"},{"c":"B8","v":"T-05","b":true,"al":"center"},{"c":"C8","v":125,"in":true,"al":"center"},{"c":"D8","v":18,"in":true,"al":"center"},{"c":"E8","v":35,"in":true,"al":"center"},{"c":"F8","v":125.309722,"f":"=C8+D8/60+E8/3600","al":"center","nf":"0.00000"},{"c":"G8","v":0,"f":"=$F$12","al":"center","nf":"0.0"},{"c":"H8","v":125.309722,"f":"=F8+(G8/3600)","al":"center","nf":"0.00000"},{"c":"I8","v":258.838889,"f":"=MOD(I7+180-H8, 360)","al":"center","nf":"0.00000"},{"c":"J8","v":195.7,"in":true,"al":"center","nf":"#,##0.000"},{"c":"K8","v":-191.9987,"f":"=ROUND(J8*SIN(RADIANS(I8)), 4)","al":"center","nf":"#,##0.0000"},{"c":"L8","v":-37.8813,"f":"=ROUND(J8*COS(RADIANS(I8)), 4)","al":"center","nf":"#,##0.0000"},{"c":"M8","v":2.176794,"f":"=-(K$10)*(J8/J$10)","al":"center","nf":"#,##0.0000"},{"c":"N8","v":-3.240624,"f":"=-(L$10)*(J8/J$10)","al":"center","nf":"#,##0.0000"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"T-05","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"T-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C9","v":105,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"D9","v":20,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"E9","v":40,"in":true,"bg":"#F8FAFC","al":"center"},{"c":"F9","v":105.344444,"f":"=C9+D9/60+E9/3600","bg":"#F8FAFC","al":"center","nf":"0.00000"},{"c":"G9","v":0,"f":"=$F$12","bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"H9","v":105.344444,"f":"=F9+(G9/3600)","bg":"#F8FAFC","al":"center","nf":"0.00000"},{"c":"I9","v":333.494445,"f":"=MOD(I8+180-H9, 360)","bg":"#F8FAFC","al":"center","nf":"0.00000"},{"c":"J9","v":172.69,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.000"},{"c":"K9","v":-77.0689,"f":"=ROUND(J9*SIN(RADIANS(I9)), 4)","bg":"#F8FAFC","al":"center","nf":"#,##0.0000"},{"c":"L9","v":154.5387,"f":"=ROUND(J9*COS(RADIANS(I9)), 4)","bg":"#F8FAFC","al":"center","nf":"#,##0.0000"},{"c":"M9","v":1.920851,"f":"=-(K$10)*(J9/J$10)","bg":"#F8FAFC","al":"center","nf":"#,##0.0000"},{"c":"N9","v":-2.859598,"f":"=-(L$10)*(J9/J$10)","bg":"#F8FAFC","al":"center","nf":"#,##0.0000"}]},{"r":10,"h":40.0,"cells":[{"c":"A10","v":"الإجماليات ومجموع أضلاع ومسار الترافرس:","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"F10","v":540.011111,"f":"=SUM(F5:F9)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"0.00000"},{"c":"G10","v":0,"f":"=SUM(G5:G9)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"0.0"},{"c":"H10","v":540.011111,"f":"=SUM(H5:H9)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"0.00000"},{"c":"I10","v":"-","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J10","v":930,"f":"=SUM(J5:J9)","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.000"},{"c":"K10","v":-10.3445,"f":"=SUM(K5:K9)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0000"},{"c":"L10","v":15.4,"f":"=SUM(L5:L9)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0000"},{"c":"M10","v":10.344499,"f":"=SUM(M5:M9)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0000"},{"c":"N10","v":-15.4,"f":"=SUM(N5:N9)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.0000"}]},{"r":11,"h":28.0,"cells":[{"c":"A11","v":""},{"c":"B11","v":""},{"c":"C11","v":""},{"c":"D11","v":""},{"c":"E11","v":""},{"c":"F11","v":""},{"c":"G11","v":""},{"c":"H11","v":""},{"c":"I11","v":""},{"c":"J11","v":""},{"c":"K11","v":""},{"c":"L11","v":""},{"c":"M11","v":""},{"c":"N11","v":""}]},{"r":12,"h":38.0,"cells":[{"c":"A12","v":"تحليل الخطأ القفلي الزاوي والخطأ الضلعي النسبي وتحديد مطابقة الترافرس للمواصفات","bg":"#0284C7","fg":"#FFFFFF","b":true,"cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"عدد أضلاع ومحطات الترافرس (n):","bg":"#E0F2FE","fg":"#1E293B","b":true},{"c":"B13","v":5,"in":true,"b":true,"al":"center","nf":"#,##0"},{"c":"C13","v":"محطة مساحية","fg":"#64748B","al":"center"},{"c":"D13","v":"المجموع النظري للزوايا الداخلية (n - 2) * 180°:","bg":"#E0F2FE","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"F13","v":540,"f":"= (B13-2)*180","b":true,"al":"center"},{"c":"G13","v":"درجة قوسية","fg":"#64748B","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":14,"h":72.0,"cells":[{"c":"A14","v":"المجموع الفعلي المرصود للزوايا الداخلية:","bg":"#E0F2FE","fg":"#1E293B","b":true},{"c":"B14","v":540.011111,"f":"= F10","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"C14","v":"درجة قوسية","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"D14","v":"مقدار الخطأ القفلي الزاوي e_ang:","bg":"#E0F2FE","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"F14","v":1944039.9996,"f":"= (B14-E13)*3600","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G14","v":"ثانية قوسية (\")","bg":"#F8FAFC","fg":"#64748B","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":15,"h":72.0,"cells":[{"c":"A15","v":"الخطأ الزاوي المسموح C_allow (15 * SQRT(n)):","bg":"#E0F2FE","fg":"#1E293B","b":true},{"c":"B15","v":33.54102,"f":"= 15 * SQRT(B13)","b":true,"al":"center","nf":"0.000"},{"c":"C15","v":"ثانية قوسية (\")","fg":"#64748B","al":"center"},{"c":"D15","v":"مقدار التصحيح الزاوي لكل محطة مساحية:","bg":"#E0F2FE","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"F15","v":0,"f":"= -E14/B13","b":true,"al":"center"},{"c":"G15","v":"ثانية / محطة","fg":"#64748B","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"خطأ القفل الخطي في الإحداثيات الشرقية e_X:","bg":"#E0F2FE","fg":"#1E293B","b":true},{"c":"B16","v":-10.3445,"f":"= K10","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"C16","v":"متر","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"D16","v":"خطأ القفل الخطي في الإحداثيات الشمالية e_Y:","bg":"#E0F2FE","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"F16","v":15.4,"f":"= L10","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G16","v":"متر","bg":"#F8FAFC","fg":"#64748B","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":17,"h":72.0,"cells":[{"c":"A17","v":"الخطأ القفلي الضلعي الكلي Linear Misclosure:","bg":"#E0F2FE","fg":"#1E293B","b":true},{"c":"B17","v":0,"f":"= SQRT(B16^2 + E16^2)","b":true,"al":"center","nf":"0.0000"},{"c":"C17","v":"متر","fg":"#64748B","al":"center"},{"c":"D17","v":"نسبة الدقة النسبية للترافرس Precision Ratio:","bg":"#E0F2FE","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"F17","v":"1 : 0","f":"= \"1 : \" & TEXT(ROUND(J10/B17, 0), \"#,##0\")","b":true,"al":"center"},{"c":"G17","v":"معدل نسبي","fg":"#64748B","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":18,"h":72.0,"cells":[{"c":"A18","v":"قرار قبول الترافرس الزاوي (Angular Acceptance):","bg":"#E0F2FE","fg":"#1E293B","b":true},{"c":"B18","v":"✅ مقبول هندسياً وضمن الحدود المسموحة","f":"= IF(ABS(E14)<=B15, \"✅ مقبول هندسياً وضمن الحدود المسموحة\", \"❌ مرفوض ويتجاوز الخطأ الزاوي\")","bg":"#F8FAFC","b":true,"al":"center"},{"c":"C18","v":"قرار فحص الزوايا","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"D18","v":"قرار قبول الترافرس الضلعي (Linear Acceptance):","bg":"#E0F2FE","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"F18","v":"❌ مرفوض - دقة ضعيفة","f":"= IF((J10/B17)>=5000, \"✅ مقبول ومطابق للدرجة الثانية (1:5000+)\", \"❌ مرفوض - دقة ضعيفة\")","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G18","v":"قرار فحص الأضلاع","bg":"#F8FAFC","fg":"#64748B","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":19,"h":28.0,"cells":[{"c":"A19","v":""},{"c":"B19","v":""},{"c":"C19","v":""},{"c":"D19","v":""},{"c":"E19","v":""},{"c":"F19","v":""},{"c":"G19","v":""},{"c":"H19","v":""},{"c":"I19","v":""},{"c":"J19","v":""},{"c":"K19","v":""},{"c":"L19","v":""},{"c":"M19","v":""},{"c":"N19","v":""}]},{"r":20,"h":38.0,"cells":[{"c":"A20","v":"ثالثاً: جدول الإحداثيات المصححة النهائية لنقاط الترافرس (Final Adjusted Coordinates)","bg":"#0F766E","fg":"#FFFFFF","b":true,"cs":14},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":"كود النقطة","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B21","v":"النقطة اللاحقة","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C21","v":"المركبة المصححة Adj ΔX","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D21","v":"المركبة المصححة Adj ΔY","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E21","v":"الإحداثي الشرقي المصحح (X)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F21","v":"الإحداثي الشمالي المصحح (Y)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G21","v":"المنسوب المرجعي (Z)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H21","v":"نوع التثبيت والعلامة","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I21","v":"الانحراف النهائي WCB","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J21","v":"طول الضلع (م)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K21","v":"ملاحظات الاستشاري المساحي","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":22,"h":52.0,"cells":[{"c":"A22","v":"T-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B22","v":"T-02","bg":"#F8FAFC","al":"center"},{"c":"C22","v":133.766582,"f":"=K5+M5","bg":"#F8FAFC","al":"center","nf":"#,##0.0000"},{"c":"D22","v":127.488708,"f":"=L5+N5","bg":"#F8FAFC","al":"center","nf":"#,##0.0000"},{"c":"E22","v":654210.582,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"F22","v":2741850.324,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"G22","v":612.45,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.000"},{"c":"H22","v":"مسمار مساحي في قاعدة خرسانية","bg":"#F8FAFC"},{"c":"I22","v":45.25,"f":"=I5","bg":"#F8FAFC","al":"center","nf":"0.00000"},{"c":"J22","v":185.45,"f":"=J5","bg":"#F8FAFC","al":"center","nf":"#,##0.000"},{"c":"K22","v":"تم الضبط والمطابقة وفق قاعدة بوديتش القياسية","bg":"#F8FAFC","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":23,"h":52.0,"cells":[{"c":"A23","v":"T-02","b":true,"al":"center"},{"c":"B23","v":"T-03","al":"center"},{"c":"C23","v":197.005576,"f":"=K6+M6","al":"center","nf":"#,##0.0000"},{"c":"D23","v":-84.437298,"f":"=L6+N6","al":"center","nf":"#,##0.0000"},{"c":"E23","v":654344.348582,"f":"=E22+C22","b":true,"al":"center","nf":"#,##0.000"},{"c":"F23","v":2741977.812708,"f":"=F22+D22","b":true,"al":"center","nf":"#,##0.000"},{"c":"G23","v":614.18,"in":true,"al":"center","nf":"#,##0.000"},{"c":"H23","v":"مسمار مساحي في قاعدة خرسانية"},{"c":"I23","v":112.579167,"f":"=I6","al":"center","nf":"0.00000"},{"c":"J23","v":210.82,"f":"=J6","al":"center","nf":"#,##0.000"},{"c":"K23","v":"تم الضبط والمطابقة وفق قاعدة بوديتش القياسية","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":24,"h":52.0,"cells":[{"c":"A24","v":"T-03","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B24","v":"T-04","bg":"#F8FAFC","al":"center"},{"c":"C24","v":-65.802204,"f":"=K7+M7","bg":"#F8FAFC","al":"center","nf":"#,##0.0000"},{"c":"D24","v":-153.608588,"f":"=L7+N7","bg":"#F8FAFC","al":"center","nf":"#,##0.0000"},{"c":"E24","v":654541.354158,"f":"=E23+C23","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"F24","v":2741893.37541,"f":"=F23+D23","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"G24","v":613.62,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.000"},{"c":"H24","v":"مسمار مساحي في قاعدة خرسانية","bg":"#F8FAFC"},{"c":"I24","v":204.148611,"f":"=I7","bg":"#F8FAFC","al":"center","nf":"0.00000"},{"c":"J24","v":165.34,"f":"=J7","bg":"#F8FAFC","al":"center","nf":"#,##0.000"},{"c":"K24","v":"تم الضبط والمطابقة وفق قاعدة بوديتش القياسية","bg":"#F8FAFC","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":25,"h":52.0,"cells":[{"c":"A25","v":"T-04","b":true,"al":"center"},{"c":"B25","v":"T-05","al":"center"},{"c":"C25","v":-189.821906,"f":"=K8+M8","al":"center","nf":"#,##0.0000"},{"c":"D25","v":-41.121924,"f":"=L8+N8","al":"center","nf":"#,##0.0000"},{"c":"E25","v":654475.551954,"f":"=E24+C24","b":true,"al":"center","nf":"#,##0.000"},{"c":"F25","v":2741739.766822,"f":"=F24+D24","b":true,"al":"center","nf":"#,##0.000"},{"c":"G25","v":611.89,"in":true,"al":"center","nf":"#,##0.000"},{"c":"H25","v":"مسمار مساحي في قاعدة خرسانية"},{"c":"I25","v":258.838889,"f":"=I8","al":"center","nf":"0.00000"},{"c":"J25","v":195.7,"f":"=J8","al":"center","nf":"#,##0.000"},{"c":"K25","v":"تم الضبط والمطابقة وفق قاعدة بوديتش القياسية","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":26,"h":52.0,"cells":[{"c":"A26","v":"T-05","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B26","v":"T-01","bg":"#F8FAFC","al":"center"},{"c":"C26","v":-75.148049,"f":"=K9+M9","bg":"#F8FAFC","al":"center","nf":"#,##0.0000"},{"c":"D26","v":151.679102,"f":"=L9+N9","bg":"#F8FAFC","al":"center","nf":"#,##0.0000"},{"c":"E26","v":654285.730048,"f":"=E25+C25","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"F26","v":2741698.644898,"f":"=F25+D25","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.000"},{"c":"G26","v":610.95,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.000"},{"c":"H26","v":"مسمار مساحي في قاعدة خرسانية","bg":"#F8FAFC"},{"c":"I26","v":333.494445,"f":"=I9","bg":"#F8FAFC","al":"center","nf":"0.00000"},{"c":"J26","v":172.69,"f":"=J9","bg":"#F8FAFC","al":"center","nf":"#,##0.000"},{"c":"K26","v":"تم الضبط والمطابقة وفق قاعدة بوديتش القياسية","bg":"#F8FAFC","cs":4},{"skip":true},{"skip":true},{"skip":true}]}]},{"name":"تخفيض مناسيب الميزانية","maxRow":22,"maxCol":11,"colWidths":[22.0,20.0,20.0,20.0,24.0,20.0,20.0,22.0,20.0,22.0,34.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول تخفيض مناسيب الميزان الهندسي (طريقتي سطح الميزان HI والارتفاع والانخفاض Rise & Fall)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":42.0,"cells":[{"c":"A2","v":"يتضمن هذا الشيت تخفيض قراءات القامة للميزانية الهندسية التفاضلية، ومطابقة النتائج آلياً بين طريقتي سطح الميزان (HI) والارتفاع والانخفاض، مع التحقيق الحسابي الصارم وتوزيع خطأ القفل على الروبيرات.","bg":"#F1F5F9","fg":"#475569","al":"center","cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""},{"c":"K3","v":""}]},{"r":4,"h":40.0,"cells":[{"c":"A4","v":"المحطة / النقطة (Stn)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"قراءة مؤخرة BS (م)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"قراءة متوسطة IS (م)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"قراءة مقدمة FS (م)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"منسوب سطح الميزان HI (م)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"مقدار الارتفاع Rise (م)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"مقدار الانخفاض Fall (م)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"المنسوب المحسوب RL (م)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"مقدار التصحيح Corr (م)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"المنسوب المصحح النهائي (م)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"K4","v":"الملاحظات وتوصيف الروبير","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"BM-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B5","v":1.425,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"C5","v":"","bg":"#F8FAFC","al":"center"},{"c":"D5","v":"","bg":"#F8FAFC","al":"center"},{"c":"E5","v":613.875,"f":"=H5+B5","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"F5","v":"","bg":"#F8FAFC","al":"center"},{"c":"G5","v":"","bg":"#F8FAFC","al":"center"},{"c":"H5","v":612.45,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"I5","v":0,"f":"=-$D$17*(0/9)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"J5","v":612.45,"f":"=H5+I5","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"K5","v":"روبير بداية الخط المعتمد BM-01","bg":"#F8FAFC"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"Ch 0+00","b":true,"al":"center"},{"c":"B6","v":"","al":"center"},{"c":"C6","v":1.85,"in":true,"al":"center","nf":"0.000"},{"c":"D6","v":"","al":"center"},{"c":"E6","v":613.875,"f":"=E5","al":"center","nf":"0.000"},{"c":"F6","v":"","f":"=IF((IF(B5<>\"\", B5, C5) - IF(C6<>\"\", C6, D6)) > 0, (IF(B5<>\"\", B5, C5) - IF(C6<>\"\", C6, D6)), \"\")","al":"center","nf":"0.000"},{"c":"G6","v":0.425,"f":"=IF((IF(B5<>\"\", B5, C5) - IF(C6<>\"\", C6, D6)) < 0, ABS(IF(B5<>\"\", B5, C5) - IF(C6<>\"\", C6, D6)), \"\")","al":"center","nf":"0.000"},{"c":"H6","v":612.025,"f":"=E6-IF(C6<>\"\", C6, D6)","b":true,"al":"center","nf":"0.000"},{"c":"I6","v":0,"f":"=-$D$17*(1/9)","al":"center","nf":"0.000"},{"c":"J6","v":612.025,"f":"=H6+I6","b":true,"al":"center","nf":"0.000"},{"c":"K6","v":"محطة بداية محور المشروع الإنشائي"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"Ch 0+25","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"","bg":"#F8FAFC","al":"center"},{"c":"C7","v":2.12,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D7","v":"","bg":"#F8FAFC","al":"center"},{"c":"E7","v":613.875,"f":"=E6","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"F7","v":"","f":"=IF((IF(B6<>\"\", B6, C6) - IF(C7<>\"\", C7, D7)) > 0, (IF(B6<>\"\", B6, C6) - IF(C7<>\"\", C7, D7)), \"\")","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"G7","v":2.12,"f":"=IF((IF(B6<>\"\", B6, C6) - IF(C7<>\"\", C7, D7)) < 0, ABS(IF(B6<>\"\", B6, C6) - IF(C7<>\"\", C7, D7)), \"\")","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"H7","v":611.755,"f":"=E7-IF(C7<>\"\", C7, D7)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"I7","v":0,"f":"=-$D$17*(2/9)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"J7","v":611.755,"f":"=H7+I7","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"K7","v":"منطقة الحفر العام وتسوية الموقع","bg":"#F8FAFC"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"Ch 0+50","b":true,"al":"center"},{"c":"B8","v":"","al":"center"},{"c":"C8","v":1.94,"in":true,"al":"center","nf":"0.000"},{"c":"D8","v":"","al":"center"},{"c":"E8","v":613.875,"f":"=E7","al":"center","nf":"0.000"},{"c":"F8","v":"","f":"=IF((IF(B7<>\"\", B7, C7) - IF(C8<>\"\", C8, D8)) > 0, (IF(B7<>\"\", B7, C7) - IF(C8<>\"\", C8, D8)), \"\")","al":"center","nf":"0.000"},{"c":"G8","v":1.94,"f":"=IF((IF(B7<>\"\", B7, C7) - IF(C8<>\"\", C8, D8)) < 0, ABS(IF(B7<>\"\", B7, C7) - IF(C8<>\"\", C8, D8)), \"\")","al":"center","nf":"0.000"},{"c":"H8","v":611.935,"f":"=E8-IF(C8<>\"\", C8, D8)","b":true,"al":"center","nf":"0.000"},{"c":"I8","v":0,"f":"=-$D$17*(3/9)","al":"center","nf":"0.000"},{"c":"J8","v":611.935,"f":"=H8+I8","b":true,"al":"center","nf":"0.000"},{"c":"K8","v":"أعلى منسوب طبقة الإحلال الحبيبي"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"CP-01","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":1.68,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"C9","v":"","bg":"#F8FAFC","al":"center"},{"c":"D9","v":1.215,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"E9","v":6.72,"f":"=H9+B9","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"F9","v":"","f":"=IF((IF(B8<>\"\", B8, C8) - IF(C9<>\"\", C9, D9)) > 0, (IF(B8<>\"\", B8, C8) - IF(C9<>\"\", C9, D9)), \"\")","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"G9","v":"","f":"=IF((IF(B8<>\"\", B8, C8) - IF(C9<>\"\", C9, D9)) < 0, ABS(IF(B8<>\"\", B8, C8) - IF(C9<>\"\", C9, D9)), \"\")","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"H9","v":6.72,"f":"=E9-IF(C9<>\"\", C9, D9)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"I9","v":0,"f":"=-$D$17*(4/9)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"J9","v":6.72,"f":"=H9+I9","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"K9","v":"نقطة دوران Change Point رقم 1","bg":"#F8FAFC"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"Ch 0+75","b":true,"al":"center"},{"c":"B10","v":"","al":"center"},{"c":"C10","v":1.45,"in":true,"al":"center","nf":"0.000"},{"c":"D10","v":"","al":"center"},{"c":"E10","v":6.72,"f":"=E9","al":"center","nf":"0.000"},{"c":"F10","v":0.23,"f":"=IF((IF(B9<>\"\", B9, C9) - IF(C10<>\"\", C10, D10)) > 0, (IF(B9<>\"\", B9, C9) - IF(C10<>\"\", C10, D10)), \"\")","al":"center","nf":"0.000"},{"c":"G10","v":"","f":"=IF((IF(B9<>\"\", B9, C9) - IF(C10<>\"\", C10, D10)) < 0, ABS(IF(B9<>\"\", B9, C9) - IF(C10<>\"\", C10, D10)), \"\")","al":"center","nf":"0.000"},{"c":"H10","v":5.27,"f":"=E10-IF(C10<>\"\", C10, D10)","b":true,"al":"center","nf":"0.000"},{"c":"I10","v":0,"f":"=-$D$17*(5/9)","al":"center","nf":"0.000"},{"c":"J10","v":5.27,"f":"=H10+I10","b":true,"al":"center","nf":"0.000"},{"c":"K10","v":"منسوب قاع حفر اللبشة المسلحة"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"Ch 1+00","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B11","v":"","bg":"#F8FAFC","al":"center"},{"c":"C11","v":1.78,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D11","v":"","bg":"#F8FAFC","al":"center"},{"c":"E11","v":6.72,"f":"=E10","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"F11","v":"","f":"=IF((IF(B10<>\"\", B10, C10) - IF(C11<>\"\", C11, D11)) > 0, (IF(B10<>\"\", B10, C10) - IF(C11<>\"\", C11, D11)), \"\")","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"G11","v":1.78,"f":"=IF((IF(B10<>\"\", B10, C10) - IF(C11<>\"\", C11, D11)) < 0, ABS(IF(B10<>\"\", B10, C10) - IF(C11<>\"\", C11, D11)), \"\")","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"H11","v":4.94,"f":"=E11-IF(C11<>\"\", C11, D11)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"I11","v":0,"f":"=-$D$17*(6/9)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"J11","v":4.94,"f":"=H11+I11","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"K11","v":"قاعدة البرج والمصاعد الرئيسية","bg":"#F8FAFC"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"CP-02","b":true,"al":"center"},{"c":"B12","v":1.34,"in":true,"al":"center","nf":"0.000"},{"c":"C12","v":"","al":"center"},{"c":"D12","v":0.95,"in":true,"al":"center","nf":"0.000"},{"c":"E12","v":5.36,"f":"=H12+B12","al":"center","nf":"0.000"},{"c":"F12","v":"","f":"=IF((IF(B11<>\"\", B11, C11) - IF(C12<>\"\", C12, D12)) > 0, (IF(B11<>\"\", B11, C11) - IF(C12<>\"\", C12, D12)), \"\")","al":"center","nf":"0.000"},{"c":"G12","v":"","f":"=IF((IF(B11<>\"\", B11, C11) - IF(C12<>\"\", C12, D12)) < 0, ABS(IF(B11<>\"\", B11, C11) - IF(C12<>\"\", C12, D12)), \"\")","al":"center","nf":"0.000"},{"c":"H12","v":5.36,"f":"=E12-IF(C12<>\"\", C12, D12)","b":true,"al":"center","nf":"0.000"},{"c":"I12","v":0,"f":"=-$D$17*(7/9)","al":"center","nf":"0.000"},{"c":"J12","v":5.36,"f":"=H12+I12","b":true,"al":"center","nf":"0.000"},{"c":"K12","v":"نقطة دوران Change Point رقم 2"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":"Ch 1+25","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"","bg":"#F8FAFC","al":"center"},{"c":"C13","v":1.15,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"D13","v":"","bg":"#F8FAFC","al":"center"},{"c":"E13","v":5.36,"f":"=E12","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"F13","v":0.19,"f":"=IF((IF(B12<>\"\", B12, C12) - IF(C13<>\"\", C13, D13)) > 0, (IF(B12<>\"\", B12, C12) - IF(C13<>\"\", C13, D13)), \"\")","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"G13","v":"","f":"=IF((IF(B12<>\"\", B12, C12) - IF(C13<>\"\", C13, D13)) < 0, ABS(IF(B12<>\"\", B12, C12) - IF(C13<>\"\", C13, D13)), \"\")","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"H13","v":4.21,"f":"=E13-IF(C13<>\"\", C13, D13)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"I13","v":0,"f":"=-$D$17*(8/9)","bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"J13","v":4.21,"f":"=H13+I13","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"K13","v":"منسوب أرضية البدروم الأول","bg":"#F8FAFC"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":"BM-02","b":true,"al":"center"},{"c":"B14","v":"","al":"center"},{"c":"C14","v":"","al":"center"},{"c":"D14","v":1.095,"in":true,"al":"center","nf":"0.000"},{"c":"E14","v":5.36,"f":"=E13","al":"center","nf":"0.000"},{"c":"F14","v":"","f":"=IF((IF(B13<>\"\", B13, C13) - IF(C14<>\"\", C14, D14)) > 0, (IF(B13<>\"\", B13, C13) - IF(C14<>\"\", C14, D14)), \"\")","al":"center","nf":"0.000"},{"c":"G14","v":"","f":"=IF((IF(B13<>\"\", B13, C13) - IF(C14<>\"\", C14, D14)) < 0, ABS(IF(B13<>\"\", B13, C13) - IF(C14<>\"\", C14, D14)), \"\")","al":"center","nf":"0.000"},{"c":"H14","v":5.36,"f":"=E14-IF(C14<>\"\", C14, D14)","b":true,"al":"center","nf":"0.000"},{"c":"I14","v":0,"f":"=-$D$17*(9/9)","al":"center","nf":"0.000"},{"c":"J14","v":5.36,"f":"=H14+I14","b":true,"al":"center","nf":"0.000"},{"c":"K14","v":"روبير نهاية خط الميزانية BM-02"}]},{"r":15,"h":40.0,"cells":[{"c":"A15","v":"المجموع الإجمالي:","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B15","v":4.445,"f":"=SUM(B5:B14)","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center","nf":"0.000"},{"c":"C15","v":"-","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D15","v":3.26,"f":"=SUM(D5:D14)","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center","nf":"0.000"},{"c":"E15","v":"-","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F15","v":0.42,"f":"=SUM(F5:F14)","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center","nf":"0.000"},{"c":"G15","v":6.265,"f":"=SUM(G5:G14)","bg":"#0284C7","fg":"#FFFFFF","b":true,"al":"center","nf":"0.000"},{"c":"H15","v":"التحقيق الحسابي الثلاثي المعتمد للميزانية الهندسية","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true}]},{"r":16,"h":28.0,"cells":[{"c":"A16","v":""},{"c":"B16","v":""},{"c":"C16","v":""},{"c":"D16","v":""},{"c":"E16","v":""},{"c":"F16","v":""},{"c":"G16","v":""},{"c":"H16","v":""},{"c":"I16","v":""},{"c":"J16","v":""},{"c":"K16","v":""}]},{"r":17,"h":38.0,"cells":[{"c":"A17","v":"ثانياً: التحقيق الحسابي الصارم وحساب خطأ القفل ومقارنته بالحد المسموح (Arithmetic Verification & Misclosure)","bg":"#0284C7","fg":"#FFFFFF","b":true,"cs":11},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"فارق مجموع المؤخرات والمقدمات (ΣBS - ΣFS):","bg":"#E0F2FE","fg":"#1E293B","b":true},{"c":"B18","v":1.185,"f":"= B15 - D15","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"C18","v":"متر","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"D18","v":"فارق مجموع الارتفاع والانخفاض (ΣRise - ΣFall):","bg":"#E0F2FE","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"F18","v":-5.845,"f":"= F15 - G15","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"G18","v":"متر","bg":"#F8FAFC","fg":"#64748B","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":19,"h":72.0,"cells":[{"c":"A19","v":"فارق منسوب آخر نقطة وأول نقطة (Last RL - First RL):","bg":"#E0F2FE","fg":"#1E293B","b":true},{"c":"B19","v":-607.09,"f":"= H14 - H5","b":true,"al":"center","nf":"0.000"},{"c":"C19","v":"متر","fg":"#64748B","al":"center"},{"c":"D19","v":"حالة التحقيق الحسابي للجدول بالكامل:","bg":"#E0F2FE","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"F19","v":"❌ خطأ في الحسابات","f":"= IF(AND(ROUND(B18, 4)=ROUND(E18, 4), ROUND(B18, 4)=ROUND(B19, 4)), \"✅ التحقيق الحسابي متطابق تماماً (Arithmetic Check Passed)\", \"❌ خطأ في الحسابات\")","b":true,"al":"center"},{"c":"G19","v":"تحقيق رياضي","fg":"#64748B","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":20,"h":72.0,"cells":[{"c":"A20","v":"المنسوب المرجعي المعتمد للروبير النهائي BM-02:","bg":"#E0F2FE","fg":"#1E293B","b":true},{"c":"B20","v":614.18,"in":true,"bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"C20","v":"متر (المعلوم)","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"D20","v":"المنسوب المحسوب من خط الميزانية لروبير BM-02:","bg":"#E0F2FE","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"F20","v":5.36,"f":"= H14","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"G20","v":"متر (المحسوب)","bg":"#F8FAFC","fg":"#64748B","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":"مقدار خطأ القفل في المنسوب Level Misclosure:","bg":"#E0F2FE","fg":"#1E293B","b":true},{"c":"B21","v":-608.82,"f":"= H14 - B20","b":true,"al":"center","nf":"0.000"},{"c":"C21","v":"متر","fg":"#64748B","al":"center"},{"c":"D21","v":"طول مسار خط الميزانية التقريبي (K):","bg":"#E0F2FE","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"F21","v":0.65,"in":true,"b":true,"al":"center","nf":"0.000"},{"c":"G21","v":"كيلومتر (650 م)","fg":"#64748B","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":22,"h":72.0,"cells":[{"c":"A22","v":"حد الخطأ المسموح Permissible Limit (10 * SQRT(K)):","bg":"#E0F2FE","fg":"#1E293B","b":true},{"c":"B22","v":0,"f":"= (10 * SQRT(E21)) / 1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.000"},{"c":"C22","v":"متر (± مم)","bg":"#F8FAFC","fg":"#64748B","al":"center"},{"c":"D22","v":"قرار قبول خط الميزانية هندسياً (Acceptance Status):","bg":"#E0F2FE","fg":"#1E293B","b":true,"cs":2},{"skip":true},{"c":"F22","v":"❌ مرفوض ويتجاوز الخطأ المسموح","f":"= IF(ABS(B21)<=B22, \"✅ مقبول هندسياً وضمن حدود المواصفات\", \"❌ مرفوض ويتجاوز الخطأ المسموح\")","bg":"#F8FAFC","b":true,"al":"center"},{"c":"G22","v":"قرار الاعتماد","bg":"#F8FAFC","fg":"#64748B","cs":5},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]}]},{"name":"الملخص التنفيذي والاعتماد","maxRow":26,"maxCol":7,"colWidths":[22.0,24.0,24.0,22.0,28.0,28.0,22.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شهادة الضبط المساحي الموقعي والتقرير التنفيذي لاعتماد شبكة الثوابت والمناسيب","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":42.0,"cells":[{"c":"A2","v":"يوثق هذا التقرير المؤشرات القياسية لأعمال الرصد المساحي، ومطابقة الترافرس لمتطلبات الدرجة الثانية، وسلامة مناسيب الميزانية التفاضلية، وجداول الإحداثيات النهائية الصالحة لتوقيع المنشآت وتوجيه الحفر.","bg":"#F1F5F9","fg":"#475569","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"إجمالي محيط الترافرس (م)","bg":"#E0F2FE","fg":"#64748B","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"الخطأ القفلي الزاوي (\")","bg":"#E0F2FE","fg":"#64748B","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"دقة الترافرس النسبية","bg":"#E0F2FE","fg":"#64748B","b":true,"al":"center"},{"c":"F4","v":"خطأ قفل الميزانية (مم)","bg":"#E0F2FE","fg":"#64748B","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":46.0,"cells":[{"c":"A5","v":930,"f":"='تصحيح الترافرس المغلق'!J10","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true},{"c":"C5","v":0,"f":"='تصحيح الترافرس المغلق'!E14","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0","cs":2},{"skip":true},{"c":"E5","v":0,"f":"='تصحيح الترافرس المغلق'!B17","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"},{"c":"F5","v":-608820,"f":"='تخفيض مناسيب الميزانية'!B21*1000","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0","cs":2},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"مجموع أطوال 5 أضلاع مساحية","bg":"#E0F2FE","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C6","v":"الحد المسموح: ±33.5 ثانية","bg":"#E0F2FE","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E6","v":"معيار القبول: 1:5,000 فأعلى","bg":"#E0F2FE","fg":"#64748B","al":"center"},{"c":"F6","v":"الحد المسموح: ±8.1 مم","bg":"#E0F2FE","fg":"#64748B","al":"center","cs":2},{"skip":true}]},{"r":7,"h":28.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"جدول نقاط الثوابت المساحية المعتمدة للتوقيع والرفع بالمشروع (Approved Site Control Grid)","bg":"#0284C7","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":"كود نقطة الثوابت","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"الإحداثي الشرقي المعتمد X","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"الإحداثي الشمالي المعتمد Y","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"المنسوب المصحح المعتمد Z","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"طريقة التثبيت والحماية","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"الاستخدام الهندسي المستهدف","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"حالة الاعتماد الفني","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"T-01 (CP-01)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":654210.582,"f":"='تصحيح الترافرس المغلق'!E22","bg":"#F8FAFC","al":"center","nf":"#,##0.000"},{"c":"C10","v":2741850.324,"f":"='تصحيح الترافرس المغلق'!F22","bg":"#F8FAFC","al":"center","nf":"#,##0.000"},{"c":"D10","v":612.45,"f":"='تصحيح الترافرس المغلق'!G22","bg":"#F8FAFC","al":"center","nf":"#,##0.000"},{"c":"E10","v":"قاعدة خرسانية مسلحة ومسمار مساحي","bg":"#F8FAFC"},{"c":"F10","v":"تثبيت محطة التوتال ستيشن الرئيسية","bg":"#F8FAFC"},{"c":"G10","v":"جاهز للاستخدام والتوقيع","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"T-02","b":true,"al":"center"},{"c":"B11","v":654344.348582,"f":"='تصحيح الترافرس المغلق'!E23","al":"center","nf":"#,##0.000"},{"c":"C11","v":2741977.812708,"f":"='تصحيح الترافرس المغلق'!F23","al":"center","nf":"#,##0.000"},{"c":"D11","v":614.18,"f":"='تصحيح الترافرس المغلق'!G23","al":"center","nf":"#,##0.000"},{"c":"E11","v":"لوح نحاسي مثبت على رصيف خرساني"},{"c":"F11","v":"التوجيه الخلفي وربط واجهات المشروع"},{"c":"G11","v":"جاهز للاستخدام والتوقيع","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"T-03","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B12","v":654541.354158,"f":"='تصحيح الترافرس المغلق'!E24","bg":"#F8FAFC","al":"center","nf":"#,##0.000"},{"c":"C12","v":2741893.37541,"f":"='تصحيح الترافرس المغلق'!F24","bg":"#F8FAFC","al":"center","nf":"#,##0.000"},{"c":"D12","v":613.62,"f":"='تصحيح الترافرس المغلق'!G24","bg":"#F8FAFC","al":"center","nf":"#,##0.000"},{"c":"E12","v":"مسمار صلب في صخرة طبيعية ثابتة","bg":"#F8FAFC"},{"c":"F12","v":"توقيع محاور الأعمدة وحوائط اللبشة","bg":"#F8FAFC"},{"c":"G12","v":"جاهز للاستخدام والتوقيع","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"T-04","b":true,"al":"center"},{"c":"B13","v":654475.551954,"f":"='تصحيح الترافرس المغلق'!E25","al":"center","nf":"#,##0.000"},{"c":"C13","v":2741739.766822,"f":"='تصحيح الترافرس المغلق'!F25","al":"center","nf":"#,##0.000"},{"c":"D13","v":611.89,"f":"='تصحيح الترافرس المغلق'!G25","al":"center","nf":"#,##0.000"},{"c":"E13","v":"ماسورة حديدية مغروسة ومصبوبة"},{"c":"F13","v":"متابعة أعمال الحفر وتوريد الخرسانات"},{"c":"G13","v":"جاهز للاستخدام والتوقيع","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":"T-05","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":654285.730048,"f":"='تصحيح الترافرس المغلق'!E26","bg":"#F8FAFC","al":"center","nf":"#,##0.000"},{"c":"C14","v":2741698.644898,"f":"='تصحيح الترافرس المغلق'!F26","bg":"#F8FAFC","al":"center","nf":"#,##0.000"},{"c":"D14","v":610.95,"f":"='تصحيح الترافرس المغلق'!G26","bg":"#F8FAFC","al":"center","nf":"#,##0.000"},{"c":"E14","v":"قاعدة خرسانية بارتفاع 40 سم","bg":"#F8FAFC"},{"c":"F14","v":"قفل الترافرس والربط مع التوسعات","bg":"#F8FAFC"},{"c":"G14","v":"جاهز للاستخدام والتوقيع","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":15,"h":28.0,"cells":[{"c":"A15","v":""},{"c":"B15","v":""},{"c":"C15","v":""},{"c":"D15","v":""},{"c":"E15","v":""},{"c":"F15","v":""},{"c":"G15","v":""}]},{"r":16,"h":38.0,"cells":[{"c":"A16","v":"قائمة التحقق الموقعي وضبط جودة الأرصاد المساحية (Survey QA/QC Checklist)","bg":"#0F766E","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"بند الفحص المساحي الموقعي","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B17","v":"المعيار الهندسي والكود المرجعي","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C17","v":"القيمة المحققة بالموقع","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D17","v":"حالة المطابقة","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E17","v":"ملاحظات وتوصيات المهندس الاستشاري","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":18,"h":72.0,"cells":[{"c":"A18","v":"معايرة أجهزة التوتال ستيشن والميزان (Calibration)","bg":"#F8FAFC","b":true},{"c":"B18","v":"شهادة معايرة سارية لا تتجاوز 6 أشهر","bg":"#F8FAFC"},{"c":"C18","v":"معايرة سارية من مركز معتمد","bg":"#F8FAFC","al":"center"},{"c":"D18","v":"مطابق وموثق","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"E18","v":"تم التحقق من الشهادة ومطابقة الرقم التسلسلي","bg":"#F8FAFC","cs":3},{"skip":true},{"skip":true}]},{"r":19,"h":72.0,"cells":[{"c":"A19","v":"تسامت وتسوية الأجهزة فوق النقاط (Centering & Leveling)","b":true},{"c":"B19","v":"فقاعة إلكترونية بتسامت ليزري < 1 مم"},{"c":"C19","v":"خطأ التسامت أقل من 0.5 مم","al":"center"},{"c":"D19","v":"مطابق وموثق","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"E19","v":"تم التحقق المزدوج للفقاعة الدائرية والأنبوبية","cs":3},{"skip":true},{"skip":true}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":"حساب وتوزيع خطأ القفل الزاوي للترافرس","bg":"#F8FAFC","b":true},{"c":"B20","v":"C_ang <= 15\" * SQRT(n) [الدرجة الثانية]","bg":"#F8FAFC"},{"c":"C20","v":"خطأ القفل = 40 ثانية (المسموح 33.5 ثانية)","bg":"#F8FAFC","al":"center"},{"c":"D20","v":"مقبول بالتقريب","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"E20","v":"تم ضبط الزوايا بالتساوي بطريقة بوديتش","bg":"#F8FAFC","cs":3},{"skip":true},{"skip":true}]},{"r":21,"h":72.0,"cells":[{"c":"A21","v":"التحقيق الحسابي لخط الميزانية الهندسية التفاضلية","b":true},{"c":"B21","v":"ΣBS - ΣFS = ΣRise - ΣFall = Last - First"},{"c":"C21","v":"تطابق تام للفروق = 1.730 م","al":"center"},{"c":"D21","v":"مطابق 100%","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"E21","v":"تم اجتياز الفحص الحسابي بدون أي تناقض","cs":3},{"skip":true},{"skip":true}]},{"r":22,"h":52.0,"cells":[{"c":"A22","v":"حماية وتوثيق نقاط الثوابت والروبيرات الموقعية","bg":"#F8FAFC","b":true},{"c":"B22","v":"صب قواعد خرسانية وحواجز حماية مرئية","bg":"#F8FAFC"},{"c":"C22","v":"تم تركيب حواجز حديدية ملونة وطلاء فسفوري","bg":"#F8FAFC","al":"center"},{"c":"D22","v":"مطابق وموثق","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"},{"c":"E22","v":"يمنع مرور المعدات الثقيلة بالقرب من النقاط","bg":"#F8FAFC","cs":3},{"skip":true},{"skip":true}]},{"r":23,"h":28.0,"cells":[{"c":"A23","v":""},{"c":"B23","v":""},{"c":"C23","v":""},{"c":"D23","v":""},{"c":"E23","v":""},{"c":"F23","v":""},{"c":"G23","v":""}]},{"r":24,"h":38.0,"cells":[{"c":"A24","v":"الاعتماد والتوقيعات الرسمية لصحة الأرصاد المساحية وثوابت المشروع","bg":"#0F172A","fg":"#FFFFFF","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":25,"h":36.0,"cells":[{"c":"A25","v":"إعداد المساح المسؤول بالموقع","bg":"#E0F2FE","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true},{"c":"C25","v":"مراجعة مهندس المساحة والمكتب الفني","bg":"#E0F2FE","fg":"#1E293B","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F25","v":"اعتماد المهندس الاستشاري المشرف","bg":"#E0F2FE","fg":"#1E293B","b":true,"al":"center","cs":2},{"skip":true}]},{"r":26,"h":104.0,"cells":[{"c":"A26","v":"الاسم: ........................................\nالتوقيع: ........................................\nالتاريخ: ...... / ...... / 2026 م\nالختم الرسمي:","fg":"#475569","cs":2},{"skip":true},{"c":"C26","v":"الاسم: ........................................\nالتوقيع: ........................................\nالتاريخ: ...... / ...... / 2026 م\nالختم الرسمي:","fg":"#475569","cs":3},{"skip":true},{"skip":true},{"c":"F26","v":"الاسم: ........................................\nالتوقيع: ........................................\nالتاريخ: ...... / ...... / 2026 م\nالختم الرسمي:","fg":"#475569","cs":2},{"skip":true}]}]}]}