{"slug":"tower-crane-foundation-and-tie-back-design-calculation-sheet","sheets":[{"name":"إعدادات المشروع ومواصفات الونش","maxRow":41,"maxCol":8,"colWidths":[14.0,64.0,16.0,20.0,16.0,22.0,42.0,18.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت تصميم قاعدة الونش البرجي وحساب قوى الانقلاب والربط بالهيكل الإنشائي وفق CIRIA C739 و FEM 1.001 و SBC 304","fg":"#1E3A8A","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"⚠️ تنبيه استرشادي: البيانات والمواصفات وأسعار المواد المدخلة في هذا الشيت هي قيم هندسية واسترشادية. يرجى تعديل فئات الأسعار وأحمال الونش طبقاً لكتالوج الشركة المصنعة وتقرير فحص التربة المعتمد لمشروعك.","fg":"#475569","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":34.0,"cells":[{"c":"A3","v":"أقصى عزم انقلاب تشغيلي","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C3","v":"معامل أمان الاستقرار ضد الانقلاب","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E3","v":"أقصى قوة محورية في أذرع الربط","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"G3","v":"إجمالي تكلفة القاعدة والربط الإنشائي","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true}]},{"r":4,"h":46.0,"cells":[{"c":"A4","v":0,"f":"='تصميم قاعدة الونش الخرسانية'!E24","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true},{"c":"C4","v":"كيلو نيوتن.متر","f":"='تصميم قاعدة الونش الخرسانية'!E28","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00","cs":2},{"skip":true},{"c":"E4","v":"سعة التفاعل المشترك <= 1.0","f":"='قوى الربط بالهيكل الإنشائي'!F22","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"0.00","cs":2},{"skip":true},{"c":"G4","v":0,"f":"='حصر الكميات ومقايسة التكاليف'!G24","bg":"#F8FAFC","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":"كيلو نيوتن.متر (kN.m)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C5","v":"الحد الأدنى الآمن: 1.50","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E5","v":"كيلو نيوتن ضغط/شد (kN)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"G5","v":"القيمة الإجمالية شاملة التركيب","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true}]},{"r":6,"h":28.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":""},{"c":"C6","v":""},{"c":"D6","v":""},{"c":"E6","v":""},{"c":"F6","v":""},{"c":"G6","v":""},{"c":"H6","v":""}]},{"r":7,"h":38.0,"cells":[{"c":"A7","v":"أولاً: بيانات المشروع والتوصيف التعاقدي والعملة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"اسم المشروع الإنشائي:","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"C8","v":"مشروع برج الأعمال والضيافة السكني (38 دوراً)","al":"center","cs":2},{"skip":true},{"c":"E8","v":"الجهة المالكة للمشروع:","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"G8","v":"شركة التطوير العمراني القابضة","al":"center","cs":2},{"skip":true}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"المقاول العام المنفذ:","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"C9","v":"شركة الإنشاءات والمقاولات العامة المتطورة","al":"center","cs":2},{"skip":true},{"c":"E9","v":"الاستشاري الهندسي المشرف:","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"G9","v":"دار الاستشارات الهندسية وضبط الجودة","al":"center","cs":2},{"skip":true}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"كود وموقع الونش بالموقع:","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"C10","v":"Tower Crane TC-01 (North Gate Zone)","al":"center","cs":2},{"skip":true},{"c":"E10","v":"تاريخ اعتماد خطة الرفع:","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"G10","v":"2026-10-18","al":"center","cs":2},{"skip":true}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"العملة المعتمدة للشيت:","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"C11","v":"SAR","al":"center","cs":2},{"skip":true},{"c":"E11","v":"طراز الونش البرجي المعتمد:","bg":"#EFF6FF","b":true,"cs":2},{"skip":true},{"c":"G11","v":"Potain MDT 219 J10 / Top-Slewing","al":"center","cs":2},{"skip":true}]},{"r":12,"h":28.0,"cells":[{"c":"A12","v":""},{"c":"B12","v":""},{"c":"C12","v":""},{"c":"D12","v":""},{"c":"E12","v":""},{"c":"F12","v":""},{"c":"G12","v":""},{"c":"H12","v":""}]},{"r":13,"h":38.0,"cells":[{"c":"A13","v":"ثانياً: المعايير والمواصفات الفنية للونش البرجي (Crane Technical Data)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":14,"h":40.0,"cells":[{"c":"A14","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B14","v":"المعامل الهندسي / الخاصية الفنية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C14","v":"الرمز","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D14","v":"القيمة التصميمية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E14","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F14","v":"المرجعية القياسية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G14","v":"البيان التوضيحي ودور المعامل","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H14","v":"حالة التحقق","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":1,"al":"center"},{"c":"B15","v":"الارتفاع الحر الأقصى للونش بدون ربط (Freestanding Height)"},{"c":"C15","v":"H_free","al":"center"},{"c":"D15","v":48,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E15","v":"متر (m)","al":"center"},{"c":"F15","v":"FEM 1.001 / Manual","al":"center"},{"c":"G15","v":"أقصى ارتفاع يسمح به المصنع قبل الحاجة للربط بالهيكل"},{"c":"H15","v":"معتمد","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":2,"al":"center"},{"c":"B16","v":"الارتفاع الإجمالي المطلوب للونش بالمشروع (Total Working Height)"},{"c":"C16","v":"H_total","al":"center"},{"c":"D16","v":88,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E16","v":"متر (m)","al":"center"},{"c":"F16","v":"Architectural Heights","al":"center"},{"c":"G16","v":"الارتفاع الكلي اللازم للوصول لأعلى طابق مع خلوص الأمان"},{"c":"H16","v":"يتطلب روابط","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":3,"al":"center"},{"c":"B17","v":"طول ذراع الونش العامل (Working Jib Radius)"},{"c":"C17","v":"L_jib","al":"center"},{"c":"D17","v":60,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E17","v":"متر (m)","al":"center"},{"c":"F17","v":"FEM 1.001 / Site Plan","al":"center"},{"c":"G17","v":"نصف قطر التغطية الأفقي لكامل محيط الصب والتشوين"},{"c":"H17","v":"تغطية كاملة","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":4,"al":"center"},{"c":"B18","v":"أقصى حمولة رفع عند طرف الذراع (Tip Load Capacity)"},{"c":"C18","v":"Q_tip","al":"center"},{"c":"D18","v":25,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E18","v":"كيلو نيوتن (kN)","al":"center"},{"c":"F18","v":"Crane Load Chart","al":"center"},{"c":"G18","v":"طاقة الرفع عند أقصى بعد 60 متراً (تعادل 2.50 طن)"},{"c":"H18","v":"محققة","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":5,"al":"center"},{"c":"B19","v":"أقصى حمولة رفع قصوى قريبة (Max Hoisting Capacity)"},{"c":"C19","v":"Q_max","al":"center"},{"c":"D19","v":100,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E19","v":"كيلو نيوتن (kN)","al":"center"},{"c":"F19","v":"Crane Load Chart","al":"center"},{"c":"G19","v":"طاقة الرفع القصوى عند نصف قطر 18 متراً (10.0 طن)"},{"c":"H19","v":"محققة","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":6,"al":"center"},{"c":"B20","v":"الوزن الذاتي لهيكل الونش بدون ثقل الموازنة (Dead Weight)"},{"c":"C20","v":"G_crane","al":"center"},{"c":"D20","v":620,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E20","v":"كيلو نيوتن (kN)","al":"center"},{"c":"F20","v":"Manufacturer Spec","al":"center"},{"c":"G20","v":"الوزن الإجمالي للسارية والمقصورة والذراع الدوار"},{"c":"H20","v":"مضمن","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":7,"al":"center"},{"c":"B21","v":"وزن كتل ثقل الموازنة الخرسانية (Counterweight)"},{"c":"C21","v":"G_cw","al":"center"},{"c":"D21","v":215,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E21","v":"كيلو نيوتن (kN)","al":"center"},{"c":"F21","v":"Manufacturer Spec","al":"center"},{"c":"G21","v":"أثقال الموازنة المركبة على ذراع الموازنة الخلفي"},{"c":"H21","v":"مضمن","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":8,"al":"center"},{"c":"B22","v":"أبعاد مقطع سارية الونش المربعة (Mast Section Outer Size)"},{"c":"C22","v":"c_mast","al":"center"},{"c":"D22","v":2,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E22","v":"متر (m)","al":"center"},{"c":"F22","v":"Mast Section K-Type","al":"center"},{"c":"G22","v":"عرض مقطع السارية الفولاذية لتركيب أرجل التثبيت"},{"c":"H22","v":"قياسي","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":9,"al":"center"},{"c":"B23","v":"سرعة الرياح القصوى أثناء التشغيل في الخدمة (In-Service Wind)"},{"c":"C23","v":"V_in","al":"center"},{"c":"D23","v":20,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E23","v":"م/ث (m/s)","al":"center"},{"c":"F23","v":"EN 14439 (72 km/h)","al":"center"},{"c":"G23","v":"الحد الأقصى لسرعة الرياح المسموح بها لتشغيل الرفع"},{"c":"H23","v":"إيقاف عند 20","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":10,"al":"center"},{"c":"B24","v":"سرعة الرياح التصميمية القصوى خارج الخدمة والعواصف (Storm Wind)"},{"c":"C24","v":"V_out","al":"center"},{"c":"D24","v":42,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E24","v":"م/ث (m/s)","al":"center"},{"c":"F24","v":"SBC 301 / ASCE 7-16","al":"center"},{"c":"G24","v":"سرعة الرياح الإعصارية لحساب أقصى عزم انقلاب محتمل"},{"c":"H24","v":"151 كم/ساعة","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center"}]},{"r":25,"h":28.0,"cells":[{"c":"A25","v":""},{"c":"B25","v":""},{"c":"C25","v":""},{"c":"D25","v":""},{"c":"E25","v":""},{"c":"F25","v":""},{"c":"G25","v":""},{"c":"H25","v":""}]},{"r":26,"h":38.0,"cells":[{"c":"A26","v":"ثالثاً: جدول فئات أسعار المواد والمصنعيات وأعمال التثبيت (Dynamic Rates Setup)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":27,"h":40.0,"cells":[{"c":"A27","v":"كود البند","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B27","v":"توصيف المواد والمصنعيات","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C27","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D27","v":"فئة السعر الاسترشادية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E27","v":"العملة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F27","v":"المواصفة المرجعية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G27","v":"ملاحظات التنفيذ والتركيب","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H27","v":"طبيعة البند","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":"RATE-01","al":"center"},{"c":"B28","v":"خرسانة مسلحة جاهزة C35 مقاومة للأملاح لقاعدة الونش"},{"c":"C28","v":"م³","al":"center"},{"c":"D28","v":340,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E28","v":"SAR","al":"center"},{"c":"F28","v":"SBC 304 / ASTM C94","al":"center"},{"c":"G28","v":"صب مستمر مع معالجة رطبة لمدة 7 أيام"},{"c":"H28","v":"توريد وصب","al":"center"}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":"RATE-02","al":"center"},{"c":"B29","v":"حديد تسليح عالي المقاومة B420D لقاعدة الونش والكراسي"},{"c":"C29","v":"طن","al":"center"},{"c":"D29","v":3250,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E29","v":"SAR","al":"center"},{"c":"F29","v":"ASTM A615 / SASO","al":"center"},{"c":"G29","v":"تشكيل شبكتين علوية وسفلية مع روابط قص"},{"c":"H29","v":"توريد وتشكيل","al":"center"}]},{"r":30,"h":34.0,"cells":[{"c":"A30","v":"RATE-03","al":"center"},{"c":"B30","v":"خرسانة عادية نظافة سماكة 10 سم C20 أسفل القاعدة"},{"c":"C30","v":"م³","al":"center"},{"c":"D30","v":230,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E30","v":"SAR","al":"center"},{"c":"F30","v":"ACI 304","al":"center"},{"c":"G30","v":"تسوية وتنعيم قاع التأسيس قبل العزل"},{"c":"H30","v":"توريد وصب","al":"center"}]},{"r":31,"h":34.0,"cells":[{"c":"A31","v":"RATE-04","al":"center"},{"c":"B31","v":"حفر وتسوية وفرم قاع التأسيس لعمق القاعدة الخرسانية"},{"c":"C31","v":"م³","al":"center"},{"c":"D31","v":38,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E31","v":"SAR","al":"center"},{"c":"F31","v":"Soil Report","al":"center"},{"c":"G31","v":"حفر ميكانيكي مع ترحيل نواتج الحفر"},{"c":"H31","v":"مصنعية ومعدات","al":"center"}]},{"r":32,"h":34.0,"cells":[{"c":"A32","v":"RATE-05","al":"center"},{"c":"B32","v":"تصنيع وتوريد أذرع التثبيت الفولاذية المائلة Tie-Back Struts"},{"c":"C32","v":"كجم","al":"center"},{"c":"D32","v":15.5,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E32","v":"SAR","al":"center"},{"c":"F32","v":"AISC 360 / EN 10025","al":"center"},{"c":"G32","v":"قطاعات فولاذية S355 مع طلاء مقاوم للصدأ"},{"c":"H32","v":"توريد وتصنيع","al":"center"}]},{"r":33,"h":34.0,"cells":[{"c":"A33","v":"RATE-06","al":"center"},{"c":"B33","v":"تصنيع أطواق الربط الهيكلية حول سارية الونش Collar Frames"},{"c":"C33","v":"طقم","al":"center"},{"c":"D33","v":18500,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E33","v":"SAR","al":"center"},{"c":"F33","v":"Manufacturer Drawing","al":"center"},{"c":"G33","v":"طوق صلب مقوى بمسامير عالية المقاومة 10.9"},{"c":"H33","v":"توريد وتركيب","al":"center"}]},{"r":34,"h":34.0,"cells":[{"c":"A34","v":"RATE-07","al":"center"},{"c":"B34","v":"تثبيت زوايا قاعدة السارية Fixings Angles وتضمينها بالصب"},{"c":"C34","v":"طقم","al":"center"},{"c":"D34","v":22000,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E34","v":"SAR","al":"center"},{"c":"F34","v":"Potain Genuine Anchors","al":"center"},{"c":"G34","v":"أرجل التثبيت الأصلية المعتمدة للونش"},{"c":"H34","v":"توريد وتثبيت","al":"center"}]},{"r":35,"h":34.0,"cells":[{"c":"A35","v":"RATE-08","al":"center"},{"c":"B35","v":"حقن مونة إيبوكسية غير قابلة للانكماش Non-Shrink Grout"},{"c":"C35","v":"شكارة","al":"center"},{"c":"D35","v":95,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E35","v":"SAR","al":"center"},{"c":"F35","v":"ASTM C1107 (25kg)","al":"center"},{"c":"G35","v":"حقن فراغات أرجل التثبيت وقواعد الروابط"},{"c":"H35","v":"توريد ومصنعية","al":"center"}]},{"r":36,"h":34.0,"cells":[{"c":"A36","v":"RATE-09","al":"center"},{"c":"B36","v":"مسامير تثبيت كيميائية وصفائح تثبيت بالهيكل M30 Grade 8.8"},{"c":"C36","v":"نقطة","al":"center"},{"c":"D36","v":1450,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E36","v":"SAR","al":"center"},{"c":"F36","v":"ETA-05 / ACI 355.2","al":"center"},{"c":"G36","v":"حقن إيبوكسي نقي مع شهادات شد موقعية"},{"c":"H36","v":"توريد وحقن","al":"center"}]},{"r":37,"h":34.0,"cells":[{"c":"A37","v":"RATE-10","al":"center"},{"c":"B37","v":"اختبارات غير إتلافية وتدقيق الشاقولية والتحميل الموقعي"},{"c":"C37","v":"مقطوعية","al":"center"},{"c":"D37","v":7500,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E37","v":"SAR","al":"center"},{"c":"F37","v":"Third-Party TPI","al":"center"},{"c":"G37","v":"فحص شامل من شركة فحص معتمدة لطرف ثالث"},{"c":"H37","v":"خدمات فنية","al":"center"}]},{"r":38,"h":28.0,"cells":[{"c":"A38","v":""},{"c":"B38","v":""},{"c":"C38","v":""},{"c":"D38","v":""},{"c":"E38","v":""},{"c":"F38","v":""},{"c":"G38","v":""},{"c":"H38","v":""}]},{"r":39,"h":28.0,"cells":[{"c":"A39","v":""},{"c":"B39","v":""},{"c":"C39","v":""},{"c":"D39","v":""},{"c":"E39","v":""},{"c":"F39","v":""},{"c":"G39","v":""},{"c":"H39","v":""}]},{"r":40,"h":34.0,"cells":[{"c":"A40","v":"مهندس المكتب الفني والتصميم الإنشائي","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D40","v":"مدير السلامة والصحة المهنية (HSE Manager)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G40","v":"مهندس استشاري الإشراف واعتماد الرافعة","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true}]},{"r":41,"h":76.0,"cells":[{"c":"A41","v":"الاسم والتوقيع:\nالاعتماد المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true},{"c":"D41","v":"الاسم والتوقيع:\nالاعتماد المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true},{"c":"G41","v":"الاسم والتوقيع:\nالاعتماد المهني:\nالتاريخ والختم:","cs":2},{"skip":true}]}]},{"name":"تصميم قاعدة الونش الخرسانية","maxRow":51,"maxCol":8,"colWidths":[12.0,66.0,16.0,20.0,18.0,28.0,42.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"التحقق من استقرار وتصميم قاعدة الونش الخرسانية المسلحة وفق CIRIA C739 و SBC 304 و ACI 318-19","fg":"#1E3A8A","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"تشمل الحسابات: فحص الانقلاب، الانزلاق، اللامركزية، إجهاد التربة الأقصى، وعزم الانحناء والقص باتجاه واحد والقص الثاقب حول أرجل السارية.","fg":"#475569","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: الأبعاد الهندسية لقاعدة الونش وخواص التربة والخرسانة","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":40.0,"cells":[{"c":"A5","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"البيان الهندسي / الخاصية التصميمية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"الرمز","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"القيمة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"المعادلة الرياضية / المرجع","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"الشرح الهندسي ومعيار التحقق","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"الحالة الإنشائية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":1,"al":"center"},{"c":"B6","v":"طول قاعدة الونش الخرسانية المربعة (Footing Length)"},{"c":"C6","v":"L","al":"center"},{"c":"D6","v":6.8,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E6","v":"متر (m)","al":"center"},{"c":"F6","v":"Design Parameter","al":"center"},{"c":"G6","v":"طول القاعدة المقترح لتحقيق توازن الانقلاب"},{"c":"H6","v":"مدخل","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":2,"al":"center"},{"c":"B7","v":"عرض قاعدة الونش الخرسانية المربعة (Footing Width)"},{"c":"C7","v":"B","al":"center"},{"c":"D7","v":6.8,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E7","v":"متر (m)","al":"center"},{"c":"F7","v":"Design Parameter","al":"center"},{"c":"G7","v":"عرض القاعدة لضمان توزيع متماثل للأحمال"},{"c":"H7","v":"مدخل","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":3,"al":"center"},{"c":"B8","v":"سماكة عمق القاعدة الخرسانية المسلحة (Footing Depth)"},{"c":"C8","v":"T","al":"center"},{"c":"D8","v":1.45,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E8","v":"متر (m)","al":"center"},{"c":"F8","v":"Design Parameter","al":"center"},{"c":"G8","v":"سماكة جسئة لمقاومة القص الثاقب والانحناء"},{"c":"H8","v":"مدخل","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":4,"al":"center"},{"c":"B9","v":"حجم الخرسانة المسلحة الإجمالي للقاعدة (Concrete Volume)"},{"c":"C9","v":"V_conc","al":"center"},{"c":"D9","v":67.048,"f":"=D6*D7*D8","b":true,"al":"center","nf":"#,##0.00"},{"c":"E9","v":"متر مكعب (م³)","al":"center"},{"c":"F9","v":"L * B * T","al":"center"},{"c":"G9","v":"إجمالي كمية الخرسانة المصبوبة في القاعدة"},{"c":"H9","v":"محسوب","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":5,"al":"center"},{"c":"B10","v":"الوزن الذاتي لقاعدة الونش الخرسانية (Footing Dead Weight)"},{"c":"C10","v":"W_fnd","al":"center"},{"c":"D10","v":1676.2,"f":"=D9*25","b":true,"al":"center","nf":"#,##0.00"},{"c":"E10","v":"كيلو نيوتن (kN)","al":"center"},{"c":"F10","v":"V_conc * 25.0 kN/m³","al":"center"},{"c":"G10","v":"الوزن المثبت المقاوم للانقلاب بكثافة 25 kN/m³"},{"c":"H10","v":"محسوب","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":6,"al":"center"},{"c":"B11","v":"إجهاد تحمل التربة الصافي المسموح (Allowable Soil Bearing)"},{"c":"C11","v":"q_all","al":"center"},{"c":"D11","v":230,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E11","v":"كيلو نيوتن/م²","al":"center"},{"c":"F11","v":"تقرير فحص التربة الجيوتقني","al":"center"},{"c":"G11","v":"قدرة تحمل تربة التأسيس المسموح بها مع معامل أمان 3.0"},{"c":"H11","v":"معتمد","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":7,"al":"center"},{"c":"B12","v":"مقاومة الخرسانة المميزة للضغط بعد 28 يوماً (f'c)"},{"c":"C12","v":"f'c","al":"center"},{"c":"D12","v":35,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E12","v":"ميجا باسكال (MPa)","al":"center"},{"c":"F12","v":"SBC 304 C35 Spec","al":"center"},{"c":"G12","v":"المقاومة الاسطوانية التصميمية للخلطة الخرسانية"},{"c":"H12","v":"معتمد","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":8,"al":"center"},{"c":"B13","v":"إجهاد خضوع حديد التسليح الطولي عالي المقاومة (fy)"},{"c":"C13","v":"fy","al":"center"},{"c":"D13","v":420,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E13","v":"ميجا باسكال (MPa)","al":"center"},{"c":"F13","v":"ASTM A615 Grade 60","al":"center"},{"c":"G13","v":"إجهاد الخضوع لحديد التسليح المشوه المستخدم"},{"c":"H13","v":"معتمد","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":9,"al":"center"},{"c":"B14","v":"الغطاء الخرساني الصافي لحديد القاعدة الملامس للتربة"},{"c":"C14","v":"Cover","al":"center"},{"c":"D14","v":75,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E14","v":"ملم (mm)","al":"center"},{"c":"F14","v":"SBC 304 Table 20.6.1.3","al":"center"},{"c":"G14","v":"حماية حديد التسليح من الرطوبة والأملاح الكبريتية"},{"c":"H14","v":"مطابق","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":10,"al":"center"},{"c":"B15","v":"العمق الفعال لحديد التسليح في اتجاه الانحناء (d)"},{"c":"C15","v":"d","al":"center"},{"c":"D15","v":1362.5,"f":"=(D8*1000)-D14-12.5","b":true,"al":"center","nf":"#,##0.00"},{"c":"E15","v":"ملم (mm)","al":"center"},{"c":"F15","v":"(T * 1000) - Cover - 12.5","al":"center"},{"c":"G15","v":"العمق الإنشائي الفعال لمقاومة قوى الانحناء والقص"},{"c":"H15","v":"محسوب","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center"}]},{"r":16,"h":28.0,"cells":[{"c":"A16","v":""},{"c":"B16","v":""},{"c":"C16","v":""},{"c":"D16","v":""},{"c":"E16","v":""},{"c":"F16","v":""},{"c":"G16","v":""},{"c":"H16","v":""}]},{"r":17,"h":38.0,"cells":[{"c":"A17","v":"ثانياً: أحمال الونش التشغيلية وردود الأفعال التصميمية (In-Service & Storm Conditions)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":18,"h":40.0,"cells":[{"c":"A18","v":"كود الحالة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B18","v":"حالة التحميل التصميمية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C18","v":"الحمل الرأسي V (kN)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D18","v":"الحمل الأفقي H (kN)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E18","v":"عزم الانقلاب M (kN.m)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F18","v":"عزم اللي T (kN.m)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G18","v":"معيار كود التحميل","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H18","v":"التحكم الحرج","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":19,"h":36.0,"cells":[{"c":"A19","v":"CASE-1","al":"center"},{"c":"B19","v":"حالة التشغيل في الخدمة (In-Service Max Hook Load)"},{"c":"C19","v":935,"in":true,"al":"center","nf":"#,##0.00"},{"c":"D19","v":52,"in":true,"al":"center","nf":"#,##0.00"},{"c":"E19","v":1920,"in":true,"al":"center","nf":"#,##0.00"},{"c":"F19","v":310,"in":true,"al":"center","nf":"#,##0.00"},{"c":"G19","v":"FEM 1.001 Case I","al":"center"},{"c":"H19","v":"تحميل أقصى وزن ورياح 20 م/ث"}]},{"r":20,"h":36.0,"cells":[{"c":"A20","v":"CASE-2","al":"center"},{"c":"B20","v":"حالة العاصفة وخارج الخدمة (Out-of-Service Storm Wind)"},{"c":"C20","v":835,"in":true,"al":"center","nf":"#,##0.00"},{"c":"D20","v":128,"in":true,"al":"center","nf":"#,##0.00"},{"c":"E20","v":3680,"in":true,"al":"center","nf":"#,##0.00"},{"c":"F20","v":160,"in":true,"al":"center","nf":"#,##0.00"},{"c":"G20","v":"FEM 1.001 Case II","al":"center"},{"c":"H20","v":"عاصفة رياح 42 م/ث بدون خطاف"}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":"CASE-3","al":"center"},{"c":"B21","v":"حالة التركيب والتفكيك (Erection & Dismantling)"},{"c":"C21","v":720,"in":true,"al":"center","nf":"#,##0.00"},{"c":"D21","v":38,"in":true,"al":"center","nf":"#,##0.00"},{"c":"E21","v":1450,"in":true,"al":"center","nf":"#,##0.00"},{"c":"F21","v":95,"in":true,"al":"center","nf":"#,##0.00"},{"c":"G21","v":"Manufacturer Manual","al":"center"},{"c":"H21","v":"رفع قطع السارية بالمعدة المساعدة"}]},{"r":22,"h":36.0,"cells":[{"c":"A22","v":"GOV-MAX","al":"center"},{"c":"B22","v":"الحالة الحرجة التصميمية المعتمدة للحسابات الإنشائية"},{"c":"C22","v":935,"f":"=MAX(C19:C21)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"D22","v":128,"f":"=MAX(D19:D21)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"E22","v":3680,"f":"=MAX(E19:E21)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"F22","v":310,"f":"=MAX(F19:F21)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"G22","v":"CIRIA C739 Governing","al":"center"},{"c":"H22","v":"الحالة الحاكمة لتصميم القاعدة"}]},{"r":23,"h":28.0,"cells":[{"c":"A23","v":""},{"c":"B23","v":""},{"c":"C23","v":""},{"c":"D23","v":""},{"c":"E23","v":""},{"c":"F23","v":""},{"c":"G23","v":""},{"c":"H23","v":""}]},{"r":24,"h":38.0,"cells":[{"c":"A24","v":"ثالثاً: التحقق من الاستقرار الجيوتقني وإجهادات التربة (CIRIA C739 & SBC 303)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":25,"h":40.0,"cells":[{"c":"A25","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B25","v":"فحص الاستقرار الجيوتقني","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C25","v":"الرمز","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D25","v":"القيمة المحسوبة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E25","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F25","v":"معادلة التحقق الهندسية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G25","v":"الحد الحرج المسموح","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H25","v":"قرار التحقق","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":1,"al":"center"},{"c":"B26","v":"الحمل الرأسي الكلي الفعال عند قاع التأسيس"},{"c":"C26","v":"V_tot","al":"center"},{"c":"D26","v":2611.2,"f":"=C22+D10","b":true,"al":"center","nf":"#,##0.00"},{"c":"E26","v":"كيلو نيوتن (kN)","al":"center"},{"c":"F26","v":"V_crane + W_footing","al":"center"},{"c":"G26","v":"وزن الونش + وزن القاعدة الخرسانية"},{"c":"H26","v":"مدخل للتربة","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":2,"al":"center"},{"c":"B27","v":"عزم الانقلاب الكلي عند قاع صبة القاعدة الخرسانية"},{"c":"C27","v":"M_tot","al":"center"},{"c":"D27","v":3865.6,"f":"=E22+(D22*D8)","b":true,"al":"center","nf":"#,##0.00"},{"c":"E27","v":"كيلو نيوتن.متر","al":"center"},{"c":"F27","v":"M_crane + (H_crane * T)","al":"center"},{"c":"G27","v":"شاملاً تأثير القوة الأفقية على ذراع السماكة T"},{"c":"H27","v":"عزم الانقلاب الكلي","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":3,"al":"center"},{"c":"B28","v":"عزم التثبيت والمقاومة الذاتية للانقلاب حول الحافة"},{"c":"C28","v":"M_res","al":"center"},{"c":"D28","v":8878.08,"f":"=D26*(D7/2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"E28","v":"كيلو نيوتن.متر","al":"center"},{"c":"F28","v":"V_tot * (B / 2)","al":"center"},{"c":"G28","v":"عزم مقاومة وزن الخرسانة والونش حول نقطة الدوران"},{"c":"H28","v":"عزم التثبيت","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":4,"al":"center"},{"c":"B29","v":"معامل أمان الاستقرار ضد الانقلاب (FOS Overturning)"},{"c":"C29","v":"FOS_ot","al":"center"},{"c":"D29","v":2.296689,"f":"=D28/D27","b":true,"al":"center","nf":"#,##0.00"},{"c":"E29","v":"نسبة أمان","al":"center"},{"c":"F29","v":"M_res / M_tot","al":"center"},{"c":"G29","v":"FOS >= 1.50 (وفق CIRIA C739)"},{"c":"H29","v":"آمن ومطابق","f":"=IF(D29>=1.5, \"آمن ومطابق\", \"غير آمن - كبّر القاعدة\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":30,"h":34.0,"cells":[{"c":"A30","v":5,"al":"center"},{"c":"B30","v":"معامل أمان الاستقرار ضد الانزلاق الأفقي (FOS Sliding)"},{"c":"C30","v":"FOS_sl","al":"center"},{"c":"D30","v":8.16,"f":"=(D26*0.40)/D22","b":true,"al":"center","nf":"#,##0.00"},{"c":"E30","v":"نسبة أمان","al":"center"},{"c":"F30","v":"(V_tot * μ) / H_max","al":"center"},{"c":"G30","v":"FOS >= 1.50 (معامل احتكاك μ=0.40)"},{"c":"H30","v":"آمن ومطابق","f":"=IF(D30>=1.5, \"آمن ومطابق\", \"غير آمن - تزويد كعب\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":31,"h":34.0,"cells":[{"c":"A31","v":6,"al":"center"},{"c":"B31","v":"اللامركزية الناتجة عن محصلة الأحمال وعزم الانقلاب"},{"c":"C31","v":"e","al":"center"},{"c":"D31","v":1.480392,"f":"=D27/D26","b":true,"al":"center","nf":"#,##0.00"},{"c":"E31","v":"متر (m)","al":"center"},{"c":"F31","v":"M_tot / V_tot","al":"center"},{"c":"G31","v":"يجب ألا تتجاوز B / 6 لضمان عدم الشد"},{"c":"H31","v":"محسوب","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":32,"h":34.0,"cells":[{"c":"A32","v":7,"al":"center"},{"c":"B32","v":"الحد الأقصى للامركزية داخل النواة الوسطى (Kern Limit)"},{"c":"C32","v":"B/6","al":"center"},{"c":"D32","v":1.133333,"f":"=D7/6","b":true,"al":"center","nf":"#,##0.00"},{"c":"E32","v":"متر (m)","al":"center"},{"c":"F32","v":"B / 6","al":"center"},{"c":"G32","v":"شرط بقاء إجهاد الضغط على كامل مساحة القاعدة"},{"c":"H32","v":"خارج النواة (تركيز حواف)","f":"=IF(D31<=D32, \"ضمن النواة (e <= B/6)\", \"خارج النواة (تركيز حواف)\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":33,"h":34.0,"cells":[{"c":"A33","v":8,"al":"center"},{"c":"B33","v":"أقصى إجهاد تلامس فعلي على تربة التأسيس (q_max)"},{"c":"C33","v":"q_max","al":"center"},{"c":"D33","v":130.234065,"f":"=(D26/(D6*D7))*(1+(6*D31/D7))","b":true,"al":"center","nf":"#,##0.00"},{"c":"E33","v":"كيلو نيوتن/م²","al":"center"},{"c":"F33","v":"(V_tot / A) * (1 + 6e/B)","al":"center"},{"c":"G33","v":"يجب ألا يتجاوز q_all (230 kN/m²)"},{"c":"H33","v":"آمن ومطابق للتربة","f":"=IF(D33<=D11, \"آمن ومطابق للتربة\", \"غير آمن - يتجاوز التحمل\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":34,"h":34.0,"cells":[{"c":"A34","v":9,"al":"center"},{"c":"B34","v":"أدنى إجهاد تلامس على تربة التأسيس (q_min)"},{"c":"C34","v":"q_min","al":"center"},{"c":"D34","v":-17.292889,"f":"=(D26/(D6*D7))*(1-(6*D31/D7))","b":true,"al":"center","nf":"#,##0.00"},{"c":"E34","v":"كيلو نيوتن/م²","al":"center"},{"c":"F34","v":"(V_tot / A) * (1 - 6e/B)","al":"center"},{"c":"G34","v":"يجب أن يكون موجباً (ضغط بدون انفصال تربة)"},{"c":"H34","v":"إجهاد شد (غير مرغوب)","f":"=IF(D34>=0, \"ضغط موجب (بدون انفصال)\", \"إجهاد شد (غير مرغوب)\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":35,"h":28.0,"cells":[{"c":"A35","v":""},{"c":"B35","v":""},{"c":"C35","v":""},{"c":"D35","v":""},{"c":"E35","v":""},{"c":"F35","v":""},{"c":"G35","v":""},{"c":"H35","v":""}]},{"r":36,"h":38.0,"cells":[{"c":"A36","v":"رابعاً: التصميم الإنشائي للخرسانة المسلحة والتسليح والقص الثاقب (SBC 304 / ACI 318-19)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":37,"h":40.0,"cells":[{"c":"A37","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B37","v":"العنصر الإنشائي / الفحص التصميمي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C37","v":"الرمز","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D37","v":"القيمة التصميمية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E37","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F37","v":"المعادلة والاشتراط الكودي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G37","v":"الحد المسموح أو التسليح الموصى به","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H37","v":"حالة الفحص","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":38,"h":34.0,"cells":[{"c":"A38","v":1,"al":"center"},{"c":"B38","v":"طول كابولي القاعدة الخرسانية من وجه السارية الفولاذية"},{"c":"C38","v":"L_cant","al":"center"},{"c":"D38","v":2.4,"f":"=(D7-2.00)/2","b":true,"al":"center","nf":"#,##0.00"},{"c":"E38","v":"متر (m)","al":"center"},{"c":"F38","v":"(B - c_mast) / 2","al":"center"},{"c":"G38","v":"بروز القاعدة الحامل لعزم الانحناء الخارجي"},{"c":"H38","v":"2.40 م","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":39,"h":52.0,"cells":[{"c":"A39","v":2,"al":"center"},{"c":"B39","v":"إجهاد التلامس التصميمي المصعّد الأقصى (Factored Soil Pressure)"},{"c":"C39","v":"q_u","al":"center"},{"c":"D39","v":182.327691,"f":"=D33*1.40","b":true,"al":"center","nf":"#,##0.00"},{"c":"E39","v":"كيلو نيوتن/م²","al":"center"},{"c":"F39","v":"q_max * 1.40 (U = 1.2D + 1.6W equiv)","al":"center"},{"c":"G39","v":"إجهاد التربة المصعّد لحساب قوى الانحناء والقص"},{"c":"H39","v":"مصعّد","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":40,"h":34.0,"cells":[{"c":"A40","v":3,"al":"center"},{"c":"B40","v":"أقصى عزم انحناء تصميمي عند وجه السارية (Ultimate Moment)"},{"c":"C40","v":"M_u","al":"center"},{"c":"D40","v":0,"f":"=D39*D7*POWER(D38, 2)/2","b":true,"al":"center","nf":"#,##0.00"},{"c":"E40","v":"كيلو نيوتن.متر","al":"center"},{"c":"F40","v":"q_u * B * L_cant² / 2","al":"center"},{"c":"G40","v":"عزم الانحناء الأقصى لحساب كمية حديد التسليح"},{"c":"H40","v":"حاكم للتسليح","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":41,"h":34.0,"cells":[{"c":"A41","v":4,"al":"center"},{"c":"B41","v":"مساحة حديد التسليح المحسوبة المطلوبة بالاتجاهين (As_req)"},{"c":"C41","v":"As_req","al":"center"},{"c":"D41","v":0,"f":"=(D40*1000000)/(0.90*D13*0.90*D15)","b":true,"al":"center","nf":"#,##0.00"},{"c":"E41","v":"ملم² (mm²)","al":"center"},{"c":"F41","v":"Mu / (φ * fy * j * d)","al":"center"},{"c":"G41","v":"كمية الحديد النظري لمقاومة الشد السفلي"},{"c":"H41","v":"محسوب","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":42,"h":34.0,"cells":[{"c":"A42","v":5,"al":"center"},{"c":"B42","v":"الحد الأدنى لحديد التسليح الانكماشي والحراري (As_min)"},{"c":"C42","v":"As_min","al":"center"},{"c":"D42","v":17748.0,"f":"=0.0018*D7*1000*D8*1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"E42","v":"ملم² (mm²)","al":"center"},{"c":"F42","v":"0.0018 * B * T (SBC 304)","al":"center"},{"c":"G42","v":"الحد الأدنى الإلزامي للتسليح بالبلاطات السميكة"},{"c":"H42","v":"حاكم كودياً","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":43,"h":34.0,"cells":[{"c":"A43","v":6,"al":"center"},{"c":"B43","v":"شبكة التسليح المقترحة المعتمدة بالاتجاهين سفلي وعلوي"},{"c":"C43","v":"Rebar","al":"center"},{"c":"D43","v":"Φ25 @ 150 mm","b":true,"al":"center"},{"c":"E43","v":"شبكتين T&B","al":"center"},{"c":"F43","v":"As_prov = 22,250 mm²","al":"center"},{"c":"G43","v":"حديد عالي المقاومة مشوه B420D بالاتجاهين"},{"c":"H43","v":"محقق ومطابق","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":44,"h":34.0,"cells":[{"c":"A44","v":7,"al":"center"},{"c":"B44","v":"قوة القص باتجاه واحد عند مسافة d من وجه السارية (Vu_1way)"},{"c":"C44","v":"Vu_1w","al":"center"},{"c":"D44","v":1286.32186,"f":"=D39*D7*(D38-(D15/1000))","b":true,"al":"center","nf":"#,##0.00"},{"c":"E44","v":"كيلو نيوتن (kN)","al":"center"},{"c":"F44","v":"qu * B * (L_cant - d)","al":"center"},{"c":"G44","v":"قوة القص التصميمية على مقطع كمرة بعرض B"},{"c":"H44","v":"محسوب","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":45,"h":34.0,"cells":[{"c":"A45","v":8,"al":"center"},{"c":"B45","v":"مقاومة الخرسانة للقص باتجاه واحد بدون كانات (φVc_1way)"},{"c":"C45","v":"φVc_1w","al":"center"},{"c":"D45","v":6988.591097,"f":"=0.75*0.17*SQRT(D12)*D7*1000*D15/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"E45","v":"كيلو نيوتن (kN)","al":"center"},{"c":"F45","v":"0.75 * 0.17 * √(f'c) * B * d","al":"center"},{"c":"G45","v":"مقاومة قطاع الخرسانة للقص بدون تسليح جذع"},{"c":"H45","v":"آمن ومطابق للقص","f":"=IF(D44<=D45, \"آمن ومطابق للقص\", \"غير آمن - زيادة السماكة\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":46,"h":34.0,"cells":[{"c":"A46","v":9,"al":"center"},{"c":"B46","v":"أقصى حمل ضغط مركز على رجل زاوية السارية الواحدة (P_leg)"},{"c":"C46","v":"P_leg","al":"center"},{"c":"D46","v":1521.75,"f":"=(C22/4)+((E22/(2*2.00))*1.40)","b":true,"al":"center","nf":"#,##0.00"},{"c":"E46","v":"كيلو نيوتن (kN)","al":"center"},{"c":"F46","v":"(V/4) + (M / 2s)*1.40","al":"center"},{"c":"G46","v":"حمل زاوية السارية الفولاذية الثاقب للخرسانة"},{"c":"H46","v":"حمل مركّز","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":47,"h":34.0,"cells":[{"c":"A47","v":10,"al":"center"},{"c":"B47","v":"التحقق من إجهاد القص الثاقب حول أرجل السارية (Punching Check)"},{"c":"C47","v":"φVc_punch","al":"center"},{"c":"D47","v":15660.85228,"f":"=0.75*0.33*SQRT(D12)*4*(600+D15)*D15/1000","b":true,"al":"center","nf":"#,##0.00"},{"c":"E47","v":"كيلو نيوتن (kN)","al":"center"},{"c":"F47","v":"φ * 0.33 * √(f'c) * bo * d","al":"center"},{"c":"G47","v":"مقاومة الثقب الثنائي لمحيط التحميل الحرج bo"},{"c":"H47","v":"آمن ومطابق للثقب","f":"=IF(D46<=D47, \"آمن ومطابق للثقب\", \"غير آمن - تزويد كراسي\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":48,"h":28.0,"cells":[{"c":"A48","v":""},{"c":"B48","v":""},{"c":"C48","v":""},{"c":"D48","v":""},{"c":"E48","v":""},{"c":"F48","v":""},{"c":"G48","v":""},{"c":"H48","v":""}]},{"r":49,"h":28.0,"cells":[{"c":"A49","v":""},{"c":"B49","v":""},{"c":"C49","v":""},{"c":"D49","v":""},{"c":"E49","v":""},{"c":"F49","v":""},{"c":"G49","v":""},{"c":"H49","v":""}]},{"r":50,"h":34.0,"cells":[{"c":"A50","v":"مهندس المكتب الفني والتصميم الإنشائي","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D50","v":"مدير السلامة والصحة المهنية (HSE Manager)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G50","v":"مهندس استشاري الإشراف واعتماد الرافعة","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true}]},{"r":51,"h":76.0,"cells":[{"c":"A51","v":"الاسم والتوقيع:\nالاعتماد المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true},{"c":"D51","v":"الاسم والتوقيع:\nالاعتماد المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true},{"c":"G51","v":"الاسم والتوقيع:\nالاعتماد المهني:\nالتاريخ والختم:","cs":2},{"skip":true}]}]},{"name":"قوى الربط بالهيكل الإنشائي","maxRow":28,"maxCol":8,"colWidths":[12.0,60.0,20.0,16.0,18.0,28.0,38.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"حسابات قوى أطواق الربط وأذرع التثبيت بالهيكل الإنشائي (Tower Crane Tie-Back Struts & Collar Design)","fg":"#1E3A8A","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"تحدد هذه الورقة: مناسيب أطواق التثبيت، القوى الأفقية وعزم اللي عند كل منسوب، القوى المحورية في أذرع التثبيت (Struts)، وفحص الانبعاج ومسامير التثبيت الكيميائية بالبلاطات.","fg":"#475569","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: مناسيب أطواق الربط وهندسة أذرع التثبيت الإنشائية (Tie Collar Levels & Geometry)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"كود الربط","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"موقع ومنسوب طوق التثبيت بالبرج","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"المنسوب من الأرض (m)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D5","v":"عدد أذرع الربط (Struts)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E5","v":"المسافة الأفقية من المبنى (m)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F5","v":"القطاع الفولاذي المقترح","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G5","v":"طريقة التثبيت بالهيكل","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H5","v":"حالة المتطلب","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"TIE-01","al":"center"},{"c":"B6","v":"طوق الربط الأول - منسوب الدور التاسع (Collar Level 1)"},{"c":"C6","v":36,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D6","v":3,"in":true,"al":"center"},{"c":"E6","v":5.8,"in":true,"al":"center","nf":"#,##0.00"},{"c":"F6","v":"CHS 273 x 12.5 mm","al":"center"},{"c":"G6","v":"صفائح تثبيت ومسامير M30 بكامرة الحافة"},{"c":"H6","v":"إلزامي (H > 48m)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"TIE-02","al":"center"},{"c":"B7","v":"طوق الربط الثاني - منسوب الدور الحادي والعشرين (Collar 2)"},{"c":"C7","v":68,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D7","v":3,"in":true,"al":"center"},{"c":"E7","v":6.2,"in":true,"al":"center","nf":"#,##0.00"},{"c":"F7","v":"CHS 273 x 12.5 mm","al":"center"},{"c":"G7","v":"صفائح تثبيت ومسامير M30 بكامرة الحافة"},{"c":"H7","v":"إلزامي للمرحلة 2","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":"FINAL","al":"center"},{"c":"B8","v":"أقصى ارتفاع حر متبقي فوق آخر طوق ربط (Overhang Mast)"},{"c":"C8","v":20,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"D8","v":0,"in":true,"al":"center"},{"c":"E8","v":0,"in":true,"al":"center","nf":"#,##0.00"},{"c":"F8","v":"سارية الونش القياسية K-Type","al":"center"},{"c":"G8","v":"نهاية السارية الحاملة للمقصورة والذراع"},{"c":"H8","v":"آمن (أقل من 30م)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center"}]},{"r":9,"h":28.0,"cells":[{"c":"A9","v":""},{"c":"B9","v":""},{"c":"C9","v":""},{"c":"D9","v":""},{"c":"E9","v":""},{"c":"F9","v":""},{"c":"G9","v":""},{"c":"H9","v":""}]},{"r":10,"h":38.0,"cells":[{"c":"A10","v":"ثانياً: تحليل القوى المحورية وفحص الانبعاج لأذرع الربط (Struts Axial Forces & Buckling Checks)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":"كود الذراع","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B11","v":"الموقع والزاوية الهندسية مع السارية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C11","v":"طول الذراع L (m)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D11","v":"زاوية الميل θ (°)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E11","v":"قوة الشد القصوى Tu (kN)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F11","v":"قوة الضغط القصوى Pu (kN)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G11","v":"سعة الانبعاج التصميمية φPn (kN)","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H11","v":"قرار التحقق الإنشائي","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":12,"h":36.0,"cells":[{"c":"A12","v":"STRUT-01","al":"center"},{"c":"B12","v":"الذراع الأيمن المائل (Right Strut - East Corner)"},{"c":"C12","v":7.8,"in":true,"al":"center","nf":"#,##0.00"},{"c":"D12","v":32.5,"in":true,"al":"center","nf":"0.0"},{"c":"E12","v":245,"in":true,"al":"center","nf":"#,##0.00"},{"c":"F12","v":285,"in":true,"al":"center","nf":"#,##0.00"},{"c":"G12","v":480,"in":true,"al":"center","nf":"#,##0.00"},{"c":"H12","v":"آمن ومطابق للانبعاج","f":"=IF(F12<=G12, \"آمن ومطابق للانبعاج\", \"غير محقق - كبّر القطاع\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":13,"h":36.0,"cells":[{"c":"A13","v":"STRUT-02","al":"center"},{"c":"B13","v":"الذراع الأوسط العمودي (Center Strut - Perpendicular)"},{"c":"C13","v":6.2,"in":true,"al":"center","nf":"#,##0.00"},{"c":"D13","v":90,"in":true,"al":"center","nf":"0.0"},{"c":"E13","v":190,"in":true,"al":"center","nf":"#,##0.00"},{"c":"F13","v":340,"in":true,"al":"center","nf":"#,##0.00"},{"c":"G13","v":560,"in":true,"al":"center","nf":"#,##0.00"},{"c":"H13","v":"آمن ومطابق للانبعاج","f":"=IF(F13<=G13, \"آمن ومطابق للانبعاج\", \"غير محقق - كبّر القطاع\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":14,"h":36.0,"cells":[{"c":"A14","v":"STRUT-03","al":"center"},{"c":"B14","v":"الذراع الأيسر المائل (Left Strut - West Corner)"},{"c":"C14","v":8.2,"in":true,"al":"center","nf":"#,##0.00"},{"c":"D14","v":147.5,"in":true,"al":"center","nf":"0.0"},{"c":"E14","v":260,"in":true,"al":"center","nf":"#,##0.00"},{"c":"F14","v":295,"in":true,"al":"center","nf":"#,##0.00"},{"c":"G14","v":445,"in":true,"al":"center","nf":"#,##0.00"},{"c":"H14","v":"آمن ومطابق للانبعاج","f":"=IF(F14<=G14, \"آمن ومطابق للانبعاج\", \"غير محقق - كبّر القطاع\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":"MAX-GOV","al":"center"},{"c":"B15","v":"القيمة التصميمية الحاكمة لتصميم القطاعات ووصلات التثبيت"},{"c":"C15","v":8.2,"f":"=MAX(C12:C14)","al":"center","nf":"#,##0.00"},{"c":"D15","v":0,"in":true,"al":"center","nf":"0.0"},{"c":"E15","v":260,"f":"=MAX(E12:E14)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"F15","v":340,"f":"=MAX(F12:F14)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"G15","v":445,"f":"=MIN(G12:G14)","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"H15","v":"القطاع الإنشائي آمن بالكامل","f":"=IF(F15<=G15, \"القطاع الإنشائي آمن بالكامل\", \"يتطلب تدعيم\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":16,"h":28.0,"cells":[{"c":"A16","v":""},{"c":"B16","v":""},{"c":"C16","v":""},{"c":"D16","v":""},{"c":"E16","v":""},{"c":"F16","v":""},{"c":"G16","v":""},{"c":"H16","v":""}]},{"r":17,"h":38.0,"cells":[{"c":"A17","v":"ثالثاً: التحقق من وصلات الربط ومسامير التثبيت الكيميائية بالهيكل (Anchor Bolts & Base Plates)","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":18,"h":40.0,"cells":[{"c":"A18","v":"م","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B18","v":"عنصر الوصلة الهيكلية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C18","v":"المواصفة التصميمية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D18","v":"القوة المؤثرة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E18","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F18","v":"قدرة التحمل المسموحة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G18","v":"معادلة التحقق / معامل الأمان","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H18","v":"حالة الوصلة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":1,"al":"center"},{"c":"B19","v":"نوع مسامير التثبيت الكيميائية المعتمدة"},{"c":"C19","v":"Hilti HIT-RE 500 V4 / M30 Grade 8.8"},{"c":"D19","v":6,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E19","v":"مسامير/صفيحة","al":"center"},{"c":"F19","v":"عمق غرس 350 ملم في خرسانة C35"},{"c":"G19","v":"ETA-05 / ACI 355.2","al":"center"},{"c":"H19","v":"معتمد","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":2,"al":"center"},{"c":"B20","v":"أقصى قوة شد مؤثرة على المسمار الواحد (N_ua)"},{"c":"C20","v":"M30 Anchors"},{"c":"D20","v":52,"f":"=(E15/6)*1.20","b":true,"al":"center","nf":"#,##0.00"},{"c":"E20","v":"كيلو نيوتن (kN)","al":"center"},{"c":"F20","v":"φN_n = 145.00 kN (سعة الشد المسموحة)"},{"c":"G20","v":"N_ua / φN_n <= 1.0 (0.36 < 1.0)","al":"center"},{"c":"H20","v":"محقق ومطابق","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":3,"al":"center"},{"c":"B21","v":"أقصى قوة قص مؤثرة على المسمار الواحد (V_ua)"},{"c":"C21","v":"M30 Anchors"},{"c":"D21","v":56.666667,"f":"=(F15/6)*1.00","b":true,"al":"center","nf":"#,##0.00"},{"c":"E21","v":"كيلو نيوتن (kN)","al":"center"},{"c":"F21","v":"φV_n = 125.00 kN (سعة القص المسموحة)"},{"c":"G21","v":"V_ua / φV_n <= 1.0 (0.45 < 1.0)","al":"center"},{"c":"H21","v":"محقق ومطابق","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":4,"al":"center"},{"c":"B22","v":"معادلة التفاعل المشترك للقص والشد بالمسامير"},{"c":"C22","v":"ACI 318 Eq. 17.8.1"},{"c":"D22","v":0,"f":"=POWER(D20/145, 1.67) + POWER(D21/125, 1.67)","b":true,"al":"center","nf":"#,##0.00"},{"c":"E22","v":"نسبة إجهاد","al":"center"},{"c":"F22","v":"سعة التفاعل المشترك <= 1.0"},{"c":"G22","v":"ACI 318-19 Eq. 17.8.1 <= 1.0","al":"center"},{"c":"H22","v":"آمن ومطابق للتفاعل","f":"=IF(D22<=1.0, \"آمن ومطابق للتفاعل\", \"غير آمن\")","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":23,"h":52.0,"cells":[{"c":"A23","v":5,"al":"center"},{"c":"B23","v":"سماكة صفيحة التثبيت الفولاذية (Base Plate Thickness)"},{"c":"C23","v":"Grade S355 Solid Steel Plate"},{"c":"D23","v":35,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E23","v":"ملم (mm)","al":"center"},{"c":"F23","v":"tp >= √(4*M_pl / 0.9*fy*B)"},{"c":"G23","v":"تمنع أي تشوه مرن في الصفيحة الحاملة","al":"center"},{"c":"H23","v":"محقق ومطابق","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":24,"h":52.0,"cells":[{"c":"A24","v":6,"al":"center"},{"c":"B24","v":"لحام عنق وصلة الذراع بالصفيحة (Fillet Weld Size)"},{"c":"C24","v":"E70XX Electrodes Continuous Weld"},{"c":"D24","v":14,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"E24","v":"ملم (mm)","al":"center"},{"c":"F24","v":"سماكة اللحام الفعالة a = 10.0 mm"},{"c":"G24","v":"مقاومة كامل قوة الشد والضغط المحورية","al":"center"},{"c":"H24","v":"محقق ومطابق","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":25,"h":28.0,"cells":[{"c":"A25","v":""},{"c":"B25","v":""},{"c":"C25","v":""},{"c":"D25","v":""},{"c":"E25","v":""},{"c":"F25","v":""},{"c":"G25","v":""},{"c":"H25","v":""}]},{"r":26,"h":28.0,"cells":[{"c":"A26","v":""},{"c":"B26","v":""},{"c":"C26","v":""},{"c":"D26","v":""},{"c":"E26","v":""},{"c":"F26","v":""},{"c":"G26","v":""},{"c":"H26","v":""}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":"مهندس المكتب الفني والتصميم الإنشائي","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D27","v":"مدير السلامة والصحة المهنية (HSE Manager)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G27","v":"مهندس استشاري الإشراف واعتماد الرافعة","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true}]},{"r":28,"h":76.0,"cells":[{"c":"A28","v":"الاسم والتوقيع:\nالاعتماد المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true},{"c":"D28","v":"الاسم والتوقيع:\nالاعتماد المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true},{"c":"G28","v":"الاسم والتوقيع:\nالاعتماد المهني:\nالتاريخ والختم:","cs":2},{"skip":true}]}]},{"name":"حصر الكميات ومقايسة التكاليف","maxRow":26,"maxCol":8,"colWidths":[10.0,16.0,64.0,14.0,18.0,18.0,22.0,36.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول حصر الكميات والمقايسة التقديرية لتنفيذ قاعدة الونش البرجي وأنظمة الربط بالهيكل (BOQ)","fg":"#1E3A8A","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"الكميات محسوبة بدقة من جداول التصميم الإنشائي، وفئات الأسعار مرتبطة ديناميكياً بشيت الإعدادات الأول. يشمل الجدول بنود الأعمال المدنية والصلب الإنشائي والمسامير والاختبارات.","fg":"#475569","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":28.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":40.0,"cells":[{"c":"A4","v":"بند","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"كود المقايسة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"بيان الأعمال والتوصيف الهندسي للمواد","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"الوحدة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"الكمية المحصورة","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"فئة السعر","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"القيمة الإجمالية","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"ملاحظات الاعتماد والربط","bg":"#1E40AF","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":34.0,"cells":[{"c":"A5","v":1,"al":"center"},{"c":"B5","v":"BOQ-01","al":"center"},{"c":"C5","v":"أعمال حفر وتسوية ودمك قاع التأسيس لقاعدة الونش لعمق 2.0 م"},{"c":"D5","v":"م³","al":"center"},{"c":"E5","v":137.78,"f":"=ROUND(('تصميم قاعدة الونش الخرسانية'!D6+1.5)*('تصميم قاعدة الونش الخرسانية'!D7+1.5)*2.0, 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"F5","v":38,"f":"='إعدادات المشروع ومواصفات الونش'!D31","al":"center","nf":"#,##0.00"},{"c":"G5","v":5235.64,"f":"=E5*F5","b":true,"al":"center","nf":"#,##0.00"},{"c":"H5","v":"حفر ميكانيكي مع ترحيل المخلفات"}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":2,"al":"center"},{"c":"B6","v":"BOQ-02","al":"center"},{"c":"C6","v":"صب خرسانة عادية نظافة C20 سماكة 10 سم أسفل كامل مساحة القاعدة"},{"c":"D6","v":"م³","al":"center"},{"c":"E6","v":5.18,"f":"=ROUND(('تصميم قاعدة الونش الخرسانية'!D6+0.4)*('تصميم قاعدة الونش الخرسانية'!D7+0.4)*0.10, 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"F6","v":230,"f":"='إعدادات المشروع ومواصفات الونش'!D30","al":"center","nf":"#,##0.00"},{"c":"G6","v":1191.4,"f":"=E6*F6","b":true,"al":"center","nf":"#,##0.00"},{"c":"H6","v":"تسوية تامة لضمان أفقية الصب"}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":3,"al":"center"},{"c":"B7","v":"BOQ-03","al":"center"},{"c":"C7","v":"توريد وصب خرسانة مسلحة C35 صب مستمر لقاعدة الونش البرجي"},{"c":"D7","v":"م³","al":"center"},{"c":"E7","v":67.048,"f":"='تصميم قاعدة الونش الخرسانية'!D9","b":true,"al":"center","nf":"#,##0.00"},{"c":"F7","v":340,"f":"='إعدادات المشروع ومواصفات الونش'!D28","al":"center","nf":"#,##0.00"},{"c":"G7","v":22796.32,"f":"=E7*F7","b":true,"al":"center","nf":"#,##0.00"},{"c":"H7","v":"صب بمضخة خرسانية ومعالجة مستمرة"}]},{"r":8,"h":34.0,"cells":[{"c":"A8","v":4,"al":"center"},{"c":"B8","v":"BOQ-04","al":"center"},{"c":"C8","v":"توريد وتشكيل حديد تسليح عالي المقاومة B420D شبكتين وكراسي"},{"c":"D8","v":"طن","al":"center"},{"c":"E8","v":9.39,"f":"=ROUND(('تصميم قاعدة الونش الخرسانية'!D9*0.140), 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"F8","v":3250,"f":"='إعدادات المشروع ومواصفات الونش'!D29","al":"center","nf":"#,##0.00"},{"c":"G8","v":30517.5,"f":"=E8*F8","b":true,"al":"center","nf":"#,##0.00"},{"c":"H8","v":"معدل 140 كجم/م³ شامل الهالك والكراسي"}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":5,"al":"center"},{"c":"B9","v":"BOQ-05","al":"center"},{"c":"C9","v":"توريد وتثبيت زوايا سارية الونش Fixing Angles وضبط الشاقولية"},{"c":"D9","v":"طقم","al":"center"},{"c":"E9","v":1,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F9","v":22000,"f":"='إعدادات المشروع ومواصفات الونش'!D34","al":"center","nf":"#,##0.00"},{"c":"G9","v":22000,"f":"=E9*F9","b":true,"al":"center","nf":"#,##0.00"},{"c":"H9","v":"طقم أصلي معتمد مع مسامير التجميع"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":6,"al":"center"},{"c":"B10","v":"BOQ-06","al":"center"},{"c":"C10","v":"تصنيع وتوريد ودهان أذرع التثبيت الفولاذية المائلة Struts قطاع CHS"},{"c":"D10","v":"كجم","al":"center"},{"c":"E10","v":3574.2,"f":"=ROUND((7.80+6.20+8.20)*2*80.5, 2)","b":true,"al":"center","nf":"#,##0.00"},{"c":"F10","v":15.5,"f":"='إعدادات المشروع ومواصفات الونش'!D32","al":"center","nf":"#,##0.00"},{"c":"G10","v":55400.1,"f":"=E10*F10","b":true,"al":"center","nf":"#,##0.00"},{"c":"H10","v":"لعدد طوقين ربط (مجموع 6 أذرع)"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":7,"al":"center"},{"c":"B11","v":"BOQ-07","al":"center"},{"c":"C11","v":"تصنيع وتجميع أطواق الربط الهيكلية حول السارية Collar Frames"},{"c":"D11","v":"طقم","al":"center"},{"c":"E11","v":2,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F11","v":18500,"f":"='إعدادات المشروع ومواصفات الونش'!D33","al":"center","nf":"#,##0.00"},{"c":"G11","v":37000,"f":"=E11*F11","b":true,"al":"center","nf":"#,##0.00"},{"c":"H11","v":"طوق صلب مقوى لكل منسوب ربط"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":8,"al":"center"},{"c":"B12","v":"BOQ-08","al":"center"},{"c":"C12","v":"توريد وحقن مسامير تثبيت كيميائية M30 صفائح التثبيت بالهيكل"},{"c":"D12","v":"نقطة","al":"center"},{"c":"E12","v":36,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F12","v":1450,"f":"='إعدادات المشروع ومواصفات الونش'!D36","al":"center","nf":"#,##0.00"},{"c":"G12","v":52200,"f":"=E12*F12","b":true,"al":"center","nf":"#,##0.00"},{"c":"H12","v":"6 مسامير × 3 أذرع × طوقين"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":9,"al":"center"},{"c":"B13","v":"BOQ-09","al":"center"},{"c":"C13","v":"حقن مونة إيبوكسية غير قابلة للانكماش Non-Shrink Grout أسفل القواعد"},{"c":"D13","v":"شكارة","al":"center"},{"c":"E13","v":45,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F13","v":95,"f":"='إعدادات المشروع ومواصفات الونش'!D35","al":"center","nf":"#,##0.00"},{"c":"G13","v":4275,"f":"=E13*F13","b":true,"al":"center","nf":"#,##0.00"},{"c":"H13","v":"شكاير 25 كجم قوة 80 MPa"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":10,"al":"center"},{"c":"B14","v":"BOQ-10","al":"center"},{"c":"C14","v":"خدمات المعاينة الموقعية واختبارات الشد والتحميل لطرف ثالث معتمد"},{"c":"D14","v":"مقطوعية","al":"center"},{"c":"E14","v":1,"in":true,"b":true,"al":"center","nf":"#,##0.00"},{"c":"F14","v":7500,"f":"='إعدادات المشروع ومواصفات الونش'!D37","al":"center","nf":"#,##0.00"},{"c":"G14","v":7500,"f":"=E14*F14","b":true,"al":"center","nf":"#,##0.00"},{"c":"H14","v":"إصدار شهادة سلامة تشغيل الونش"}]},{"r":15,"h":36.0,"cells":[{"c":"A15","v":"إجمالي الأعمال المدنية والخرسانات (قاعدة الونش الخرسانية):","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"left","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G15","v":59740.86,"f":"=SUM(G5:G8)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"H15","v":"قيمة إجمالية","bg":"#DBEAFE","al":"center"}]},{"r":16,"h":36.0,"cells":[{"c":"A16","v":"إجمالي أنظمة الربط بالهيكل والتثبيت الميكانيكي (Tie-Back & Collars):","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"left","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G16","v":170875.1,"f":"=SUM(G9:G13)","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"H16","v":"قيمة إجمالية","bg":"#DBEAFE","al":"center"}]},{"r":17,"h":36.0,"cells":[{"c":"A17","v":"إجمالي خدمات الاختبار والاعتماد الهندسي الموقعي:","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"left","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G17","v":7500,"f":"=G14","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"H17","v":"قيمة إجمالية","bg":"#DBEAFE","al":"center"}]},{"r":18,"h":36.0,"cells":[{"c":"A18","v":"المجموع الصافي للأعمال التقديرية (Subtotal):","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"left","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G18","v":238115.96,"f":"=SUM(G15:G17)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"H18","v":"قيمة إجمالية","bg":"#EFF6FF","al":"center"}]},{"r":19,"h":36.0,"cells":[{"c":"A19","v":"نسبة الطوارئ والاحتياطي الفني للأعمال الموقعية (5% Contingency):","b":true,"al":"left","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G19","v":11905.798,"f":"=G18*0.05","b":true,"al":"center","nf":"#,##0.00"},{"c":"H19","v":"قيمة إجمالية","al":"center"}]},{"r":20,"h":36.0,"cells":[{"c":"A20","v":"ضريبة القيمة المضافة النظامية (15% VAT):","b":true,"al":"left","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G20","v":37503.2637,"f":"=(G18+G19)*0.15","b":true,"al":"center","nf":"#,##0.00"},{"c":"H20","v":"قيمة إجمالية","al":"center"}]},{"r":21,"h":42.0,"cells":[{"c":"A21","v":"الإجمالي العام الشامل للضريبة والتنفيذ (Grand Total):","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"left","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G21","v":287525.0217,"f":"=G18+G19+G20","bg":"#1E3A8A","fg":"#FFFFFF","b":true,"al":"center","nf":"#,##0.00"},{"c":"H21","v":"قيمة إجمالية","bg":"#1E3A8A","al":"center"}]},{"r":22,"h":28.0,"cells":[{"c":"A22","v":""},{"c":"B22","v":""},{"c":"C22","v":""},{"c":"D22","v":""},{"c":"E22","v":""},{"c":"F22","v":""},{"c":"G22","v":""},{"c":"H22","v":""}]},{"r":23,"h":28.0,"cells":[{"c":"A23","v":""},{"c":"B23","v":""},{"c":"C23","v":""},{"c":"D23","v":""},{"c":"E23","v":""},{"c":"F23","v":""},{"c":"G23","v":""},{"c":"H23","v":""}]},{"r":24,"h":28.0,"cells":[{"c":"A24","v":""},{"c":"B24","v":""},{"c":"C24","v":""},{"c":"D24","v":""},{"c":"E24","v":""},{"c":"F24","v":""},{"c":"G24","v":""},{"c":"H24","v":""}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":"مهندس المكتب الفني والتصميم الإنشائي","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D25","v":"مدير السلامة والصحة المهنية (HSE Manager)","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"G25","v":"مهندس استشاري الإشراف واعتماد الرافعة","bg":"#EFF6FF","fg":"#1E3A8A","b":true,"al":"center","cs":2},{"skip":true}]},{"r":26,"h":76.0,"cells":[{"c":"A26","v":"الاسم والتوقيع:\nالاعتماد المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true},{"c":"D26","v":"الاسم والتوقيع:\nالاعتماد المهني:\nالتاريخ والختم:","cs":3},{"skip":true},{"skip":true},{"c":"G26","v":"الاسم والتوقيع:\nالاعتماد المهني:\nالتاريخ والختم:","cs":2},{"skip":true}]}]}]}