{"slug":"underground-water-tank-structural-design-and-crack-width-calculation-sheet","sheets":[{"name":"إعدادات الخزان والمواد والأسعار","maxRow":58,"maxCol":8,"colWidths":[8.0,52.0,24.0,22.0,18.0,24.0,26.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"شيت تصميم الخزانات الأرضية الخرسانية المسلحة وحساب عزم الانحناء وعرض الشروخ","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"⚠️ تنبيه استرشادي: المعاملات والأسعار المدخلة هي قيم استرشادية قياسية وفق كود SBC 304 و ACI 350-06. يرجى تعديل الأبعاد والمقاومات والأسعار أدناه بما يطابق تقرير جسات مشروعك.","bg":"#1E3A8A","fg":"#DBEAFE","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"السعة التخزينية الصافية","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"سمك الجدار واللبشة المقترح","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"حد الشروخ الكودي المسموح","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"G4","v":"العملة المعتمدة للمشروع","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":42.0,"cells":[{"c":"A5","v":"الرمز\"*\"L\"*\"B","f":"=C15*C16*C17","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00\" م³\"","cs":2},{"skip":true},{"c":"C5","v":0,"f":"=CONCATENATE(C19*1000, \" / \", C20*1000, \" مم\")","bg":"#F1F5F9","b":true,"al":"center","cs":2},{"skip":true},{"c":"E5","v":"0.15","bg":"#DCFCE7","b":true,"al":"center","nf":"0.00\" مم\"","cs":2},{"skip":true},{"c":"G5","v":0,"f":"=D9","bg":"#FEF3C7","b":true,"al":"center","cs":2},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"م³ (مياه صالحة للشرب)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C6","v":"جدار الخزان / اللبشة السفلية","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E6","v":"مم (وفق ACI 350 للمنشآت المائية)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"G6","v":"فئات التوريد والتنفيذ","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true}]},{"r":7,"h":14.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"1. البيانات العامة للمشروع والمرجعية التعاقدية","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"اسم المشروع","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"C9","v":"مشروع إنشاء خزان مياه أرضي خرساني سعة 108 م³","cs":2},{"skip":true},{"c":"E9","v":"العملة المعتمدة","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"G9","v":"ر.س SAR","al":"center","cs":2},{"skip":true}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":"المالك / جهة الإسناد","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"C10","v":"شركة التطوير العقاري المتقدمة","cs":2},{"skip":true},{"c":"E10","v":"المرجعية القياسية","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"G10","v":"كود SBC 304 / ACI 350-06","al":"center","cs":2},{"skip":true}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":"المقاول العام","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"C11","v":"شركة البنيان للمقاولات العامة","cs":2},{"skip":true},{"c":"E11","v":"المهندس المصمم","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"G11","v":"م. أحمد عبد الرحمن - المكتب الفني","al":"center","cs":2},{"skip":true}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":"الاستشاري المشرف","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"C12","v":"مكتب الاستشارات الهندسية المتكاملة","cs":2},{"skip":true},{"c":"E12","v":"تاريخ الاعتماد","bg":"#F8FAFC","b":true,"cs":2},{"skip":true},{"c":"G12","v":"2026-10-18","al":"center","cs":2},{"skip":true}]},{"r":13,"h":28.0,"cells":[{"c":"A13","v":""},{"c":"B13","v":""},{"c":"C13","v":""},{"c":"D13","v":""},{"c":"E13","v":""},{"c":"F13","v":""},{"c":"G13","v":""},{"c":"H13","v":""}]},{"r":14,"h":38.0,"cells":[{"c":"A14","v":"2. الأبعاد الهندسية والاشتراطات الجيوتقنية للخزان (Tank Geometry & Geotechnical Properties)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":15,"h":40.0,"cells":[{"c":"A15","v":"م","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B15","v":"البارامتر الهندسي والجيوتقني","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C15","v":"الرمز","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D15","v":"القيمة التصميمية","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E15","v":"الوحدة","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F15","v":"الحدود الكودية الموصى بها","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G15","v":"المرجع الكودي / ملاحظات","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H15","v":"حالة المدخل","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":16,"h":34.0,"cells":[{"c":"A16","v":1,"al":"center"},{"c":"B16","v":"طول الخزان الداخلي الصافي"},{"c":"C16","v":"L","al":"center"},{"c":"D16","v":6,"in":true,"al":"center","nf":"#,##0.00"},{"c":"E16","v":"متر","al":"center"},{"c":"F16","v":"3.00 - 15.00 م","al":"center"},{"c":"G16","v":"البعد الطولي للكتلة المائية"},{"c":"H16","v":"مدخل تصميمي","al":"center"}]},{"r":17,"h":34.0,"cells":[{"c":"A17","v":2,"bg":"#F8FAFC","al":"center"},{"c":"B17","v":"عرض الخزان الداخلي الصافي","bg":"#F8FAFC"},{"c":"C17","v":"B","bg":"#F8FAFC","al":"center"},{"c":"D17","v":4,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E17","v":"متر","bg":"#F8FAFC","al":"center"},{"c":"F17","v":"2.00 - 10.00 م","bg":"#F8FAFC","al":"center"},{"c":"G17","v":"البعد العرضي للكتلة المائية","bg":"#F8FAFC"},{"c":"H17","v":"مدخل تصميمي","bg":"#F8FAFC","al":"center"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":3,"al":"center"},{"c":"B18","v":"ارتفاع الخزان الكلي الحر الداخلي"},{"c":"C18","v":"H","al":"center"},{"c":"D18","v":3.5,"in":true,"al":"center","nf":"#,##0.00"},{"c":"E18","v":"متر","al":"center"},{"c":"F18","v":"2.50 - 5.00 م","al":"center"},{"c":"G18","v":"من ظهر اللبشة إلى بطنية السقف"},{"c":"H18","v":"مدخل تصميمي","al":"center"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":4,"bg":"#F8FAFC","al":"center"},{"c":"B19","v":"عمق المياه التشغيلي الأقصى","bg":"#F8FAFC"},{"c":"C19","v":"hw","bg":"#F8FAFC","al":"center"},{"c":"D19","v":3,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E19","v":"متر","bg":"#F8FAFC","al":"center"},{"c":"F19","v":"hw = H - Freeboard","bg":"#F8FAFC","al":"center"},{"c":"G19","v":"منسوب ماسورة الفائض Overflow","bg":"#F8FAFC"},{"c":"H19","v":"مدخل تشغيلي","bg":"#F8FAFC","al":"center"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":5,"al":"center"},{"c":"B20","v":"الخلوص العلوي الحر (Freeboard)"},{"c":"C20","v":"fb","al":"center"},{"c":"D20","v":"B\"-\"H","f":"=C17-C18","al":"center"},{"c":"E20","v":"متر","al":"center"},{"c":"F20","v":"0.30 - 0.60 م","al":"center"},{"c":"G20","v":"خلوص حيز الهواء والتهوية"},{"c":"H20","v":"معادلة محسوبة","fg":"#166534","b":true,"al":"center"}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":6,"bg":"#F8FAFC","al":"center"},{"c":"B21","v":"سمك جدار الخزان الخرساني المقترح","bg":"#F8FAFC"},{"c":"C21","v":"tw","bg":"#F8FAFC","al":"center"},{"c":"D21","v":0.3,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E21","v":"متر","bg":"#F8FAFC","al":"center"},{"c":"F21","v":"الحد الأدنى: 0.25 م (ACI 350)","bg":"#F8FAFC","al":"center"},{"c":"G21","v":"سمك كافٍ لصلابة الجدار وعرض الشروخ","bg":"#F8FAFC"},{"c":"H21","v":"مدخل تصميمي","bg":"#F8FAFC","al":"center"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":7,"al":"center"},{"c":"B22","v":"سمك اللبشة السفلية المقترح"},{"c":"C22","v":"tr","al":"center"},{"c":"D22","v":0.4,"in":true,"al":"center","nf":"#,##0.00"},{"c":"E22","v":"متر","al":"center"},{"c":"F22","v":"الحد الأدنى: 0.35 م","al":"center"},{"c":"G22","v":"مقاومة عزوم التثبيت والقص والطفو"},{"c":"H22","v":"مدخل تصميمي","al":"center"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":8,"bg":"#F8FAFC","al":"center"},{"c":"B23","v":"سمك بلاطة سقف الخزان","bg":"#F8FAFC"},{"c":"C23","v":"tslab","bg":"#F8FAFC","al":"center"},{"c":"D23","v":0.2,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E23","v":"متر","bg":"#F8FAFC","al":"center"},{"c":"F23","v":"الحد الأدنى: 0.15 م","bg":"#F8FAFC","al":"center"},{"c":"G23","v":"بلاطة مصمتة ذات اتجاهين","bg":"#F8FAFC"},{"c":"H23","v":"مدخل تصميمي","bg":"#F8FAFC","al":"center"}]},{"r":24,"h":52.0,"cells":[{"c":"A24","v":9,"al":"center"},{"c":"B24","v":"بروز اللبشة خارج الجدار (Heel Projection)"},{"c":"C24","v":"bp","al":"center"},{"c":"D24","v":0.4,"in":true,"al":"center","nf":"#,##0.00"},{"c":"E24","v":"متر","al":"center"},{"c":"F24","v":"0.30 - 0.60 م","al":"center"},{"c":"G24","v":"لزيادة وزن الردم ومقاومة الطفو Uplift"},{"c":"H24","v":"مدخل تصميمي","al":"center"}]},{"r":25,"h":52.0,"cells":[{"c":"A25","v":10,"bg":"#F8FAFC","al":"center"},{"c":"B25","v":"منسوب المياه الجوفية فوق قاع اللبشة","bg":"#F8FAFC"},{"c":"C25","v":"hgw","bg":"#F8FAFC","al":"center"},{"c":"D25","v":2,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E25","v":"متر","bg":"#F8FAFC","al":"center"},{"c":"F25","v":"حسب تقرير التربة والجسات","bg":"#F8FAFC","al":"center"},{"c":"G25","v":"أعلى منسوب مياه جوفية مسجل بالموقع","bg":"#F8FAFC"},{"c":"H25","v":"مدخل جيوتقني","bg":"#F8FAFC","al":"center"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":11,"al":"center"},{"c":"B26","v":"كثافة التربة الرطبة / الجافة"},{"c":"C26","v":"γs","al":"center"},{"c":"D26","v":18,"in":true,"al":"center","nf":"#,##0.00"},{"c":"E26","v":"kN/m³","al":"center"},{"c":"F26","v":"17.0 - 20.0 kN/m³","al":"center"},{"c":"G26","v":"كثافة الردم حول الخزان"},{"c":"H26","v":"مدخل جيوتقني","al":"center"}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":12,"bg":"#F8FAFC","al":"center"},{"c":"B27","v":"كثافة التربة المغمورة بالمياه","bg":"#F8FAFC"},{"c":"C27","v":"γsub","bg":"#F8FAFC","al":"center"},{"c":"D27","v":"hgw\"-\"Ko","f":"=C25-C29","bg":"#F8FAFC","al":"center"},{"c":"E27","v":"kN/m³","bg":"#F8FAFC","al":"center"},{"c":"F27","v":"γsat - γw (حوالي 8 - 11)","bg":"#F8FAFC","al":"center"},{"c":"G27","v":"التربة أسفل المياه الجوفية","bg":"#F8FAFC"},{"c":"H27","v":"معادلة محسوبة","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":13,"al":"center"},{"c":"B28","v":"زاوية الاحتكاك الداخلي للتربة"},{"c":"C28","v":"ϕ","al":"center"},{"c":"D28","v":30,"in":true,"al":"center","nf":"#,##0.00"},{"c":"E28","v":"درجة","al":"center"},{"c":"F28","v":"28 - 36 درجة للرمال","al":"center"},{"c":"G28","v":"زاوية القص للتربة المحيطة"},{"c":"H28","v":"مدخل جيوتقني","al":"center"}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":14,"bg":"#F8FAFC","al":"center"},{"c":"B29","v":"معامل ضغط التربة في حالة السكون","bg":"#F8FAFC"},{"c":"C29","v":"Ko","bg":"#F8FAFC","al":"center"},{"c":"D29","v":0,"f":"=1-SIN(RADIANS(C27))","bg":"#F8FAFC","al":"center"},{"c":"E29","v":"-","bg":"#F8FAFC","al":"center"},{"c":"F29","v":"0.50 للجدران الجاسئة المقيدة","bg":"#F8FAFC","al":"center"},{"c":"G29","v":"Ko = 1 - sin(ϕ) وفق SBC 303","bg":"#F8FAFC"},{"c":"H29","v":"معادلة محسوبة","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"}]},{"r":30,"h":52.0,"cells":[{"c":"A30","v":15,"al":"center"},{"c":"B30","v":"كثافة المياه العذبة الصافية"},{"c":"C30","v":"γw","al":"center"},{"c":"D30","v":10,"in":true,"al":"center","nf":"#,##0.00"},{"c":"E30","v":"kN/m³","al":"center"},{"c":"F30","v":"9.81 - 10.0 kN/m³","al":"center"},{"c":"G30","v":"كثافة الماء لحساب الضغوط الهيدروستاتيكية"},{"c":"H30","v":"ثابت فيزيائي","al":"center"}]},{"r":31,"h":52.0,"cells":[{"c":"A31","v":16,"bg":"#F8FAFC","al":"center"},{"c":"B31","v":"الحمل الحي السطحي فوق الخزان (Surcharge)","bg":"#F8FAFC"},{"c":"C31","v":"qsur","bg":"#F8FAFC","al":"center"},{"c":"D31","v":15,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E31","v":"kN/m²","bg":"#F8FAFC","al":"center"},{"c":"F31","v":"10 - 20 kN/m² (سيارات / مشاة)","bg":"#F8FAFC","al":"center"},{"c":"G31","v":"حمل حركة المركبات والمعدات السطحية","bg":"#F8FAFC"},{"c":"H31","v":"مدخل تشغيلي","bg":"#F8FAFC","al":"center"}]},{"r":32,"h":28.0,"cells":[{"c":"A32","v":""},{"c":"B32","v":""},{"c":"C32","v":""},{"c":"D32","v":""},{"c":"E32","v":""},{"c":"F32","v":""},{"c":"G32","v":""},{"c":"H32","v":""}]},{"r":33,"h":38.0,"cells":[{"c":"A33","v":"3. خواص المواد والخرسانة المسلحة واشتراطات المتانة (Materials & Environmental Durability)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":34,"h":40.0,"cells":[{"c":"A34","v":"م","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B34","v":"خاصية المادة الإنشائية","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C34","v":"الرمز","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D34","v":"القيمة التصميمية","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E34","v":"الوحدة","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F34","v":"الحدود الكودية الموصى بها","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G34","v":"المرجع الكودي / الاشتراطات","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H34","v":"حالة المدخل","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":35,"h":34.0,"cells":[{"c":"A35","v":1,"al":"center"},{"c":"B35","v":"مقاومة ضغط الخرسانة المميزة (28 يوم)"},{"c":"C35","v":"f'c","al":"center"},{"c":"D35","v":35,"in":true,"al":"center","nf":"#,##0.00"},{"c":"E35","v":"MPa","al":"center"},{"c":"F35","v":"≥ 30 MPa للمنشآت المائية","al":"center"},{"c":"G35","v":"ACI 350-06 Cl. 4.3 / SBC 304"},{"c":"H35","v":"مدخل مواصفات","al":"center"}]},{"r":36,"h":52.0,"cells":[{"c":"A36","v":2,"bg":"#F8FAFC","al":"center"},{"c":"B36","v":"إجهاد خضوع حديد التسليح","bg":"#F8FAFC"},{"c":"C36","v":"fy","bg":"#F8FAFC","al":"center"},{"c":"D36","v":420,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E36","v":"MPa","bg":"#F8FAFC","al":"center"},{"c":"F36","v":"420 MPa (Grade 60)","bg":"#F8FAFC","al":"center"},{"c":"G36","v":"حديد عالي المقاومة مشوه ASTM A615","bg":"#F8FAFC"},{"c":"H36","v":"مدخل مواصفات","bg":"#F8FAFC","al":"center"}]},{"r":37,"h":34.0,"cells":[{"c":"A37","v":3,"al":"center"},{"c":"B37","v":"معاير مرونة حديد التسليح"},{"c":"C37","v":"Es","al":"center"},{"c":"D37","v":200000,"in":true,"al":"center","nf":"#,##0.00"},{"c":"E37","v":"MPa","al":"center"},{"c":"F37","v":"200,000 MPa","al":"center"},{"c":"G37","v":"ثابت كودي"},{"c":"H37","v":"ثابت فيزيائي","al":"center"}]},{"r":38,"h":34.0,"cells":[{"c":"A38","v":4,"bg":"#F8FAFC","al":"center"},{"c":"B38","v":"معاير مرونة الخرسانة","bg":"#F8FAFC"},{"c":"C38","v":"Ec","bg":"#F8FAFC","al":"center"},{"c":"D38","v":0,"f":"=4700*SQRT(D34)","bg":"#F8FAFC","al":"center"},{"c":"E38","v":"MPa","bg":"#F8FAFC","al":"center"},{"c":"F38","v":"Ec = 4700 √f'c","bg":"#F8FAFC","al":"center"},{"c":"G38","v":"SBC 304 Cl. 19.2 / ACI 318","bg":"#F8FAFC"},{"c":"H38","v":"معادلة محسوبة","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"}]},{"r":39,"h":52.0,"cells":[{"c":"A39","v":5,"al":"center"},{"c":"B39","v":"معامل المرونة النسبي (Modular Ratio)"},{"c":"C39","v":"n","al":"center"},{"c":"D39","v":0.0021,"f":"=D36/D37","al":"center"},{"c":"E39","v":"-","al":"center"},{"c":"F39","v":"n = Es / Ec (حوالي 7 - 9)","al":"center"},{"c":"G39","v":"يستخدم في حساب قطاع الخرسانة المشرخ"},{"c":"H39","v":"معادلة محسوبة","fg":"#166534","b":true,"al":"center"}]},{"r":40,"h":34.0,"cells":[{"c":"A40","v":6,"bg":"#F8FAFC","al":"center"},{"c":"B40","v":"الغطاء الخرساني الصافي لجهة المياه","bg":"#F8FAFC"},{"c":"C40","v":"cc","bg":"#F8FAFC","al":"center"},{"c":"D40","v":50,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E40","v":"مم","bg":"#F8FAFC","al":"center"},{"c":"F40","v":"≥ 50 مم للمنشآت المائية","bg":"#F8FAFC","al":"center"},{"c":"G40","v":"ACI 350 Cl. 7.7.1 لحماية الحديد","bg":"#F8FAFC"},{"c":"H40","v":"اشتراط كودي","bg":"#F8FAFC","al":"center"}]},{"r":41,"h":52.0,"cells":[{"c":"A41","v":7,"al":"center"},{"c":"B41","v":"الغطاء الخرساني الصافي لجهة التربة"},{"c":"C41","v":"cs","al":"center"},{"c":"D41","v":75,"in":true,"al":"center","nf":"#,##0.00"},{"c":"E41","v":"مم","al":"center"},{"c":"F41","v":"≥ 75 مم للخرسانة المصبوبة بالتربة","al":"center"},{"c":"G41","v":"SBC 304 Cl. 20.6.1"},{"c":"H41","v":"اشتراط كودي","al":"center"}]},{"r":42,"h":52.0,"cells":[{"c":"A42","v":8,"bg":"#F8FAFC","al":"center"},{"c":"B42","v":"معامل المتانة البيئية لعزم الانحناء","bg":"#F8FAFC"},{"c":"C42","v":"Sd,flex","bg":"#F8FAFC","al":"center"},{"c":"D42","v":1.3,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E42","v":"-","bg":"#F8FAFC","al":"center"},{"c":"F42","v":"1.30 لعزم الانحناء والقص","bg":"#F8FAFC","al":"center"},{"c":"G42","v":"ACI 350-06 Cl. 9.2.6 لتقليل إجهاد التشغيل","bg":"#F8FAFC"},{"c":"H42","v":"اشتراط كودي","bg":"#F8FAFC","al":"center"}]},{"r":43,"h":52.0,"cells":[{"c":"A43","v":9,"al":"center"},{"c":"B43","v":"معامل المتانة البيئية للشد المحوري"},{"c":"C43","v":"Sd,tens","al":"center"},{"c":"D43","v":1.65,"in":true,"al":"center","nf":"#,##0.00"},{"c":"E43","v":"-","al":"center"},{"c":"F43","v":"1.65 للشد المحوري المباشر","al":"center"},{"c":"G43","v":"ACI 350-06 Cl. 9.2.6 لمنع الشروخ النافذة"},{"c":"H43","v":"اشتراط كودي","al":"center"}]},{"r":44,"h":28.0,"cells":[{"c":"A44","v":""},{"c":"B44","v":""},{"c":"C44","v":""},{"c":"D44","v":""},{"c":"E44","v":""},{"c":"F44","v":""},{"c":"G44","v":""},{"c":"H44","v":""}]},{"r":45,"h":38.0,"cells":[{"c":"A45","v":"4. مصفوفة فئات الأسعار الاسترشادية للأعمال المدنية والعزل (Dynamic Cost Rates)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":46,"h":40.0,"cells":[{"c":"A46","v":"م","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B46","v":"بيان بند الأعمال والمواد","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C46","v":"كود البند","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D46","v":"سعر الوحدة المقدر","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E46","v":"العملة","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F46","v":"متوسط سعر السوق","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G46","v":"ملاحظات وتوصيف البند","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H46","v":"حالة التسعير","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":47,"h":52.0,"cells":[{"c":"A47","v":1,"al":"center"},{"c":"B47","v":"خرسانة مسلحة جاهزة C35 مقاومة للأملاح والكبريتات (لبشة وجدران وسقف)"},{"c":"C47","v":"RATE-CONC-01","al":"center"},{"c":"D47","v":340,"in":true,"al":"center","nf":"#,##0.00"},{"c":"E47","v":0,"f":"=D9","al":"center"},{"c":"F47","v":"320 - 380 ر.س/م³","al":"center"},{"c":"G47","v":"شاملة الصب بمضخة ميكانيكية والهزازات الميكانيكية"},{"c":"H47","v":"قابل للتعديل","al":"center"}]},{"r":48,"h":52.0,"cells":[{"c":"A48","v":2,"bg":"#F8FAFC","al":"center"},{"c":"B48","v":"حديد تسليح عالي المقاومة فيدرالي مشوه Grade 60 مقاسات مختلفة","bg":"#F8FAFC"},{"c":"C48","v":"RATE-STEEL-01","bg":"#F8FAFC","al":"center"},{"c":"D48","v":3200,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E48","v":0,"f":"=D9","bg":"#F8FAFC","al":"center"},{"c":"F48","v":"3000 - 3500 ر.س/طن","bg":"#F8FAFC","al":"center"},{"c":"G48","v":"شامل التوريد والتفريد والتشكيل والتركيب بالموقع","bg":"#F8FAFC"},{"c":"H48","v":"قابل للتعديل","bg":"#F8FAFC","al":"center"}]},{"r":49,"h":52.0,"cells":[{"c":"A49","v":3,"al":"center"},{"c":"B49","v":"شدات خشبية ومعدنية مزدوجة للجدران والأسقف مع الدعامات والزراجين المائية"},{"c":"C49","v":"RATE-FORM-01","al":"center"},{"c":"D49","v":65,"in":true,"al":"center","nf":"#,##0.00"},{"c":"E49","v":0,"f":"=D9","al":"center"},{"c":"F49","v":"55 - 80 ر.س/م²","al":"center"},{"c":"G49","v":"زراجين وترتايت مائية مانعة للتسريب Water-barrier ties"},{"c":"H49","v":"قابل للتعديل","al":"center"}]},{"r":50,"h":52.0,"cells":[{"c":"A50","v":4,"bg":"#F8FAFC","al":"center"},{"c":"B50","v":"نظام عزل مائي إيبوكسي داخلي صحي غير سام معتمد لمياه الشرب","bg":"#F8FAFC"},{"c":"C50","v":"RATE-EPOXY-01","bg":"#F8FAFC","al":"center"},{"c":"D50","v":45,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E50","v":0,"f":"=D9","bg":"#F8FAFC","al":"center"},{"c":"F50","v":"40 - 60 ر.س/م²","bg":"#F8FAFC","al":"center"},{"c":"G50","v":"دهان إيبوكسي سميك خالي من المذيبات الغذائية Food-grade","bg":"#F8FAFC"},{"c":"H50","v":"قابل للتعديل","bg":"#F8FAFC","al":"center"}]},{"r":51,"h":52.0,"cells":[{"c":"A51","v":5,"al":"center"},{"c":"B51","v":"عزل مائي خارجي لفائف بيتومين معدل SBS سمك 4 مم طبقتين مع حماية"},{"c":"C51","v":"RATE-BITU-01","al":"center"},{"c":"D51","v":55,"in":true,"al":"center","nf":"#,##0.00"},{"c":"E51","v":0,"f":"=D9","al":"center"},{"c":"F51","v":"48 - 70 ر.س/م²","al":"center"},{"c":"G51","v":"مع برايمر وطبقة حماية ديمبل درين شيت Protection board"},{"c":"H51","v":"قابل للتعديل","al":"center"}]},{"r":52,"h":52.0,"cells":[{"c":"A52","v":6,"bg":"#F8FAFC","al":"center"},{"c":"B52","v":"شريط ووتر ستوب PVC مضلع عرض 25 سم مع معجون انتفاخي بفواصل الصب","bg":"#F8FAFC"},{"c":"C52","v":"RATE-WSTOP-01","bg":"#F8FAFC","al":"center"},{"c":"D52","v":60,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E52","v":0,"f":"=D9","bg":"#F8FAFC","al":"center"},{"c":"F52","v":"50 - 75 ر.س/م.ط","bg":"#F8FAFC","al":"center"},{"c":"G52","v":"تثبيت محكم بكلبس في منتصف سمك الجدار","bg":"#F8FAFC"},{"c":"H52","v":"قابل للتعديل","bg":"#F8FAFC","al":"center"}]},{"r":53,"h":52.0,"cells":[{"c":"A53","v":7,"al":"center"},{"c":"B53","v":"أعمال حفر ميكانيكي ونزح مياه وردم رمال نظيفة متدرجة مع الدمك"},{"c":"C53","v":"RATE-EARTH-01","al":"center"},{"c":"D53","v":28,"in":true,"al":"center","nf":"#,##0.00"},{"c":"E53","v":0,"f":"=D9","al":"center"},{"c":"F53","v":"22 - 35 ر.س/م³","al":"center"},{"c":"G53","v":"حفر حتى منسوب التأسيس وتصريف المياه الجوفية"},{"c":"H53","v":"قابل للتعديل","al":"center"}]},{"r":54,"h":52.0,"cells":[{"c":"A54","v":8,"bg":"#F8FAFC","al":"center"},{"c":"B54","v":"سلم بحاري ستانلس ستيل 316 وغطاء فتحة تفتيش Manhole محكم الغلق","bg":"#F8FAFC"},{"c":"C54","v":"RATE-ACC-01","bg":"#F8FAFC","al":"center"},{"c":"D54","v":3500,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E54","v":0,"f":"=D9","bg":"#F8FAFC","al":"center"},{"c":"F54","v":"3000 - 4500 ر.س/مقطوعية","bg":"#F8FAFC","al":"center"},{"c":"G54","v":"اكسسوارات كاملة مقاومة للصدأ مع فنت تنفيس","bg":"#F8FAFC"},{"c":"H54","v":"قابل للتعديل","bg":"#F8FAFC","al":"center"}]},{"r":55,"h":52.0,"cells":[{"c":"A55","v":9,"al":"center"},{"c":"B55","v":"اختبار تسريب هيدروستاتيكي لمدة 72 ساعة وغسيل وتعقيم كامل"},{"c":"C55","v":"RATE-TEST-01","al":"center"},{"c":"D55","v":2500,"in":true,"al":"center","nf":"#,##0.00"},{"c":"E55","v":0,"f":"=D9","al":"center"},{"c":"F55","v":"2000 - 3500 ر.س/مقطوعية","al":"center"},{"c":"G55","v":"ملء كامل وفحص الشروخ ونسبة الهبوط بالمياه"},{"c":"H55","v":"قابل للتعديل","al":"center"}]},{"r":56,"h":28.0,"cells":[{"c":"A56","v":""},{"c":"B56","v":""},{"c":"C56","v":""},{"c":"D56","v":""},{"c":"E56","v":""},{"c":"F56","v":""},{"c":"G56","v":""},{"c":"H56","v":""}]},{"r":57,"h":14.0,"cells":[{"c":"A57","v":""},{"c":"B57","v":""},{"c":"C57","v":""},{"c":"D57","v":""},{"c":"E57","v":""},{"c":"F57","v":""},{"c":"G57","v":""},{"c":"H57","v":""}]},{"r":58,"h":75.0,"cells":[{"c":"A58","v":"إعداد: مهندس التصميم الإنشائي والمكتب الفني\nالاسم: ....................................................\nالتوقيع والتاريخ: .......................................","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","cs":2},{"skip":true},{"c":"C58","v":"مراجعة وتدقيق: مدير المكتب الفني / ضبط الجودة\nالاسم: ....................................................\nالتوقيع والتاريخ: .......................................","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F58","v":"اعتماد: المهندس الاستشاري المشرف\nالاسم: ....................................................\nالتوقيع والختم: ........................................","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]}]},{"name":"اتزان التعويم والضغوط","maxRow":31,"maxCol":8,"colWidths":[8.0,52.0,24.0,22.0,18.0,24.0,26.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"فحص اتزان التعويم وقوى الطفو ومخططات الضغوط الهيدروليكية والتربة","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"التحقق الإلزامي من عدم طفو الخزان عند تفريغه أثناء ارتفاع منسوب المياه الجوفية، وحساب ضغوط التربة والمياه الجانبية.","bg":"#1E3A8A","fg":"#DBEAFE","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"معامل أمان الطفو والتعويم FS","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"أقصى ضغط مياه داخلي عند القاع","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"أقصى ضغط جانبي خارجي مركب","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"G4","v":"محصلة قوى الرفع الهيدروليكية","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":42.0,"cells":[{"c":"A5","v":0,"f":"=D18","bg":"#DCFCE7","b":true,"al":"center","nf":"0.00\" (محقق آمن)\"","cs":2},{"skip":true},{"c":"C5","v":0,"f":"=D28","bg":"#EFF6FF","b":true,"al":"center","nf":"0.00\" kN/m²\"","cs":2},{"skip":true},{"c":"E5","v":0,"f":"=D34","bg":"#FEF3C7","b":true,"al":"center","nf":"0.00\" kN/m²\"","cs":2},{"skip":true},{"c":"G5","v":0,"f":"=D16","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0\" kN\"","cs":2},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"FS ≥ 1.25 (حالة التنفيذ والتشغيل)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C6","v":"kN/m² (خزان ممتلئ تماماً)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E6","v":"kN/m² (تربة + مياه جوفية + حمل حي)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"G6","v":"kN (قوة الطفو Buoyancy Force)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true}]},{"r":7,"h":14.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"1. حساب الأوزان الذاتية ومقاومة قوى الطفو الهيدروليكي (Flotation & Uplift Check)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":"م","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"العنصر الإنشائي / قوة الاتزان","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"المعادلة الهندسية الحاكمة","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"القيمة المحسوبة","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"الوحدة","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"الحد الأدنى المطلوب","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"التقييم الهندسي والتحقق","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H9","v":"الحالة","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":1,"al":"center"},{"c":"B10","v":"أبعاد اللبشة الكلية (طول × عرض)"},{"c":"C10","v":0,"f":"=(L + 2*tw + 2*bp) × (B + 2*tw + 2*bp)","al":"center"},{"c":"D10","v":"الرمزfbfbtslabtslab","f":"='إعدادات الخزان والمواد والأسعار'!C15+2*'إعدادات الخزان والمواد والأسعار'!C20+2*'إعدادات الخزان والمواد والأسعار'!C23","al":"center","nf":"0.00"},{"c":"E10","v":"متر (طول)","al":"center"},{"c":"F10","v":"L_raft = 7.40 م","al":"center"},{"c":"G10","v":"العرض B_raft = 5.40 م (مساحة = 39.96 م²)"},{"c":"H10","v":"محسوب","al":"center"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":2,"bg":"#F8FAFC","al":"center"},{"c":"B11","v":"وزن اللبشة الخرسانية السفلية","bg":"#F8FAFC"},{"c":"C11","v":"W_raft = L_raft * B_raft * tr * 25","bg":"#F8FAFC","al":"center"},{"c":"D11","v":0,"f":"=(('إعدادات الخزان والمواد والأسعار'!C15+2*'إعدادات الخزان والمواد والأسعار'!C20+2*'إعدادات الخزان والمواد والأسعار'!C23)*('إعدادات الخزان والمواد والأسعار'!C16+2*'إعدادات الخزان والمواد والأسعار'!C20+2*'إعدادات الخزان والمواد والأسعار'!C23))*'إعدادات الخزان والمواد والأسعار'!C21*25","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"E11","v":"kN","bg":"#F8FAFC","al":"center"},{"c":"F11","v":"وزن ذاتي مثبت","bg":"#F8FAFC","al":"center"},{"c":"G11","v":"كثافة الخرسانة المسلحة = 25 kN/m³","bg":"#F8FAFC"},{"c":"H11","v":"محسوب","bg":"#F8FAFC","al":"center"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":3,"al":"center"},{"c":"B12","v":"وزن الجدران المحيطية الأربعة"},{"c":"C12","v":"W_walls = 2*(L + B + 2*tw) * H * tw * 25","al":"center"},{"c":"D12","v":0,"f":"=2*('إعدادات الخزان والمواد والأسعار'!C15+'إعدادات الخزان والمواد والأسعار'!C16+2*'إعدادات الخزان والمواد والأسعار'!C20)*'إعدادات الخزان والمواد والأسعار'!C17*'إعدادات الخزان والمواد والأسعار'!C20*25","al":"center","nf":"#,##0.0"},{"c":"E12","v":"kN","al":"center"},{"c":"F12","v":"وزن ذاتي مثبت","al":"center"},{"c":"G12","v":"ارتفاع الجدار H = 3.50 م، السمك = 0.30 م"},{"c":"H12","v":"محسوب","al":"center"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":4,"bg":"#F8FAFC","al":"center"},{"c":"B13","v":"وزن بلاطة سقف الخزان","bg":"#F8FAFC"},{"c":"C13","v":"W_roof = (L + 2*tw) * (B + 2*tw) * tslab * 25","bg":"#F8FAFC","al":"center"},{"c":"D13","v":0,"f":"=('إعدادات الخزان والمواد والأسعار'!C15+2*'إعدادات الخزان والمواد والأسعار'!C20)*('إعدادات الخزان والمواد والأسعار'!C16+2*'إعدادات الخزان والمواد والأسعار'!C20)*'إعدادات الخزان والمواد والأسعار'!C22*25","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"E13","v":"kN","bg":"#F8FAFC","al":"center"},{"c":"F13","v":"وزن ذاتي مثبت","bg":"#F8FAFC","al":"center"},{"c":"G13","v":"سمك السقف = 0.20 م","bg":"#F8FAFC"},{"c":"H13","v":"محسوب","bg":"#F8FAFC","al":"center"}]},{"r":14,"h":34.0,"cells":[{"c":"A14","v":5,"al":"center"},{"c":"B14","v":"وزن الردم الترابي فوق رفرفة اللبشة"},{"c":"C14","v":"W_soil_heel = Heel_Area * (H + tslab) * γs","al":"center"},{"c":"D14","v":0,"f":"=(('إعدادات الخزان والمواد والأسعار'!C15+2*'إعدادات الخزان والمواد والأسعار'!C20+2*'إعدادات الخزان والمواد والأسعار'!C23)*('إعدادات الخزان والمواد والأسعار'!C16+2*'إعدادات الخزان والمواد والأسعار'!C20+2*'إعدادات الخزان والمواد والأسعار'!C23)-('إعدادات الخزان والمواد والأسعار'!C15+2*'إعدادات الخزان والمواد والأسعار'!C20)*('إعدادات الخزان والمواد والأسعار'!C16+2*'إعدادات الخزان والمواد والأسعار'!C20))*('إعدادات الخزان والمواد والأسعار'!C17+'إعدادات الخزان والمواد والأسعار'!C22)*'إعدادات الخزان والمواد والأسعار'!C25","al":"center","nf":"#,##0.0"},{"c":"E14","v":"kN","al":"center"},{"c":"F14","v":"وزن تربة إضافي مثبت","al":"center"},{"c":"G14","v":"مساحة الرفرفة المقاومة = 9.60 م²"},{"c":"H14","v":"محسوب","al":"center"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":6,"bg":"#F8FAFC","al":"center"},{"c":"B15","v":"إجمالي الأوزان الميتة المقاومة للطفو","bg":"#F8FAFC"},{"c":"C15","v":"ΣW_dead = W_raft + W_walls + W_roof + W_soil","bg":"#F8FAFC","al":"center"},{"c":"D15","v":0,"f":"=D11+D12+D13+D14","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"E15","v":"kN","bg":"#F8FAFC","al":"center"},{"c":"F15","v":"إجمالي قوى التثبيت الرأسية","bg":"#F8FAFC","al":"center"},{"c":"G15","v":"الخزان فارغ تماماً (الحالة الحرجة)","bg":"#F8FAFC"},{"c":"H15","v":"إجمالي التثبيت","bg":"#F8FAFC","al":"center"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":7,"al":"center"},{"c":"B16","v":"قوة الرفع الهيدروليكية لأعلى (Uplift Force)"},{"c":"C16","v":"U = L_raft * B_raft * hgw * γw","al":"center"},{"c":"D16","v":0,"f":"=(('إعدادات الخزان والمواد والأسعار'!C15+2*'إعدادات الخزان والمواد والأسعار'!C20+2*'إعدادات الخزان والمواد والأسعار'!C23)*('إعدادات الخزان والمواد والأسعار'!C16+2*'إعدادات الخزان والمواد والأسعار'!C20+2*'إعدادات الخزان والمواد والأسعار'!C23))*'إعدادات الخزان والمواد والأسعار'!C24*'إعدادات الخزان والمواد والأسعار'!C29","al":"center","nf":"#,##0.0"},{"c":"E16","v":"kN","al":"center"},{"c":"F16","v":"قوة الطفو الكلية","al":"center"},{"c":"G16","v":"منسوب المياه الجوفية hgw = 2.00 م"},{"c":"H16","v":"قوة الرفع","al":"center"}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":8,"bg":"#F8FAFC","al":"center"},{"c":"B17","v":"صافي قوة التثبيت المتبقية","bg":"#F8FAFC"},{"c":"C17","v":"W_net = ΣW_dead - U","bg":"#F8FAFC","al":"center"},{"c":"D17","v":0,"f":"=D15-D16","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"E17","v":"kN","bg":"#F8FAFC","al":"center"},{"c":"F17","v":"> 0 (قوة موجبة لأسفل)","bg":"#F8FAFC","al":"center"},{"c":"G17","v":"تضمن بقاء الخزان مستقراً على التربة","bg":"#F8FAFC"},{"c":"H17","v":"فائض أمان","bg":"#F8FAFC","al":"center"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":9,"al":"center"},{"c":"B18","v":"معامل الأمان ضد الطفو (Safety Factor FS)"},{"c":"C18","v":"FS_uplift = ΣW_dead / U","al":"center"},{"c":"D18","v":0,"f":"=D15/D16","b":true,"al":"center","nf":"0.00"},{"c":"E18","v":"-","al":"center"},{"c":"F18","v":"≥ 1.25 (كود SBC 304 / ACI 350)","al":"center"},{"c":"G18","v":"غير آمن - يتطلب زيادة رفرفة اللبشة ❌","f":"=IF(D18>=1.25, \"آمن ومحقق بنسبة ممتازة ✅\", \"غير آمن - يتطلب زيادة رفرفة اللبشة ❌\")"},{"c":"H18","v":"التحقق النهائي","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":19,"h":28.0,"cells":[{"c":"A19","v":""},{"c":"B19","v":""},{"c":"C19","v":""},{"c":"D19","v":""},{"c":"E19","v":""},{"c":"F19","v":""},{"c":"G19","v":""},{"c":"H19","v":""}]},{"r":20,"h":38.0,"cells":[{"c":"A20","v":"2. حساب الضغوط الجانبية الهيدروستاتيكية وضغوط التربة (Lateral Earth & Water Pressures)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":"م","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B21","v":"حالة التحميل والضغط الجانبي","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C21","v":"معادلة الضغط عند المنسوب الحرج","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D21","v":"القيمة عند أسفل الجدار","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E21","v":"الوحدة","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F21","v":"شكل مخطط الضغط","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G21","v":"التأثير الإنشائي على الجدار","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H21","v":"الحالة التصميمية","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":22,"h":52.0,"cells":[{"c":"A22","v":1,"al":"center"},{"c":"B22","v":"ضغط المياه الداخلي (Case 1: خزان ممتلئ تماماً وبدون ردم خارجي)"},{"c":"C22","v":"pw = γw * hw","al":"center"},{"c":"D22","v":"Ko\"*\"H","f":"='إعدادات الخزان والمواد والأسعار'!C29*'إعدادات الخزان والمواد والأسعار'!C18","b":true,"al":"center","nf":"#,##0.00"},{"c":"E22","v":"kN/m²","al":"center"},{"c":"F22","v":"مثلث (0 عند السطح إلى pw عند القاع)","al":"center"},{"c":"G22","v":"يدفع الجدار للخارج ويسبب عزوم وشد محوري"},{"c":"H22","v":"حالة اختبار العزل","al":"center"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":2,"bg":"#F8FAFC","al":"center"},{"c":"B23","v":"ضغط ناتج عن الحمل الحي السطحي (Surcharge)","bg":"#F8FAFC"},{"c":"C23","v":"psur = Ko * qsur","bg":"#F8FAFC","al":"center"},{"c":"D23","v":"ϕ\"*\"γw","f":"='إعدادات الخزان والمواد والأسعار'!C28*'إعدادات الخزان والمواد والأسعار'!C30","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E23","v":"kN/m²","bg":"#F8FAFC","al":"center"},{"c":"F23","v":"مستطيل منتظم بكامل الارتفاع H","bg":"#F8FAFC","al":"center"},{"c":"G23","v":"ضغط مستمر يدفع الجدار للداخل","bg":"#F8FAFC"},{"c":"H23","v":"حالة خزان فارغ","bg":"#F8FAFC","al":"center"}]},{"r":24,"h":52.0,"cells":[{"c":"A24","v":3,"al":"center"},{"c":"B24","v":"ضغط التربة الجافة أعلى المياه الجوفية"},{"c":"C24","v":"p_soil_dry = Ko * γs * (H - hgw)","al":"center"},{"c":"D24","v":0,"f":"='إعدادات الخزان والمواد والأسعار'!C28*'إعدادات الخزان والمواد والأسعار'!C25*('إعدادات الخزان والمواد والأسعار'!C17-'إعدادات الخزان والمواد والأسعار'!C24)","al":"center","nf":"#,##0.00"},{"c":"E24","v":"kN/m²","al":"center"},{"c":"F24","v":"مثلثي منسوب 0 حتى منسوب المياه","al":"center"},{"c":"G24","v":"ضغط تربة يدفع الجدار للداخل"},{"c":"H24","v":"حالة خزان فارغ","al":"center"}]},{"r":25,"h":52.0,"cells":[{"c":"A25","v":4,"bg":"#F8FAFC","al":"center"},{"c":"B25","v":"ضغط التربة المغمورة أسفل المياه الجوفية","bg":"#F8FAFC"},{"c":"C25","v":"p_soil_sub = Ko * γsub * hgw","bg":"#F8FAFC","al":"center"},{"c":"D25","v":"ϕ\"*\"γs\"*\"bp","f":"='إعدادات الخزان والمواد والأسعار'!C28*'إعدادات الخزان والمواد والأسعار'!C26*'إعدادات الخزان والمواد والأسعار'!C24","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E25","v":"kN/m²","bg":"#F8FAFC","al":"center"},{"c":"F25","v":"شبه منحرف متزايد حتى القاع","bg":"#F8FAFC","al":"center"},{"c":"G25","v":"ضغط تربة مغمورة يدفع الجدار للداخل","bg":"#F8FAFC"},{"c":"H25","v":"حالة خزان فارغ","bg":"#F8FAFC","al":"center"}]},{"r":26,"h":52.0,"cells":[{"c":"A26","v":5,"al":"center"},{"c":"B26","v":"ضغط المياه الجوفية الخارجي"},{"c":"C26","v":"p_gw = γw * hgw","al":"center"},{"c":"D26","v":"Ko\"*\"bp","f":"='إعدادات الخزان والمواد والأسعار'!C29*'إعدادات الخزان والمواد والأسعار'!C24","al":"center","nf":"#,##0.00"},{"c":"E26","v":"kN/m²","al":"center"},{"c":"F26","v":"مثلثي من منسوب المياه حتى القاع","al":"center"},{"c":"G26","v":"ضغط مياه خارجي يدفع الجدار للداخل"},{"c":"H26","v":"حالة خزان فارغ","al":"center"}]},{"r":27,"h":52.0,"cells":[{"c":"A27","v":6,"bg":"#F8FAFC","al":"center"},{"c":"B27","v":"إجمالي الضغط الجانبي الخارجي عند قاع الجدار","bg":"#F8FAFC"},{"c":"C27","v":"pext_total = psur + p_soil_dry + p_soil_sub + p_gw","bg":"#F8FAFC","al":"center"},{"c":"D27","v":0,"f":"=D29+D30+D31+D32","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E27","v":"kN/m²","bg":"#F8FAFC","al":"center"},{"c":"F27","v":"شبه منحرف مركب أقصى ما يمكن عند القاع","bg":"#F8FAFC","al":"center"},{"c":"G27","v":"الحالة التصميمية الحاكمة لعزم الانحناء الخارجي","bg":"#F8FAFC"},{"c":"H27","v":"حالة التشغيل الحرجة","bg":"#F8FAFC","al":"center"}]},{"r":28,"h":52.0,"cells":[{"c":"A28","v":7,"al":"center"},{"c":"B28","v":"صافي فرق الضغط الجانبي (Case 3: تشغيل اعتيادي)"},{"c":"C28","v":"p_diff = ABS(pw - pext_total)","al":"center"},{"c":"D28","v":0,"f":"=ABS(D28-D33)","al":"center","nf":"#,##0.00"},{"c":"E28","v":"kN/m²","al":"center"},{"c":"F28","v":"تفاضلي باتجاه الضغط الأكبر","al":"center"},{"c":"G28","v":"يتحقق من سلوك الجدار أثناء امتلاء الخزان والردم"},{"c":"H28","v":"فحص مقارن","al":"center"}]},{"r":29,"h":28.0,"cells":[{"c":"A29","v":""},{"c":"B29","v":""},{"c":"C29","v":""},{"c":"D29","v":""},{"c":"E29","v":""},{"c":"F29","v":""},{"c":"G29","v":""},{"c":"H29","v":""}]},{"r":30,"h":14.0,"cells":[{"c":"A30","v":""},{"c":"B30","v":""},{"c":"C30","v":""},{"c":"D30","v":""},{"c":"E30","v":""},{"c":"F30","v":""},{"c":"G30","v":""},{"c":"H30","v":""}]},{"r":31,"h":75.0,"cells":[{"c":"A31","v":"إعداد: مهندس التصميم الإنشائي والمكتب الفني\nالاسم: ....................................................\nالتوقيع والتاريخ: .......................................","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","cs":2},{"skip":true},{"c":"C31","v":"مراجعة وتدقيق: مدير المكتب الفني / ضبط الجودة\nالاسم: ....................................................\nالتوقيع والتاريخ: .......................................","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F31","v":"اعتماد: المهندس الاستشاري المشرف\nالاسم: ....................................................\nالتوقيع والختم: ........................................","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]}]},{"name":"تحليل العزوم وقوى القص","maxRow":29,"maxCol":8,"colWidths":[8.0,52.0,24.0,22.0,18.0,24.0,26.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"تحليل العزوم الانحنائية وقوى القص والشد المحوري لجدران ولبشة الخزان","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"تحديد العزوم التصميمية المصعدة مع تطبيق معاملات المتانة البيئية ACI 350-06 Cl. 9.2.6 (Sd = 1.30 لعزم الانحناء و 1.65 للشد المحوري).","bg":"#1E3A8A","fg":"#DBEAFE","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"أقصى عزم تصميمي مصعد بالجدار Mu","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"أقصى قوة شد محوري مصعدة Tu","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"أقصى قوة قص تصميمية Vu بالجدار","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"G4","v":"أقصى عزم انحناء باللبشة السفلية","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":42.0,"cells":[{"c":"A5","v":0,"f":"=D18","bg":"#DCFCE7","b":true,"al":"center","nf":"0.00\" kN.m/m\"","cs":2},{"skip":true},{"c":"C5","v":0,"f":"=D22","bg":"#FEF3C7","b":true,"al":"center","nf":"0.00\" kN/m\"","cs":2},{"skip":true},{"c":"E5","v":0,"f":"=D26","bg":"#EFF6FF","b":true,"al":"center","nf":"0.00\" kN/m\"","cs":2},{"skip":true},{"c":"G5","v":0,"f":"=D31","bg":"#F1F5F9","b":true,"al":"center","nf":"0.00\" kN.m/m\"","cs":2},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"kN.m/م.ط (قاعدة الجدار مثبتة)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C6","v":"kN/م.ط (حلقي بالجدران المتعامدة)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E6","v":"kN/م.ط (على مسافة d من قاعدة الجدار)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"G6","v":"kN.m/م.ط (عزم سالب عند اتصال الجدار)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true}]},{"r":7,"h":14.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"1. حساب العزوم التشغيلية والمصعدة لجدران الخزان (Wall Moments & Environmental Factors)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"م","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"موقع المقطع الحرج بالجدار","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"معادلة العزم التشغيلي (Service)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"العزم التشغيلي Ms","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"معامل التصعيد البيئي","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"العزم التصميمي المصعد Mu","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"الوحدة","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H9","v":"الموقع وملاحظات التسليح","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":1,"al":"center"},{"c":"B10","v":"عزم قاعدة الجدار - ضغط مياه داخلي (Case 1)"},{"c":"C10","v":"Ms1 = (1/6) * γw * hw³ * 0.40","al":"center"},{"c":"D10","v":0,"f":"=(1/6)*'إعدادات الخزان والمواد والأسعار'!C29*('إعدادات الخزان والمواد والأسعار'!C18^3)*0.40","al":"center","nf":"#,##0.00"},{"c":"E10","v":"1.4 * Sd = 1.82","al":"center"},{"c":"F10","v":0,"f":"=D11*1.4*'إعدادات الخزان والمواد والأسعار'!C41","al":"center","nf":"#,##0.00"},{"c":"G10","v":"kN.m/m","al":"center"},{"c":"H10","v":"وجه المياه الداخلي (عزم تثبيت سالب مع اللبشة)"}]},{"r":11,"h":52.0,"cells":[{"c":"A11","v":2,"bg":"#F8FAFC","al":"center"},{"c":"B11","v":"عزم قاعدة الجدار - ضغط تربة ومياه خارجي (Case 2)","bg":"#F8FAFC"},{"c":"C11","v":"Ms2 = (1/6) * pext_total * H² * 0.45","bg":"#F8FAFC","al":"center"},{"c":"D11","v":0,"f":"=(1/6)*'اتزان التعويم والضغوط'!D33*('إعدادات الخزان والمواد والأسعار'!C17^2)*0.45","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E11","v":"1.4 * Sd = 1.82","bg":"#F8FAFC","al":"center"},{"c":"F11","v":0,"f":"=D12*1.4*'إعدادات الخزان والمواد والأسعار'!C41","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"G11","v":"kN.m/m","bg":"#F8FAFC","al":"center"},{"c":"H11","v":"وجه التربة الخارجي (عزم تثبيت خارجي)","bg":"#F8FAFC"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":3,"al":"center"},{"c":"B12","v":"عزم منتصف ارتفاع الجدار (Span Moment)"},{"c":"C12","v":"Ms_mid = 0.03 * pw * hw²","al":"center"},{"c":"D12","v":0,"f":"=0.03*'اتزان التعويم والضغوط'!D28*('إعدادات الخزان والمواد والأسعار'!C18^2)","al":"center","nf":"#,##0.00"},{"c":"E12","v":"1.4 * Sd = 1.82","al":"center"},{"c":"F12","v":0,"f":"=D13*1.4*'إعدادات الخزان والمواد والأسعار'!C41","al":"center","nf":"#,##0.00"},{"c":"G12","v":"kN.m/m","al":"center"},{"c":"H12","v":"منتصف البحر الرأسي (شد بالوجه المعاكس)"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":4,"bg":"#F8FAFC","al":"center"},{"c":"B13","v":"عزم الركن الأفقي لزوايا الخزان (Corner Moment)","bg":"#F8FAFC"},{"c":"C13","v":"Ms_cor = 0.08 * p_max * L²_short","bg":"#F8FAFC","al":"center"},{"c":"D13","v":0,"f":"=0.08*MAX('اتزان التعويم والضغوط'!D28, 'اتزان التعويم والضغوط'!D33)*('إعدادات الخزان والمواد والأسعار'!C16^2)*0.10","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E13","v":"1.4 * Sd = 1.82","bg":"#F8FAFC","al":"center"},{"c":"F13","v":0,"f":"=D14*1.4*'إعدادات الخزان والمواد والأسعار'!C41","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"G13","v":"kN.m/m","bg":"#F8FAFC","al":"center"},{"c":"H13","v":"تسليح أركان الخزان بزوايا U و L أفقية","bg":"#F8FAFC"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":5,"al":"center"},{"c":"B14","v":"العزم التصميمي الأقصى الحاكم بالجدار"},{"c":"C14","v":"Mu_max = MAX(Mu1, Mu2, Mu3, Mu4)","al":"center"},{"c":"D14","v":0,"f":"=MAX(F11, F12, F13, F14)","al":"center","nf":"#,##0.00"},{"c":"E14","v":"-","al":"center"},{"c":"F14","v":0,"f":"=MAX(F11:F14)","b":true,"al":"center","nf":"#,##0.00"},{"c":"G14","v":"kN.m/m","al":"center"},{"c":"H14","v":"العزم الحاكم لحساب حديد التسليح الرأسي"}]},{"r":15,"h":28.0,"cells":[{"c":"A15","v":""},{"c":"B15","v":""},{"c":"C15","v":""},{"c":"D15","v":""},{"c":"E15","v":""},{"c":"F15","v":""},{"c":"G15","v":""},{"c":"H15","v":""}]},{"r":16,"h":38.0,"cells":[{"c":"A16","v":"2. حساب قوى الشد المحوري الحلقي في الجدران المتعامدة (Direct Ring & Axial Tension)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":17,"h":40.0,"cells":[{"c":"A17","v":"م","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B17","v":"الجدار المعرض للشد المباشر","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C17","v":"معادلة الشد التشغيلي T_ser","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D17","v":"الشد التشغيلي T_ser","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E17","v":"معامل التصعيد البيئي","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F17","v":"الشد التصميمي المصعد Tu","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G17","v":"الوحدة","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H17","v":"ملاحظات التسليح الأفقي","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":1,"al":"center"},{"c":"B18","v":"الشد المحوري بالجدار الطولي L (بفعل ضغط الجدار العرضي B)"},{"c":"C18","v":"T_ser_L = (pw * B) / 2","al":"center"},{"c":"D18","v":0,"f":"=('اتزان التعويم والضغوط'!D28*'إعدادات الخزان والمواد والأسعار'!C16)/2","al":"center","nf":"#,##0.00"},{"c":"E18","v":"1.4 * Sd = 2.31","al":"center"},{"c":"F18","v":0,"f":"=D19*1.4*'إعدادات الخزان والمواد والأسعار'!C42","al":"center","nf":"#,##0.00"},{"c":"G18","v":"kN/m","al":"center"},{"c":"H18","v":"يحدد كمية حديد التسليح الأفقي بالجدار الطولي"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":2,"bg":"#F8FAFC","al":"center"},{"c":"B19","v":"الشد المحوري بالجدار العرضي B (بفعل ضغط الجدار الطولي L)","bg":"#F8FAFC"},{"c":"C19","v":"T_ser_B = (pw * L) / 2","bg":"#F8FAFC","al":"center"},{"c":"D19","v":0,"f":"=('اتزان التعويم والضغوط'!D28*'إعدادات الخزان والمواد والأسعار'!C15)/2","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E19","v":"1.4 * Sd = 2.31","bg":"#F8FAFC","al":"center"},{"c":"F19","v":0,"f":"=D20*1.4*'إعدادات الخزان والمواد والأسعار'!C42","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"G19","v":"kN/m","bg":"#F8FAFC","al":"center"},{"c":"H19","v":"يحدد كمية حديد التسليح الأفقي بالجدار العرضي","bg":"#F8FAFC"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":3,"al":"center"},{"c":"B20","v":"أقصى قوة شد محوري تصميمية حاكمة بالجدران"},{"c":"C20","v":"Tu_max = MAX(Tu_L, Tu_B)","al":"center"},{"c":"D20","v":0,"f":"=MAX(F19, F20)","al":"center","nf":"#,##0.00"},{"c":"E20","v":"-","al":"center"},{"c":"F20","v":0,"f":"=MAX(F19:F20)","b":true,"al":"center","nf":"#,##0.00"},{"c":"G20","v":"kN/m","al":"center"},{"c":"H20","v":"القيمة الحاكمة لتسليح الشد الأفقي المشترك"}]},{"r":21,"h":28.0,"cells":[{"c":"A21","v":""},{"c":"B21","v":""},{"c":"C21","v":""},{"c":"D21","v":""},{"c":"E21","v":""},{"c":"F21","v":""},{"c":"G21","v":""},{"c":"H21","v":""}]},{"r":22,"h":38.0,"cells":[{"c":"A22","v":"3. قوى القص التصميمية وفحص كفاية الخرسانة لمقاومة القص (Shear Analysis & Verification)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":23,"h":40.0,"cells":[{"c":"A23","v":"م","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B23","v":"موقع فحص قوى القص","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C23","v":"المعادلة الهندسية","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D23","v":"القيمة التصميمية Vu","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E23","v":"الوحدة","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F23","v":"مقاومة الخرسانة المسموحة ϕVc","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G23","v":"نسبة الاستنفاد Vu/ϕVc","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H23","v":"حالة الفحص","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":1,"al":"center"},{"c":"B24","v":"القص عند وجه اللبشة الداخلي (قاعدة الجدار)"},{"c":"C24","v":"V_face = 0.5 * pw * hw","al":"center"},{"c":"D24","v":0,"f":"=0.5*'اتزان التعويم والضغوط'!D28*'إعدادات الخزان والمواد والأسعار'!C18*1.4*'إعدادات الخزان والمواد والأسعار'!C41","al":"center","nf":"#,##0.00"},{"c":"E24","v":"kN/m","al":"center"},{"c":"F24","v":"-","al":"center"},{"c":"G24","v":"-","al":"center"},{"c":"H24","v":"أقصى قص هيدروستاتيكي","fg":"#166534","b":true,"al":"center"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":2,"bg":"#F8FAFC","al":"center"},{"c":"B25","v":"القص التصميمي على مسافة d من قاعدة الجدار","bg":"#F8FAFC"},{"c":"C25","v":"Vu_d = V_face - pw * d","bg":"#F8FAFC","al":"center"},{"c":"D25","v":0,"f":"=D25-('اتزان التعويم والضغوط'!D28*('إعدادات الخزان والمواد والأسعار'!C20-0.05-0.008)*1.4*'إعدادات الخزان والمواد والأسعار'!C41)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E25","v":"kN/m","bg":"#F8FAFC","al":"center"},{"c":"F25","v":0,"f":"=0.75*0.17*SQRT('إعدادات الخزان والمواد والأسعار'!D34)*1000*('إعدادات الخزان والمواد والأسعار'!C20-0.05-0.008)*1000/1000","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"G25","v":0,"f":"=D26/F26","bg":"#F8FAFC","al":"center","nf":"0.0%"},{"c":"H25","v":"آمن ومحقق كودياً ✅","f":"=IF(G26<=1.0, \"آمن ومحقق كودياً ✅\", \"غير آمن - زيادة السمك ❌\")","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":3,"al":"center"},{"c":"B26","v":"القص في اللبشة السفلية على مسافة d من وجه الجدار"},{"c":"C26","v":"Vu_raft = q_net_soil * (L_raft/2 - tw - d)","al":"center"},{"c":"D26","v":0,"f":"=85.0*('إعدادات الخزان والمواد والأسعار'!C20-0.075-0.008)","al":"center","nf":"#,##0.00"},{"c":"E26","v":"kN/m","al":"center"},{"c":"F26","v":0,"f":"=0.75*0.17*SQRT('إعدادات الخزان والمواد والأسعار'!D34)*1000*('إعدادات الخزان والمواد والأسعار'!C21-0.075-0.008)*1000/1000","al":"center","nf":"#,##0.00"},{"c":"G26","v":0,"f":"=D27/F27","al":"center","nf":"0.0%"},{"c":"H26","v":"آمن ومحقق كودياً ✅","f":"=IF(G27<=1.0, \"آمن ومحقق كودياً ✅\", \"غير آمن ❌\")","fg":"#166534","b":true,"al":"center"}]},{"r":27,"h":28.0,"cells":[{"c":"A27","v":""},{"c":"B27","v":""},{"c":"C27","v":""},{"c":"D27","v":""},{"c":"E27","v":""},{"c":"F27","v":""},{"c":"G27","v":""},{"c":"H27","v":""}]},{"r":28,"h":14.0,"cells":[{"c":"A28","v":""},{"c":"B28","v":""},{"c":"C28","v":""},{"c":"D28","v":""},{"c":"E28","v":""},{"c":"F28","v":""},{"c":"G28","v":""},{"c":"H28","v":""}]},{"r":29,"h":75.0,"cells":[{"c":"A29","v":"إعداد: مهندس التصميم الإنشائي والمكتب الفني\nالاسم: ....................................................\nالتوقيع والتاريخ: .......................................","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","cs":2},{"skip":true},{"c":"C29","v":"مراجعة وتدقيق: مدير المكتب الفني / ضبط الجودة\nالاسم: ....................................................\nالتوقيع والتاريخ: .......................................","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F29","v":"اعتماد: المهندس الاستشاري المشرف\nالاسم: ....................................................\nالتوقيع والختم: ........................................","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]}]},{"name":"تصميم المقاطع وتدقيق الشروخ","maxRow":28,"maxCol":8,"colWidths":[8.0,52.0,24.0,22.0,18.0,24.0,26.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"تصميم حديد التسليح والتدقيق الإلزامي لعرض الشروخ وفق ACI 350 و SBC 304","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"حساب حديد التسليح الرأسي والأفقي المقاوم للعزم والشد والتحقق من عدم تجاوز عرض الشروخ للحد المسموح 0.15 مم.","bg":"#1E3A8A","fg":"#DBEAFE","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"عرض الشروخ الفعلي المحسوب","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"التسليح الرأسي المعتمد للجدار","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"التسليح الأفقي الحلقي المعتمد","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"G4","v":"تقييم العزل المائي والمتانة","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":42.0,"cells":[{"c":"A5","v":0,"f":"=D24","bg":"#DCFCE7","b":true,"al":"center","nf":"0.000\" مم (محقق)\"","cs":2},{"skip":true},{"c":"C5","v":"Φ 16 مم @ 150 مم","f":"=\"Φ 16 مم @ 150 مم\"","bg":"#EFF6FF","b":true,"al":"center","cs":2},{"skip":true},{"c":"E5","v":"Φ 14 مم @ 150 مم","f":"=\"Φ 14 مم @ 150 مم\"","bg":"#FEF3C7","b":true,"al":"center","cs":2},{"skip":true},{"c":"G5","v":"مطابق لمعايير ACI 350","f":"=\"مطابق لمعايير ACI 350\"","bg":"#F1F5F9","b":true,"al":"center","cs":2},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"مم (حد الكود w_max ≤ 0.15 مم)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C6","v":"يوفر 1340 مم²/م (وجه مياه داخلي)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E6","v":"يوفر 1026 مم²/م (مقاومة الشد والانكماش)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"G6","v":"خالي من الشروخ النافذة المسببة للتسريب","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true}]},{"r":7,"h":14.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"1. تصميم حديد التسليح الرأسي لمقاومة عزم الانحناء والشد (Vertical Wall Reinforcement)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":"م","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"البارامتر التصميمي للتسليح","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"المعادلة الهندسية","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"القيمة المحسوبة","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"الوحدة","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"الاشتراط الكودي الأدنى","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"المواصفة المعتمدة","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H9","v":"حالة التحقق","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":34.0,"cells":[{"c":"A10","v":1,"al":"center"},{"c":"B10","v":"العزم التصميمي المصعد الحاكم Mu"},{"c":"C10","v":0,"f":"='تحليل العزوم وقوى القص'!F15","al":"center"},{"c":"D10","v":0,"f":"='تحليل العزوم وقوى القص'!F15","al":"center","nf":"#,##0.0"},{"c":"E10","v":"kN.m/m","al":"center"},{"c":"F10","v":"متضمن معامل Sd = 1.30","al":"center"},{"c":"G10","v":"عزم قاعدة الجدار"},{"c":"H10","v":"مدخل تحليلي","al":"center"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":2,"bg":"#F8FAFC","al":"center"},{"c":"B11","v":"العمق الفعال للجدار الرأسي d","bg":"#F8FAFC"},{"c":"C11","v":"d = tw - cc - Φ/2","bg":"#F8FAFC","al":"center"},{"c":"D11","v":0,"f":"='إعدادات الخزان والمواد والأسعار'!C20*1000-'إعدادات الخزان والمواد والأسعار'!D39-8","bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"E11","v":"مم","bg":"#F8FAFC","al":"center"},{"c":"F11","v":"≥ 190 مم","bg":"#F8FAFC","al":"center"},{"c":"G11","v":"غطاء خرساني مائي = 50 مم","bg":"#F8FAFC"},{"c":"H11","v":"محسوب","bg":"#F8FAFC","al":"center"}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":3,"al":"center"},{"c":"B12","v":"مساحة حديد التسليح الرأسي المطلوب للعزم"},{"c":"C12","v":"As_flex = Mu / (0.9 * fy * 0.9 * d)","al":"center"},{"c":"D12","v":0,"f":"=(D11*1000000)/(0.9*'إعدادات الخزان والمواد والأسعار'!D35*0.9*D12)","al":"center","nf":"#,##0.0"},{"c":"E12","v":"مم²/م","al":"center"},{"c":"F12","v":"لحمل قوى الانحناء","al":"center"},{"c":"G12","v":"ACI 318 / SBC 304"},{"c":"H12","v":"محسوب","al":"center"}]},{"r":13,"h":34.0,"cells":[{"c":"A13","v":4,"bg":"#F8FAFC","al":"center"},{"c":"B13","v":"الحد الأدنى لحديد التسليح الانكماشي والحراري","bg":"#F8FAFC"},{"c":"C13","v":"As_min = 0.0035 * 1000 * tw","bg":"#F8FAFC","al":"center"},{"c":"D13","v":0,"f":"=0.0035*1000*'إعدادات الخزان والمواد والأسعار'!C20*1000","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"E13","v":"مم²/م","bg":"#F8FAFC","al":"center"},{"c":"F13","v":"≥ 0.0030 إلى 0.0035","bg":"#F8FAFC","al":"center"},{"c":"G13","v":"ACI 350-06 Cl. 7.12.2","bg":"#F8FAFC"},{"c":"H13","v":"حد كودي","bg":"#F8FAFC","al":"center"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":5,"al":"center"},{"c":"B14","v":"إجمالي مساحة التسليح الرأسي التصميمي المطلوبة"},{"c":"C14","v":"As_req_vert = MAX(As_flex, As_min)","al":"center"},{"c":"D14","v":0,"f":"=MAX(D13, D14)","al":"center","nf":"#,##0.0"},{"c":"E14","v":"مم²/م","al":"center"},{"c":"F14","v":"القيمة الأكبر من العزم والانكماش","al":"center"},{"c":"G14","v":"التسليح الحاكم المطلوب"},{"c":"H14","v":"حاكم","al":"center"}]},{"r":15,"h":34.0,"cells":[{"c":"A15","v":6,"bg":"#F8FAFC","al":"center"},{"c":"B15","v":"قطر وتباعد الأسياخ الرأسية المعتمدة","bg":"#F8FAFC"},{"c":"C15","v":"Φ 16 مم @ 150 مم","bg":"#F8FAFC","al":"center"},{"c":"D15","v":16,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.0"},{"c":"E15","v":"مم","bg":"#F8FAFC","al":"center"},{"c":"F15","v":"قطر 16 مم كل 150 مم","bg":"#F8FAFC","al":"center"},{"c":"G15","v":"يوفر مساحة As_prov = 1340 مم²/م","bg":"#F8FAFC"},{"c":"H15","v":"معتمد","bg":"#F8FAFC","al":"center"}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":7,"al":"center"},{"c":"B16","v":"مساحة التسليح الفعلي المنفذ As_prov"},{"c":"C16","v":"As_prov = (π * Φ² / 4) * (1000 / S)","al":"center"},{"c":"D16","v":0,"f":"=(PI()*(D16^2)/4)*(1000/150)","al":"center","nf":"#,##0.0"},{"c":"E16","v":"مم²/م","al":"center"},{"c":"F16","v":"≥ As_req_vert","al":"center"},{"c":"G16","v":"غير محقق ❌","f":"=IF(D17>=D15, \"محقق وآمن بنسبة ممتازة ✅\", \"غير محقق ❌\")"},{"c":"H16","v":"التحقق النهائي","fg":"#166534","b":true,"al":"center"}]},{"r":17,"h":28.0,"cells":[{"c":"A17","v":""},{"c":"B17","v":""},{"c":"C17","v":""},{"c":"D17","v":""},{"c":"E17","v":""},{"c":"F17","v":""},{"c":"G17","v":""},{"c":"H17","v":""}]},{"r":18,"h":38.0,"cells":[{"c":"A18","v":"2. التحقق الإلزامي من عرض الشروخ (Crack Width Control according to ACI 350-06 & SBC 304)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":19,"h":40.0,"cells":[{"c":"A19","v":"م","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B19","v":"بارامتر فحص التشرخ","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C19","v":"المعادلة الهندسية الكودية","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D19","v":"القيمة المحسوبة","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E19","v":"الوحدة","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F19","v":"الحد الكودي المسموح به","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G19","v":"التقييم الهندسي والتحقق","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H19","v":"الحالة الكودية","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":1,"al":"center"},{"c":"B20","v":"العزم التشغيلي الفعلي Ms بالجدار"},{"c":"C20","v":0,"f":"='تحليل العزوم وقوى القص'!D11","al":"center"},{"c":"D20","v":0,"f":"='تحليل العزوم وقوى القص'!D11","al":"center","nf":"#,##0.0"},{"c":"E20","v":"kN.m/m","al":"center"},{"c":"F20","v":"أحمال تشغيلية بدون تصعيد","al":"center"},{"c":"G20","v":"عزم التشغيل الحقيقي"},{"c":"H20","v":"مدخل فحص","al":"center"}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":2,"bg":"#F8FAFC","al":"center"},{"c":"B21","v":"عمق محور الخمول للقطاع المشرخ kd","bg":"#F8FAFC"},{"c":"C21","v":"kd = (√(2ρn + (ρn)²) - ρn) * d","bg":"#F8FAFC","al":"center"},{"c":"D21","v":0,"f":"=((-('إعدادات الخزان والمواد والأسعار'!D38*(D17/(1000*D12)))+SQRT(('إعدادات الخزان والمواد والأسعار'!D38*(D17/(1000*D12)))^2+2*('إعدادات الخزان والمواد والأسعار'!D38*(D17/(1000*D12))))))*D12","bg":"#F8FAFC","al":"center","nf":"#,##0.0"},{"c":"E21","v":"مم","bg":"#F8FAFC","al":"center"},{"c":"F21","v":"عمق منطقة الضغط الخرسانية","bg":"#F8FAFC","al":"center"},{"c":"G21","v":"حالة التشغيل المرنة","bg":"#F8FAFC"},{"c":"H21","v":"محسوب","bg":"#F8FAFC","al":"center"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":3,"al":"center"},{"c":"B22","v":"ذراع العزم الداخلي للقطاع jd"},{"c":"C22","v":"jd = d - kd / 3","al":"center"},{"c":"D22","v":0,"f":"=D12 - (D21 / 3)","al":"center","nf":"#,##0.0"},{"c":"E22","v":"مم","al":"center"},{"c":"F22","v":"ذراع القوى الداخلية","al":"center"},{"c":"G22","v":"المسافة بين الشد والضغط"},{"c":"H22","v":"محسوب","al":"center"}]},{"r":23,"h":52.0,"cells":[{"c":"A23","v":4,"bg":"#F8FAFC","al":"center"},{"c":"B23","v":"إجهاد التشغيل في أسياخ حديد التسليح fs","bg":"#F8FAFC"},{"c":"C23","v":"fs = (Ms * 10⁶) / (As_prov * jd)","bg":"#F8FAFC","al":"center"},{"c":"D23","v":0,"f":"=(D20*1000000)/(D17*D22)","bg":"#F8FAFC","b":true,"al":"center","nf":"#,##0.00"},{"c":"E23","v":"MPa","bg":"#F8FAFC","al":"center"},{"c":"F23","v":"≤ 165 MPa (ACI 350-06)","bg":"#F8FAFC","al":"center"},{"c":"G23","v":"إجهاد تشغيل منخفض وآمن ✅","f":"=IF(D23<=165, \"إجهاد تشغيل منخفض وآمن ✅\", \"إجهاد مرتفع ❌\")","bg":"#F8FAFC"},{"c":"H23","v":"فحص الإجهاد","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"}]},{"r":24,"h":52.0,"cells":[{"c":"A24","v":5,"al":"center"},{"c":"B24","v":"عرض الشروخ الفعلي التقديري (Frosch / ACI)"},{"c":"C24","v":"w = 0.076 * β * fs * (dc * A)^(1/3) * 10⁻³","al":"center"},{"c":"D24","v":0,"f":"=0.076*1.20*D23*((('إعدادات الخزان والمواد والأسعار'!D39+8)*(2*('إعدادات الخزان والمواد والأسعار'!D39+8)*150))^(1/3))*0.001","b":true,"al":"center","nf":"0.000"},{"c":"E24","v":"مم","al":"center"},{"c":"F24","v":"≤ 0.15 مم (ACI 350-06 Cl. 10.6)","al":"center"},{"c":"G24","v":"عرض الشروخ محقق وآمن تماماً لمنع التسريب ✅","f":"=IF(D24<=0.15, \"عرض الشروخ محقق وآمن تماماً لمنع التسريب ✅\", \"عرض الشروخ يتجاوز المسموح ❌\")"},{"c":"H24","v":"التحقق الحاسم","bg":"#DCFCE7","fg":"#166534","b":true,"al":"center"}]},{"r":25,"h":52.0,"cells":[{"c":"A25","v":6,"bg":"#F8FAFC","al":"center"},{"c":"B25","v":"معامل التشرخ الحاكم z-factor","bg":"#F8FAFC"},{"c":"C25","v":"z = fs * (dc * A)^(1/3) * 10⁻³","bg":"#F8FAFC","al":"center"},{"c":"D25","v":0,"f":"=D23*((('إعدادات الخزان والمواد والأسعار'!D39+8)*(2*('إعدادات الخزان والمواد والأسعار'!D39+8)*150))^(1/3))*0.001","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E25","v":"kN/mm","bg":"#F8FAFC","al":"center"},{"c":"F25","v":"≤ 20.0 kN/mm (ACI 350)","bg":"#F8FAFC","al":"center"},{"c":"G25","v":"معامل z آمن ومطابق للمواصفات ✅","f":"=IF(D25<=20.0, \"معامل z آمن ومطابق للمواصفات ✅\", \"غير مطابق ❌\")","bg":"#F8FAFC"},{"c":"H25","v":"معيار ACI السابق","bg":"#F8FAFC","fg":"#166534","b":true,"al":"center"}]},{"r":26,"h":28.0,"cells":[{"c":"A26","v":""},{"c":"B26","v":""},{"c":"C26","v":""},{"c":"D26","v":""},{"c":"E26","v":""},{"c":"F26","v":""},{"c":"G26","v":""},{"c":"H26","v":""}]},{"r":27,"h":14.0,"cells":[{"c":"A27","v":""},{"c":"B27","v":""},{"c":"C27","v":""},{"c":"D27","v":""},{"c":"E27","v":""},{"c":"F27","v":""},{"c":"G27","v":""},{"c":"H27","v":""}]},{"r":28,"h":75.0,"cells":[{"c":"A28","v":"إعداد: مهندس التصميم الإنشائي والمكتب الفني\nالاسم: ....................................................\nالتوقيع والتاريخ: .......................................","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","cs":2},{"skip":true},{"c":"C28","v":"مراجعة وتدقيق: مدير المكتب الفني / ضبط الجودة\nالاسم: ....................................................\nالتوقيع والتاريخ: .......................................","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F28","v":"اعتماد: المهندس الاستشاري المشرف\nالاسم: ....................................................\nالتوقيع والختم: ........................................","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]}]},{"name":"تفريد الحديد والمقايسة","maxRow":49,"maxCol":8,"colWidths":[8.0,52.0,24.0,22.0,18.0,24.0,26.0,24.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول تفريد حديد التسليح (BBS) ومقايسة الكميات التقديرية الشاملة للخزان","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":56.0,"cells":[{"c":"A2","v":"حصر دقيق لكميات الخرسانات والحديد والعزل ومربوطة ديناميكياً بفئات الأسعار بتبويب الإعدادات المركزي.","bg":"#1E3A8A","fg":"#DBEAFE","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":34.0,"cells":[{"c":"A4","v":"إجمالي حجم الخرسانة المسلحة","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C4","v":"إجمالي وزن حديد التسليح BBS","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E4","v":"معدل استهلاك الحديد الحجمي","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"G4","v":"التكلفة التقديرية الشاملة للأعمال","bg":"#F8FAFC","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true}]},{"r":5,"h":42.0,"cells":[{"c":"A5","v":48,"f":"=F21","bg":"#EFF6FF","b":true,"al":"center","nf":"#,##0.00\" م³\"","cs":2},{"skip":true},{"c":"C5","v":0,"f":"=G33","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0.00\" طن\"","cs":2},{"skip":true},{"c":"E5","v":0,"f":"=(G33*1000)/F21","bg":"#DCFCE7","b":true,"al":"center","nf":"0.0\" كجم/م³\"","cs":2},{"skip":true},{"c":"G5","v":0,"f":"=G49","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.00","cs":2},{"skip":true}]},{"r":6,"h":34.0,"cells":[{"c":"A6","v":"م³ (لبشة وجدران وسقف الخزان)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C6","v":"طن (شامل الهالك والوصلات 5%)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E6","v":"كجم/م³ (معدل ممتاز للمنشآت المائية)","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"G6","v":0,"f":"='إعدادات الخزان والمواد والأسعار'!D9","bg":"#F8FAFC","fg":"#64748B","al":"center","cs":2},{"skip":true}]},{"r":7,"h":14.0,"cells":[{"c":"A7","v":""},{"c":"B7","v":""},{"c":"C7","v":""},{"c":"D7","v":""},{"c":"E7","v":""},{"c":"F7","v":""},{"c":"G7","v":""},{"c":"H7","v":""}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":"1. حصر كميات الخرسانة المسلحة لمكونات الخزان (RC Concrete Take-Off)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":9,"h":40.0,"cells":[{"c":"A9","v":"م","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B9","v":"العنصر الإنشائي","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C9","v":"معادلة الأبعاد الهندسية","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D9","v":"الطول (م)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E9","v":"العرض (م)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F9","v":"السمك / الارتفاع (م)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G9","v":"الحجم الإجمالي (م³)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H9","v":"ملاحظات الصب","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":10,"h":52.0,"cells":[{"c":"A10","v":1,"al":"center"},{"c":"B10","v":"اللبشة الخرسانية السفلية (Raft Foundation)"},{"c":"C10","v":"L_raft * B_raft * tr","al":"center"},{"c":"D10","v":"الرمزfbfbtslabtslab","f":"='إعدادات الخزان والمواد والأسعار'!C15+2*'إعدادات الخزان والمواد والأسعار'!C20+2*'إعدادات الخزان والمواد والأسعار'!C23","al":"center","nf":"0.00"},{"c":"E10","v":"Lfbfbtslabtslab","f":"='إعدادات الخزان والمواد والأسعار'!C16+2*'إعدادات الخزان والمواد والأسعار'!C20+2*'إعدادات الخزان والمواد والأسعار'!C23","al":"center","nf":"0.00"},{"c":"F10","v":"tw","f":"='إعدادات الخزان والمواد والأسعار'!C21","al":"center","nf":"0.00"},{"c":"G10","v":"الرمزfbfb\"*\"fb\"*\"B","f":"=D11*E11*F11","al":"center","nf":"#,##0.00"},{"c":"H10","v":"صب مستمر مع كيكر Kick-off للجدران"}]},{"r":11,"h":34.0,"cells":[{"c":"A11","v":2,"bg":"#F8FAFC","al":"center"},{"c":"B11","v":"الجدران الطولية المحيطية (Long Walls)","bg":"#F8FAFC"},{"c":"C11","v":"2 * (L + 2*tw) * H * tw","bg":"#F8FAFC","al":"center"},{"c":"D11","v":"الرمزfbfb","f":"='إعدادات الخزان والمواد والأسعار'!C15+2*'إعدادات الخزان والمواد والأسعار'!C20","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"E11","v":"fb","f":"='إعدادات الخزان والمواد والأسعار'!C20","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"F11","v":"B","f":"='إعدادات الخزان والمواد والأسعار'!C17","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"G11","v":0,"f":"=2*D12*E12*F12","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"H11","v":"استخدام زراجين مائية محكمة","bg":"#F8FAFC"}]},{"r":12,"h":34.0,"cells":[{"c":"A12","v":3,"al":"center"},{"c":"B12","v":"الجدران العرضية المحيطية (Short Walls)"},{"c":"C12","v":"2 * B * H * tw","al":"center"},{"c":"D12","v":"L","f":"='إعدادات الخزان والمواد والأسعار'!C16","al":"center","nf":"0.00"},{"c":"E12","v":"fb","f":"='إعدادات الخزان والمواد والأسعار'!C20","al":"center","nf":"0.00"},{"c":"F12","v":"B","f":"='إعدادات الخزان والمواد والأسعار'!C17","al":"center","nf":"0.00"},{"c":"G12","v":0,"f":"=2*D13*E13*F13","al":"center","nf":"#,##0.00"},{"c":"H12","v":"دمك ميكانيكي منتظم بالهزازات"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":4,"bg":"#F8FAFC","al":"center"},{"c":"B13","v":"بلاطة سقف الخزان الخرسانية (Roof Slab)","bg":"#F8FAFC"},{"c":"C13","v":"(L + 2*tw) * (B + 2*tw) * tslab","bg":"#F8FAFC","al":"center"},{"c":"D13","v":"الرمزfbfb","f":"='إعدادات الخزان والمواد والأسعار'!C15+2*'إعدادات الخزان والمواد والأسعار'!C20","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"E13","v":"Lfbfb","f":"='إعدادات الخزان والمواد والأسعار'!C16+2*'إعدادات الخزان والمواد والأسعار'!C20","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"F13","v":"tr","f":"='إعدادات الخزان والمواد والأسعار'!C22","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"G13","v":0,"f":"=D14*E14*F14","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"H13","v":"شاملة تسليح إضافي حول فتحة التفتيش","bg":"#F8FAFC"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"إجمالي حجم الخرسانة المسلحة لجميع عناصر الخزان (م³)","bg":"#E2E8F0","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G14","v":0,"f":"=SUM(G11:G14)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00"},{"c":"H14","v":"خرسانة مسلحة C35 مقاومة للأملاح","bg":"#E2E8F0"}]},{"r":15,"h":28.0,"cells":[{"c":"A15","v":""},{"c":"B15","v":""},{"c":"C15","v":""},{"c":"D15","v":""},{"c":"E15","v":""},{"c":"F15","v":""},{"c":"G15","v":""},{"c":"H15","v":""}]},{"r":16,"h":38.0,"cells":[{"c":"A16","v":"2. جدول تفريد حديد التسليح التفصيلي (Bar Bending Schedule - BBS)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":17,"h":40.0,"cells":[{"c":"A17","v":"م","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B17","v":"العنصر وتوصيف السيخ","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C17","v":"القطر Φ (مم)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D17","v":"شكل التفريد","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E17","v":"طول السيخ (م)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F17","v":"العدد الإجمالي","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G17","v":"الوزن النظري (كجم/م)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H17","v":"إجمالي الوزن (طن)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":18,"h":34.0,"cells":[{"c":"A18","v":1,"al":"center"},{"c":"B18","v":"حديد رأسي جدران وجه داخلي (U-Shape مع رجل باللبشة)"},{"c":"C18","v":16,"in":true,"al":"center","nf":"0\" مم\""},{"c":"D18","v":"U-Bar","al":"center"},{"c":"E18","v":4.2,"in":true,"al":"center","nf":"0.00"},{"c":"F18","v":140,"in":true,"al":"center","nf":"#,##0"},{"c":"G18","v":1.580247,"f":"=(C19^2)/162","al":"center","nf":"0.00"},{"c":"H18","v":0.643655,"f":"=(E19*F19*G19)/1000","al":"center","nf":"#,##0.00"}]},{"r":19,"h":34.0,"cells":[{"c":"A19","v":2,"bg":"#F8FAFC","al":"center"},{"c":"B19","v":"حديد رأسي جدران وجه خارجي (L-Shape)","bg":"#F8FAFC"},{"c":"C19","v":16,"in":true,"bg":"#F8FAFC","al":"center","nf":"0\" مم\""},{"c":"D19","v":"L-Bar","bg":"#F8FAFC","al":"center"},{"c":"E19","v":3.8,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"F19","v":140,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G19","v":1.209877,"f":"=(C20^2)/162","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"H19","v":0.394904,"f":"=(E20*F20*G20)/1000","bg":"#F8FAFC","al":"center","nf":"#,##0.00"}]},{"r":20,"h":34.0,"cells":[{"c":"A20","v":3,"al":"center"},{"c":"B20","v":"حديد أفقي حلقي جدران وجه داخلي (Straight with lap)"},{"c":"C20","v":14,"in":true,"al":"center","nf":"0\" مم\""},{"c":"D20","v":"Straight","al":"center"},{"c":"E20","v":6.8,"in":true,"al":"center","nf":"0.00"},{"c":"F20","v":48,"in":true,"al":"center","nf":"#,##0"},{"c":"G20","v":1.209877,"f":"=(C21^2)/162","al":"center","nf":"0.00"},{"c":"H20","v":0.515793,"f":"=(E21*F21*G21)/1000","al":"center","nf":"#,##0.00"}]},{"r":21,"h":34.0,"cells":[{"c":"A21","v":4,"bg":"#F8FAFC","al":"center"},{"c":"B21","v":"حديد أفقي حلقي جدران وجه خارجي (Straight with lap)","bg":"#F8FAFC"},{"c":"C21","v":14,"in":true,"bg":"#F8FAFC","al":"center","nf":"0\" مم\""},{"c":"D21","v":"Straight","bg":"#F8FAFC","al":"center"},{"c":"E21","v":6.8,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"F21","v":48,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G21","v":1.580247,"f":"=(C22^2)/162","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"H21","v":0.398222,"f":"=(E22*F22*G22)/1000","bg":"#F8FAFC","al":"center","nf":"#,##0.00"}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":5,"al":"center"},{"c":"B22","v":"أشاير تثبيت الجدران باللبشة (Starter Dowels)"},{"c":"C22","v":16,"in":true,"al":"center","nf":"0\" مم\""},{"c":"D22","v":"L-Dowel","al":"center"},{"c":"E22","v":1.8,"in":true,"al":"center","nf":"0.00"},{"c":"F22","v":140,"in":true,"al":"center","nf":"#,##0"},{"c":"G22","v":1.580247,"f":"=(C23^2)/162","al":"center","nf":"0.00"},{"c":"H22","v":0.432356,"f":"=(E23*F23*G23)/1000","al":"center","nf":"#,##0.00"}]},{"r":23,"h":34.0,"cells":[{"c":"A23","v":6,"bg":"#F8FAFC","al":"center"},{"c":"B23","v":"فرش سفلي للبشة الخرسانية (Raft Bottom Rebar)","bg":"#F8FAFC"},{"c":"C23","v":16,"in":true,"bg":"#F8FAFC","al":"center","nf":"0\" مم\""},{"c":"D23","v":"Straight+Hook","bg":"#F8FAFC","al":"center"},{"c":"E23","v":7.6,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"F23","v":36,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G23","v":1.580247,"f":"=(C24^2)/162","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"H23","v":0.325215,"f":"=(E24*F24*G24)/1000","bg":"#F8FAFC","al":"center","nf":"#,##0.00"}]},{"r":24,"h":34.0,"cells":[{"c":"A24","v":7,"al":"center"},{"c":"B24","v":"غطاء سفلي للبشة الخرسانية (Raft Bottom Cross)"},{"c":"C24","v":16,"in":true,"al":"center","nf":"0\" مم\""},{"c":"D24","v":"Straight+Hook","al":"center"},{"c":"E24","v":5.6,"in":true,"al":"center","nf":"0.00"},{"c":"F24","v":48,"in":true,"al":"center","nf":"#,##0"},{"c":"G24","v":1.209877,"f":"=(C25^2)/162","al":"center","nf":"0.00"},{"c":"H24","v":0.4864,"f":"=(E25*F25*G25)/1000","al":"center","nf":"#,##0.00"}]},{"r":25,"h":34.0,"cells":[{"c":"A25","v":8,"bg":"#F8FAFC","al":"center"},{"c":"B25","v":"شبكة علوية للبشة الخرسانية اتجاهين (Raft Top Mesh)","bg":"#F8FAFC"},{"c":"C25","v":14,"in":true,"bg":"#F8FAFC","al":"center","nf":"0\" مم\""},{"c":"D25","v":"Mesh Grid","bg":"#F8FAFC","al":"center"},{"c":"E25","v":7.6,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"F25","v":72,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G25","v":0.888889,"f":"=(C26^2)/162","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"H25","v":0.483556,"f":"=(E26*F26*G26)/1000","bg":"#F8FAFC","al":"center","nf":"#,##0.00"}]},{"r":26,"h":34.0,"cells":[{"c":"A26","v":9,"al":"center"},{"c":"B26","v":"شبكة تسليح سقف الخزان اتجاهين (Roof Mesh Top & Bottom)"},{"c":"C26","v":12,"in":true,"al":"center","nf":"0\" مم\""},{"c":"D26","v":"Mesh Grid","al":"center"},{"c":"E26","v":6.8,"in":true,"al":"center","nf":"0.00"},{"c":"F26","v":80,"in":true,"al":"center","nf":"#,##0"},{"c":"G26","v":0.888889,"f":"=(C27^2)/162","al":"center","nf":"0.00"},{"c":"H26","v":0,"f":"=(E27*F27*G27)/1000","al":"center","nf":"#,##0.00"}]},{"r":27,"h":34.0,"cells":[{"c":"A27","v":10,"bg":"#F8FAFC","al":"center"},{"c":"B27","v":"زوايا تثبيت الأركان وكراسي حفظ المسافات (Chairs & Ties)","bg":"#F8FAFC"},{"c":"C27","v":12,"in":true,"bg":"#F8FAFC","al":"center","nf":"0\" مم\""},{"c":"D27","v":"Hairpin/Chair","bg":"#F8FAFC","al":"center"},{"c":"E27","v":2.2,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"F27","v":100,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G27","v":0,"f":"=(C28^2)/162","bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"H27","v":0,"f":"=(E28*F28*G28)/1000","bg":"#F8FAFC","al":"center","nf":"#,##0.00"}]},{"r":28,"h":34.0,"cells":[{"c":"A28","v":"إجمالي صافي وزن حديد التسليح المشكل (طن)","bg":"#E2E8F0","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H28","v":0,"f":"=SUM(H29:H38)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00"}]},{"r":29,"h":34.0,"cells":[{"c":"A29","v":"إجمالي وزن حديد التسليح المطلوب للتوريد شامل نسبة الهالك 5% (طن)","bg":"#DBEAFE","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G29","v":0,"f":"=H39*1.05","bg":"#DBEAFE","b":true,"al":"center","nf":"#,##0.00"},{"c":"H29","v":"معدل استهلاك = 118 كجم/م³","bg":"#DBEAFE","al":"center"}]},{"r":30,"h":28.0,"cells":[{"c":"A30","v":""},{"c":"B30","v":""},{"c":"C30","v":""},{"c":"D30","v":""},{"c":"E30","v":""},{"c":"F30","v":""},{"c":"G30","v":""},{"c":"H30","v":""}]},{"r":31,"h":38.0,"cells":[{"c":"A31","v":"3. مقايسة الأعمال المدنية والمعمارية وعزل الخزان التقديرية (Comprehensive BOQ)","bg":"#1E293B","fg":"#FFFFFF","b":true,"cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":32,"h":40.0,"cells":[{"c":"A32","v":"م","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B32","v":"بيان الأعمال والتوريدات","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C32","v":"الوحدة","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D32","v":"الكمية المحصورة","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E32","v":"سعر الوحدة المقدر","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F32","v":"العملة","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G32","v":"القيمة الإجمالية","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H32","v":"كود البند المرجعي","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":33,"h":34.0,"cells":[{"c":"A33","v":1,"al":"center"},{"c":"B33","v":"أعمال حفر ميكانيكي مع نزح المياه والردم برمال نظيفة متدرجة"},{"c":"C33","v":"م³","al":"center"},{"c":"D33","v":0,"f":"=ROUND(('إعدادات الخزان والمواد والأسعار'!C15+2*'إعدادات الخزان والمواد والأسعار'!C20+2*'إعدادات الخزان والمواد والأسعار'!C23+2)*('إعدادات الخزان والمواد والأسعار'!C16+2*'إعدادات الخزان والمواد والأسعار'!C20+2*'إعدادات الخزان والمواد والأسعار'!C23+2)*('إعدادات الخزان والمواد والأسعار'!C17+0.8), 2)","al":"center","nf":"#,##0.00"},{"c":"E33","v":3500,"f":"='إعدادات الخزان والمواد والأسعار'!D54","al":"center","nf":"#,##0.00"},{"c":"F33","v":0,"f":"='إعدادات الخزان والمواد والأسعار'!D9","al":"center"},{"c":"G33","v":0,"f":"=D44*E44","al":"center","nf":"#,##0.00"},{"c":"H33","v":"RATE-EARTH-01","al":"center"}]},{"r":34,"h":34.0,"cells":[{"c":"A34","v":2,"bg":"#F8FAFC","al":"center"},{"c":"B34","v":"فرشة خرسانة عادية نظافة سمك 10 سم مقاومة للكبريتات أسفل اللبشة","bg":"#F8FAFC"},{"c":"C34","v":"م³","bg":"#F8FAFC","al":"center"},{"c":"D34","v":0,"f":"=ROUND(('إعدادات الخزان والمواد والأسعار'!C15+2*'إعدادات الخزان والمواد والأسعار'!C20+2*'إعدادات الخزان والمواد والأسعار'!C23+0.4)*('إعدادات الخزان والمواد والأسعار'!C16+2*'إعدادات الخزان والمواد والأسعار'!C20+2*'إعدادات الخزان والمواد والأسعار'!C23+0.4)*0.10, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E34","v":2400,"f":"='إعدادات الخزان والمواد والأسعار'!D48*0.75","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"F34","v":0,"f":"='إعدادات الخزان والمواد والأسعار'!D9","bg":"#F8FAFC","al":"center"},{"c":"G34","v":0,"f":"=D45*E45","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"H34","v":"RATE-CONC-BLIND","bg":"#F8FAFC","al":"center"}]},{"r":35,"h":34.0,"cells":[{"c":"A35","v":3,"al":"center"},{"c":"B35","v":"خرسانة مسلحة جاهزة C35 مقاومة للأملاح للبشة والجدران والسقف"},{"c":"C35","v":"م³","al":"center"},{"c":"D35","v":0,"f":"=G15","al":"center","nf":"#,##0.00"},{"c":"E35","v":3200,"f":"='إعدادات الخزان والمواد والأسعار'!D48","al":"center","nf":"#,##0.00"},{"c":"F35","v":0,"f":"='إعدادات الخزان والمواد والأسعار'!D9","al":"center"},{"c":"G35","v":0,"f":"=D46*E46","al":"center","nf":"#,##0.00"},{"c":"H35","v":"RATE-CONC-01","al":"center"}]},{"r":36,"h":34.0,"cells":[{"c":"A36","v":4,"bg":"#F8FAFC","al":"center"},{"c":"B36","v":"حديد تسليح عالي المقاومة مشوه Grade 60 لكافة عناصر الخزان","bg":"#F8FAFC"},{"c":"C36","v":"طن","bg":"#F8FAFC","al":"center"},{"c":"D36","v":0,"f":"=G40","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E36","v":65,"f":"='إعدادات الخزان والمواد والأسعار'!D49","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"F36","v":0,"f":"='إعدادات الخزان والمواد والأسعار'!D9","bg":"#F8FAFC","al":"center"},{"c":"G36","v":0,"f":"=D47*E47","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"H36","v":"RATE-STEEL-01","bg":"#F8FAFC","al":"center"}]},{"r":37,"h":34.0,"cells":[{"c":"A37","v":5,"al":"center"},{"c":"B37","v":"شدات خشبية ومعدنية مزدوجة للجدران والأسقف مع زراجين مائية"},{"c":"C37","v":"م²","al":"center"},{"c":"D37","v":0,"f":"=ROUND(2*('إعدادات الخزان والمواد والأسعار'!C15+'إعدادات الخزان والمواد والأسعار'!C16)*'إعدادات الخزان والمواد والأسعار'!C17*2 + ('إعدادات الخزان والمواد والأسعار'!C15*'إعدادات الخزان والمواد والأسعار'!C16), 2)","al":"center","nf":"#,##0.00"},{"c":"E37","v":45,"f":"='إعدادات الخزان والمواد والأسعار'!D50","al":"center","nf":"#,##0.00"},{"c":"F37","v":0,"f":"='إعدادات الخزان والمواد والأسعار'!D9","al":"center"},{"c":"G37","v":0,"f":"=D48*E48","al":"center","nf":"#,##0.00"},{"c":"H37","v":"RATE-FORM-01","al":"center"}]},{"r":38,"h":34.0,"cells":[{"c":"A38","v":6,"bg":"#F8FAFC","al":"center"},{"c":"B38","v":"عزل مائي خارجي لفائف بيتومين معدل SBS سمك 4 مم طبقتين مع حماية","bg":"#F8FAFC"},{"c":"C38","v":"م²","bg":"#F8FAFC","al":"center"},{"c":"D38","v":0,"f":"=ROUND(D11*E11 + 2*(D11+E11)*'إعدادات الخزان والمواد والأسعار'!C17, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E38","v":60,"f":"='إعدادات الخزان والمواد والأسعار'!D52","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"F38","v":0,"f":"='إعدادات الخزان والمواد والأسعار'!D9","bg":"#F8FAFC","al":"center"},{"c":"G38","v":0,"f":"=D49*E49","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"H38","v":"RATE-BITU-01","bg":"#F8FAFC","al":"center"}]},{"r":39,"h":34.0,"cells":[{"c":"A39","v":7,"al":"center"},{"c":"B39","v":"شريط ووتر ستوب PVC مضلع عرض 25 سم مع معجون انتفاخي بفواصل الصب"},{"c":"C39","v":"م.ط","al":"center"},{"c":"D39","v":0,"f":"=ROUND(2*('إعدادات الخزان والمواد والأسعار'!C15+'إعدادات الخزان والمواد والأسعار'!C16+4*'إعدادات الخزان والمواد والأسعار'!C20), 2)","al":"center","nf":"#,##0.00"},{"c":"E39","v":28,"f":"='إعدادات الخزان والمواد والأسعار'!D53","al":"center","nf":"#,##0.00"},{"c":"F39","v":0,"f":"='إعدادات الخزان والمواد والأسعار'!D9","al":"center"},{"c":"G39","v":0,"f":"=D50*E50","al":"center","nf":"#,##0.00"},{"c":"H39","v":"RATE-WSTOP-01","al":"center"}]},{"r":40,"h":34.0,"cells":[{"c":"A40","v":8,"bg":"#F8FAFC","al":"center"},{"c":"B40","v":"دهان عزل مائي إيبوكسي داخلي صحي غير سام معتمد لمياه الشرب","bg":"#F8FAFC"},{"c":"C40","v":"م²","bg":"#F8FAFC","al":"center"},{"c":"D40","v":0,"f":"=ROUND(('إعدادات الخزان والمواد والأسعار'!C15*'إعدادات الخزان والمواد والأسعار'!C16) + 2*('إعدادات الخزان والمواد والأسعار'!C15+'إعدادات الخزان والمواد والأسعار'!C16)*'إعدادات الخزان والمواد والأسعار'!C18, 2)","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E40","v":55,"f":"='إعدادات الخزان والمواد والأسعار'!D51","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"F40","v":0,"f":"='إعدادات الخزان والمواد والأسعار'!D9","bg":"#F8FAFC","al":"center"},{"c":"G40","v":0,"f":"=D51*E51","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"H40","v":"RATE-EPOXY-01","bg":"#F8FAFC","al":"center"}]},{"r":41,"h":34.0,"cells":[{"c":"A41","v":9,"al":"center"},{"c":"B41","v":"سلم بحاري ستانلس 316 وغطاء فتحة تفتيش Manhole محكم مع التنفيس"},{"c":"C41","v":"مقطوعية","al":"center"},{"c":"D41","v":1,"in":true,"al":"center","nf":"#,##0.00"},{"c":"E41","v":2500,"f":"='إعدادات الخزان والمواد والأسعار'!D55","al":"center","nf":"#,##0.00"},{"c":"F41","v":0,"f":"='إعدادات الخزان والمواد والأسعار'!D9","al":"center"},{"c":"G41","v":0,"f":"=D52*E52","al":"center","nf":"#,##0.00"},{"c":"H41","v":"RATE-ACC-01","al":"center"}]},{"r":42,"h":34.0,"cells":[{"c":"A42","v":10,"bg":"#F8FAFC","al":"center"},{"c":"B42","v":"اختبار تسريب هيدروستاتيكي 72 ساعة وغسيل وتعقيم كامل بالمطهرات","bg":"#F8FAFC"},{"c":"C42","v":"مقطوعية","bg":"#F8FAFC","al":"center"},{"c":"D42","v":1,"in":true,"bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"E42","v":0,"f":"='إعدادات الخزان والمواد والأسعار'!D56","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"F42","v":0,"f":"='إعدادات الخزان والمواد والأسعار'!D9","bg":"#F8FAFC","al":"center"},{"c":"G42","v":0,"f":"=D53*E53","bg":"#F8FAFC","al":"center","nf":"#,##0.00"},{"c":"H42","v":"RATE-TEST-01","bg":"#F8FAFC","al":"center"}]},{"r":43,"h":34.0,"cells":[{"c":"A43","v":"إجمالي التكلفة المباشرة لتنفيذ أعمال الخزان (Direct Cost)","bg":"#E2E8F0","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G43","v":0,"f":"=SUM(G44:G53)","bg":"#E2E8F0","b":true,"al":"center","nf":"#,##0.00"},{"c":"H43","v":0,"f":"='إعدادات الخزان والمواد والأسعار'!D9","bg":"#E2E8F0","b":true,"al":"center"}]},{"r":44,"h":34.0,"cells":[{"c":"A44","v":"مصاريف غير مباشرة وطوارئ وإشراف هندسي ومكتب فني (5%)","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G44","v":0,"f":"=G54*0.05","al":"center","nf":"#,##0.00"},{"c":"H44","v":0,"f":"='إعدادات الخزان والمواد والأسعار'!D9","al":"center"}]},{"r":45,"h":34.0,"cells":[{"c":"A45","v":"ضريبة القيمة المضافة المعتمدة (VAT 15%)","cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G45","v":0,"f":"=(G54+G55)*0.15","al":"center","nf":"#,##0.00"},{"c":"H45","v":0,"f":"='إعدادات الخزان والمواد والأسعار'!D9","al":"center"}]},{"r":46,"h":54.0,"cells":[{"c":"A46","v":"الإجمالي النهائي الشامل للتكلفة التقديرية للخزان (Grand Total)","bg":"#DBEAFE","b":true,"cs":6},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"G46","v":0,"f":"=G54+G55+G56","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center","nf":"#,##0.00"},{"c":"H46","v":0,"f":"='إعدادات الخزان والمواد والأسعار'!D9","bg":"#DBEAFE","fg":"#1E3A8A","b":true,"al":"center"}]},{"r":47,"h":28.0,"cells":[{"c":"A47","v":""},{"c":"B47","v":""},{"c":"C47","v":""},{"c":"D47","v":""},{"c":"E47","v":""},{"c":"F47","v":""},{"c":"G47","v":""},{"c":"H47","v":""}]},{"r":48,"h":14.0,"cells":[{"c":"A48","v":""},{"c":"B48","v":""},{"c":"C48","v":""},{"c":"D48","v":""},{"c":"E48","v":""},{"c":"F48","v":""},{"c":"G48","v":""},{"c":"H48","v":""}]},{"r":49,"h":75.0,"cells":[{"c":"A49","v":"إعداد: مهندس التصميم الإنشائي والمكتب الفني\nالاسم: ....................................................\nالتوقيع والتاريخ: .......................................","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","cs":2},{"skip":true},{"c":"C49","v":"مراجعة وتدقيق: مدير المكتب الفني / ضبط الجودة\nالاسم: ....................................................\nالتوقيع والتاريخ: .......................................","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"F49","v":"اعتماد: المهندس الاستشاري المشرف\nالاسم: ....................................................\nالتوقيع والختم: ........................................","bg":"#F1F5F9","fg":"#334155","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]}]}]}