{"slug":"villa-landscape-hardscape-and-garden-boq","sheets":[{"name":"ملخص اللاندسكيب والمساحات","maxRow":23,"maxCol":10,"colWidths":[22.0,16.0,24.0,16.0,20.0,18.0,24.0,16.0,22.0,18.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"نموذج مقايسة أعمال اللاندسكيب والهاردسكيب وتنسيق حدائق الفلل والإنترلوك وشبكات الري","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":54.0,"cells":[{"c":"A2","v":"شيت هندسي متكامل لحساب كميات وتكاليف الأرضيات الخارجية والإنترلوك والبرجولات والشلالات وشبكات الري الأوتوماتيكي والإضاءة والزراعات","bg":"#065F46","fg":"#E2E8F0","al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: محددات ومساحات الحديقة والفراغات الخارجية للفيلا (عدّل القيم بالخلايا الخضراء لتتحدث المقايسة تلقائياً)","bg":"#0F766E","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":52.0,"cells":[{"c":"A5","v":"مساحة الأرض الكلية (م²):","bg":"#F1F5F9","b":true},{"c":"B5","v":600,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"C5","v":"مسطح مبنى الفيلا الأرضي (م²):","bg":"#F1F5F9","b":true},{"c":"D5","v":240,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"E5","v":"صافي مسطح الحديقة (م²):","bg":"#F1F5F9","b":true},{"c":"F5","v":360,"f":"=B5-D5","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0\" م²\""},{"c":"G5","v":"مسطح الهاردسكيب والمشايات (55%):","bg":"#F1F5F9","b":true},{"c":"H5","v":198,"f":"=ROUND(F5*0.55, 1)","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0.0\" م²\""},{"c":"I5","v":"مسطح الزراعة والنجيل (45%):","bg":"#F1F5F9","b":true},{"c":"J5","v":162,"f":"=F5-H5","bg":"#ECFDF5","b":true,"al":"center","nf":"#,##0.0\" م²\""}]},{"r":6,"h":12.0,"cells":[{"c":"A6","v":""},{"c":"B6","v":""},{"c":"C6","v":""},{"c":"D6","v":""},{"c":"E6","v":""},{"c":"F6","v":""},{"c":"G6","v":""},{"c":"H6","v":""},{"c":"I6","v":""},{"c":"J6","v":""}]},{"r":7,"h":34.0,"cells":[{"c":"A7","v":"إجمالي تكلفة اللاندسكيب والهاردسكيب","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"C7","v":"إجمالي أعمال الهاردسكيب والبرجولات والشلال","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"E7","v":"إجمالي السوفت سكيب وشبكة الري والإضاءة","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"G7","v":"متوسط تكلفة المتر المربع لتنسيق الحديقة","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true},{"c":"I7","v":"إجمالي مصنعيات التركيب والزراعة فقط","bg":"#F1F5F9","fg":"#475569","b":true,"al":"center","cs":2},{"skip":true}]},{"r":8,"h":46.0,"cells":[{"c":"A8","v":535879.9,"f":"='المقايسة التفصيلية للاندسكيب'!J47","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true},{"c":"C8","v":363020,"f":"=SUM(G13:G16)","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true},{"c":"E8","v":172859.9,"f":"=SUM(G17:G19)","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true},{"c":"G8","v":1488.555278,"f":"=IF(F5>0, A8/F5, 0)","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0\" / م²\"","cs":2},{"skip":true},{"c":"I8","v":136248.7,"f":"='المقايسة التفصيلية للاندسكيب'!I47","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0","cs":2},{"skip":true}]},{"r":9,"h":34.0,"cells":[{"c":"A9","v":"شامل الأرضيات والبرجولة والري والزراعة","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"C9","v":"الأرضيات الصلبة + البرجولة + الجلسات + الشلال","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"E9","v":"النجيل والأشجار + الري الأوتوماتيكي + الإضاءة","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"G9","v":"التكلفة الشاملة لكل متر مربع من الحديقة","fg":"#64748B","al":"center","cs":2},{"skip":true},{"c":"I9","v":"أجور تركيب الإنترلوك والبرجولة والري والزراعة","fg":"#64748B","al":"center","cs":2},{"skip":true}]},{"r":10,"h":14.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""},{"c":"F10","v":""},{"c":"G10","v":""},{"c":"H10","v":""},{"c":"I10","v":""},{"c":"J10","v":""}]},{"r":11,"h":38.0,"cells":[{"c":"A11","v":"ثانياً: ملخص التكاليف والكميات حسب أقسام اللاندسكيب والهاردسكيب السبعة","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":"كود القسم","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B12","v":"قسم اللاندسكيب / الهاردسكيب ونطاق الأعمال","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"E12","v":"تكلفة توريد الخامات","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F12","v":"تكلفة مصنعية التركيب","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G12","v":"الإجمالي الكلي للقسم","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H12","v":"النسبة من الميزانية %","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I12","v":"الضوابط الفنية ومعايير الاستلام الهندسي بالحديقة","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"LS-01","b":true,"al":"center"},{"c":"B13","v":"أعمال التسوية الترابية وإحلال التربة الزراعية وتصريف الأمطار","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"E13","v":33686,"f":"='المقايسة التفصيلية للاندسكيب'!H10","al":"center","nf":"#,##0"},{"c":"F13","v":18870.5,"f":"='المقايسة التفصيلية للاندسكيب'!I10","al":"center","nf":"#,##0"},{"c":"G13","v":52556.5,"f":"='المقايسة التفصيلية للاندسكيب'!J10","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"},{"c":"H13","v":0,"f":"=IF($G$20>0, G13/$G$20, 0)","b":true,"al":"center","nf":"0.0%"},{"c":"I13","v":"إبعاد أحواض الزراعة المروية مسافة 60 سم عن أساسات الفيلا وعمل ميول صرف","cs":2},{"skip":true}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"LS-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":"أعمال الهاردسكيب والأرضيات الخارجية والإنترلوك والبردورات","bg":"#F8FAFC","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"E14","v":86841,"f":"='المقايسة التفصيلية للاندسكيب'!H16","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"F14","v":31954.5,"f":"='المقايسة التفصيلية للاندسكيب'!I16","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G14","v":118795.5,"f":"='المقايسة التفصيلية للاندسكيب'!J16","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"},{"c":"H14","v":0,"f":"=IF($G$20>0, G14/$G$20, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0%"},{"c":"I14","v":"دمك طبقة البيس كورس جيداً واستخدام إنترلوك 8 سم لمدخل السيارات و6 سم للمشايات","bg":"#F8FAFC","cs":2},{"skip":true}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"LS-03","b":true,"al":"center"},{"c":"B15","v":"أعمال البرجولات والجلسات الخارجية الغاطسة وركن الشواء (BBQ)","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"E15","v":109660,"f":"='المقايسة التفصيلية للاندسكيب'!H22","al":"center","nf":"#,##0"},{"c":"F15","v":34328,"f":"='المقايسة التفصيلية للاندسكيب'!I22","al":"center","nf":"#,##0"},{"c":"G15","v":143988,"f":"='المقايسة التفصيلية للاندسكيب'!J22","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"},{"c":"H15","v":0,"f":"=IF($G$20>0, G15/$G$20, 0)","b":true,"al":"center","nf":"0.0%"},{"c":"I15","v":"دهان هيكل البرجولة الحديدي ببرايمر إيبوكسي وتأسيس الصرف والمياه لركن الشواء","cs":2},{"skip":true}]},{"r":16,"h":52.0,"cells":[{"c":"A16","v":"LS-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B16","v":"أعمال الشلالات الجدارية والنوافير والديكورات المائية","bg":"#F8FAFC","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"E16","v":36020,"f":"='المقايسة التفصيلية للاندسكيب'!H28","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"F16","v":11660,"f":"='المقايسة التفصيلية للاندسكيب'!I28","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G16","v":47680,"f":"='المقايسة التفصيلية للاندسكيب'!J28","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"},{"c":"H16","v":0,"f":"=IF($G$20>0, G16/$G$20, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0%"},{"c":"I16","v":"عزل حوض الشلال بـ 3 طبقات سيكا 107 وإيبوكسي مائي وتركيب مضخة غاطسة صامتة","bg":"#F8FAFC","cs":2},{"skip":true}]},{"r":17,"h":52.0,"cells":[{"c":"A17","v":"LS-05","b":true,"al":"center"},{"c":"B17","v":"أعمال شبكة الري الأوتوماتيكي والرشاشات والتنقيط (Irrigation)","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"E17","v":28213.7,"f":"='المقايسة التفصيلية للاندسكيب'!H34","al":"center","nf":"#,##0"},{"c":"F17","v":9995.7,"f":"='المقايسة التفصيلية للاندسكيب'!I34","al":"center","nf":"#,##0"},{"c":"G17","v":38209.4,"f":"='المقايسة التفصيلية للاندسكيب'!J34","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"},{"c":"H17","v":0,"f":"=IF($G$20>0, G17/$G$20, 0)","b":true,"al":"center","nf":"0.0%"},{"c":"I17","v":"فصل محابس رشاشات النجيل (Pop-up) عن محابس نقاط الأشجار لضبط كميات المياه","cs":2},{"skip":true}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"LS-06","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B18","v":"أعمال الإضاءة الخارجية للحديقة والمشايات والأسوار (IP65 / IP68)","bg":"#F8FAFC","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"E18","v":55130,"f":"='المقايسة التفصيلية للاندسكيب'!H40","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"F18","v":15580,"f":"='المقايسة التفصيلية للاندسكيب'!I40","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"G18","v":70710,"f":"='المقايسة التفصيلية للاندسكيب'!J40","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"},{"c":"H18","v":0,"f":"=IF($G$20>0, G18/$G$20, 0)","bg":"#F8FAFC","b":true,"al":"center","nf":"0.0%"},{"c":"I18","v":"استخدام كشافات حراب وغاطسة بمعامل حماية IP67 وربطها بقاطع تفاضلي ضد التسريب","bg":"#F8FAFC","cs":2},{"skip":true}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":"LS-07","b":true,"al":"center"},{"c":"B19","v":"أعمال السوفت سكيب والنجيل والنخيل والأشجار ومغطيات التربة","b":true,"cs":3},{"skip":true},{"skip":true},{"c":"E19","v":50080.5,"f":"='المقايسة التفصيلية للاندسكيب'!H46","al":"center","nf":"#,##0"},{"c":"F19","v":13860,"f":"='المقايسة التفصيلية للاندسكيب'!I46","al":"center","nf":"#,##0"},{"c":"G19","v":63940.5,"f":"='المقايسة التفصيلية للاندسكيب'!J46","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"},{"c":"H19","v":0,"f":"=IF($G$20>0, G19/$G$20, 0)","b":true,"al":"center","nf":"0.0%"},{"c":"I19","v":"توريد رولات نجيل باسبالوم خالية من الحشائش الغريبة وتدعيم النخيل والأشجار بسنادات","cs":2},{"skip":true}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":"إجمالي تكلفة أعمال اللاندسكيب والهاردسكيب وتنسيق الحديقة","bg":"#FEF3C7","b":true,"cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"E20","v":399631.2,"f":"=SUM(E13:E19)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0"},{"c":"F20","v":136248.7,"f":"=SUM(F13:F19)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0"},{"c":"G20","v":535879.9,"f":"=SUM(G13:G19)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0"},{"c":"H20","v":0,"f":"=SUM(H13:H19)","bg":"#FEF3C7","b":true,"al":"center","nf":"0.0%"},{"c":"I20","v":"شامل التوريد والتركيب والزراعة وضمان صيانة النباتات لمدة 3 أشهر","bg":"#FEF3C7","b":true,"al":"center","cs":2},{"skip":true}]},{"r":21,"h":14.0,"cells":[{"c":"A21","v":""},{"c":"B21","v":""},{"c":"C21","v":""},{"c":"D21","v":""},{"c":"E21","v":""},{"c":"F21","v":""},{"c":"G21","v":""},{"c":"H21","v":""},{"c":"I21","v":""},{"c":"J21","v":""}]},{"r":22,"h":34.0,"cells":[{"c":"A22","v":"إعداد مهندس اللاندسكيب / المكتب الفني","bg":"#F1F5F9","b":true,"al":"center","cs":3},{"skip":true},{"skip":true},{"c":"D22","v":"مراجعة المهندس المشرف على التنفيذ والزراعة","bg":"#F1F5F9","b":true,"al":"center","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"H22","v":"موافقة المالك / صاحب الفيلا","bg":"#F1F5F9","b":true,"al":"center","cs":3},{"skip":true},{"skip":true}]},{"r":23,"h":72.0,"cells":[{"c":"A23","v":"الاسم: ...........................................\nالتوقيع: ........................................","cs":3},{"skip":true},{"skip":true},{"c":"D23","v":"الاسم: ...........................................\nالتوقيع: ........................................","cs":4},{"skip":true},{"skip":true},{"skip":true},{"c":"H23","v":"الاسم: ...........................................\nالتوقيع: ........................................","cs":3},{"skip":true},{"skip":true}]}]},{"name":"المقايسة التفصيلية للاندسكيب","maxRow":47,"maxCol":10,"colWidths":[14.0,62.0,14.0,14.0,16.0,16.0,16.0,18.0,18.0,20.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"جدول الكميات والمقايسة التفصيلية لأعمال اللاندسكيب والهاردسكيب وتنسيق الحدائق (28 بنداً)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":54.0,"cells":[{"c":"A2","v":"ترتبط الكميات ديناميكياً بصافي مسطح الحديقة ومسطح الهاردسكيب والسوفت سكيب في اللوحة الرئيسية، مع فصل الخامات عن المصنعيات","bg":"#065F46","fg":"#E2E8F0","al":"center","cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""},{"c":"I3","v":""},{"c":"J3","v":""}]},{"r":4,"h":42.0,"cells":[{"c":"A4","v":"كود البند","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"بيان الأعمال والمواصفات الفنية لأعمال الهاردسكيب واللاندسكيب","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"الوحدة","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"معامل الحصر","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"الكمية التلقائية","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"سعر وحدة التوريد","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"سعر وحدة المصنعية","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"إجمالي تكلفة التوريد","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"I4","v":"إجمالي تكلفة المصنعية","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"J4","v":"الإجمالي الكلي للبند","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":38.0,"cells":[{"c":"A5","v":"القسم الأول: أعمال التسوية الترابية وإحلال التربة الزراعية وتصريف الأمطار (Site Grading & Drainage)","bg":"#065F46","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":"01-01","b":true,"al":"center"},{"c":"B6","v":"تنظيف وتسوية أرضية الحديقة وإزالة مخلفات البناء والردم وضبط الميول السطحية بعيداً عن المبنى"},{"c":"C6","v":"م2 مسطح","b":true,"al":"center"},{"c":"D6","v":1,"in":true,"al":"center","nf":"0.00"},{"c":"E6","v":360,"f":"=ROUND('ملخص اللاندسكيب والمساحات'!$F$5*D6, 1)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F6","v":10,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G6","v":28,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H6","v":3600,"f":"=E6*F6","al":"center","nf":"#,##0"},{"c":"I6","v":10080,"f":"=E6*G6","al":"center","nf":"#,##0"},{"c":"J6","v":13680,"f":"=H6+I6","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":"01-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"حفر وإحلال وتوريد تربة زراعية رملية حلوة معالجة مخلوطة بالبيتموس والكمبوست بعمق 40 سم للأحواض","bg":"#F8FAFC"},{"c":"C7","v":"م3 تربة","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D7","v":0.45,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"E7","v":72.9,"f":"=ROUND('ملخص اللاندسكيب والمساحات'!$J$5*D7, 1)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F7","v":240,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G7","v":65,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H7","v":17496,"f":"=E7*F7","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"I7","v":4738.5,"f":"=E7*G7","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J7","v":22234.5,"f":"=H7+I7","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":"01-03","b":true,"al":"center"},{"c":"B8","v":"توريد وفرش ودمك طبقة تأسيس حصوية (Base Course) بسمك 15 سم أسفل المشايات وموقف السيارات"},{"c":"C8","v":"م3 مدموك","b":true,"al":"center"},{"c":"D8","v":0.18,"in":true,"al":"center","nf":"0.00"},{"c":"E8","v":35.6,"f":"=ROUND('ملخص اللاندسكيب والمساحات'!$H$5*D8, 1)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F8","v":185,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G8","v":65,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H8","v":6586,"f":"=E8*F8","al":"center","nf":"#,##0"},{"c":"I8","v":2314,"f":"=E8*G8","al":"center","nf":"#,##0"},{"c":"J8","v":8900,"f":"=H8+I8","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":"01-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"توريد وتركيب مجاري تصريف مياه الأمطار والغسيل (Linear Trench Drains) بأغطية جريليت","bg":"#F8FAFC"},{"c":"C9","v":"م.ط مجرى","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D9","v":0.08,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"E9","v":15.8,"f":"=ROUND('ملخص اللاندسكيب والمساحات'!$H$5*D9, 1)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F9","v":380,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G9","v":110,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H9","v":6004,"f":"=E9*F9","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"I9","v":1738,"f":"=E9*G9","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J9","v":7742,"f":"=H9+I9","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":10,"h":40.0,"cells":[{"c":"A10","v":"إجمالي القسم الأول","bg":"#F1F5F9","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H10","v":33686,"f":"=SUM(H6:H9)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"I10","v":18870.5,"f":"=SUM(I6:I9)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"J10","v":52556.5,"f":"=SUM(J6:J9)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"}]},{"r":11,"h":38.0,"cells":[{"c":"A11","v":"القسم الثاني: أعمال الهاردسكيب والأرضيات الخارجية والإنترلوك والبردورات (Hardscape Pavings)","bg":"#065F46","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":12,"h":52.0,"cells":[{"c":"A12","v":"02-01","b":true,"al":"center"},{"c":"B12","v":"توريد وتركيب بلاط إنترلوك أسمنتي معالج (سمك 8 سم لموقف السيارات و6 سم للممرات) شامل فرشة الرمل"},{"c":"C12","v":"م2 إنترلوك","b":true,"al":"center"},{"c":"D12","v":0.55,"in":true,"al":"center","nf":"0.00"},{"c":"E12","v":108.9,"f":"=ROUND('ملخص اللاندسكيب والمساحات'!$H$5*D12, 1)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F12","v":210,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G12","v":85,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H12","v":22869,"f":"=E12*F12","al":"center","nf":"#,##0"},{"c":"I12","v":9256.5,"f":"=E12*G12","al":"center","nf":"#,##0"},{"c":"J12","v":32125.5,"f":"=H12+I12","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":13,"h":52.0,"cells":[{"c":"A13","v":"02-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"توريد وتركيب أرضيات بورسلين خارجي مضاد للانزلاق (Anti-Slip R11 سمك 20 مم) للتراسات والجلسات","bg":"#F8FAFC"},{"c":"C13","v":"م2 بورسلين","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D13","v":0.35,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"E13","v":69.3,"f":"=ROUND('ملخص اللاندسكيب والمساحات'!$H$5*D13, 1)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F13","v":480,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G13","v":140,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H13","v":33264,"f":"=E13*F13","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"I13","v":9702,"f":"=E13*G13","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J13","v":42966,"f":"=H13+I13","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":14,"h":52.0,"cells":[{"c":"A14","v":"02-03","b":true,"al":"center"},{"c":"B14","v":"توريد وتركيب بلاطات خطو حجرية (Stepping Stones بازلت/ترافنتينو) وسط النجيل والحصى الديكوري"},{"c":"C14","v":"م2 حجر","b":true,"al":"center"},{"c":"D14","v":0.1,"in":true,"al":"center","nf":"0.00"},{"c":"E14","v":19.8,"f":"=ROUND('ملخص اللاندسكيب والمساحات'!$H$5*D14, 1)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F14","v":520,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G14","v":160,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H14","v":10296,"f":"=E14*F14","al":"center","nf":"#,##0"},{"c":"I14","v":3168,"f":"=E14*G14","al":"center","nf":"#,##0"},{"c":"J14","v":13464,"f":"=H14+I14","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":15,"h":52.0,"cells":[{"c":"A15","v":"02-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B15","v":"توريد وتركيب بردورات فاصلة بين الأحواض الزراعية والمشايات (Kerbstones) شاملة الخرسانة الخلفية","bg":"#F8FAFC"},{"c":"C15","v":"م.ط بردورة","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D15","v":0.42,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"E15","v":151.2,"f":"=ROUND('ملخص اللاندسكيب والمساحات'!$F$5*D15, 1)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F15","v":135,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G15","v":65,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H15","v":20412,"f":"=E15*F15","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"I15","v":9828,"f":"=E15*G15","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J15","v":30240,"f":"=H15+I15","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":16,"h":40.0,"cells":[{"c":"A16","v":"إجمالي القسم الثاني","bg":"#F1F5F9","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H16","v":86841,"f":"=SUM(H12:H15)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"I16","v":31954.5,"f":"=SUM(I12:I15)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"J16","v":118795.5,"f":"=SUM(J12:J15)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"}]},{"r":17,"h":38.0,"cells":[{"c":"A17","v":"القسم الثالث: أعمال البرجولات والجلسات الخارجية الغاطسة وركن الشواء (Pergolas & Outdoor Living)","bg":"#065F46","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":18,"h":52.0,"cells":[{"c":"A18","v":"03-01","b":true,"al":"center"},{"c":"B18","v":"تصنيع وتركيب برجولة رئيسية من قطاعات الألومنيوم أو الحديد المدهون إلكتروستاتيك وتكسيات WPC"},{"c":"C18","v":"م2 برجولة","b":true,"al":"center"},{"c":"D18","v":0.08,"in":true,"al":"center","nf":"0.00"},{"c":"E18","v":28.8,"f":"=ROUND('ملخص اللاندسكيب والمساحات'!$F$5*D18, 1)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F18","v":1850,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G18","v":550,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H18","v":53280,"f":"=E18*F18","al":"center","nf":"#,##0"},{"c":"I18","v":15840,"f":"=E18*G18","al":"center","nf":"#,##0"},{"c":"J18","v":69120,"f":"=H18+I18","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":19,"h":52.0,"cells":[{"c":"A19","v":"03-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B19","v":"إنشاء وتشطيب جلسة خارجية مبنية أو غاطسة (Sunken Seating) مكسوة بالبورسلين والخشب المعالج","bg":"#F8FAFC"},{"c":"C19","v":"م.ط جلسة","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D19","v":0.04,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"E19","v":14.4,"f":"=ROUND('ملخص اللاندسكيب والمساحات'!$F$5*D19, 1)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F19","v":1450,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G19","v":520,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H19","v":20880,"f":"=E19*F19","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"I19","v":7488,"f":"=E19*G19","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J19","v":28368,"f":"=H19+I19","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":20,"h":52.0,"cells":[{"c":"A20","v":"03-03","b":true,"al":"center"},{"c":"B20","v":"تجهيز وبناء ركن الشواء والبوفيه الخارجي (Outdoor BBQ Counter) بالرخام الجرانيت والحوض"},{"c":"C20","v":"مقطوعية","b":true,"al":"center"},{"c":"D20","v":1,"in":true,"al":"center","nf":"0.00"},{"c":"E20","v":1,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F20","v":24000,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G20","v":8500,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H20","v":24000,"f":"=E20*F20","al":"center","nf":"#,##0"},{"c":"I20","v":8500,"f":"=E20*G20","al":"center","nf":"#,##0"},{"c":"J20","v":32500,"f":"=H20+I20","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":21,"h":52.0,"cells":[{"c":"A21","v":"03-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B21","v":"توريد وتركيب موقد نار خارجي ديكوري (Outdoor Gas/Bio-Ethanol Fire Pit) وسط الجلسة","bg":"#F8FAFC"},{"c":"C21","v":"عدد","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D21","v":1,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"E21","v":1,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F21","v":11500,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G21","v":2500,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H21","v":11500,"f":"=E21*F21","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"I21","v":2500,"f":"=E21*G21","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J21","v":14000,"f":"=H21+I21","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":22,"h":40.0,"cells":[{"c":"A22","v":"إجمالي القسم الثالث","bg":"#F1F5F9","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H22","v":109660,"f":"=SUM(H18:H21)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"I22","v":34328,"f":"=SUM(I18:I21)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"J22","v":143988,"f":"=SUM(J18:J21)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"}]},{"r":23,"h":38.0,"cells":[{"c":"A23","v":"القسم الرابع: أعمال الشلالات الجدارية والنوافير والديكورات المائية (Water Features)","bg":"#065F46","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":24,"h":52.0,"cells":[{"c":"A24","v":"04-01","b":true,"al":"center"},{"c":"B24","v":"إنشاء وعزل حوض وجدار الشلال الخرساني بـ 3 طبقات عزل أسمنتي مرن Sika-107 ودهان إيبوكسي مائي"},{"c":"C24","v":"مقطوعية","b":true,"al":"center"},{"c":"D24","v":1,"in":true,"al":"center","nf":"0.00"},{"c":"E24","v":1,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F24","v":12500,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G24","v":5500,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H24","v":12500,"f":"=E24*F24","al":"center","nf":"#,##0"},{"c":"I24","v":5500,"f":"=E24*G24","al":"center","nf":"#,##0"},{"c":"J24","v":18000,"f":"=H24+I24","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":25,"h":52.0,"cells":[{"c":"A25","v":"04-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B25","v":"تكسية خلفية وجوانب الشلال الجداري بحجر المايكا الطبيعي أو الرخام المشطوف مع مصب ستانلس 316","bg":"#F8FAFC"},{"c":"C25","v":"م2 تكسية","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D25","v":1,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"E25","v":14,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F25","v":780,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G25","v":240,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H25","v":10920,"f":"=E25*F25","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"I25","v":3360,"f":"=E25*G25","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J25","v":14280,"f":"=H25+I25","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":26,"h":52.0,"cells":[{"c":"A26","v":"04-03","b":true,"al":"center"},{"c":"B26","v":"توريد وتركيب مضخة تدوير مياه غاطسة صامتة مع فلتر تنقية ومحابس ضبط تدفق المياه للشلال"},{"c":"C26","v":"مجموعة","b":true,"al":"center"},{"c":"D26","v":1,"in":true,"al":"center","nf":"0.00"},{"c":"E26","v":1,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F26","v":8800,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G26","v":1800,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H26","v":8800,"f":"=E26*F26","al":"center","nf":"#,##0"},{"c":"I26","v":1800,"f":"=E26*G26","al":"center","nf":"#,##0"},{"c":"J26","v":10600,"f":"=H26+I26","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":27,"h":52.0,"cells":[{"c":"A27","v":"04-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B27","v":"توريد وتركيب كشافات إضاءة غاطسة تحت الماء (Submersible LED IP68 12V) داخل حوض الشلال","bg":"#F8FAFC"},{"c":"C27","v":"عدد","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D27","v":1,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"E27","v":4,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F27","v":950,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G27","v":250,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H27","v":3800,"f":"=E27*F27","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"I27","v":1000,"f":"=E27*G27","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J27","v":4800,"f":"=H27+I27","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":28,"h":40.0,"cells":[{"c":"A28","v":"إجمالي القسم الرابع","bg":"#F1F5F9","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H28","v":36020,"f":"=SUM(H24:H27)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"I28","v":11660,"f":"=SUM(I24:I27)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"J28","v":47680,"f":"=SUM(J24:J27)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"}]},{"r":29,"h":38.0,"cells":[{"c":"A29","v":"القسم الخامس: أعمال شبكة الري الأوتوماتيكي والرشاشات والتنقيط (Automatic Irrigation)","bg":"#065F46","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":30,"h":52.0,"cells":[{"c":"A30","v":"05-01","b":true,"al":"center"},{"c":"B30","v":"توريد وتمديد شبكة مواسير التغذية الرئيسية والفرعية للري (UPVC Class 4 ضغط 10 بار) بالحفر والردم"},{"c":"C30","v":"م.ط مواسير","b":true,"al":"center"},{"c":"D30","v":0.65,"in":true,"al":"center","nf":"0.00"},{"c":"E30","v":105.3,"f":"=ROUND('ملخص اللاندسكيب والمساحات'!$J$5*D30, 1)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F30","v":65,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G30","v":35,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H30","v":6844.5,"f":"=E30*F30","al":"center","nf":"#,##0"},{"c":"I30","v":3685.5,"f":"=E30*G30","al":"center","nf":"#,##0"},{"c":"J30","v":10530,"f":"=H30+I30","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":31,"h":52.0,"cells":[{"c":"A31","v":"05-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B31","v":"توريد وتركيب رشاشات نجيل غاطسة منبثقة (Pop-up Sprinklers Hunter/Rain Bird) شاملة الفواني","bg":"#F8FAFC"},{"c":"C31","v":"عدد رشاش","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D31","v":0.14,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"E31","v":23,"f":"=ROUND('ملخص اللاندسكيب والمساحات'!$J$5*D31, 0)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F31","v":290,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G31","v":85,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H31","v":6670,"f":"=E31*F31","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"I31","v":1955,"f":"=E31*G31","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J31","v":8625,"f":"=H31+I31","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":32,"h":52.0,"cells":[{"c":"A32","v":"05-03","b":true,"al":"center"},{"c":"B32","v":"توريد ومد خراطيم الري بالتنقيط (Drip Lines GR 16mm) للأشجار والأسوار النباتية"},{"c":"C32","v":"م.ط خرطوم","b":true,"al":"center"},{"c":"D32","v":1.2,"in":true,"al":"center","nf":"0.00"},{"c":"E32","v":194.4,"f":"=ROUND('ملخص اللاندسكيب والمساحات'!$J$5*D32, 1)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F32","v":18,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G32","v":8,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H32","v":3499.2,"f":"=E32*F32","al":"center","nf":"#,##0"},{"c":"I32","v":1555.2,"f":"=E32*G32","al":"center","nf":"#,##0"},{"c":"J32","v":5054.4,"f":"=H32+I32","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":33,"h":52.0,"cells":[{"c":"A33","v":"05-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B33","v":"توريد وتركيب لوحة تحكم ذكية (Smart Timer Controller) + 4 محابس سولينويد كهربائية بصندوق الحماية","bg":"#F8FAFC"},{"c":"C33","v":"مجموعة","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D33","v":1,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"E33","v":1,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F33","v":11200,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G33","v":2800,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H33","v":11200,"f":"=E33*F33","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"I33","v":2800,"f":"=E33*G33","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J33","v":14000,"f":"=H33+I33","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":34,"h":40.0,"cells":[{"c":"A34","v":"إجمالي القسم الخامس","bg":"#F1F5F9","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H34","v":28213.7,"f":"=SUM(H30:H33)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"I34","v":9995.7,"f":"=SUM(I30:I33)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"J34","v":38209.4,"f":"=SUM(J30:J33)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"}]},{"r":35,"h":38.0,"cells":[{"c":"A35","v":"القسم السادس: أعمال الإضاءة الخارجية للحديقة والمشايات والأسوار (Landscape Lighting IP65)","bg":"#065F46","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":36,"h":52.0,"cells":[{"c":"A36","v":"06-01","b":true,"al":"center"},{"c":"B36","v":"تمديد كابلات كهرباء أرضية مسلحة أو داخل خراطيم حماية (HDPE) لدوائر إنارة الحديقة والسور"},{"c":"C36","v":"م.ط كابل","b":true,"al":"center"},{"c":"D36","v":0.55,"in":true,"al":"center","nf":"0.00"},{"c":"E36","v":198,"f":"=ROUND('ملخص اللاندسكيب والمساحات'!$F$5*D36, 1)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F36","v":85,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G36","v":35,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H36","v":16830,"f":"=E36*F36","al":"center","nf":"#,##0"},{"c":"I36","v":6930,"f":"=E36*G36","al":"center","nf":"#,##0"},{"c":"J36","v":23760,"f":"=H36+I36","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":37,"h":52.0,"cells":[{"c":"A37","v":"06-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B37","v":"توريد وتركيب كشافات حراب موجهة للأشجار والنخيل (Spike Spotlights LED Warm 3000K IP65)","bg":"#F8FAFC"},{"c":"C37","v":"عدد كشاف","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D37","v":0.12,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"E37","v":19,"f":"=ROUND('ملخص اللاندسكيب والمساحات'!$J$5*D37, 0)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F37","v":420,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G37","v":110,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H37","v":7980,"f":"=E37*F37","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"I37","v":2090,"f":"=E37*G37","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J37","v":10070,"f":"=H37+I37","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":38,"h":52.0,"cells":[{"c":"A38","v":"06-03","b":true,"al":"center"},{"c":"B38","v":"توريد وتركيب أعمدة بولارد قصيرة لإنارة المشايات (Pathway Bollard Lights 60cm IP65)"},{"c":"C38","v":"عدد بولارد","b":true,"al":"center"},{"c":"D38","v":0.08,"in":true,"al":"center","nf":"0.00"},{"c":"E38","v":16,"f":"=ROUND('ملخص اللاندسكيب والمساحات'!$H$5*D38, 0)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F38","v":680,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G38","v":140,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H38","v":10880,"f":"=E38*F38","al":"center","nf":"#,##0"},{"c":"I38","v":2240,"f":"=E38*G38","al":"center","nf":"#,##0"},{"c":"J38","v":13120,"f":"=H38+I38","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":39,"h":52.0,"cells":[{"c":"A39","v":"06-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B39","v":"توريد وتركيب أباليك جدارية للسور (Up/Down Wall Lights) وشرائط ليد مخفية للجلسات والدرج","bg":"#F8FAFC"},{"c":"C39","v":"نقطة إنارة","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D39","v":0.1,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"E39","v":36,"f":"=ROUND('ملخص اللاندسكيب والمساحات'!$F$5*D39, 0)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F39","v":540,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G39","v":120,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H39","v":19440,"f":"=E39*F39","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"I39","v":4320,"f":"=E39*G39","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J39","v":23760,"f":"=H39+I39","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":40,"h":40.0,"cells":[{"c":"A40","v":"إجمالي القسم السادس","bg":"#F1F5F9","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H40","v":55130,"f":"=SUM(H36:H39)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"I40","v":15580,"f":"=SUM(I36:I39)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"J40","v":70710,"f":"=SUM(J36:J39)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"}]},{"r":41,"h":38.0,"cells":[{"c":"A41","v":"القسم السابع: أعمال السوفت سكيب والنجيل والنخيل والأشجار والزهور (Softscape & Planting)","bg":"#065F46","fg":"#FFFFFF","b":true,"cs":10},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":42,"h":52.0,"cells":[{"c":"A42","v":"07-01","b":true,"al":"center"},{"c":"B42","v":"توريد وفرش رولات نجيل طبيعي أخضر (باسبالوم Paspalum درجة أولى) أو نجيل صناعي كثافة عالية"},{"c":"C42","v":"م2 نجيل","b":true,"al":"center"},{"c":"D42","v":0.75,"in":true,"al":"center","nf":"0.00"},{"c":"E42","v":121.5,"f":"=ROUND('ملخص اللاندسكيب والمساحات'!$J$5*D42, 1)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F42","v":95,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G42","v":35,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H42","v":11542.5,"f":"=E42*F42","al":"center","nf":"#,##0"},{"c":"I42","v":4252.5,"f":"=E42*G42","al":"center","nf":"#,##0"},{"c":"J42","v":15795,"f":"=H42+I42","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":43,"h":52.0,"cells":[{"c":"A43","v":"07-02","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B43","v":"توريد وزراعة أشجار نخيل زينة (واشنطونيا / ملوكي / ديل سمكة) وأشجار ظل مزهرة شاملة الجور","bg":"#F8FAFC"},{"c":"C43","v":"عدد شجرة","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D43","v":0.06,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"E43","v":10,"f":"=ROUND('ملخص اللاندسكيب والمساحات'!$J$5*D43, 0)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F43","v":2200,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G43","v":450,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H43","v":22000,"f":"=E43*F43","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"I43","v":4500,"f":"=E43*G43","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J43","v":26500,"f":"=H43+I43","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":44,"h":52.0,"cells":[{"c":"A44","v":"07-03","b":true,"al":"center"},{"c":"B44","v":"توريد وزراعة سياج نباتي كثيف بمحاذاة السور (فيكس / كينوكاربس / ياسمين) ومغطيات تربة"},{"c":"C44","v":"شتلة/م.ط","b":true,"al":"center"},{"c":"D44","v":0.45,"in":true,"al":"center","nf":"0.00"},{"c":"E44","v":73,"f":"=ROUND('ملخص اللاندسكيب والمساحات'!$J$5*D44, 0)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F44","v":140,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G44","v":45,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H44","v":10220,"f":"=E44*F44","al":"center","nf":"#,##0"},{"c":"I44","v":3285,"f":"=E44*G44","al":"center","nf":"#,##0"},{"c":"J44","v":13505,"f":"=H44+I44","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":45,"h":52.0,"cells":[{"c":"A45","v":"07-04","bg":"#F8FAFC","b":true,"al":"center"},{"c":"B45","v":"توريد وفرش زلط ديكوري أبيض وملون ولحاء خشب (Bark Mulch) وفواصل ألومنيوم حول الأحواض","bg":"#F8FAFC"},{"c":"C45","v":"م2 ديكور","bg":"#F8FAFC","b":true,"al":"center"},{"c":"D45","v":0.15,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.00"},{"c":"E45","v":24.3,"f":"=ROUND('ملخص اللاندسكيب والمساحات'!$J$5*D45, 1)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"F45","v":260,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"G45","v":75,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H45","v":6318,"f":"=E45*F45","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"I45","v":1822.5,"f":"=E45*G45","bg":"#F8FAFC","al":"center","nf":"#,##0"},{"c":"J45","v":8140.5,"f":"=H45+I45","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":46,"h":40.0,"cells":[{"c":"A46","v":"إجمالي القسم السابع","bg":"#F1F5F9","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H46","v":50080.5,"f":"=SUM(H42:H45)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"I46","v":13860,"f":"=SUM(I42:I45)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"},{"c":"J46","v":63940.5,"f":"=SUM(J42:J45)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0"}]},{"r":47,"h":46.0,"cells":[{"c":"A47","v":"الإجمالي العام لمقايسة اللاندسكيب والهاردسكيب وتنسيق الحدائق (توريد + تركيب)","bg":"#FEF3C7","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H47","v":399631.2,"f":"=H10+H16+H22+H28+H34+H40+H46","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0"},{"c":"I47","v":136248.7,"f":"=I10+I16+I22+I28+I34+I40+I46","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0"},{"c":"J47","v":535879.9,"f":"=J10+J16+J22+J28+J34+J40+J46","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0"}]}]},{"name":"حاسبة الري والتربة والطلبيات","maxRow":15,"maxCol":8,"colWidths":[8.0,56.0,22.0,22.0,18.0,18.0,18.0,22.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"حاسبة طلبيات شبكة الري الأوتوماتيكي وخلطة التربة الزراعية ومواد الهاردسكيب للموقع","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":54.0,"cells":[{"c":"A2","v":"تستنتج الكميات التجارية المطلوبة للشراء (أمتار رمل حلو، شكاير بيتموس وكمبوست، رشاشات، محابس سولينويد، وبلاط إنترلوك)","bg":"#065F46","fg":"#E2E8F0","al":"center","cs":8},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""},{"c":"H3","v":""}]},{"r":4,"h":42.0,"cells":[{"c":"A4","v":"م","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B4","v":"الصنف / الخامة المطلوبة لتنسيق الحديقة","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C4","v":"القسم التابع له","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"D4","v":"وحدة التوريد التجارية","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"E4","v":"معدل الاستهلاك القياسي","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"F4","v":"الكمية المطلوبة للموقع","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"G4","v":"متوسط سعر الوحدة","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"H4","v":"إجمالي التكلفة التقديرية","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":5,"h":38.0,"cells":[{"c":"A5","v":1,"b":true,"al":"center"},{"c":"B5","v":"رمل زراعي حلو مغسول خالي من الأملاح (عمق 40 سم للأحواض)","b":true},{"c":"C5","v":"تأسيس التربة الزراعية","al":"center"},{"c":"D5","v":"متر مكعب (م³)","b":true,"al":"center"},{"c":"E5","v":0.45,"in":true,"al":"center","nf":"0.000"},{"c":"F5","v":72.9,"f":"=ROUND('ملخص اللاندسكيب والمساحات'!$J$5*E5, 1)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"G5","v":190,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H5","v":13851.0,"f":"=F5*G5","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":6,"h":38.0,"cells":[{"c":"A6","v":2,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B6","v":"بالات بيتموس مستورد وكمبوست عضوي محسن لخواص التربة","bg":"#F8FAFC","b":true},{"c":"C6","v":"تحسين وتسميد التربة","bg":"#F8FAFC","al":"center"},{"c":"D6","v":"بالة / شيكارة (50 لتر)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E6","v":0.35,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"F6","v":57,"f":"=ROUNDUP('ملخص اللاندسكيب والمساحات'!$J$5*E6, 0)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"G6","v":280,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H6","v":15960,"f":"=F6*G6","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":7,"h":38.0,"cells":[{"c":"A7","v":3,"b":true,"al":"center"},{"c":"B7","v":"سن متدرج وبيس كورس ورمل تسوية أسفل الإنترلوك والمشايات","b":true},{"c":"C7","v":"تأسيس الهاردسكيب","al":"center"},{"c":"D7","v":"متر مكعب (م³)","b":true,"al":"center"},{"c":"E7","v":0.22,"in":true,"al":"center","nf":"0.000"},{"c":"F7","v":43.6,"f":"=ROUND('ملخص اللاندسكيب والمساحات'!$H$5*E7, 1)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"G7","v":210,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H7","v":9156,"f":"=F7*G7","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":8,"h":38.0,"cells":[{"c":"A8","v":4,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B8","v":"بلاط إنترلوك وبورسلين خارجي شامل نسبة الهالك والقص (8%)","bg":"#F8FAFC","b":true},{"c":"C8","v":"أرضيات الهاردسكيب","bg":"#F8FAFC","al":"center"},{"c":"D8","v":"متر مربع توريد","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E8","v":1.08,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"F8","v":213.8,"f":"=ROUND('ملخص اللاندسكيب والمساحات'!$H$5*E8, 1)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"G8","v":310,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H8","v":66278,"f":"=F8*G8","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":9,"h":38.0,"cells":[{"c":"A9","v":5,"b":true,"al":"center"},{"c":"B9","v":"أسمنت بورتلاندي ومواد لصق للبردورات والبورسلين والشلال","b":true},{"c":"C9","v":"مون اللصق والبردورات","al":"center"},{"c":"D9","v":"شيكارة 50 كجم","b":true,"al":"center"},{"c":"E9","v":0.32,"in":true,"al":"center","nf":"0.000"},{"c":"F9","v":64,"f":"=ROUNDUP('ملخص اللاندسكيب والمساحات'!$H$5*E9, 0)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"G9","v":145,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H9","v":9280,"f":"=F9*G9","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":10,"h":38.0,"cells":[{"c":"A10","v":6,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B10","v":"مواسير تغذية شبكة الري (UPVC Class 4 ضغط 10 بار أقطار 1 و1.5 بوصة)","bg":"#F8FAFC","b":true},{"c":"C10","v":"شبكة الري الأوتوماتيكي","bg":"#F8FAFC","al":"center"},{"c":"D10","v":"ماسورة (طول 6 متر)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E10","v":0.12,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"F10","v":20,"f":"=ROUNDUP('ملخص اللاندسكيب والمساحات'!$J$5*E10, 0)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"G10","v":340,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H10","v":6800,"f":"=F10*G10","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":11,"h":38.0,"cells":[{"c":"A11","v":7,"b":true,"al":"center"},{"c":"B11","v":"رشاشات نجيل غاطسة منبثقة (Pop-up Sprinklers Hunter/Rain Bird)","b":true},{"c":"C11","v":"شبكة ري النجيل","al":"center"},{"c":"D11","v":"عدد رشاش كامل بالفونية","b":true,"al":"center"},{"c":"E11","v":0.14,"in":true,"al":"center","nf":"0.000"},{"c":"F11","v":23,"f":"=ROUNDUP('ملخص اللاندسكيب والمساحات'!$J$5*E11, 0)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"G11","v":290,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H11","v":6670,"f":"=F11*G11","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":12,"h":38.0,"cells":[{"c":"A12","v":8,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B12","v":"لفات خراطيم الري بالتنقيط (Drip Line GR 16mm) للأشجار والأسوار","bg":"#F8FAFC","b":true},{"c":"C12","v":"شبكة الري بالتنقيط","bg":"#F8FAFC","al":"center"},{"c":"D12","v":"لفة قياسية (100 متر)","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E12","v":0.015,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"F12","v":3,"f":"=ROUNDUP('ملخص اللاندسكيب والمساحات'!$J$5*E12, 0)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"G12","v":1650,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H12","v":4950,"f":"=F12*G12","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":13,"h":38.0,"cells":[{"c":"A13","v":9,"b":true,"al":"center"},{"c":"B13","v":"محابس كهربائية سولينويد (Solenoid Valves 1 inch 24V) + لوحة تايمر","b":true},{"c":"C13","v":"التحكم الذكي بالري","al":"center"},{"c":"D13","v":"مجموعة تحكم متكاملة","b":true,"al":"center"},{"c":"E13","v":1,"in":true,"al":"center","nf":"0.000"},{"c":"F13","v":1,"in":true,"bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"G13","v":11200,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H13","v":11200,"f":"=F13*G13","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":14,"h":38.0,"cells":[{"c":"A14","v":10,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B14","v":"كشافات حراب وأعمدة بولارد وكشافات غاطسة للشلال (LED IP65/IP68)","bg":"#F8FAFC","b":true},{"c":"C14","v":"إضاءة اللاندسكيب","bg":"#F8FAFC","al":"center"},{"c":"D14","v":"كشاف خارجي","bg":"#F8FAFC","b":true,"al":"center"},{"c":"E14","v":0.15,"in":true,"bg":"#F8FAFC","al":"center","nf":"0.000"},{"c":"F14","v":54,"f":"=ROUNDUP('ملخص اللاندسكيب والمساحات'!$F$5*E14, 0)","bg":"#F1F5F9","b":true,"al":"center","nf":"#,##0.0"},{"c":"G14","v":520,"in":true,"bg":"#ECFDF5","fg":"#065F46","b":true,"al":"center","nf":"#,##0"},{"c":"H14","v":28080,"f":"=F14*G14","bg":"#E0F2FE","b":true,"al":"center","nf":"#,##0"}]},{"r":15,"h":44.0,"cells":[{"c":"A15","v":"إجمالي تكلفة سلة التوريدات الأساسية للتربة والري والأرضيات والإضاءة","bg":"#FEF3C7","b":true,"cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"c":"H15","v":172225,"f":"=SUM(H5:H14)","bg":"#FEF3C7","b":true,"al":"center","nf":"#,##0"}]}]},{"name":"مقارنة النجيل والبرجولات","maxRow":14,"maxCol":7,"colWidths":[8.0,34.0,22.0,22.0,22.0,22.0,22.0],"rows":[{"r":1,"h":54.0,"cells":[{"c":"A1","v":"مصفوفة المقارنة الهندسية والمالية لبدائل النجيل (طبيعي vs صناعي) وبدائل البرجولات والأرضيات","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":2,"h":54.0,"cells":[{"c":"A2","v":"دليل استشاري لمساعدة مالك الفيلا على اختيار الخامات الأكثر تحملاً للعوامل الجوية والأقل في تكاليف الصيانة","bg":"#065F46","fg":"#E2E8F0","al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":3,"h":14.0,"cells":[{"c":"A3","v":""},{"c":"B3","v":""},{"c":"C3","v":""},{"c":"D3","v":""},{"c":"E3","v":""},{"c":"F3","v":""},{"c":"G3","v":""}]},{"r":4,"h":38.0,"cells":[{"c":"A4","v":"أولاً: مقارنة فنية ومالية بين بدائل المسطحات الخضراء (النجيل الطبيعي vs. النجيل الصناعي vs. الحدائق الجافة)","bg":"#065F46","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":5,"h":42.0,"cells":[{"c":"A5","v":"م","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"B5","v":"معيار المقارنة الهندسية","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"},{"c":"C5","v":"نجيل طبيعي (باسبالوم / برمودا)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"E5","v":"نجيل صناعي لاندسكيب (كثافة 40-50 مم)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center","cs":2},{"skip":true},{"c":"G5","v":"حدائق صخرية ومغطيات تربة (Xeriscape)","bg":"#0F172A","fg":"#FFFFFF","b":true,"al":"center"}]},{"r":6,"h":52.0,"cells":[{"c":"A6","v":1,"b":true,"al":"center"},{"c":"B6","v":"تكلفة التأسيس الأولية للمتر المربع","bg":"#F1F5F9","b":true},{"c":"C6","v":"منخفضة للتوريد، لكنها تتطلب تربة زراعية 40 سم وشبكة رشاشات كاملة","cs":2},{"skip":true},{"c":"E6","v":"متوسطة إلى مرتفعة للتوريد، وتكتفي بطبقة دك رملية أو خرسانية بدون رشاشات","cs":2},{"skip":true},{"c":"G6","v":"متوسطة (حصى ديكوري + نسيج جيوتكستيل مانع للحشائش + شجيرات صبارية)"}]},{"r":7,"h":52.0,"cells":[{"c":"A7","v":2,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B7","v":"تلطيف درجة حرارة الحديقة صيفاً","bg":"#F1F5F9","b":true},{"c":"C7","v":"ممتاز جداً؛ يخفض حرارة الجو المحيط بالفيلا بمقدار 4 إلى 6 درجات مئوية","bg":"#F8FAFC","cs":2},{"skip":true},{"c":"E7","v":"يمتص الحرارة تحت شمس الظهيرة ويحتاج للرش بالماء قبل الاستخدام نهاراً","bg":"#F8FAFC","cs":2},{"skip":true},{"c":"G7","v":"جيد عند دمجه مع أشجار ظل كثيفة (مثل البونسيانا أو النيم)","bg":"#F8FAFC"}]},{"r":8,"h":52.0,"cells":[{"c":"A8","v":3,"b":true,"al":"center"},{"c":"B8","v":"استهلاك المياه والصيانة الشهرية","bg":"#F1F5F9","b":true},{"c":"C8","v":"يستهلك 5 إلى 7 لتر/م² يومياً صيفاً، ويحتاج قص وتسميد دوري كل أسبوعين","cs":2},{"skip":true},{"c":"E8","v":"صفر استهلاك مياه وصفر قص؛ يحتاج فقط للغسيل والتمشيط الدوري","cs":2},{"skip":true},{"c":"G8","v":"يوفر 75% من استهلاك المياه ويعتمد على نقاط ري بالتنقيط فقط"}]},{"r":9,"h":52.0,"cells":[{"c":"A9","v":4,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B9","v":"العمر الافتراضي والتحمل","bg":"#F1F5F9","b":true},{"c":"C9","v":"دائم ومتجدد مدى الحياة طالما استمرت شبكة الري والصيانة المنتظمة","bg":"#F8FAFC","cs":2},{"skip":true},{"c":"E9","v":"من 6 إلى 9 سنوات (حسب مقاومة الألياف للأشعة فوق البنفسجية UV)","bg":"#F8FAFC","cs":2},{"skip":true},{"c":"G9","v":"دائم وعمره يفوق 15 سنة بأقل مجهود صيانة","bg":"#F8FAFC"}]},{"r":10,"h":14.0,"cells":[{"c":"A10","v":""},{"c":"B10","v":""},{"c":"C10","v":""},{"c":"D10","v":""},{"c":"E10","v":""},{"c":"F10","v":""},{"c":"G10","v":""}]},{"r":11,"h":38.0,"cells":[{"c":"A11","v":"ثانياً: مقارنة بدائل البرجولات الخارجية (خشب طبيعي عزيزي vs. حديد وألومنيوم بديل الخشب WPC)","bg":"#334155","fg":"#FFFFFF","b":true,"al":"center","cs":7},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true},{"skip":true}]},{"r":12,"h":44.0,"cells":[{"c":"A12","v":1,"b":true,"al":"center"},{"c":"B12","v":"مقاومة الشمس والرطوبة والتشقق","bg":"#F1F5F9","b":true},{"c":"C12","v":"الخشب الطبيعي (العزيزي/السويدي) يحتاج لدهان زيت وحماية سنوية لمنع التشقق","cs":3},{"skip":true},{"skip":true},{"c":"F12","v":"الحديد المدهون إلكتروستاتيك أو الألومنيوم مع WPC يقاوم الشمس والمطر بدون صيانة","cs":2},{"skip":true}]},{"r":13,"h":44.0,"cells":[{"c":"A13","v":2,"bg":"#F8FAFC","b":true,"al":"center"},{"c":"B13","v":"الأمان الإنشائي والبحور الواسعة","bg":"#F1F5F9","b":true},{"c":"C13","v":"الخشب محدود البحور (حتى 4 م) ويحتاج لأعمدة وسطية في المساحات الكبيرة","bg":"#F8FAFC","cs":3},{"skip":true},{"skip":true},{"c":"F13","v":"القطاعات المعدنية تغطي بحوراً واسعة (حتى 6.5 م) مع إمكانية دمج إضاءة ليد مخفية","bg":"#F8FAFC","cs":2},{"skip":true}]},{"r":14,"h":44.0,"cells":[{"c":"A14","v":3,"b":true,"al":"center"},{"c":"B14","v":"متوسط التكلفة التقديرية للمتر المربع","bg":"#F1F5F9","b":true},{"c":"C14","v":"يتراوح بين 1,900 إلى 2,600 حسب نوع الخشب وسماكة المراين","cs":3},{"skip":true},{"skip":true},{"c":"F14","v":"يتراوح بين 2,200 إلى 3,100 شامل الدهان الحراري وتكسيات بديل الخشب الخارجي","cs":2},{"skip":true}]}]}]}